ANCIENT CHINESE CURSE
“MayYou Live in interesting time”
…we are really living in interesting times!
MAYYOU LIVE IN INTERESTINGTIME
GOVERNMENTS ARE ASKING FOR BIM
IT ISTIMETO BIM
DUBAI DECREES BIM –
WHY?
• Improve project delivery in terms of
quality
• Enhance coordination and collaboration
between stakeholders throughout the
project life-cycle
• Reduce time and cost
• Standardize requirements and specs
• Facilitate generation of BOQs
• Improve pricing accuracy
Ref: Circular 196/2014, 207/2015
MANUFACTURINGVS CONSTRUCTION
TECHNOLOGY CAN HELP MEETTHE
CHALLENGE
Promising Innovations:
▪ BIM
▪ As-built laser scanning,
photogrammetry
▪ Drones
▪ IoT
▪ Augmented Reality
▪ 3D Printing
▪ Robotics
▪ Modular construction
▪ AI & Construction simulation
Processes:
▪ AdvancedWorkface Packaging
▪ Lean Construction
▪ BPM
▪ BIM-based project control
OUR FOCUSTHISYEAR’S CONFERENCE
• BIM Based Project Control
• Advanced Work Packaging
• Lean Construction
DEFINITIONS: BIM
▪ BIM is often misunderstood and the focus has mainly been on the 3D
models and multi-discipline coordination of design information. The "I"
in BIM is the real benefit but in the same time the biggest challenge.
▪ At CCC, our BIM-centric work processes have helped us achieve various
organizational, execution and collaboration improvement which led to
better performing project delivery.
DEFINITIONS: BIM
▪ BIM is often misunderstood and the focus has mainly been on the 3D
models and multi-discipline coordination of design information. The "I"
in BIM is the real benefit but in the same time the biggest challenge.
▪ At CCC, our BIM-centric work processes have helped us achieve various
organizational, execution and collaboration improvement which led to
better performing project delivery.
BIM AUTHORING – CCC APPROACH
▪ Developed BIM authoring standards to meet contractor
requirements
▪ Established Centers of excellent in Dubai, Cairo, Ramallah
and Athens
▪ StandardWBS: Object Level and progress steps level
▪ Comprehensive EDI with clients, A/E’s and Subcontractors
▪ Developed best practices for scope / change management
LINKINGWITH PROJECT CONTROL
▪ Linking with Estimation
▪ Quantify resource requirements per object: Labor, material and
equipment
▪ Linking with Planning
▪ Determine when resources are needed
▪ Constructability review (4D)
▪ Linking to Document Management :
▪ Engineering status
▪ Required drawings & Specifications per work package.
▪ Linking with ERP/Material Management
LINKINGWITH PROJECT CONTROL
▪ Linking with Quality System
▪ Quantify testing scope,
▪ Assure quality and fast delivery of project
▪ Manage punchlists.
▪ Verify progress
▪ Establish interfaces between trades
▪ Linking with O&M System (WIP)
▪ Help clients to identify requirements as early possible
▪ Assure clients smooth data handover.
BIM HELP US ORGANIZE ANDVISUALIZE
INFORMATION IN A STRUCTURED
APPROACH
WBS
Drawing
Libraries
BIM Universe
OUTPUT FROM BIM Material
WBS
Drawing
Libraries
BOQ
Schedule
Progress
BIM Universe
BIM APPLICATION IN CONSTRUCTION
Concrete
Reinforcing
Bars
Formwork
Cladding / Surface finish
Stages Required
to Finish Column
Quantification and BOQs
ADVANCEDWORK PACKAGING &
WORKFACE PLANNING (AWP/WFP)
▪ Typically, drawings and materials are late causing delays and claims. We
wanted a collaborative way to assure their on-time availability.
▪ In CCC, we define a “Work Front”, it is the multi-disciplined project scope
breakdown with a duration of 1 month. We subdivide the work front into work
packages by crew (including subs).
▪ We define a fragnet as a sequence of operations needed to complete a
workfront.
▪ Front End Loading (FEL) establishes a team of workface planners who have
construction experience. Their role is to identify the required engineering,
procurement and construction resources to complete each work front. A
work front cannot start until most resources are secured.
▪ Planning & progress measurement are based on work fronts
▪ BIM is a key enabler for AWP/WFP.
LEAN CONSTRUCTION
▪ We needed to optimize site work processes.
▪ Lean construction is an adaption of Lean manufacturing and production
principles which aims to improve the construction process primarily through
minimizing waste and maximizing value (Bryde, 2012).
▪ Lean construction subdivides the work into collection of typical workflows by
different crews.
▪ Concentration is on preventing sub-optimization
▪ Lean methodology transfers the detailed planning to the site foremen
through collaborative weekly meetings.
▪ Lean transfers ownership of detailed planning to site staff.
▪ This greatly enhances the confidence in weekly planning.
BIM- AWP - LEAN
The AWP Effect
NegativeImpact
Dependence on
other discipline and
activities.
Lean Effect
Laminar flow of Work
Minimize idle time
Optimize crew usage
Minimize Buffers
IN CONCLUSION
▪ It is a journey to leverage BIM, but it is not hard (Sunway case)
▪ Commitment from top management and buy-in by all players is a must
▪ CCC built it’s own hybrid solution based on international best practices
▪ Open issues:
▪ Owners leadership & role
▪ O&M handover requirements from construction
▪ Imposition vs integration of software tools
FINAL WORDS: TO SUCCEED YOU NEED COLLABORATION,
STRUCTURED DATA AND PLANNING
THANKYOU

Weitere ähnliche Inhalte

Was ist angesagt?

Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013CCT International
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastCCT International
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsCCT International
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIMCCT International
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBuiltEnvironmentUBM
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBuiltEnvironmentUBM
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FMBIM User Day
 
BIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-BuildBIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-BuildAjaz Hasan
 
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...Muriel Walter
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation SlideLee Pei Gie
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case StudyBIM User Day
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3Alfredo Carrato
 
What is bim execution plan why is it important
What is bim execution plan  why is it important What is bim execution plan  why is it important
What is bim execution plan why is it important Krishna Outsourcing
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanCCT International
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1BIM User Day
 

Was ist angesagt? (20)

Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
Zuhair Haddad - 2nd Annual BIM Conference ME September 2013
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
BIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to useBIM SHOW LIVE 14 - Story of BIM from design to use
BIM SHOW LIVE 14 - Story of BIM from design to use
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 
BIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case studyBIM Show Live 2015: Fit-out case study
BIM Show Live 2015: Fit-out case study
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
Bim execution plan
Bim execution planBim execution plan
Bim execution plan
 
BIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-BuildBIM - Changing Perceptions of Design-Build
BIM - Changing Perceptions of Design-Build
 
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...11.30 uur   thomas vandenbergh - uitdagingen bij de introductie van bim binne...
11.30 uur thomas vandenbergh - uitdagingen bij de introductie van bim binne...
 
Pre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution PlansPre and Post Contract BIM Execution Plans
Pre and Post Contract BIM Execution Plans
 
Software Application Presentation Slide
Software Application Presentation SlideSoftware Application Presentation Slide
Software Application Presentation Slide
 
4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study4th Qatar BIM User Day, Case Study
4th Qatar BIM User Day, Case Study
 
BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3BIM Project Execution Plans and Open BIM via IFC2x3
BIM Project Execution Plans and Open BIM via IFC2x3
 
What is bim execution plan why is it important
What is bim execution plan  why is it important What is bim execution plan  why is it important
What is bim execution plan why is it important
 
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi LabbanFiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
Fiatech 2014 - Computer Simulation of Pipe Fabrication, Ramzi Labban
 
1st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #11st Qatar BIM User Day BIM processes Case Study #1
1st Qatar BIM User Day BIM processes Case Study #1
 

Ähnlich wie Make BIM work for you

PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamPMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamHani
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012carolmcnulty
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th JanMartin Brown
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectNguyen Manh Tuan
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Bim and project management
Bim and project managementBim and project management
Bim and project managementOmar Selim
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation SlidesArissa Loh
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxOffshore outsourcing India
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015Aconex
 
5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdfBIM Experts
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planNI BT
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controlsOmar Selim
 

Ähnlich wie Make BIM work for you (20)

PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham SarsamPMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
PMIGLC CQM Discussion Panel on BIM4CQM-Haitham Sarsam
 
Foundation works norwich - 15th october 2012
Foundation works   norwich - 15th october 2012Foundation works   norwich - 15th october 2012
Foundation works norwich - 15th october 2012
 
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire  20th JanContractor Lead BIM: Baxall Construction: CE Lancashire  20th Jan
Contractor Lead BIM: Baxall Construction: CE Lancashire 20th Jan
 
BIM Process & BIM Pilot Project
BIM Process & BIM Pilot ProjectBIM Process & BIM Pilot Project
BIM Process & BIM Pilot Project
 
Spar2010murphy
Spar2010murphySpar2010murphy
Spar2010murphy
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Bim and project management
Bim and project managementBim and project management
Bim and project management
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
atb-brochure.pdf
atb-brochure.pdfatb-brochure.pdf
atb-brochure.pdf
 
GTB-brochure.pdf
GTB-brochure.pdfGTB-brochure.pdf
GTB-brochure.pdf
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
BIM for Baker
BIM for BakerBIM for Baker
BIM for Baker
 
Structural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptxStructural BIM Services | Offshore Outsourcing India.pptx
Structural BIM Services | Offshore Outsourcing India.pptx
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
How BIM Can Accelerate Project-Wide Review Cycles - Webinar, November 11, 2015
 
5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf
 
Know the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution planKnow the project kickoff meeting and project execution plan
Know the project kickoff meeting and project execution plan
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 
Bim and project controls
Bim and project controlsBim and project controls
Bim and project controls
 

Mehr von CCT International

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)CCT International
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeCCT International
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCCCT International
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...CCT International
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...CCT International
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementCCT International
 
Imagine a World Without Isometric
Imagine a World Without IsometricImagine a World Without Isometric
Imagine a World Without IsometricCCT International
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeCCT International
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...CCT International
 
Digital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMITDigital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMITCCT International
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceCCT International
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationCCT International
 
Top 10 BIM Tips for Contractors
Top 10 BIM Tips for ContractorsTop 10 BIM Tips for Contractors
Top 10 BIM Tips for ContractorsCCT International
 
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...CCT International
 

Mehr von CCT International (16)

Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
 
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to PracticeFiatech 2016 - Advanced Work Packaging: from Theory to Practice
Fiatech 2016 - Advanced Work Packaging: from Theory to Practice
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
 
Imagine a World Without Isometric
Imagine a World Without IsometricImagine a World Without Isometric
Imagine a World Without Isometric
 
Advanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to PracticeAdvanced Work Packaging (AWP) - Reduction to Practice
Advanced Work Packaging (AWP) - Reduction to Practice
 
Smart Construction Site
Smart Construction SiteSmart Construction Site
Smart Construction Site
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
Digital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMITDigital Pens - Firas Hijazi - FIATECH and COMIT
Digital Pens - Firas Hijazi - FIATECH and COMIT
 
Advanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a GlanceAdvanced Work Packaging - CCT Solutions at a Glance
Advanced Work Packaging - CCT Solutions at a Glance
 
Advanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life ImplementationAdvanced Work Packaging - Real Life Implementation
Advanced Work Packaging - Real Life Implementation
 
Top 10 BIM Tips for Contractors
Top 10 BIM Tips for ContractorsTop 10 BIM Tips for Contractors
Top 10 BIM Tips for Contractors
 
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
A discrete Event Simulation Model of Asphalt Paving Operations, Ramzi Labban ...
 

Kürzlich hochgeladen

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 

Kürzlich hochgeladen (20)

Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 

Make BIM work for you

  • 1. Dubai, UAE 23 and 24th of May 2016 www.bimconference.me
  • 2. MAKE BIMWORK FORYOU Zuhair Haddad, CIO CCC
  • 3. ANCIENT CHINESE CURSE “MayYou Live in interesting time” …we are really living in interesting times!
  • 4. MAYYOU LIVE IN INTERESTINGTIME
  • 6.
  • 8. DUBAI DECREES BIM – WHY? • Improve project delivery in terms of quality • Enhance coordination and collaboration between stakeholders throughout the project life-cycle • Reduce time and cost • Standardize requirements and specs • Facilitate generation of BOQs • Improve pricing accuracy Ref: Circular 196/2014, 207/2015
  • 10. TECHNOLOGY CAN HELP MEETTHE CHALLENGE Promising Innovations: ▪ BIM ▪ As-built laser scanning, photogrammetry ▪ Drones ▪ IoT ▪ Augmented Reality ▪ 3D Printing ▪ Robotics ▪ Modular construction ▪ AI & Construction simulation Processes: ▪ AdvancedWorkface Packaging ▪ Lean Construction ▪ BPM ▪ BIM-based project control
  • 11. OUR FOCUSTHISYEAR’S CONFERENCE • BIM Based Project Control • Advanced Work Packaging • Lean Construction
  • 12. DEFINITIONS: BIM ▪ BIM is often misunderstood and the focus has mainly been on the 3D models and multi-discipline coordination of design information. The "I" in BIM is the real benefit but in the same time the biggest challenge. ▪ At CCC, our BIM-centric work processes have helped us achieve various organizational, execution and collaboration improvement which led to better performing project delivery.
  • 13. DEFINITIONS: BIM ▪ BIM is often misunderstood and the focus has mainly been on the 3D models and multi-discipline coordination of design information. The "I" in BIM is the real benefit but in the same time the biggest challenge. ▪ At CCC, our BIM-centric work processes have helped us achieve various organizational, execution and collaboration improvement which led to better performing project delivery.
  • 14. BIM AUTHORING – CCC APPROACH ▪ Developed BIM authoring standards to meet contractor requirements ▪ Established Centers of excellent in Dubai, Cairo, Ramallah and Athens ▪ StandardWBS: Object Level and progress steps level ▪ Comprehensive EDI with clients, A/E’s and Subcontractors ▪ Developed best practices for scope / change management
  • 15. LINKINGWITH PROJECT CONTROL ▪ Linking with Estimation ▪ Quantify resource requirements per object: Labor, material and equipment ▪ Linking with Planning ▪ Determine when resources are needed ▪ Constructability review (4D) ▪ Linking to Document Management : ▪ Engineering status ▪ Required drawings & Specifications per work package. ▪ Linking with ERP/Material Management
  • 16. LINKINGWITH PROJECT CONTROL ▪ Linking with Quality System ▪ Quantify testing scope, ▪ Assure quality and fast delivery of project ▪ Manage punchlists. ▪ Verify progress ▪ Establish interfaces between trades ▪ Linking with O&M System (WIP) ▪ Help clients to identify requirements as early possible ▪ Assure clients smooth data handover.
  • 17. BIM HELP US ORGANIZE ANDVISUALIZE INFORMATION IN A STRUCTURED APPROACH WBS Drawing Libraries BIM Universe
  • 18. OUTPUT FROM BIM Material WBS Drawing Libraries BOQ Schedule Progress BIM Universe
  • 19. BIM APPLICATION IN CONSTRUCTION Concrete Reinforcing Bars Formwork Cladding / Surface finish Stages Required to Finish Column Quantification and BOQs
  • 20. ADVANCEDWORK PACKAGING & WORKFACE PLANNING (AWP/WFP) ▪ Typically, drawings and materials are late causing delays and claims. We wanted a collaborative way to assure their on-time availability. ▪ In CCC, we define a “Work Front”, it is the multi-disciplined project scope breakdown with a duration of 1 month. We subdivide the work front into work packages by crew (including subs). ▪ We define a fragnet as a sequence of operations needed to complete a workfront. ▪ Front End Loading (FEL) establishes a team of workface planners who have construction experience. Their role is to identify the required engineering, procurement and construction resources to complete each work front. A work front cannot start until most resources are secured. ▪ Planning & progress measurement are based on work fronts ▪ BIM is a key enabler for AWP/WFP.
  • 21. LEAN CONSTRUCTION ▪ We needed to optimize site work processes. ▪ Lean construction is an adaption of Lean manufacturing and production principles which aims to improve the construction process primarily through minimizing waste and maximizing value (Bryde, 2012). ▪ Lean construction subdivides the work into collection of typical workflows by different crews. ▪ Concentration is on preventing sub-optimization ▪ Lean methodology transfers the detailed planning to the site foremen through collaborative weekly meetings. ▪ Lean transfers ownership of detailed planning to site staff. ▪ This greatly enhances the confidence in weekly planning.
  • 22. BIM- AWP - LEAN The AWP Effect NegativeImpact Dependence on other discipline and activities. Lean Effect Laminar flow of Work Minimize idle time Optimize crew usage Minimize Buffers
  • 23. IN CONCLUSION ▪ It is a journey to leverage BIM, but it is not hard (Sunway case) ▪ Commitment from top management and buy-in by all players is a must ▪ CCC built it’s own hybrid solution based on international best practices ▪ Open issues: ▪ Owners leadership & role ▪ O&M handover requirements from construction ▪ Imposition vs integration of software tools FINAL WORDS: TO SUCCEED YOU NEED COLLABORATION, STRUCTURED DATA AND PLANNING