Model Schools - Phase V
                            February 9, 2011




Steven Grossman                                Katherine P. Craven
Chairman, State Treasurer                         Executive Director
MSBA Model School Program
• 45 schools submitted in Phases I – V by 17
  design firms
• 9 schools accepted as model schools
     –   3 high schools (Ashland, Hudson, Whitman-Hanson)
     –   1 middle/high school (Ipswich)
     –   1 middle school (Lynnfield)
     –   4 elementary schools (Fairhaven, Winthrop, Groton,
         Williamstown)
• 17 schools currently under consideration
     – 4 elementary schools in Phase III & IV
     – 13 schools of different grade configurations in Phase V


February 9, 2011                                                 2
Model School Adaptations
• High Schools:                           • Middle Schools:
     – Whitman-Hanson:                      – Lynnfield:
                   –   East Bridgewater            – Quincy
                   –   Norwood
                   –   Natick
                                          • Elementary Schools:
                   –   Plymouth North
                                            – Winthrop:
     – Ashland:
                                                   – Douglas
                   – Minnechaug
     – Hudson:
                   – Tewksbury
                   – West Springfield




February 9, 2011                                                  3
MSBA Model School Program - Phase V
• Request for Designer Services issued on October 27,
  2010, submissions received on December 2, 2010
• Targeted at public schools of any and all grade
  configurations with the following requirements:
     – Can be modified to reflect current code requirements
     – Adaptable to other sites
     – New school (not the result of an addition/renovation project unless the
       addition/renovation is easily removed or adapted to current standards)
     – Incorporates energy efficient and sustainable design elements
     – Recent construction
• Three phase, streamlined process
     – First step currently in process
     – Staff preparing recommendations for site visits at February 23, 2011
       Facilities Assessment Subcommittee meeting



February 9, 2011                                                                 4
MSBA Model School Submittal - Phase V




    *Academic Spaces sized for an enrollment of 1450, Core Spaces provided for an enrollment of 1700
February 9, 2011                                                                                       5
Glenwood Elementary School
•    District: Wachusett
     Regional
•    Designer: Lamoureux
     Pagano Associates
•    Grades Served: K-5
•    Design Enrollment: 600
•    GSF: 88,659 SF




February 9, 2011                         6
Lincoln Elementary School
• District: New Bedford
• Designer: Mount Vernon
  Group Architects
• Grades Served: PK-5
• Design Enrollment: 600
• GSF: 91,217 SF




February 9, 2011                           7
Malcolm White Elementary School
• District: Woburn
• Designer: Tappé
  Associates, Inc.
• Grades Served: PK-5
• Design Enrollment: 406
• GSF: 67,500 SF




February 9, 2011                        8
Lanesborough Elementary School
• District: Lanesborough
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: PK-6
• Design Enrollment: 350
• GSF: 57,595 SF




February 9, 2011                       9
Webster Middle School
• District: Webster
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: 3-6
• Design Enrollment: 700
• GSF: 108,880 SF




February 9, 2011                           10
Barnum-Waltersville School
• District: Bridgeport, CT
• Designer: JCJ
  Architecture
• Grades Served: PK-8
• Design Enrollment: 1250
• GSF: 172,154 SF




February 9, 2011                           11
Ferryway School

• District: Malden
• Designer: Flansburgh
  Architects
• Grades Served: K-8
• Design Enrollment: 850
• GSF: 121,600 SF




February 9, 2011                     12
Littleton Middle School
• District: Littleton
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: 6-8
• Design Enrollment: 500
• GSF: 75,119 SF




February 9, 2011                             13
Dedham Middle School
• District: Dedham
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: 6-8
• Design Enrollment: 725
• GSF: 129,167 SF




February 9, 2011                          14
Manchester-Essex Middle/High School
• District: Manchester
  Essex Regional
• Designer: Mount Vernon
  Group Architects
• Grades Served: 6-12
• Design Enrollment: 750
• GSF: 163,720 SF




February 9, 2011                   15
North Brookfield Jr/Sr High School
• District: North Brookfield
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: 7-12
• Design Enrollment: 400
• GSF: 83,000 SF




February 9, 2011                           16
Shrewsbury High School
• District: Shrewsbury
• Designer: Lamoureux
  Pagano Associates
• Grades Served: 9-12
• Design Enrollment: 1450*
• GSF: 265,00 SF




*Academic Spaces sized for an enrollment of 1450, Core 
Spaces provided for an enrollment of 1700

February 9, 2011                                          17
King Philip Regional High School
• District: King Philip
  Regional
• Designer: Dore & Whittier
  Architects, Inc.
• Grades Served: 9-12
• Design Enrollment: 1350
• GSF: 232,000 SF




February 9, 2011                           18

Weitere ähnliche Inhalte

Was ist angesagt?

Public Meetings - School Closings
Public Meetings - School ClosingsPublic Meetings - School Closings
Public Meetings - School ClosingsTodd Neibauer
 
Reassignment committee meeting january 30 - final-update1-31-12 2
Reassignment committee meeting   january 30 - final-update1-31-12 2Reassignment committee meeting   january 30 - final-update1-31-12 2
Reassignment committee meeting january 30 - final-update1-31-12 2Nash-Rocky Mount Public Schools
 
melissagaddis_portfoliospreads1
melissagaddis_portfoliospreads1melissagaddis_portfoliospreads1
melissagaddis_portfoliospreads1Melissa Gaddis
 
Hilll School Master Plan 2013
Hilll School Master Plan 2013Hilll School Master Plan 2013
Hilll School Master Plan 2013Geoffrey Richards
 

Was ist angesagt? (6)

Public Meetings - School Closings
Public Meetings - School ClosingsPublic Meetings - School Closings
Public Meetings - School Closings
 
Reassignment committee meeting january 30 - final-update1-31-12 2
Reassignment committee meeting   january 30 - final-update1-31-12 2Reassignment committee meeting   january 30 - final-update1-31-12 2
Reassignment committee meeting january 30 - final-update1-31-12 2
 
Sterling sfu m_ed
Sterling sfu m_edSterling sfu m_ed
Sterling sfu m_ed
 
International presentation 2016
International presentation 2016 International presentation 2016
International presentation 2016
 
melissagaddis_portfoliospreads1
melissagaddis_portfoliospreads1melissagaddis_portfoliospreads1
melissagaddis_portfoliospreads1
 
Hilll School Master Plan 2013
Hilll School Master Plan 2013Hilll School Master Plan 2013
Hilll School Master Plan 2013
 

Ähnlich wie February 9, 2011 Board Meeting, Model School Update Presentation

Visalia Unified School District - Celebrating Partnerships 6-16-15 Presentation
Visalia Unified School District - Celebrating Partnerships 6-16-15 PresentationVisalia Unified School District - Celebrating Partnerships 6-16-15 Presentation
Visalia Unified School District - Celebrating Partnerships 6-16-15 PresentationTulareKingsLinkedLearning
 
Superintendent John McCarthy’s Presentation
Superintendent John McCarthy’s PresentationSuperintendent John McCarthy’s Presentation
Superintendent John McCarthy’s PresentationYes4SMS
 
JBosek_Select Portfolio_v2
JBosek_Select Portfolio_v2JBosek_Select Portfolio_v2
JBosek_Select Portfolio_v2Janelle Bosek
 
North Reading Town Meeting 120319
North Reading Town Meeting 120319North Reading Town Meeting 120319
North Reading Town Meeting 120319helenmaynard
 
Adriandahlinmasccc2014ed&com
Adriandahlinmasccc2014ed&comAdriandahlinmasccc2014ed&com
Adriandahlinmasccc2014ed&comJen Boudrie
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposalyestoinvest
 
Community meetings presentation1
Community meetings presentation1Community meetings presentation1
Community meetings presentation1chsdpresos
 
Bridges-Orman-resume-rev 9-2014
Bridges-Orman-resume-rev 9-2014Bridges-Orman-resume-rev 9-2014
Bridges-Orman-resume-rev 9-2014Orman Bridges, Jr.
 
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014ECarverCoSchools
 
Berkhamsted Schools Group Development Plan Update 2015
Berkhamsted Schools Group Development Plan Update 2015Berkhamsted Schools Group Development Plan Update 2015
Berkhamsted Schools Group Development Plan Update 2015Mark S. Steed
 
Resume Brian Kolins
Resume Brian KolinsResume Brian Kolins
Resume Brian KolinsBrian Kolins
 
Andrew Cline - Portfolio
Andrew Cline - PortfolioAndrew Cline - Portfolio
Andrew Cline - PortfolioAndrew Cline
 
12 4-18 ltr to sbe from p. faison w attachments
12 4-18 ltr to sbe from p. faison w attachments12 4-18 ltr to sbe from p. faison w attachments
12 4-18 ltr to sbe from p. faison w attachmentsEducationNC
 
Danielle Carrier Resume 2016 UST
Danielle Carrier Resume 2016 USTDanielle Carrier Resume 2016 UST
Danielle Carrier Resume 2016 USTDanielle Carrier
 

Ähnlich wie February 9, 2011 Board Meeting, Model School Update Presentation (20)

Resume
ResumeResume
Resume
 
Resume cullen broderick
Resume cullen broderick Resume cullen broderick
Resume cullen broderick
 
February 9, 2011 Board Meeting, Project Overview Presentation
February 9, 2011 Board Meeting, Project Overview PresentationFebruary 9, 2011 Board Meeting, Project Overview Presentation
February 9, 2011 Board Meeting, Project Overview Presentation
 
Visalia Unified School District - Celebrating Partnerships 6-16-15 Presentation
Visalia Unified School District - Celebrating Partnerships 6-16-15 PresentationVisalia Unified School District - Celebrating Partnerships 6-16-15 Presentation
Visalia Unified School District - Celebrating Partnerships 6-16-15 Presentation
 
Superintendent John McCarthy’s Presentation
Superintendent John McCarthy’s PresentationSuperintendent John McCarthy’s Presentation
Superintendent John McCarthy’s Presentation
 
JBosek_Select Portfolio_v2
JBosek_Select Portfolio_v2JBosek_Select Portfolio_v2
JBosek_Select Portfolio_v2
 
North Reading Town Meeting 120319
North Reading Town Meeting 120319North Reading Town Meeting 120319
North Reading Town Meeting 120319
 
Adriandahlinmasccc2014ed&com
Adriandahlinmasccc2014ed&comAdriandahlinmasccc2014ed&com
Adriandahlinmasccc2014ed&com
 
Holyoke Two Middle Schools Proposal
Holyoke Two Middle Schools ProposalHolyoke Two Middle Schools Proposal
Holyoke Two Middle Schools Proposal
 
Community meetings presentation1
Community meetings presentation1Community meetings presentation1
Community meetings presentation1
 
Bridges-Orman-resume-rev 9-2014
Bridges-Orman-resume-rev 9-2014Bridges-Orman-resume-rev 9-2014
Bridges-Orman-resume-rev 9-2014
 
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014
School Board Facilities Cmte - Long Term Recommendations, Dec. 11, 2014
 
Julie Carpenter Resume
Julie Carpenter ResumeJulie Carpenter Resume
Julie Carpenter Resume
 
Berkhamsted Schools Group Development Plan Update 2015
Berkhamsted Schools Group Development Plan Update 2015Berkhamsted Schools Group Development Plan Update 2015
Berkhamsted Schools Group Development Plan Update 2015
 
Lewinsville Center
Lewinsville CenterLewinsville Center
Lewinsville Center
 
Resume Brian Kolins
Resume Brian KolinsResume Brian Kolins
Resume Brian Kolins
 
Andrew Cline - Portfolio
Andrew Cline - PortfolioAndrew Cline - Portfolio
Andrew Cline - Portfolio
 
12 4-18 ltr to sbe from p. faison w attachments
12 4-18 ltr to sbe from p. faison w attachments12 4-18 ltr to sbe from p. faison w attachments
12 4-18 ltr to sbe from p. faison w attachments
 
Resume Final
Resume FinalResume Final
Resume Final
 
Danielle Carrier Resume 2016 UST
Danielle Carrier Resume 2016 USTDanielle Carrier Resume 2016 UST
Danielle Carrier Resume 2016 UST
 

Mehr von Massachusetts School Building Authority

Mehr von Massachusetts School Building Authority (13)

Cefpi power point presentation revised
Cefpi power point presentation revisedCefpi power point presentation revised
Cefpi power point presentation revised
 
May 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forumMay 5, 2011 society of marketing professionals services forum
May 5, 2011 society of marketing professionals services forum
 
Bourne elementary and ecc timeline v2
Bourne elementary and ecc timeline v2Bourne elementary and ecc timeline v2
Bourne elementary and ecc timeline v2
 
February 9, 2011 Board Meeting, Audit Division Presentation
February 9, 2011 Board Meeting, Audit Division PresentationFebruary 9, 2011 Board Meeting, Audit Division Presentation
February 9, 2011 Board Meeting, Audit Division Presentation
 
MSBA Project Division PowerPoint, 2.9.11 Board Meeting
MSBA Project Division PowerPoint, 2.9.11 Board MeetingMSBA Project Division PowerPoint, 2.9.11 Board Meeting
MSBA Project Division PowerPoint, 2.9.11 Board Meeting
 
Board meeting presentation 11 17-10 - final
Board meeting presentation 11 17-10 - finalBoard meeting presentation 11 17-10 - final
Board meeting presentation 11 17-10 - final
 
September Board meeting presentation
September Board meeting presentationSeptember Board meeting presentation
September Board meeting presentation
 
September Board meeting Presentation
September Board meeting PresentationSeptember Board meeting Presentation
September Board meeting Presentation
 
January 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association PresentationJanuary 2010 MA Municipal Association Presentation
January 2010 MA Municipal Association Presentation
 
June 2010_MACHPS_green_schools
June 2010_MACHPS_green_schoolsJune 2010_MACHPS_green_schools
June 2010_MACHPS_green_schools
 
January 2010 Presentation to MMA Conference
January 2010 Presentation to MMA ConferenceJanuary 2010 Presentation to MMA Conference
January 2010 Presentation to MMA Conference
 
7.28.10 Board Meeting Presentation
7.28.10 Board Meeting Presentation7.28.10 Board Meeting Presentation
7.28.10 Board Meeting Presentation
 
Mars april 2010 final
Mars april 2010 finalMars april 2010 final
Mars april 2010 final
 

February 9, 2011 Board Meeting, Model School Update Presentation

  • 1. Model Schools - Phase V February 9, 2011 Steven Grossman Katherine P. Craven Chairman, State Treasurer Executive Director
  • 2. MSBA Model School Program • 45 schools submitted in Phases I – V by 17 design firms • 9 schools accepted as model schools – 3 high schools (Ashland, Hudson, Whitman-Hanson) – 1 middle/high school (Ipswich) – 1 middle school (Lynnfield) – 4 elementary schools (Fairhaven, Winthrop, Groton, Williamstown) • 17 schools currently under consideration – 4 elementary schools in Phase III & IV – 13 schools of different grade configurations in Phase V February 9, 2011 2
  • 3. Model School Adaptations • High Schools: • Middle Schools: – Whitman-Hanson: – Lynnfield: – East Bridgewater – Quincy – Norwood – Natick • Elementary Schools: – Plymouth North – Winthrop: – Ashland: – Douglas – Minnechaug – Hudson: – Tewksbury – West Springfield February 9, 2011 3
  • 4. MSBA Model School Program - Phase V • Request for Designer Services issued on October 27, 2010, submissions received on December 2, 2010 • Targeted at public schools of any and all grade configurations with the following requirements: – Can be modified to reflect current code requirements – Adaptable to other sites – New school (not the result of an addition/renovation project unless the addition/renovation is easily removed or adapted to current standards) – Incorporates energy efficient and sustainable design elements – Recent construction • Three phase, streamlined process – First step currently in process – Staff preparing recommendations for site visits at February 23, 2011 Facilities Assessment Subcommittee meeting February 9, 2011 4
  • 5. MSBA Model School Submittal - Phase V *Academic Spaces sized for an enrollment of 1450, Core Spaces provided for an enrollment of 1700 February 9, 2011 5
  • 6. Glenwood Elementary School • District: Wachusett Regional • Designer: Lamoureux Pagano Associates • Grades Served: K-5 • Design Enrollment: 600 • GSF: 88,659 SF February 9, 2011 6
  • 7. Lincoln Elementary School • District: New Bedford • Designer: Mount Vernon Group Architects • Grades Served: PK-5 • Design Enrollment: 600 • GSF: 91,217 SF February 9, 2011 7
  • 8. Malcolm White Elementary School • District: Woburn • Designer: Tappé Associates, Inc. • Grades Served: PK-5 • Design Enrollment: 406 • GSF: 67,500 SF February 9, 2011 8
  • 9. Lanesborough Elementary School • District: Lanesborough • Designer: Dore & Whittier Architects, Inc. • Grades Served: PK-6 • Design Enrollment: 350 • GSF: 57,595 SF February 9, 2011 9
  • 10. Webster Middle School • District: Webster • Designer: Dore & Whittier Architects, Inc. • Grades Served: 3-6 • Design Enrollment: 700 • GSF: 108,880 SF February 9, 2011 10
  • 11. Barnum-Waltersville School • District: Bridgeport, CT • Designer: JCJ Architecture • Grades Served: PK-8 • Design Enrollment: 1250 • GSF: 172,154 SF February 9, 2011 11
  • 12. Ferryway School • District: Malden • Designer: Flansburgh Architects • Grades Served: K-8 • Design Enrollment: 850 • GSF: 121,600 SF February 9, 2011 12
  • 13. Littleton Middle School • District: Littleton • Designer: Dore & Whittier Architects, Inc. • Grades Served: 6-8 • Design Enrollment: 500 • GSF: 75,119 SF February 9, 2011 13
  • 14. Dedham Middle School • District: Dedham • Designer: Dore & Whittier Architects, Inc. • Grades Served: 6-8 • Design Enrollment: 725 • GSF: 129,167 SF February 9, 2011 14
  • 15. Manchester-Essex Middle/High School • District: Manchester Essex Regional • Designer: Mount Vernon Group Architects • Grades Served: 6-12 • Design Enrollment: 750 • GSF: 163,720 SF February 9, 2011 15
  • 16. North Brookfield Jr/Sr High School • District: North Brookfield • Designer: Dore & Whittier Architects, Inc. • Grades Served: 7-12 • Design Enrollment: 400 • GSF: 83,000 SF February 9, 2011 16
  • 17. Shrewsbury High School • District: Shrewsbury • Designer: Lamoureux Pagano Associates • Grades Served: 9-12 • Design Enrollment: 1450* • GSF: 265,00 SF *Academic Spaces sized for an enrollment of 1450, Core  Spaces provided for an enrollment of 1700 February 9, 2011 17
  • 18. King Philip Regional High School • District: King Philip Regional • Designer: Dore & Whittier Architects, Inc. • Grades Served: 9-12 • Design Enrollment: 1350 • GSF: 232,000 SF February 9, 2011 18