SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Chanchalerm Watcharapasakhon Page 1 of 3
Chanchalerm Watcharapasakhon
Senior Instrument& Process Control system
Experience
Over 15 years working
experience
Qualifications /
Memberships
Bachelor Degree in
Instrumentation Systems
Engineering
Profile
Key Work Experience:
Instrumentation, Control & Automation Engineering with more than 15 years’
experience in detailed Engineering design,project management, commissioning
and Construction Chemical factory, Petrochemical plant, Pharmaceutical factory
and Offshore platform.
Exposure to engineering activities such as:
• Carry out and provide input to Conceptual and FEED study.
• Preparing construction contractors detailed scope of work and work pack.
• Prepare of Basic engineering documents.
• Review of P&IDs and Cause & Effect drawings.
• Preparation of Instrument database.
• Preparation of Specification for Control and Shutdown systems.
• Preparation of Specification for SCADA system.
• Preparation of I/O database.
• Review/preparation of Fieldbus device segment grouping.
• Evaluation of bids and Technical Bid Analysis for various field instruments,
packages
• Sizing of Orifices, other Flow Elements
• Sizing of Relief valves and Control Valves.
• Guidance to draughtsmen/designers to prepare Instrumentlocation plans, Hook
up drawings, Cable run layouts, Termination and wiring drawings and MTO
preparation for cables ,fittings , tubing etc.,
• Multi-discipline interfacing
• Inspection at Vendor’s works, FAT for DCS/ESD /PLC/Control panels and
systems.
• Vendor document review
• Performed Quality control ,completeness and correctness checks ofengineering
and design deliverables as per companyqualitycontrol procedure which is based
on ISO 9001
• Exposure to various international codes and standards being used in Oil and
Gas.
• Involved in standardization of instrumentation documents.
• Prepare plant process control / shutdown philosophy.
• Prepare system architecture
• Review / approval of system detailed engineering drawings.
• Involved in system Installation and configuration with system vendor.
• Participate in safety reviews / process hazardous analysis and ensure safe and
cost effective design in compliance with applicable codes and standards.
• Instrument installation and commissioning activities in refinery/petrochemical
/chemical plants/ Offshore platform.
• Inspection of material on receipt at warehouse.
• Onsite inspection of installations and punch listing.
• Witnessing of calibration of instruments, leak tests, cable insulation tests etc.
• Verification of contractor’s document submittals, Loop check packages etc.
• Preparation of as-built drawings for the final submission to engineering
consultant and client.
• Preparation of Instrument Specification, Datasheet and prelim calculation for
Instrument devices base on Process data for Orifice plate, Vortex Flow meter,
Colioris Flow meter, Electromagnetic Flow meter, Turbine Flow m eter, PD meter,
Thermal Mass flow meter, DP Flow Transmitters, Ultrasonic Flow meter, Radar
Level, Displacer Level, Magnetic Level Gauge, DP Level Transmitter, Float Level
switch, Pressure Gauges, Pressure Switch, Pressure Transmitter, Temperature
Gauge, Thermocouple, RTD, Temperature switch, Temperature Transmitter,
Chanchalerm Watcharapasakhon Page 2 of 3
Control valves, On-off valves, Shutdown valves, Pressure safety valve, Breather
Valve, Flame arrester, pH analyser, Conductivity analyser, Gas Chromatography
analyser, Gas Detector and Load cell.
• Preparation of Instrumentspecification for Instrumentpackage for Flow Metering
Station, Automatic Tank Gauging, Weight Scale and Continuous Emission
Monitoring System (CEMS).
• Preparation of Instrument Requisition and Technical Bid Evaluate for Control
System such as DCS, PLC and SIS, Instrument Devices, Instrument Bulk
material, Flow Metering Station, ATG, CEMS.
• Check Vendor calculations for control valves, safety relieve valves, flow
elements, Thermowell wake frequency.
• Participate in HAZOP reviews.
• Participate in SIL classification and SIL verification review.
• Project Management for Instrument work for Man-hour and cost control,
Schedule control, Progress report, Register for Project document and drawing,
Technical clarification among Project team, owner, Sub-contractor, vendor.
Project Experience
Overview of main projects performed as Senior Instrumental Engineer/Lead:
M+W (THAILAND) LTD. (January 2016 to Present)
ACG – ACG New plant (01/2016 – 04/2016)
BASF – BASF AIYARA (04/2016 – 06/2016)
SIAM PHARMA GROUP – Luk Plub (05/2016 – 12/2016)
TROPICALTECH LTD (08/2015 – 12/2015)
Overview of main projects performed as Procurement Manager
- Price negotiated with Supplier.
- Find Supplier who can supply material meet technical specification and TOR.
TECHNIP ENGINEERING (THAILAND) LTD (10/2011 – 07/2015)
Overview of main projects performed as Lead/Senior Instrument Engineer for
Greenfield and Brownfield Offshore platform:
Client : Chevron Thailand
• Feed Study for ERCPP RVP & VRU Improvement (10/2011 – 12/2011)
• Detail Design for Blow Down System for Erawan, Platform E (11/2011 – 2/2012)
• Feed Study for ERPE ICSS Retrofit (12/2011 – 3/2012)
• Platong Lab Safety Improvement Project (5/2012 – 8/2012)
• Funan VRC Upgrade Project (6/2012 – 9/2012)
• Detail Design for ERPE ICSS Retrofit (4/2012 – 2/2013)
• Detail Design for ERPC ICSS Retrofit (3/2013 – 5/2013)
• South Pailin Fire & Gas system retrofit (10/2013 – 2/2014)
• BAWA & ERWF Control Upgrade (6/2014 – 2/2015)
Client : PTTEP
• Arthit South Gathering Platform / Basic Engineering (4/2013 – 8/2013)
• Bongkot Infill Study project (3/2015 – 5/2015)
• Bongkot Small Platform Basic Engineering Project (3/2015 – 6/2015)
Client : Total E&P
• Badamyar Project / Basic Engineering (9/2013 – 5/2014)
Chanchalerm Watcharapasakhon Page 3 of 3
THAI NIPPON STEEL ENGINEERING & CONSTRUCTION (5/2011 – 10/2011)
Overview of main projects performed as Instrument Engineer:
• PTTEP - PTTEP Bundle Project / EPC Project (5/2011 – 9/2011)
CTCI (THAILAND) CO. LTD. (2/2004 – 5/2011)
Overview of main projects performed as Lead InstrumentEngineer for :
• PTTAC - AN/MMA Project / EPC Project
• PTTAC - PTTAC METERING PACKAGE / EPC Project
• PTTUT - PPCL Steam metering modification work / EPC Project
• PTTAC - AN/MMA Project / EPC Project
• PTT UTILITY CUP I - CUP-1 Pipe line distribution system package 1 Project /
EPC Project
• PTT Phenol - PTT Phenol Project / EPC Project
• Thai Olefins Public Co., Ltd.(PTT Chem I4) - TOC Plant I Debottleneck Project /
Detail Design Project
• HMC Polymers Co., Ltd. - HMC additive Feeding project / EPC Project
• Thai Olefins Public Co., Ltd. - New Parallel C3 Project / EPC Project
• Thai Olefins Public Co., Ltd. - New Air oxidation system / EPC Project
INTELLIGENT AUTOMATION CO. LTD. (06/2002 – 06/2003)
Overview of main projects performed as Sale Engineer:
 Estimate Control panel for Allen-Bradley PLC & SCADA system.
 Responsible to introduce company to new Customer

Weitere ähnliche Inhalte

Was ist angesagt?

E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)lateefur rahman
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOCsaurabh singh
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical CompletionsAndy Lang
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installationslaithu2908
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 
INGAA TVC Presentation
INGAA TVC PresentationINGAA TVC Presentation
INGAA TVC PresentationMTS Webmaster
 
Phase of Environmental project (from tendering to construction)
Phase of Environmental project (from tendering to construction)Phase of Environmental project (from tendering to construction)
Phase of Environmental project (from tendering to construction)Harush.D.P MTech
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion DiagramsTejas Deshpande
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet FinalKevin J. Lord
 
Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Descriptiontariq ghareb
 

Was ist angesagt? (17)

E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)E&I QA QC MD LATEEFUR RAHMAN (2)
E&I QA QC MD LATEEFUR RAHMAN (2)
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
Resume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineerResume srivenkatesh instrument engineer
Resume srivenkatesh instrument engineer
 
Mechanical Completions
Mechanical CompletionsMechanical Completions
Mechanical Completions
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installations
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 
INGAA TVC Presentation
INGAA TVC PresentationINGAA TVC Presentation
INGAA TVC Presentation
 
Phase of Environmental project (from tendering to construction)
Phase of Environmental project (from tendering to construction)Phase of Environmental project (from tendering to construction)
Phase of Environmental project (from tendering to construction)
 
Piping and Insruementaion Diagrams
Piping and Insruementaion DiagramsPiping and Insruementaion Diagrams
Piping and Insruementaion Diagrams
 
STS Product Sheet Final
STS Product Sheet FinalSTS Product Sheet Final
STS Product Sheet Final
 
OMPRAKASH_Resume
OMPRAKASH_ResumeOMPRAKASH_Resume
OMPRAKASH_Resume
 
Bfd pfd-pid
Bfd pfd-pidBfd pfd-pid
Bfd pfd-pid
 
Line Card
Line CardLine Card
Line Card
 
SUDHEESH CV .
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Description
 

Andere mochten auch

An overview of technological advancements and
An overview of technological advancements andAn overview of technological advancements and
An overview of technological advancements andeSAT Publishing House
 
8/22 國際研習會簡報_workshop presentation
8/22 國際研習會簡報_workshop presentation8/22 國際研習會簡報_workshop presentation
8/22 國際研習會簡報_workshop presentationCDRI_snowshih
 
Content writing services by goigi
Content writing services by goigiContent writing services by goigi
Content writing services by goigigoiginivedita
 
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...A photomultiplier high voltage power supply irtcorporating a ceramic transfor...
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...Love Kiss
 
Issues and challenges with renewable energy in oman
Issues and challenges with renewable energy in omanIssues and challenges with renewable energy in oman
Issues and challenges with renewable energy in omaneSAT Publishing House
 
How do i get divorced
How do i get divorcedHow do i get divorced
How do i get divorcedaschfords law
 
Fern paradise Green House : Niwat Architects
Fern paradise Green House : Niwat ArchitectsFern paradise Green House : Niwat Architects
Fern paradise Green House : Niwat ArchitectsNiwat Architect Co.,ltd.
 
Serat wirid hidayat jati
Serat wirid hidayat jatiSerat wirid hidayat jati
Serat wirid hidayat jatiNiki Sinten
 
Evaluation Question 3
Evaluation Question 3Evaluation Question 3
Evaluation Question 3miloomahoney
 
Raport z warsztatów - projektowanie przyszłości madaliny
Raport  z warsztatów - projektowanie przyszłości madalinyRaport  z warsztatów - projektowanie przyszłości madaliny
Raport z warsztatów - projektowanie przyszłości madalinyArtur Brzyski
 
SlideShare Unsur Kimia Halogen
SlideShare Unsur Kimia HalogenSlideShare Unsur Kimia Halogen
SlideShare Unsur Kimia HalogenDika Fiqri Jatmiko
 
Fern paradise Architect Green House : Niwat Architects
Fern paradise Architect Green House : Niwat ArchitectsFern paradise Architect Green House : Niwat Architects
Fern paradise Architect Green House : Niwat ArchitectsNiwat Architect Co.,ltd.
 
Deber de informatica
Deber de informaticaDeber de informatica
Deber de informaticakelvinmaster4
 
Patnent Information services
Patnent Information servicesPatnent Information services
Patnent Information servicesLihua Gao
 

Andere mochten auch (17)

An overview of technological advancements and
An overview of technological advancements andAn overview of technological advancements and
An overview of technological advancements and
 
8/22 國際研習會簡報_workshop presentation
8/22 國際研習會簡報_workshop presentation8/22 國際研習會簡報_workshop presentation
8/22 國際研習會簡報_workshop presentation
 
Content writing services by goigi
Content writing services by goigiContent writing services by goigi
Content writing services by goigi
 
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...A photomultiplier high voltage power supply irtcorporating a ceramic transfor...
A photomultiplier high voltage power supply irtcorporating a ceramic transfor...
 
Issues and challenges with renewable energy in oman
Issues and challenges with renewable energy in omanIssues and challenges with renewable energy in oman
Issues and challenges with renewable energy in oman
 
How do i get divorced
How do i get divorcedHow do i get divorced
How do i get divorced
 
Fern paradise Green House : Niwat Architects
Fern paradise Green House : Niwat ArchitectsFern paradise Green House : Niwat Architects
Fern paradise Green House : Niwat Architects
 
Serat wirid hidayat jati
Serat wirid hidayat jatiSerat wirid hidayat jati
Serat wirid hidayat jati
 
Evaluation Question 3
Evaluation Question 3Evaluation Question 3
Evaluation Question 3
 
Interaksi sosial
Interaksi sosialInteraksi sosial
Interaksi sosial
 
Raport z warsztatów - projektowanie przyszłości madaliny
Raport  z warsztatów - projektowanie przyszłości madalinyRaport  z warsztatów - projektowanie przyszłości madaliny
Raport z warsztatów - projektowanie przyszłości madaliny
 
SlideShare Unsur Kimia Halogen
SlideShare Unsur Kimia HalogenSlideShare Unsur Kimia Halogen
SlideShare Unsur Kimia Halogen
 
Fern paradise Architect Green House : Niwat Architects
Fern paradise Architect Green House : Niwat ArchitectsFern paradise Architect Green House : Niwat Architects
Fern paradise Architect Green House : Niwat Architects
 
Tugas kimia mekanika kuantum
Tugas kimia mekanika kuantumTugas kimia mekanika kuantum
Tugas kimia mekanika kuantum
 
الماء1
الماء1الماء1
الماء1
 
Deber de informatica
Deber de informaticaDeber de informatica
Deber de informatica
 
Patnent Information services
Patnent Information servicesPatnent Information services
Patnent Information services
 

Ähnlich wie CV_Chanchalerm

Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlBathrinath mangalamoorthi
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latestArun Das
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrGovinda Raman
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latestArun Das
 
Suman Professional
Suman ProfessionalSuman Professional
Suman ProfessionalSuman Das
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2mohammad tanweer
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobJibin Jacob
 
Arun das latest resume (1)
Arun das latest resume (1)Arun das latest resume (1)
Arun das latest resume (1)Arun Das
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume Arun Das
 

Ähnlich wie CV_Chanchalerm (20)

Sr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & controlSr Lead Engineer - Instrumentation & control
Sr Lead Engineer - Instrumentation & control
 
Giridhar
GiridharGiridhar
Giridhar
 
vijins new-11-2016
vijins new-11-2016vijins new-11-2016
vijins new-11-2016
 
1.mep engineer latest
1.mep engineer latest1.mep engineer latest
1.mep engineer latest
 
CV of Control and Instrumentation Engr
CV of Control and Instrumentation EngrCV of Control and Instrumentation Engr
CV of Control and Instrumentation Engr
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 
CV_Thangaraj Raja
CV_Thangaraj RajaCV_Thangaraj Raja
CV_Thangaraj Raja
 
Instrument engineer CV
Instrument engineer CVInstrument engineer CV
Instrument engineer CV
 
CV
CVCV
CV
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Resume mep latest
Resume mep latestResume mep latest
Resume mep latest
 
Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
E&I QA QC SUPERVISOR....ORGINAL 2
E&I QA QC  SUPERVISOR....ORGINAL 2E&I QA QC  SUPERVISOR....ORGINAL 2
E&I QA QC SUPERVISOR....ORGINAL 2
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Abhishek
AbhishekAbhishek
Abhishek
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
Arun das latest resume (1)
Arun das latest resume (1)Arun das latest resume (1)
Arun das latest resume (1)
 
Arun das latest resume
Arun das latest resume Arun das latest resume
Arun das latest resume
 

CV_Chanchalerm

  • 1. Chanchalerm Watcharapasakhon Page 1 of 3 Chanchalerm Watcharapasakhon Senior Instrument& Process Control system Experience Over 15 years working experience Qualifications / Memberships Bachelor Degree in Instrumentation Systems Engineering Profile Key Work Experience: Instrumentation, Control & Automation Engineering with more than 15 years’ experience in detailed Engineering design,project management, commissioning and Construction Chemical factory, Petrochemical plant, Pharmaceutical factory and Offshore platform. Exposure to engineering activities such as: • Carry out and provide input to Conceptual and FEED study. • Preparing construction contractors detailed scope of work and work pack. • Prepare of Basic engineering documents. • Review of P&IDs and Cause & Effect drawings. • Preparation of Instrument database. • Preparation of Specification for Control and Shutdown systems. • Preparation of Specification for SCADA system. • Preparation of I/O database. • Review/preparation of Fieldbus device segment grouping. • Evaluation of bids and Technical Bid Analysis for various field instruments, packages • Sizing of Orifices, other Flow Elements • Sizing of Relief valves and Control Valves. • Guidance to draughtsmen/designers to prepare Instrumentlocation plans, Hook up drawings, Cable run layouts, Termination and wiring drawings and MTO preparation for cables ,fittings , tubing etc., • Multi-discipline interfacing • Inspection at Vendor’s works, FAT for DCS/ESD /PLC/Control panels and systems. • Vendor document review • Performed Quality control ,completeness and correctness checks ofengineering and design deliverables as per companyqualitycontrol procedure which is based on ISO 9001 • Exposure to various international codes and standards being used in Oil and Gas. • Involved in standardization of instrumentation documents. • Prepare plant process control / shutdown philosophy. • Prepare system architecture • Review / approval of system detailed engineering drawings. • Involved in system Installation and configuration with system vendor. • Participate in safety reviews / process hazardous analysis and ensure safe and cost effective design in compliance with applicable codes and standards. • Instrument installation and commissioning activities in refinery/petrochemical /chemical plants/ Offshore platform. • Inspection of material on receipt at warehouse. • Onsite inspection of installations and punch listing. • Witnessing of calibration of instruments, leak tests, cable insulation tests etc. • Verification of contractor’s document submittals, Loop check packages etc. • Preparation of as-built drawings for the final submission to engineering consultant and client. • Preparation of Instrument Specification, Datasheet and prelim calculation for Instrument devices base on Process data for Orifice plate, Vortex Flow meter, Colioris Flow meter, Electromagnetic Flow meter, Turbine Flow m eter, PD meter, Thermal Mass flow meter, DP Flow Transmitters, Ultrasonic Flow meter, Radar Level, Displacer Level, Magnetic Level Gauge, DP Level Transmitter, Float Level switch, Pressure Gauges, Pressure Switch, Pressure Transmitter, Temperature Gauge, Thermocouple, RTD, Temperature switch, Temperature Transmitter,
  • 2. Chanchalerm Watcharapasakhon Page 2 of 3 Control valves, On-off valves, Shutdown valves, Pressure safety valve, Breather Valve, Flame arrester, pH analyser, Conductivity analyser, Gas Chromatography analyser, Gas Detector and Load cell. • Preparation of Instrumentspecification for Instrumentpackage for Flow Metering Station, Automatic Tank Gauging, Weight Scale and Continuous Emission Monitoring System (CEMS). • Preparation of Instrument Requisition and Technical Bid Evaluate for Control System such as DCS, PLC and SIS, Instrument Devices, Instrument Bulk material, Flow Metering Station, ATG, CEMS. • Check Vendor calculations for control valves, safety relieve valves, flow elements, Thermowell wake frequency. • Participate in HAZOP reviews. • Participate in SIL classification and SIL verification review. • Project Management for Instrument work for Man-hour and cost control, Schedule control, Progress report, Register for Project document and drawing, Technical clarification among Project team, owner, Sub-contractor, vendor. Project Experience Overview of main projects performed as Senior Instrumental Engineer/Lead: M+W (THAILAND) LTD. (January 2016 to Present) ACG – ACG New plant (01/2016 – 04/2016) BASF – BASF AIYARA (04/2016 – 06/2016) SIAM PHARMA GROUP – Luk Plub (05/2016 – 12/2016) TROPICALTECH LTD (08/2015 – 12/2015) Overview of main projects performed as Procurement Manager - Price negotiated with Supplier. - Find Supplier who can supply material meet technical specification and TOR. TECHNIP ENGINEERING (THAILAND) LTD (10/2011 – 07/2015) Overview of main projects performed as Lead/Senior Instrument Engineer for Greenfield and Brownfield Offshore platform: Client : Chevron Thailand • Feed Study for ERCPP RVP & VRU Improvement (10/2011 – 12/2011) • Detail Design for Blow Down System for Erawan, Platform E (11/2011 – 2/2012) • Feed Study for ERPE ICSS Retrofit (12/2011 – 3/2012) • Platong Lab Safety Improvement Project (5/2012 – 8/2012) • Funan VRC Upgrade Project (6/2012 – 9/2012) • Detail Design for ERPE ICSS Retrofit (4/2012 – 2/2013) • Detail Design for ERPC ICSS Retrofit (3/2013 – 5/2013) • South Pailin Fire & Gas system retrofit (10/2013 – 2/2014) • BAWA & ERWF Control Upgrade (6/2014 – 2/2015) Client : PTTEP • Arthit South Gathering Platform / Basic Engineering (4/2013 – 8/2013) • Bongkot Infill Study project (3/2015 – 5/2015) • Bongkot Small Platform Basic Engineering Project (3/2015 – 6/2015) Client : Total E&P • Badamyar Project / Basic Engineering (9/2013 – 5/2014)
  • 3. Chanchalerm Watcharapasakhon Page 3 of 3 THAI NIPPON STEEL ENGINEERING & CONSTRUCTION (5/2011 – 10/2011) Overview of main projects performed as Instrument Engineer: • PTTEP - PTTEP Bundle Project / EPC Project (5/2011 – 9/2011) CTCI (THAILAND) CO. LTD. (2/2004 – 5/2011) Overview of main projects performed as Lead InstrumentEngineer for : • PTTAC - AN/MMA Project / EPC Project • PTTAC - PTTAC METERING PACKAGE / EPC Project • PTTUT - PPCL Steam metering modification work / EPC Project • PTTAC - AN/MMA Project / EPC Project • PTT UTILITY CUP I - CUP-1 Pipe line distribution system package 1 Project / EPC Project • PTT Phenol - PTT Phenol Project / EPC Project • Thai Olefins Public Co., Ltd.(PTT Chem I4) - TOC Plant I Debottleneck Project / Detail Design Project • HMC Polymers Co., Ltd. - HMC additive Feeding project / EPC Project • Thai Olefins Public Co., Ltd. - New Parallel C3 Project / EPC Project • Thai Olefins Public Co., Ltd. - New Air oxidation system / EPC Project INTELLIGENT AUTOMATION CO. LTD. (06/2002 – 06/2003) Overview of main projects performed as Sale Engineer:  Estimate Control panel for Allen-Bradley PLC & SCADA system.  Responsible to introduce company to new Customer