The SunShot Program




   The Dollar a Watt Team

Program Name or Ancillary Text   eere.energy.gov
Imagine a World…

                What if we had subsidy-free solar
                 electricity at an LCOE of 5-6 ¢/kWh ???
                • Scaling without Subsidies
                • Jobs and Competitiveness
                • National Energy Security
                • Healthy Environment




ARPA-E Summit                                       doe.energy.gov
Enabling this World




ARPA-E Summit          doe.energy.gov
What is SunShot?


    • Price and date targets
          – 5-6¢/kWh fully installed at the MW
            scale by 2020
          – Unsubsidized grid parity in residential
            and commercial markets by 2020

    • Transformational technologies
          – PV Modules
          – BOS
          – Power Electronics




ARPA-E Summit                                         doe.energy.gov
SunShot enables unsubsidized
             deployment of solar energy

             Total PV Generation Fraction
20%
18%       $1/Watt
          $1.50/Watt
16%
          SP targets
14%       $2/Watt
12%       Reference
10%
 8%
 6%
 4%
 2%
 0%
   2010          2020     2030       2040   2050
                                                                      Total PV Capacity
                                                 700
                                                          $1/Watt
                                                 600      $1.50/Watt
                                                 500      SP targets
      Goodrich, Margolis, et al                  400
                                                          $2/Watt
                                                          Reference
                                            GW




      NREL                                       300
                                                 200
                                                 100
                                                   0
                                                   2010        2020         2030          2040      2050
 ARPA-E Summit                                                                                   doe.energy.gov
SunShot enables unsubsidized
            deployment of solar energy
                $1/Watt 2030 Cumulative PV Capacity Map (375 GW total)




                                                                         Total PV Capacity
                                                                               (GW)



                                                                                <1
                                                                               1- 3
                                                                               3- 5
                                                                               5- 8
                $1/Watt 2050 Cumulative PV Capacity Map (610 GW total)
                                                                              8 - 12
                                                                              12 - 17
                                                                               > 17

    Goodrich, Margolis, et al
    NREL



ARPA-E Summit                                                                                doe.energy.gov
Taking a Team Approach
                                      R. Ramesh
                                    SunShot Director
      Minh Le                                                            Rajeev Ram
     PV Module       Module Task                          Power        Power Electronics
       EERE          Force (EERE)                      Electronics         ARPA-E
                                                        (ARPA-E)
                      GOAL : 50c                       GOAL 10c
                         /Watt                            /Watt


    Tex Wilkins                                                          Kevin Lynn
        CSP                                                          Systems Integration
       EERE                                                                EERE
                                                       Balance of
                      Fundamental                       Systems
                       Research                          (EERE)
                         (SC)                           GOAL:
  Jim Horwitz                                          40c /Watt     Jennifer De Cesaro
  Fundamental                                                          BOS-Software
    Science                      Rachel Tronstein &
                                                                           EERE
      OS                           John Lushetsky,
                           SunShot Strategic Planning, EERE

     Advisory Board : Bill Brinkman ( OS); Arun Majumdar (ARPA-E); Cathy Zoi (EERE)
ARPA-E Summit                                                                    doe.energy.gov
Core Funding Strategy



                                    Technologies not ready          Final phase may include
                                   for integration teams may        down select competition
                                    continue in development        for large scale deployment
                                                                     on Government facility.

                                     VERTICALLY INTEGRATED TEAMS




            (based on road maps)




ARPA-E Summit                                                                                   doe.energy.gov
R,D & D Roadmaps : Guiding Technology
     Development and Deployment


  • Roadmap for Module: Materials, manufacturing, integration,
    reliability testing
  • Roadmap for Power Electronics: Component innovations,
    communication protocols
  • Roadmap for Balance of System: Materials, Design,
    Automation
  • Industry, National Labs and Academia deeply involved in
    creating and implementing road maps




ARPA-E Summit                                            doe.energy.gov
Engaging the stakeholders



    •    Dollar a Watt Workshop, August 2010
    •    Solar Roundtable, Jan 13
    •    Soft BOS workshop Feb 9
    •    Power Electronics Workshop Feb 8
    •    Hard BOS workshop Feb 9
    •    Manufacturing/Demonstration workshop March
    •    CSP workshop : March 2
    •    This workshop
    •    Website, blogsite,…
    •    More to come …

ARPA-E Summit                      12                 doe.energy.gov
Algorithms : PV Module
                     Technologies

     $
    Watt
         ∝
           Manufacturing Cost
              Efficiency
                                   η ∝ J SC ⋅VOC ⋅ FF
 Efficiency




ARPA-E Summit                                           doe.energy.gov
Barriers based investment :
CIGS Modules
    $
   Watt
        ∝
          Manufacturing Cost
             Efficiency
                                         η ∝ J SC ⋅VOC ⋅ FF
         $3.50

         $3.00

         $2.50

         $2.00
 $/WDC




                 $3.50
         $1.50                   $0.42
                                         $0.28
         $1.00
                         $1.70                   $0.28
                                                         $0.22
         $0.50
                                                                 $0.50
         $0.00




ARPA-E Summit                              16                            doe.energy.gov
Approach to 50c/W Modules:
CIGS Modules

    $
   Watt
        ∝
          Manufacturing Cost
             Efficiency
                                                    η ∝ J SC ⋅VOC ⋅ FF
                                      Cost
                Drivers             Reduction                                   Pathways
                                                Technical Risk
                                    Potential
  Materials cost and availability     High         Medium        Thinner layers or replacement with
  (Indium, selenium, cadmium)                                    Earth abundant and benign materials
                                                                 (e.g., CZTS, ZnS, …)
  Transparent Conductors              High           Low         ITO alternative materials and/or
                                                                 deposition methodologies
  Large scale spatial uniformity      High         Medium        Improved in-situ metrology, thermal
  and improved throughput                                        control, and elimination of chemical
  with same or lower cost of                                     bath CdS
  capital
  Glass and/or Encapsulants          Medium        Medium        Flexible low-cost front and backsheets
                                                                 with low WVTR (i.e., ultrabarriers, glass
                                                                 replacement)
  Operational costs of               Medium        Medium        Eliminate batch selenization, alternative
  selenization ovens                                             deposition methodologies (e.g.,
                                                                 atmospheric deposition).
ARPA-E Summit                                          17                                            doe.energy.gov
Barriers based investments:
CIGS Modules

    $
   Watt
        ∝
          Manufacturing Cost
             Efficiency
                                             η ∝ J SC ⋅VOC ⋅ FF
                            Potential
                                         Technical
                              Current                                Pathways
           Action                          Risk
                             Increase
                            (mA/cm2)
 Larger band gap junction      2.5        Medium      Replace CdS ( e.g. 2.5 eV) with wide
 partner                                              bandgap emitter (i.e., ZnS (3.1 eV))
 Improved TCO                  1.5        Medium      Develop TCO with high conductivity,
                                                      transparency, environmental stability
                                                      (i.e., a-InZnO)
 Reduce CdS window             1.5        Medium      Develop 20 nm thick continuous CdS
 layer thickness                                      layer without shunting.
 Minimize reflection off       1.5      Medium        Develop a suitable low cost anti-
 CIGS surface                                         reflection coating
 Improved monolithic           1           Low        Reduce line width of laser/mechanical
 integration                                          scribing
ARPA-E Summit                                    18                                       doe.energy.gov
Barriers based investments:
CIGS Modules

    $
   Watt
        ∝
          Manufacturing Cost
             Efficiency
                                           η ∝ J SC ⋅VOC ⋅ FF

                            Potential
                                        Technical
                             Voltage
                Action                    Risk                Pathways
                            Increase
                               (V)
     Increase the Ga/In       0.1       Medium      Increase CIGS deposition
     ratio in CIGS by a                             temperature via higher
     factor of 2 to 3                               temperature glass substrates
                                                    or alternative stable
                                                    substrates.
     Improve the absorber     0.05      Medium      Implement in-situ quality
     carrier lifetime and                           control at minimal additional
     concentration                                  cost

ARPA-E Summit                                19                                 doe.energy.gov
Barriers based investments:
CIGS Modules

 $
Watt
     ∝
       Manufacturing Cost
          Efficiency
                                             η ∝ J SC ⋅VOC ⋅ FF

                                             Technical
                              Potential FF                        Pathways
                 Action                        Risk
                               Increase


           Reduce parasitic      0.10          Low       Improve the density, phase,
           leakage current                               and crystallinity of the
                                                         absorber


           Reduce contact        0.07          Low       Improved TCO and contact
           resistance                                    grid combination



ARPA-E Summit                                   20                                doe.energy.gov
Balance of System




ARPA-E Summit        doe.energy.gov
Power Electronics for Commercial
           Rooftop Solar

                            Goal: Module level MPPT (>98%)

                            Barrier: Cost & reliability

                            Approach: DC/DC       or      DC/AC   module   integrated
                            converters

    Goal: Light weight, roof-top inverter
        99%, 200-500kW, eliminates DC conduit and wiring

    Barrier: High-frequency switches and magnetics
        AC switches (for current drive architectures)

    Approach: Wide-bandgap switches with advanced magnetic materials

                   Actively Engaging the Stakeholders:
                Extracts from Power Electronics Workshop
ARPA-E Summit                                                                doe.energy.gov
Power Electronics for
                   Utility Scale Solar

Goal: Consolidate the number of inverters
e.g., 20 MW installation will have 20 x 1MW inverters

Barrier: Longer wiring, limited by loss

Approach: Higher DC bus voltages
       DC/DC boost converters at module string (w/ MPPT)

Goal: Improve power quality while delivering cost
    high frequency electronics - improved EMI, reduced harmonics

Barrier: - Low loss, high-voltage switches and magnetics
    - Utility ‘ownership’ of line frequency transformer

Approach: Wide-bandgap switches with advanced magnetic materials

                    Actively Engaging the Stakeholders:
                 Extracts from Power Electronics Workshop
 ARPA-E Summit                                                     doe.energy.gov
Balance of Systems : A complex
              beast to tackle!!



                                               Today   2014     2017




     BOS is different for Utility vs. Commercial vs. Residential

ARPA-E Summit                                                 doe.energy.gov
Utility Scale BOS

•    Opportunity for small improvements in a range of areas

•    Three elements of the strategy:
      1. Design innovations
      2. Materials and Mechanics
      3. Installation approaches and automation



                                                                       Automation




Plug and Play with BIPV                Wiring, Frameworks, Mechanics
ARPA-E Summit                                                                   doe.energy.gov
PV BOS Hard Costs Workshop


• Topic 1: Transformational Building Integrated
  Photovoltaic (BIPV) Modules (Cost Target <$2/W)
     – Develop a business case for integrating PV into a roofing product
       with the potential for GW’s of installations
     – Develop a partnership with a roofing company
     – Encourage the Integration of Power
       Electronics
     – Demonstrate a form factor and
       installation design that reduces the
       temperature of both the PV cell and
       the roof assembly
     – Develop a highly reliability product
       with lifetimes of 20 years or more
     – Demonstrate a form factor that can
       be quickly and easily installed.

ARPA-E Summit                             26                           doe.energy.gov
Why SunShot ?

                                    1995: 43%
      • Global Competitiveness                  2000: 27%


                                                            2009: 6%
                • Energy Security

        • Environmental Issues

       • Life without subsidies




ARPA-E Summit                                                          doe.energy.gov
Thank You




                ramamoorthy.ramesh@ee.doe.gov




ARPA-E Summit                        doe.energy.gov

Weitere ähnliche Inhalte

Was ist angesagt?

Blunden - Solar Photovoltaic Electricity
Blunden - Solar Photovoltaic ElectricityBlunden - Solar Photovoltaic Electricity
Blunden - Solar Photovoltaic ElectricityGW Solar Institute
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call PresentationAES Tietê
 
Smart grids More efficient and reliable grids
Smart grids More efficient and reliable gridsSmart grids More efficient and reliable grids
Smart grids More efficient and reliable gridsIMDEA Energia
 
Ukrainian solar market report 2011 eng
Ukrainian solar market report 2011 engUkrainian solar market report 2011 eng
Ukrainian solar market report 2011 engDmitry Lukomskiy
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Burton Lee
 
4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings ResultsAES Tietê
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentationAES Tietê
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Rick Borry
 
Direct Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksDirect Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksE Source Companies, LLC
 
Grid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergyGrid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergySonia Large
 
Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum greenbuilding
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporatefinance19
 

Was ist angesagt? (16)

Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009Dorset Transition Energy Survey 2009
Dorset Transition Energy Survey 2009
 
Minh Le | DOE Solar Program
Minh Le | DOE Solar ProgramMinh Le | DOE Solar Program
Minh Le | DOE Solar Program
 
Blunden - Solar Photovoltaic Electricity
Blunden - Solar Photovoltaic ElectricityBlunden - Solar Photovoltaic Electricity
Blunden - Solar Photovoltaic Electricity
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call Presentation
 
Smart grids More efficient and reliable grids
Smart grids More efficient and reliable gridsSmart grids More efficient and reliable grids
Smart grids More efficient and reliable grids
 
Ukrainian solar market report 2011 eng
Ukrainian solar market report 2011 engUkrainian solar market report 2011 eng
Ukrainian solar market report 2011 eng
 
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
Renewable Energy in Nordic Countries - Alf Bjorseth - SCATEC - April 2010
 
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
Ppa Overview Tioga Energy 2009 04 13 2 Ppa 1
 
4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results4Q08 and 2008 Earnings Results
4Q08 and 2008 Earnings Results
 
1 q08 earnings call presentation
1 q08 earnings call presentation1 q08 earnings call presentation
1 q08 earnings call presentation
 
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
Could Texas Become The Largest Solar Opportunity in the World? An Update on t...
 
Direct Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program BenchmarksDirect Load Control (DLC) Program Benchmarks
Direct Load Control (DLC) Program Benchmarks
 
Grid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest EnergyGrid Connections And PPAs: Tim Foster, Smartest Energy
Grid Connections And PPAs: Tim Foster, Smartest Energy
 
FSM Energy Policy-Summary
FSM Energy Policy-SummaryFSM Energy Policy-Summary
FSM Energy Policy-Summary
 
Presentation or kuwait green building forum
Presentation or kuwait green building forum Presentation or kuwait green building forum
Presentation or kuwait green building forum
 
AES library.corporate
 AES library.corporate AES library.corporate
AES library.corporate
 

Ähnlich wie Arpa e doe dollar per watt 2 28 2011 workshop

National Bo S Process Cost Webinar
National Bo S Process Cost WebinarNational Bo S Process Cost Webinar
National Bo S Process Cost WebinarSolarTech
 
DG Technologies
DG TechnologiesDG Technologies
DG Technologiesgregalex
 
2012 Reenergize the Americas 1A: Richard Gruber
2012 Reenergize the Americas 1A: Richard Gruber2012 Reenergize the Americas 1A: Richard Gruber
2012 Reenergize the Americas 1A: Richard GruberReenergize
 
Nhr resume
Nhr resumeNhr resume
Nhr resumenivreddy
 
Smart grid overview for rlc 1 26-12 rh
Smart grid overview for rlc 1 26-12 rhSmart grid overview for rlc 1 26-12 rh
Smart grid overview for rlc 1 26-12 rhRoger Hicks
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalRahul Walawalkar
 
Introduction to Ameresco
Introduction to AmerescoIntroduction to Ameresco
Introduction to AmerescoGo-NPS
 
Bhatia small wind[1]
Bhatia small wind[1]Bhatia small wind[1]
Bhatia small wind[1]satishmnair
 
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...IRJET Journal
 
Wind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity EconomicsWind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity Economicsvijcons
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET Journal
 
ESS-Bilbao Initiative Workshop. SNS Linac experience
ESS-Bilbao Initiative Workshop. SNS Linac experienceESS-Bilbao Initiative Workshop. SNS Linac experience
ESS-Bilbao Initiative Workshop. SNS Linac experienceESS BILBAO
 
Foothill College Energy System
Foothill College Energy SystemFoothill College Energy System
Foothill College Energy SystemRobert Cormia
 
IRJET- Advanced Footstep Power Generation System using RFID for Charging
IRJET-  	  Advanced Footstep Power Generation System using RFID for ChargingIRJET-  	  Advanced Footstep Power Generation System using RFID for Charging
IRJET- Advanced Footstep Power Generation System using RFID for ChargingIRJET Journal
 
Wattminder exec brief
Wattminder exec briefWattminder exec brief
Wattminder exec briefSam Beal
 

Ähnlich wie Arpa e doe dollar per watt 2 28 2011 workshop (20)

National Bo S Process Cost Webinar
National Bo S Process Cost WebinarNational Bo S Process Cost Webinar
National Bo S Process Cost Webinar
 
DG Technologies
DG TechnologiesDG Technologies
DG Technologies
 
2012 Reenergize the Americas 1A: Richard Gruber
2012 Reenergize the Americas 1A: Richard Gruber2012 Reenergize the Americas 1A: Richard Gruber
2012 Reenergize the Americas 1A: Richard Gruber
 
Nhr resume
Nhr resumeNhr resume
Nhr resume
 
Smart grid overview for rlc 1 26-12 rh
Smart grid overview for rlc 1 26-12 rhSmart grid overview for rlc 1 26-12 rh
Smart grid overview for rlc 1 26-12 rh
 
Power Saving Methods in EPON
Power Saving Methods in EPONPower Saving Methods in EPON
Power Saving Methods in EPON
 
Doug waters army presentation
Doug waters army presentationDoug waters army presentation
Doug waters army presentation
 
Thin films in India(april 18,2012)
Thin films in India(april 18,2012)Thin films in India(april 18,2012)
Thin films in India(april 18,2012)
 
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
2014 PV Distribution System Modeling Workshop: DOE Solar Energy Grid Integrat...
 
India Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar FinalIndia Wind Storage Opportunities Walawalkar Final
India Wind Storage Opportunities Walawalkar Final
 
Introduction to Ameresco
Introduction to AmerescoIntroduction to Ameresco
Introduction to Ameresco
 
Bhatia small wind[1]
Bhatia small wind[1]Bhatia small wind[1]
Bhatia small wind[1]
 
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
A Survey on Impact Assessment of D-FACTS Controllers with Electric Vehicles i...
 
Wind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity EconomicsWind Vs Conventional Electricity Economics
Wind Vs Conventional Electricity Economics
 
Syria
SyriaSyria
Syria
 
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
IRJET- Development and Comparison of an Improved Incremental Conductance Algo...
 
ESS-Bilbao Initiative Workshop. SNS Linac experience
ESS-Bilbao Initiative Workshop. SNS Linac experienceESS-Bilbao Initiative Workshop. SNS Linac experience
ESS-Bilbao Initiative Workshop. SNS Linac experience
 
Foothill College Energy System
Foothill College Energy SystemFoothill College Energy System
Foothill College Energy System
 
IRJET- Advanced Footstep Power Generation System using RFID for Charging
IRJET-  	  Advanced Footstep Power Generation System using RFID for ChargingIRJET-  	  Advanced Footstep Power Generation System using RFID for Charging
IRJET- Advanced Footstep Power Generation System using RFID for Charging
 
Wattminder exec brief
Wattminder exec briefWattminder exec brief
Wattminder exec brief
 

Mehr von chandyGhosh

Doe dollar per watt overview
Doe dollar per watt overviewDoe dollar per watt overview
Doe dollar per watt overviewchandyGhosh
 
Doe 1 dollar per watt roadmap dpw lushetsky
Doe 1 dollar per watt roadmap dpw lushetskyDoe 1 dollar per watt roadmap dpw lushetsky
Doe 1 dollar per watt roadmap dpw lushetskychandyGhosh
 
Spirae overview 2011
Spirae overview 2011Spirae overview 2011
Spirae overview 2011chandyGhosh
 
invVEST Sept-15th Smart Grid Delegation presentation
invVEST Sept-15th Smart Grid Delegation presentationinvVEST Sept-15th Smart Grid Delegation presentation
invVEST Sept-15th Smart Grid Delegation presentationchandyGhosh
 
Asok Kumar 2011 05 16 denver
Asok Kumar 2011 05 16 denverAsok Kumar 2011 05 16 denver
Asok Kumar 2011 05 16 denverchandyGhosh
 
Oracle India Mop Delegation Visit to Colorado 051611
Oracle India Mop Delegation Visit to Colorado 051611Oracle India Mop Delegation Visit to Colorado 051611
Oracle India Mop Delegation Visit to Colorado 051611chandyGhosh
 
Matt Baker invVEST Smart Grid Panel
Matt Baker invVEST Smart Grid PanelMatt Baker invVEST Smart Grid Panel
Matt Baker invVEST Smart Grid PanelchandyGhosh
 
Matt Futch Usa India May-16-2011
Matt Futch Usa India May-16-2011Matt Futch Usa India May-16-2011
Matt Futch Usa India May-16-2011chandyGhosh
 
TJ Deora Energy Policy Leadership GEO
TJ Deora Energy Policy Leadership GEOTJ Deora Energy Policy Leadership GEO
TJ Deora Energy Policy Leadership GEOchandyGhosh
 
Probir Ghosh India Delegation invVEST 5-16-2011
Probir Ghosh India Delegation invVEST 5-16-2011Probir Ghosh India Delegation invVEST 5-16-2011
Probir Ghosh India Delegation invVEST 5-16-2011chandyGhosh
 
Smart Grid Overview
Smart Grid OverviewSmart Grid Overview
Smart Grid OverviewchandyGhosh
 
WVF Xcel Colorado Slidesbb 08-27-09
WVF Xcel Colorado Slidesbb 08-27-09WVF Xcel Colorado Slidesbb 08-27-09
WVF Xcel Colorado Slidesbb 08-27-09chandyGhosh
 
WVF InvVest SEI 8-27-09
WVF InvVest SEI  8-27-09WVF InvVest SEI  8-27-09
WVF InvVest SEI 8-27-09chandyGhosh
 
Du Global Energy Overview 5 6 09
Du Global Energy Overview 5 6 09Du Global Energy Overview 5 6 09
Du Global Energy Overview 5 6 09chandyGhosh
 
NREL Solar Technology Overview
NREL Solar Technology OverviewNREL Solar Technology Overview
NREL Solar Technology OverviewchandyGhosh
 
LHH Renewable Energy Presentation041609
LHH Renewable Energy Presentation041609LHH Renewable Energy Presentation041609
LHH Renewable Energy Presentation041609chandyGhosh
 
InvVest Presentation To LHH
InvVest Presentation To LHHInvVest Presentation To LHH
InvVest Presentation To LHHchandyGhosh
 

Mehr von chandyGhosh (18)

Doe dollar per watt overview
Doe dollar per watt overviewDoe dollar per watt overview
Doe dollar per watt overview
 
Doe 1 dollar per watt roadmap dpw lushetsky
Doe 1 dollar per watt roadmap dpw lushetskyDoe 1 dollar per watt roadmap dpw lushetsky
Doe 1 dollar per watt roadmap dpw lushetsky
 
Spirae overview 2011
Spirae overview 2011Spirae overview 2011
Spirae overview 2011
 
invVEST Sept-15th Smart Grid Delegation presentation
invVEST Sept-15th Smart Grid Delegation presentationinvVEST Sept-15th Smart Grid Delegation presentation
invVEST Sept-15th Smart Grid Delegation presentation
 
Asok Kumar 2011 05 16 denver
Asok Kumar 2011 05 16 denverAsok Kumar 2011 05 16 denver
Asok Kumar 2011 05 16 denver
 
Oracle India Mop Delegation Visit to Colorado 051611
Oracle India Mop Delegation Visit to Colorado 051611Oracle India Mop Delegation Visit to Colorado 051611
Oracle India Mop Delegation Visit to Colorado 051611
 
Matt Baker invVEST Smart Grid Panel
Matt Baker invVEST Smart Grid PanelMatt Baker invVEST Smart Grid Panel
Matt Baker invVEST Smart Grid Panel
 
Matt Futch Usa India May-16-2011
Matt Futch Usa India May-16-2011Matt Futch Usa India May-16-2011
Matt Futch Usa India May-16-2011
 
TJ Deora Energy Policy Leadership GEO
TJ Deora Energy Policy Leadership GEOTJ Deora Energy Policy Leadership GEO
TJ Deora Energy Policy Leadership GEO
 
Probir Ghosh India Delegation invVEST 5-16-2011
Probir Ghosh India Delegation invVEST 5-16-2011Probir Ghosh India Delegation invVEST 5-16-2011
Probir Ghosh India Delegation invVEST 5-16-2011
 
Smart Grid Overview
Smart Grid OverviewSmart Grid Overview
Smart Grid Overview
 
WVF ESD
WVF ESDWVF ESD
WVF ESD
 
WVF Xcel Colorado Slidesbb 08-27-09
WVF Xcel Colorado Slidesbb 08-27-09WVF Xcel Colorado Slidesbb 08-27-09
WVF Xcel Colorado Slidesbb 08-27-09
 
WVF InvVest SEI 8-27-09
WVF InvVest SEI  8-27-09WVF InvVest SEI  8-27-09
WVF InvVest SEI 8-27-09
 
Du Global Energy Overview 5 6 09
Du Global Energy Overview 5 6 09Du Global Energy Overview 5 6 09
Du Global Energy Overview 5 6 09
 
NREL Solar Technology Overview
NREL Solar Technology OverviewNREL Solar Technology Overview
NREL Solar Technology Overview
 
LHH Renewable Energy Presentation041609
LHH Renewable Energy Presentation041609LHH Renewable Energy Presentation041609
LHH Renewable Energy Presentation041609
 
InvVest Presentation To LHH
InvVest Presentation To LHHInvVest Presentation To LHH
InvVest Presentation To LHH
 

Kürzlich hochgeladen

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 

Kürzlich hochgeladen (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 

Arpa e doe dollar per watt 2 28 2011 workshop

  • 1. The SunShot Program The Dollar a Watt Team Program Name or Ancillary Text eere.energy.gov
  • 2. Imagine a World… What if we had subsidy-free solar electricity at an LCOE of 5-6 ¢/kWh ??? • Scaling without Subsidies • Jobs and Competitiveness • National Energy Security • Healthy Environment ARPA-E Summit doe.energy.gov
  • 3. Enabling this World ARPA-E Summit doe.energy.gov
  • 4. What is SunShot? • Price and date targets – 5-6¢/kWh fully installed at the MW scale by 2020 – Unsubsidized grid parity in residential and commercial markets by 2020 • Transformational technologies – PV Modules – BOS – Power Electronics ARPA-E Summit doe.energy.gov
  • 5. SunShot enables unsubsidized deployment of solar energy Total PV Generation Fraction 20% 18% $1/Watt $1.50/Watt 16% SP targets 14% $2/Watt 12% Reference 10% 8% 6% 4% 2% 0% 2010 2020 2030 2040 2050 Total PV Capacity 700 $1/Watt 600 $1.50/Watt 500 SP targets Goodrich, Margolis, et al 400 $2/Watt Reference GW NREL 300 200 100 0 2010 2020 2030 2040 2050 ARPA-E Summit doe.energy.gov
  • 6. SunShot enables unsubsidized deployment of solar energy $1/Watt 2030 Cumulative PV Capacity Map (375 GW total) Total PV Capacity (GW) <1 1- 3 3- 5 5- 8 $1/Watt 2050 Cumulative PV Capacity Map (610 GW total) 8 - 12 12 - 17 > 17 Goodrich, Margolis, et al NREL ARPA-E Summit doe.energy.gov
  • 7. Taking a Team Approach R. Ramesh SunShot Director Minh Le Rajeev Ram PV Module Module Task Power Power Electronics EERE Force (EERE) Electronics ARPA-E (ARPA-E) GOAL : 50c GOAL 10c /Watt /Watt Tex Wilkins Kevin Lynn CSP Systems Integration EERE EERE Balance of Fundamental Systems Research (EERE) (SC) GOAL: Jim Horwitz 40c /Watt Jennifer De Cesaro Fundamental BOS-Software Science Rachel Tronstein & EERE OS John Lushetsky, SunShot Strategic Planning, EERE Advisory Board : Bill Brinkman ( OS); Arun Majumdar (ARPA-E); Cathy Zoi (EERE) ARPA-E Summit doe.energy.gov
  • 8. Core Funding Strategy Technologies not ready Final phase may include for integration teams may down select competition continue in development for large scale deployment on Government facility. VERTICALLY INTEGRATED TEAMS (based on road maps) ARPA-E Summit doe.energy.gov
  • 9. R,D & D Roadmaps : Guiding Technology Development and Deployment • Roadmap for Module: Materials, manufacturing, integration, reliability testing • Roadmap for Power Electronics: Component innovations, communication protocols • Roadmap for Balance of System: Materials, Design, Automation • Industry, National Labs and Academia deeply involved in creating and implementing road maps ARPA-E Summit doe.energy.gov
  • 10. Engaging the stakeholders • Dollar a Watt Workshop, August 2010 • Solar Roundtable, Jan 13 • Soft BOS workshop Feb 9 • Power Electronics Workshop Feb 8 • Hard BOS workshop Feb 9 • Manufacturing/Demonstration workshop March • CSP workshop : March 2 • This workshop • Website, blogsite,… • More to come … ARPA-E Summit 12 doe.energy.gov
  • 11. Algorithms : PV Module Technologies $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF Efficiency ARPA-E Summit doe.energy.gov
  • 12. Barriers based investment : CIGS Modules $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF $3.50 $3.00 $2.50 $2.00 $/WDC $3.50 $1.50 $0.42 $0.28 $1.00 $1.70 $0.28 $0.22 $0.50 $0.50 $0.00 ARPA-E Summit 16 doe.energy.gov
  • 13. Approach to 50c/W Modules: CIGS Modules $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF Cost Drivers Reduction Pathways Technical Risk Potential Materials cost and availability High Medium Thinner layers or replacement with (Indium, selenium, cadmium) Earth abundant and benign materials (e.g., CZTS, ZnS, …) Transparent Conductors High Low ITO alternative materials and/or deposition methodologies Large scale spatial uniformity High Medium Improved in-situ metrology, thermal and improved throughput control, and elimination of chemical with same or lower cost of bath CdS capital Glass and/or Encapsulants Medium Medium Flexible low-cost front and backsheets with low WVTR (i.e., ultrabarriers, glass replacement) Operational costs of Medium Medium Eliminate batch selenization, alternative selenization ovens deposition methodologies (e.g., atmospheric deposition). ARPA-E Summit 17 doe.energy.gov
  • 14. Barriers based investments: CIGS Modules $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF Potential Technical Current Pathways Action Risk Increase (mA/cm2) Larger band gap junction 2.5 Medium Replace CdS ( e.g. 2.5 eV) with wide partner bandgap emitter (i.e., ZnS (3.1 eV)) Improved TCO 1.5 Medium Develop TCO with high conductivity, transparency, environmental stability (i.e., a-InZnO) Reduce CdS window 1.5 Medium Develop 20 nm thick continuous CdS layer thickness layer without shunting. Minimize reflection off 1.5 Medium Develop a suitable low cost anti- CIGS surface reflection coating Improved monolithic 1 Low Reduce line width of laser/mechanical integration scribing ARPA-E Summit 18 doe.energy.gov
  • 15. Barriers based investments: CIGS Modules $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF Potential Technical Voltage Action Risk Pathways Increase (V) Increase the Ga/In 0.1 Medium Increase CIGS deposition ratio in CIGS by a temperature via higher factor of 2 to 3 temperature glass substrates or alternative stable substrates. Improve the absorber 0.05 Medium Implement in-situ quality carrier lifetime and control at minimal additional concentration cost ARPA-E Summit 19 doe.energy.gov
  • 16. Barriers based investments: CIGS Modules $ Watt ∝ Manufacturing Cost Efficiency η ∝ J SC ⋅VOC ⋅ FF Technical Potential FF Pathways Action Risk Increase Reduce parasitic 0.10 Low Improve the density, phase, leakage current and crystallinity of the absorber Reduce contact 0.07 Low Improved TCO and contact resistance grid combination ARPA-E Summit 20 doe.energy.gov
  • 17. Balance of System ARPA-E Summit doe.energy.gov
  • 18. Power Electronics for Commercial Rooftop Solar Goal: Module level MPPT (>98%) Barrier: Cost & reliability Approach: DC/DC or DC/AC module integrated converters Goal: Light weight, roof-top inverter 99%, 200-500kW, eliminates DC conduit and wiring Barrier: High-frequency switches and magnetics AC switches (for current drive architectures) Approach: Wide-bandgap switches with advanced magnetic materials Actively Engaging the Stakeholders: Extracts from Power Electronics Workshop ARPA-E Summit doe.energy.gov
  • 19. Power Electronics for Utility Scale Solar Goal: Consolidate the number of inverters e.g., 20 MW installation will have 20 x 1MW inverters Barrier: Longer wiring, limited by loss Approach: Higher DC bus voltages DC/DC boost converters at module string (w/ MPPT) Goal: Improve power quality while delivering cost high frequency electronics - improved EMI, reduced harmonics Barrier: - Low loss, high-voltage switches and magnetics - Utility ‘ownership’ of line frequency transformer Approach: Wide-bandgap switches with advanced magnetic materials Actively Engaging the Stakeholders: Extracts from Power Electronics Workshop ARPA-E Summit doe.energy.gov
  • 20. Balance of Systems : A complex beast to tackle!! Today 2014 2017 BOS is different for Utility vs. Commercial vs. Residential ARPA-E Summit doe.energy.gov
  • 21. Utility Scale BOS • Opportunity for small improvements in a range of areas • Three elements of the strategy: 1. Design innovations 2. Materials and Mechanics 3. Installation approaches and automation Automation Plug and Play with BIPV Wiring, Frameworks, Mechanics ARPA-E Summit doe.energy.gov
  • 22. PV BOS Hard Costs Workshop • Topic 1: Transformational Building Integrated Photovoltaic (BIPV) Modules (Cost Target <$2/W) – Develop a business case for integrating PV into a roofing product with the potential for GW’s of installations – Develop a partnership with a roofing company – Encourage the Integration of Power Electronics – Demonstrate a form factor and installation design that reduces the temperature of both the PV cell and the roof assembly – Develop a highly reliability product with lifetimes of 20 years or more – Demonstrate a form factor that can be quickly and easily installed. ARPA-E Summit 26 doe.energy.gov
  • 23. Why SunShot ? 1995: 43% • Global Competitiveness 2000: 27% 2009: 6% • Energy Security • Environmental Issues • Life without subsidies ARPA-E Summit doe.energy.gov
  • 24. Thank You ramamoorthy.ramesh@ee.doe.gov ARPA-E Summit doe.energy.gov