Planning of the mooring operation
1. Universidad Marítima del Caribe
Language Coordination
English VII
Operations
Compiled by César Rivas
2. Mooring operations
require three parties to
work together,
Forward team
Aft team
Bridge personnel
These three parties
must work together and
communicate effectively.
4. During the planning of the mooring
operation, some aspects should be
considered:
The nature of the berth where the vessel will make
fast
The availability of quayside bollards
The expected environment conditions during the stay,
including the height of tide
The windage area of the vessel
6. The expected cargo operation
Whether tugs will be required
How the vessel is expected to come alongside and the
order of the lines
Whether own vessel or other vessels will be double-
banking alongside
During the planning of the mooring
operation, some aspects should be
considered:
11. Prior to
commencing the
mooring operation, the
Master should outline
the intended berthing
plan with the officer in
charge, who will then
inform with a detailed
briefing to all the crew
members involved.
16. Members of the
mooring party should
have PPE and should
be trained.
If there are junior
inexperienced crew
members, they should
be supervised during
the operation.
17. Crew members
must not stand in
dangerous areas
(snapback zone)
when performing
the mooring
operation.
18.
19. References
Bhanawat, A. (2018). 6 Common Mooring Methods used for Ships. Article on line.
Retrieved from: https://www.marineinsight.com/marine-navigation/mooring-
methods-ships/
Mooring Operation Loss Prevention Briefing (2017). The North of England P & I
Association