SlideShare ist ein Scribd-Unternehmen logo
1 von 12
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
CCT Solutions at a Glance
AMR H. ELSERSY, Ph.D.
VP Marketing & Consulting Services
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Who We Are
• CCT was established in 1999, as the technology
arm of a global construction contractor (CCC).
• Our project control solutions are used on
landmark projects.
• Our consulting services are based on proven
long experience in construction
• C3D is our solution for managing construction
based on AWP+ methodology!
• We offer comprehensive solutions for site
management, visual project control, pipeline
construction, testing and commissioning .
• Our mobile solutions are designed for control
of material, welding, progress, crew-based
timesheet, GIS data, etc.
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Challenge
• We’re involved typically in large fast track LSTK
projects.
• We work with many O/O, EP companies who have
different requirements, design & ERP systems, and
work practices.
• Typically, we are faced with large inconsistent
information that we need to process in order to
manage construction.
• Hence, our solutions have to be powerful and
flexible.
• Our solutions should offer effective supply chain
management up to project handover.
• Our mission is to provide visual methods to
manage complex projects effectively.
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
C3D allows users to link 3D objects to multifaceted data in an
object oriented fashion. BIM data is modeled in classes and
hierarchies (PCWBS, OBS, CBS, SBS, RBS, EWP, CWP, IWP etc.).
View BIM data
hierarchies in
any structure
you wish
Sort BIM
components as
needed and by
any class or value
Properties
on the fly
Colorize according
to construction
requirements
(progress,
material shortage,
WFP)
Smooth 3D rendering optimized for very large models
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Relations Creation: C3D allows the user to create links
between classes utilizing sophisticated tools, such as:
– Volumes selection
– Non-Uniform volumes selection (2D Maps)
– Timeline Snippets allowing re-execution of instruction
when changes occurs.
IWPs Definition using volumes
Timelines for Linking
2D Maps
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Data Concurrency
– Temporal database structure
– Data history maintenance via static save, scope and revision
control.
– Geometrical & data comparison of different versions of data
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
Integration:
Having an open architecture, C3D can integrate with several
cost estimation systems, scheduling software, ERP solutions,
etc.
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
C3D in Brief
• Interoperability:
– C3D is a CAD-neutral vendor platform.
– C3D can read from SmartPlant 3D, PDMS, Revit,
Autocad, Microstation, Tekla, IFC, XML (ISO 15926),
STEP (ISO 10303), ACIS SAT, etc.
• Scalability:
– C3D was designed for large projects, capable of handling
multiple models from multiple disciplines.
– Data integration progressively
• Industry Recognition:
– Fiatech, CIFE, ENCORD
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Offering
We offer IT solutions and best practices to help you
manage and integrate various construction data
related to:
– Scope (MTO / BOQ)
– Planning & Scheduling
– Budget / Cost
– Material Procurement and warehousing
– Pre-fabrication and field installation progress.
– Testing and commissioning
– Etc.
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
Our Offering
Our solution, C3D, provide you the means to:
– Build CWPs and IWPs according to schedule and progress
targets.
– Identify in detail the current scope, resources, HSE and QC
requirements to complete these WPs.
– Perform weekly/ monthly look-ahead planning.
– Prioritize between IWPs according to schedule and
commissioning priorities.
– Assure availability of resources.
– Balance work assignments between crews.
– Track & verify progress and site productivity.
– Identify bottleneck operations and resources
– Assure compliance with QC and HSE requirements
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
• Attend our presentation tomorrow at 3:30PM. We
will show in detail AWP implementation in an on-
going project.
• Visit our booth for demos on C3D and other CCT
solutions.
Challenges and Lessons Learned
The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited.
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Session T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSysSession T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSysProject Controls Expo
 
Session T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsSession T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsProject Controls Expo
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo
 
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo
 
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...Project Controls Expo
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo
 
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...Project Controls Expo
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3Elbert Speed III
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital DevelopmentAltair
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunityProject Controls Expo
 
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511REDceo.net
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Aconex
 
AVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsAVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsVanessa Erickson
 
RT332: Measuring Progress and Productivity in Model-based Engineering
RT332: Measuring Progress and Productivity in Model-based EngineeringRT332: Measuring Progress and Productivity in Model-based Engineering
RT332: Measuring Progress and Productivity in Model-based EngineeringAVEVA Group plc
 
Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...AVEVA Group plc
 
AVEVA World Conference NA - Greg Pada, Digital Twin Solutions
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA World Conference NA - Greg Pada, Digital Twin Solutions
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA-Americas
 
AVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA-Americas
 

Was ist angesagt? (20)

Session T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSysSession T2 - Best Practice Project Controls with EcoSys
Session T2 - Best Practice Project Controls with EcoSys
 
Session T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project ControlsSession T6 - Artificial Intelligence Meets Project Controls
Session T6 - Artificial Intelligence Meets Project Controls
 
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
Project Controls Expo 13th Nov 2013 - "From Cost Plan To Bid Evaluation To Co...
 
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
Project Controls Expo - 31st Oct 2012 - Lessons Learned from an Interna.onal ...
 
Advanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation ChallengesAdvanced Work Packaging: Implementation Challenges
Advanced Work Packaging: Implementation Challenges
 
M3 - An overview of High Speed 2
M3 - An overview of High Speed 2M3 - An overview of High Speed 2
M3 - An overview of High Speed 2
 
TC-CV-2015
TC-CV-2015TC-CV-2015
TC-CV-2015
 
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
Project Controls Expo - 31st Oct 2012 - Improving Professionalism in Project ...
 
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
Project Controls Expo - 31st Oct 2012 - Data Integration Throughout the Proje...
 
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...
Session M6 - BIM –Building Information Modellingfood for thought -Chef Master...
 
ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3ELBERT SPEED Liaison Resume 3
ELBERT SPEED Liaison Resume 3
 
CAE for Digital Development
CAE for Digital DevelopmentCAE for Digital Development
CAE for Digital Development
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic Opportunity
 
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511K dev-slides(7)land dev seminar+demo -chuan[2]-200511
K dev-slides(7)land dev seminar+demo -chuan[2]-200511
 
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
Project Collaboration on Infrastructure Megaprojects - Webinar, June 3, 2015
 
AVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker SolutionsAVEVA World Conference NA - Tom Singer, Aker Solutions
AVEVA World Conference NA - Tom Singer, Aker Solutions
 
RT332: Measuring Progress and Productivity in Model-based Engineering
RT332: Measuring Progress and Productivity in Model-based EngineeringRT332: Measuring Progress and Productivity in Model-based Engineering
RT332: Measuring Progress and Productivity in Model-based Engineering
 
Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...Transformational Change in Managing Assets for Operational Excellence by Jan ...
Transformational Change in Managing Assets for Operational Excellence by Jan ...
 
AVEVA World Conference NA - Greg Pada, Digital Twin Solutions
AVEVA World Conference NA - Greg Pada, Digital Twin SolutionsAVEVA World Conference NA - Greg Pada, Digital Twin Solutions
AVEVA World Conference NA - Greg Pada, Digital Twin Solutions
 
AVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsonsAVEVA World Conference NA - Alan Smith, WorleyParsons
AVEVA World Conference NA - Alan Smith, WorleyParsons
 

Ähnlich wie Advanced Work Packaging - CCT Solutions at a Glance

Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith
 
OSL BIMevoke statement
OSL BIMevoke statementOSL BIMevoke statement
OSL BIMevoke statementOSL Rail Ltd
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsCCT International
 
Rajeev Mittal_Jan 17_1
Rajeev Mittal_Jan 17_1Rajeev Mittal_Jan 17_1
Rajeev Mittal_Jan 17_1rajeev mittal
 
Software app slides
Software app slidesSoftware app slides
Software app slidesahmong4
 
Mission-Critical Facilities Design Courses and Credential Programs Brochure
Mission-Critical Facilities Design Courses and Credential Programs BrochureMission-Critical Facilities Design Courses and Credential Programs Brochure
Mission-Critical Facilities Design Courses and Credential Programs BrochureStrategic Media Asia
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineerCADISON
 
Project Engineer
Project EngineerProject Engineer
Project EngineerCADISON
 
Engg services from cdg
Engg services from cdgEngg services from cdg
Engg services from cdgShekar N.
 
AGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESAGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESSinan Saadoun
 
CPD BIM for small engineering practices
CPD BIM for small  engineering practicesCPD BIM for small  engineering practices
CPD BIM for small engineering practicesEwa Ostrowska
 
MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)Paul Worthington
 

Ähnlich wie Advanced Work Packaging - CCT Solutions at a Glance (20)

Adrian Smith CV - 20151113
Adrian Smith CV - 20151113Adrian Smith CV - 20151113
Adrian Smith CV - 20151113
 
OSL BIMevoke statement
OSL BIMevoke statementOSL BIMevoke statement
OSL BIMevoke statement
 
PhoenixEOS
PhoenixEOSPhoenixEOS
PhoenixEOS
 
Leveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution TeamsLeveraging C3D® to Ensure Compliance of Site Execution Teams
Leveraging C3D® to Ensure Compliance of Site Execution Teams
 
Rajeev Mittal_Jan 17_1
Rajeev Mittal_Jan 17_1Rajeev Mittal_Jan 17_1
Rajeev Mittal_Jan 17_1
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Vivek Srivastava-2015
Vivek Srivastava-2015Vivek Srivastava-2015
Vivek Srivastava-2015
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Mission-Critical Facilities Design Courses and Credential Programs Brochure
Mission-Critical Facilities Design Courses and Credential Programs BrochureMission-Critical Facilities Design Courses and Credential Programs Brochure
Mission-Critical Facilities Design Courses and Credential Programs Brochure
 
Sternberger CTO eArchitect CV
Sternberger CTO eArchitect CVSternberger CTO eArchitect CV
Sternberger CTO eArchitect CV
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Cadison project-engineer
Cadison project-engineerCadison project-engineer
Cadison project-engineer
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Engg services from cdg
Engg services from cdgEngg services from cdg
Engg services from cdg
 
AGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICESAGH SMART CONSULTANCY SERVICES
AGH SMART CONSULTANCY SERVICES
 
CPD BIM for small engineering practices
CPD BIM for small  engineering practicesCPD BIM for small  engineering practices
CPD BIM for small engineering practices
 
Srini (1)
Srini (1)Srini (1)
Srini (1)
 
MTECH Project Services (EN)
MTECH Project Services (EN)MTECH Project Services (EN)
MTECH Project Services (EN)
 
SmartPlant Construction
SmartPlant ConstructionSmartPlant Construction
SmartPlant Construction
 
Zeeshan_Jafri_T
Zeeshan_Jafri_TZeeshan_Jafri_T
Zeeshan_Jafri_T
 

Mehr von CCT International

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? CCT International
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryCCT International
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction IndustryCCT International
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)CCT International
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastCCT International
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIMCCT International
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringCCT International
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?CCT International
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...CCT International
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCCCT International
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...CCT International
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...CCT International
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementCCT International
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIMCCT International
 

Mehr von CCT International (20)

BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together? BIM, Lean & Advanced Work Packaging - How do they fit together?
BIM, Lean & Advanced Work Packaging - How do they fit together?
 
Digital Transformation of the Construction Industry
Digital Transformation of the Construction IndustryDigital Transformation of the Construction Industry
Digital Transformation of the Construction Industry
 
BIM In Practice Seminar
BIM In Practice Seminar BIM In Practice Seminar
BIM In Practice Seminar
 
6.0 CURT CII - Digital Transformation of Construction Industry
6.0 CURT CII  - Digital Transformation of Construction Industry6.0 CURT CII  - Digital Transformation of Construction Industry
6.0 CURT CII - Digital Transformation of Construction Industry
 
Adding Intelligence to AWP
Adding Intelligence to AWPAdding Intelligence to AWP
Adding Intelligence to AWP
 
BIM Based Project Controls
BIM Based Project ControlsBIM Based Project Controls
BIM Based Project Controls
 
The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)The Future is Now (5th BIM and Lean Conference 2017)
The Future is Now (5th BIM and Lean Conference 2017)
 
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle EastO&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
O&M Challenge: BIM and Laser Scanning, a Hospital Project from the Middle East
 
Roads, Infrastructure and BIM
Roads, Infrastructure and BIMRoads, Infrastructure and BIM
Roads, Infrastructure and BIM
 
Contractors: Get BIM Ready!
Contractors: Get BIM Ready!Contractors: Get BIM Ready!
Contractors: Get BIM Ready!
 
Designing to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & MonitoringDesigning to Enhance Construction Planning & Monitoring
Designing to Enhance Construction Planning & Monitoring
 
Mandated BIM! Are you ready?
Mandated BIM! Are you ready?Mandated BIM! Are you ready?
Mandated BIM! Are you ready?
 
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
Integrating BIM and LEAN for Project Delivery - Construction of a Major Hospi...
 
Make BIM work for you
Make BIM work for youMake BIM work for you
Make BIM work for you
 
IBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCCIBM Case Study of Maximo Implementation at CCC
IBM Case Study of Maximo Implementation at CCC
 
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
AF-1438: Transportation MUG: CCC's Use of Maximo for Fleet Management on Infr...
 
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
Computer Simulation: Quantifying and Substantiating a Claim for Extension of ...
 
Asset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset ManagementAsset Management - Bridging Boundaries in Ongoing Asset Management
Asset Management - Bridging Boundaries in Ongoing Asset Management
 
Smart Construction Site
Smart Construction SiteSmart Construction Site
Smart Construction Site
 
The Information Challenge Managing Construction with BIM
The Information ChallengeManaging Construction with BIMThe Information ChallengeManaging Construction with BIM
The Information Challenge Managing Construction with BIM
 

Kürzlich hochgeladen

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 

Kürzlich hochgeladen (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 

Advanced Work Packaging - CCT Solutions at a Glance

  • 1. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. CCT Solutions at a Glance AMR H. ELSERSY, Ph.D. VP Marketing & Consulting Services
  • 2. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. Who We Are • CCT was established in 1999, as the technology arm of a global construction contractor (CCC). • Our project control solutions are used on landmark projects. • Our consulting services are based on proven long experience in construction • C3D is our solution for managing construction based on AWP+ methodology! • We offer comprehensive solutions for site management, visual project control, pipeline construction, testing and commissioning . • Our mobile solutions are designed for control of material, welding, progress, crew-based timesheet, GIS data, etc.
  • 3. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. Our Challenge • We’re involved typically in large fast track LSTK projects. • We work with many O/O, EP companies who have different requirements, design & ERP systems, and work practices. • Typically, we are faced with large inconsistent information that we need to process in order to manage construction. • Hence, our solutions have to be powerful and flexible. • Our solutions should offer effective supply chain management up to project handover. • Our mission is to provide visual methods to manage complex projects effectively.
  • 4. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. C3D in Brief C3D allows users to link 3D objects to multifaceted data in an object oriented fashion. BIM data is modeled in classes and hierarchies (PCWBS, OBS, CBS, SBS, RBS, EWP, CWP, IWP etc.). View BIM data hierarchies in any structure you wish Sort BIM components as needed and by any class or value Properties on the fly Colorize according to construction requirements (progress, material shortage, WFP) Smooth 3D rendering optimized for very large models
  • 5. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. C3D in Brief Relations Creation: C3D allows the user to create links between classes utilizing sophisticated tools, such as: – Volumes selection – Non-Uniform volumes selection (2D Maps) – Timeline Snippets allowing re-execution of instruction when changes occurs. IWPs Definition using volumes Timelines for Linking 2D Maps
  • 6. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. C3D in Brief Data Concurrency – Temporal database structure – Data history maintenance via static save, scope and revision control. – Geometrical & data comparison of different versions of data
  • 7. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. C3D in Brief Integration: Having an open architecture, C3D can integrate with several cost estimation systems, scheduling software, ERP solutions, etc.
  • 8. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. C3D in Brief • Interoperability: – C3D is a CAD-neutral vendor platform. – C3D can read from SmartPlant 3D, PDMS, Revit, Autocad, Microstation, Tekla, IFC, XML (ISO 15926), STEP (ISO 10303), ACIS SAT, etc. • Scalability: – C3D was designed for large projects, capable of handling multiple models from multiple disciplines. – Data integration progressively • Industry Recognition: – Fiatech, CIFE, ENCORD
  • 9. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. Our Offering We offer IT solutions and best practices to help you manage and integrate various construction data related to: – Scope (MTO / BOQ) – Planning & Scheduling – Budget / Cost – Material Procurement and warehousing – Pre-fabrication and field installation progress. – Testing and commissioning – Etc.
  • 10. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. Our Offering Our solution, C3D, provide you the means to: – Build CWPs and IWPs according to schedule and progress targets. – Identify in detail the current scope, resources, HSE and QC requirements to complete these WPs. – Perform weekly/ monthly look-ahead planning. – Prioritize between IWPs according to schedule and commissioning priorities. – Assure availability of resources. – Balance work assignments between crews. – Track & verify progress and site productivity. – Identify bottleneck operations and resources – Assure compliance with QC and HSE requirements
  • 11. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. • Attend our presentation tomorrow at 3:30PM. We will show in detail AWP implementation in an on- going project. • Visit our booth for demos on C3D and other CCT solutions. Challenges and Lessons Learned
  • 12. The information in this presentation is Confidential and Proprietary to Computers & Communication Technology (CCT). Reproduction or distribution is prohibited. THANK YOU