SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
CCNA 4 Chapter 9 V4.0
Labels: CCNA 4 Chapter 9 V4.0
1
Which two statements describe factors that influence the layout of a
proposal? (Choose two.)
Proposal layouts are required to use sans serif typefaces.
A specific proposal layout is followed when one is specified in the RFP.
A designer chooses the layout if a written RFP does not specify an outline.
The software that is used to create the proposal dictates the proposal layouts.
Proposal layouts are required to use a format that is designed by the network engineer.
2
What two items are typically included in the executive summary of a
proposal? (Choose two.)
project scope summary
high-level implementation plan
quotes for all needed equipment
technical requirements for the design
emphasis on the benefits that meet the goals of the customer
3
Which proposal section describes the intended routing protocol, security
mechanisms, and addressing for the planned network?
logical design
physical design
executive summary
implementation plan
network requirements
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
4
Which occurrence would indicate a failure of the design phase?
The incorrect model switches were ordered.
There is no customer signoff for task completion.
New requirements are identified after implementation begins.
The new network capacity is inadequate to support required traffic.
5
A network installation team is assigned to replace all core switches in an
existing data center. No other upgrades are planned. Which kind of installation is this?
a new installation
a fork-lift installation
a phased installation
a green field installation
6
What service is provided Cisco standard warranty?
software application maintenance
replacement of defected hardware
next business day delivery of replacement parts
access to the Cisco Technical Assistance Center (TAC) 24 hours a day, 7 days a week
7
An upgraded version of the Cisco IOS has been purchased. However,
the CD arrived damaged. How will this loss be covered?
a hardware warranty
a software warranty
the Cisco SMARTnet Service
an additional service contract
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
8
A company informs the account manager that the installation of a new
edge router at the customer remote branch location cannot be done at the scheduled
time
because of a large order that the branch office needs to complete. As a result, the end
date of the
project must be adjusted to accommodate the additional time. What is the action
should the
account manager take?
Cancel the order for the new edge router.
Work with designer to redesign the branch network.
Instruct the technician to complete the install of the router at on the date in the
contract.
Adjust the timeline documentation to show the company how the delay will affect the
project completion date.
9
NetworkingCompany completes the installation of a network upgrade for
a retail customer. All of the onsite tests complete successfully and the customer IT
staff approves
the results of the tests. The manager of the retail store contacts NetworkingCompany
to inform
the company that the store will not pay for the upgrade until a recently purchased
software
package is installed and tested on the network. Which two items that are contained in
the
proposal can the account manager refer to when discussing this issue with the store
manager?(Choose two.)
the project scope
the bill-of-material
the project timeline
the terms and conditions
the business goals of the customer
the evaluation of the current network
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
10
The operation of a new branch location network is delayed because a
VPN cannot be configured and established between the branch location and the main
office. It is
determined that the router at the main office does not have enough memory and does
not have
the correct Cisco IOS version image to support the VPN features. To prevent this
delay, this
problem should have been identified and corrected during which part of the design
project?
the preparation of the business case
the prioritizing of the technical goals
the characterization of the existing network
the implementation of the approved design
11
The NetworkingCompany team is tasked to prepare an implementation
schedule for a customer. It is determined that the new firewalls and wireless
controllers that are
specified in the design cannot be delivered and installed within the agreed upon time
frame. The
NetworkingCompany informs the customer of the problem. What two options can the
NetworkingCompany team take to ensure the success of the project? (Choose two.)
plan to add additional staff and resources to shorten the installation time after the new
equipment is delivered
eliminate redundancy in the design to reduce the amount of equipment that is needed
renegotiate a new time frame with the customer to accommodate the delay
delay the installation of the security devices and controllers until a later time
redesign the network to use only readily available equipment and software
12
AAA Financial Services Company is performing implementation planning
for a core switch upgrade. The company has 200 financial software programmers that
work
billable hours during the week. They have critical, scheduled money transfer
transmissions that
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
occur at hourly intervals every night. There are two, two-hour long IT maintenance
windows
scheduled for software upgrades, one on Saturday and one on Sunday. The bank
advertises
online banking as available 24 hours on business days and 21 hours on the weekends.
However,
a network upgrade that is necessary to replace some switches is expected to take four
hours.
Because of rack constraints, this time includes three hours to remove the old switches
before the
new switches can be installed and one hour to test the logical configuration. How
should the
implementation scheduling be handled
Defer the software upgrades. Use the Saturday window to perform the hardware
installation. Use the Sunday window to perform the logical testing.
Coordinate and publish a separate four-hour downtime during Friday to perform the
complete switch installation and testing process. Use the Saturday and Sunday
windows to
correct any outage problems after the Friday window.
Coordinate and publish two, four-hour downtimes incorporating the published
Saturday
and Sunday windows. Defer any software upgrades until the new network is proven to
be working
correctly with the old software. Use the Sunday window as a fallback scheduling
period if there
are problems necessitating backing out of the Saturday window.
Coordinate and publish an eight-hour downtime incorporating the Saturday window.
This
will allow four hours for installation and logical testing, one hour for troubleshooting
and decision,
and three hours to roll back to the previous configuration if the new switching cannot
pass the
logical testing. Defer any software upgrades until the new network is proven to be
working
correctly with the old software.
13
Included in a Bill of Materials (BOM) for a SOHO wired implementation is
a Cisco 2811 router, Catalyst 2560 switch, four PCs, three laptops, and a networked
printer.
Wireless LAN capability will be implemented on this network. Which two equipment
types must be
added to the BOM to implement this request? (Choose two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
DNS server
LAN switch
wireless NICs
DHCP server
wireless access points
14
A customer has just taken delivery of a Cisco 2811 router and Catalyst
3560 switch. Included with the purchase is the SMARTnet Service. Which two
resources are
included with SMARTnet Service? (Choose two.)
signature file updates
technical support from TAC
maintenance releases for OS
software application major releases
software application maintenance and minor releases
15
A Cisco 1841 router has been purchased without an agreement for
SMARTnet Service. What two items are guaranteed under the standard warranty?
(Choose two.)
access to TAC
replacement of defective physical media
advanced replacement of hardware parts
access to a renewable standard warranty contract
under normal use, replacement of defective hardware
16
Upon completion of a proposal, a network design team must sell their
ideas to two key stakeholders. Who are these two stakeholders? (Choose two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
customers
licensing boards
cabling contractors
internal management
project implementation team
17
What are two important guidelines when creating a slide presentation for
a meeting with a customer? (Choose two.)
Use all capital letters on words and phrases when possible for added emphasis.
Provide varied background graphics to enhance viewer interest.
Use contrasting colors for background and text to aid visibility.
Change fonts frequently to denote differences in subject matter.
Use bulleted text to lead the discussion.
18
In order to finalize a project proposal, an account manager of a
networking company creates the terms and conditions section. What are two clauses
that should
be included in this section? (Choose two.)
cost summary
installation steps
change order procedures
problem resolution process
maintenance contract quotation
19
Which two items will a systems engineer include in an implementation plan? (Choose
two.)
CCNA Discovery 4.1 - CCNA Discovery Answers
http://ccna-discovery-4.blogspot.com/
references to design documents
the business goals of the customer
diagrams of the existing traffic flows
the steps to install and test the network
cost of each network device and component
20
Which statement describes a phased installation into an existing network?
A phased installation generally takes less time and expense than a green-field
installation.
A phased installation is not suitable for large, multi-site network installations or
upgrades.
A phased installation requires detailed planning in order to avoid disruption of user
services.
A phased installation involves building an entire replacement network and migrating
users
over to it.

Weitere ähnliche Inhalte

Was ist angesagt?

NeilBrittleton Current CV
NeilBrittleton Current CVNeilBrittleton Current CV
NeilBrittleton Current CV
Neil Brittleton
 
12.1.3 Patch Baseline and Strategy
12.1.3 Patch Baseline and Strategy12.1.3 Patch Baseline and Strategy
12.1.3 Patch Baseline and Strategy
David Kelly
 
Speed up system deployment with Dell Connected Configuration services
Speed up system deployment with Dell Connected Configuration servicesSpeed up system deployment with Dell Connected Configuration services
Speed up system deployment with Dell Connected Configuration services
Principled Technologies
 
GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02
Albert Escala
 
Chuck_Roden_Resume
Chuck_Roden_ResumeChuck_Roden_Resume
Chuck_Roden_Resume
Chuck Roden
 
WANO - IND - Product Presentation
WANO - IND - Product PresentationWANO - IND - Product Presentation
WANO - IND - Product Presentation
Yudi Rachman
 

Was ist angesagt? (20)

Oracle EBS Upgrade to 12.2.5.1
Oracle EBS Upgrade to 12.2.5.1Oracle EBS Upgrade to 12.2.5.1
Oracle EBS Upgrade to 12.2.5.1
 
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1
Collaborate 2014 OAUG - EBS 11i Upgrade to R12 - Compare versions 12.2 vs 12.1
 
NeilBrittleton Current CV
NeilBrittleton Current CVNeilBrittleton Current CV
NeilBrittleton Current CV
 
Dell EMC™ ProDeploy set up a production-ready environment in less time and fe...
Dell EMC™ ProDeploy set up a production-ready environment in less time and fe...Dell EMC™ ProDeploy set up a production-ready environment in less time and fe...
Dell EMC™ ProDeploy set up a production-ready environment in less time and fe...
 
Ensuring Design Quality in Mixed Signal IP
Ensuring Design Quality in Mixed Signal IPEnsuring Design Quality in Mixed Signal IP
Ensuring Design Quality in Mixed Signal IP
 
P6 professional standalone_install_and_config_guide
P6 professional standalone_install_and_config_guideP6 professional standalone_install_and_config_guide
P6 professional standalone_install_and_config_guide
 
12.1.3 Patch Baseline and Strategy
12.1.3 Patch Baseline and Strategy12.1.3 Patch Baseline and Strategy
12.1.3 Patch Baseline and Strategy
 
ArcSight Management Center 2.1 Release Notes
ArcSight Management Center 2.1 Release NotesArcSight Management Center 2.1 Release Notes
ArcSight Management Center 2.1 Release Notes
 
EBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-givenEBS 12.1 and 12.2 strategy-roadmap-given
EBS 12.1 and 12.2 strategy-roadmap-given
 
10 Tips for Successful 12.2 Upgrade
10 Tips for Successful 12.2 Upgrade10 Tips for Successful 12.2 Upgrade
10 Tips for Successful 12.2 Upgrade
 
ArcSight Management Center 2.2 Release Notes.pdf
ArcSight Management Center 2.2 Release Notes.pdfArcSight Management Center 2.2 Release Notes.pdf
ArcSight Management Center 2.2 Release Notes.pdf
 
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2OOW15 - technical upgrade best practices for oracle e-business suite 12.2
OOW15 - technical upgrade best practices for oracle e-business suite 12.2
 
Speed up system deployment with Dell Connected Configuration services
Speed up system deployment with Dell Connected Configuration servicesSpeed up system deployment with Dell Connected Configuration services
Speed up system deployment with Dell Connected Configuration services
 
GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02GenerationRFID_Corp_2015_02
GenerationRFID_Corp_2015_02
 
Final ppt
Final pptFinal ppt
Final ppt
 
Riverbed Software Defined IT Survey
Riverbed Software Defined IT SurveyRiverbed Software Defined IT Survey
Riverbed Software Defined IT Survey
 
How to deploy AppInternals in azure
How to deploy AppInternals in azureHow to deploy AppInternals in azure
How to deploy AppInternals in azure
 
Chuck_Roden_Resume
Chuck_Roden_ResumeChuck_Roden_Resume
Chuck_Roden_Resume
 
Jack williams resume updated 1 2016
Jack williams resume updated 1 2016Jack williams resume updated 1 2016
Jack williams resume updated 1 2016
 
WANO - IND - Product Presentation
WANO - IND - Product PresentationWANO - IND - Product Presentation
WANO - IND - Product Presentation
 

Andere mochten auch

Ccna 4 chapter 2 v4.0 answers 2011
Ccna 4 chapter 2 v4.0 answers 2011Ccna 4 chapter 2 v4.0 answers 2011
Ccna 4 chapter 2 v4.0 answers 2011
Dân Chơi
 
Ccna 4 chapter 1 v4.0 answers 2011
Ccna 4 chapter 1 v4.0 answers 2011Ccna 4 chapter 1 v4.0 answers 2011
Ccna 4 chapter 1 v4.0 answers 2011
Dân Chơi
 
Ccna 4 chapter 6 v4.0 answers 2011
Ccna 4 chapter 6 v4.0 answers 2011Ccna 4 chapter 6 v4.0 answers 2011
Ccna 4 chapter 6 v4.0 answers 2011
Dân Chơi
 
Ccna 4 chapter 3 v4.0 answers 2011
Ccna 4 chapter 3 v4.0 answers 2011Ccna 4 chapter 3 v4.0 answers 2011
Ccna 4 chapter 3 v4.0 answers 2011
Dân Chơi
 

Andere mochten auch (10)

Ccna 4 Chapter 5 V4.0 Answers
Ccna 4 Chapter 5 V4.0 AnswersCcna 4 Chapter 5 V4.0 Answers
Ccna 4 Chapter 5 V4.0 Answers
 
Ccna 4 chapter 2 v4.0 answers 2011
Ccna 4 chapter 2 v4.0 answers 2011Ccna 4 chapter 2 v4.0 answers 2011
Ccna 4 chapter 2 v4.0 answers 2011
 
Ccna 4 chapter 1 v4.0 answers 2011
Ccna 4 chapter 1 v4.0 answers 2011Ccna 4 chapter 1 v4.0 answers 2011
Ccna 4 chapter 1 v4.0 answers 2011
 
Ccna 4 chapter 6 v4.0 answers 2011
Ccna 4 chapter 6 v4.0 answers 2011Ccna 4 chapter 6 v4.0 answers 2011
Ccna 4 chapter 6 v4.0 answers 2011
 
Ccna 4 chapter 8 v4.0 answers 2011
Ccna 4 chapter 8 v4.0 answers 2011Ccna 4 chapter 8 v4.0 answers 2011
Ccna 4 chapter 8 v4.0 answers 2011
 
Ccna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 AnswersCcna 4 Chapter 7 V4.0 Answers
Ccna 4 Chapter 7 V4.0 Answers
 
Ccna 4 Chapter 8 V4.0 Answers
Ccna 4 Chapter 8 V4.0 AnswersCcna 4 Chapter 8 V4.0 Answers
Ccna 4 Chapter 8 V4.0 Answers
 
Ccna 4 chapter 3 v4.0 answers 2011
Ccna 4 chapter 3 v4.0 answers 2011Ccna 4 chapter 3 v4.0 answers 2011
Ccna 4 chapter 3 v4.0 answers 2011
 
FS6 Episode 1: On Becoming a Teacher
FS6 Episode 1: On Becoming a TeacherFS6 Episode 1: On Becoming a Teacher
FS6 Episode 1: On Becoming a Teacher
 
Field study 6
Field study 6Field study 6
Field study 6
 

Ähnlich wie Ccna 4 Chapter 9 V4.0 Answers

IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docx
priestmanmable
 
Running head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docxRunning head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docx
todd271
 
Solution scope
Solution scopeSolution scope
Solution scope
Limen Spot
 
VMWorld 2004 - Justifying the transition from Physical to Virtual
VMWorld 2004 - Justifying the transition from Physical to VirtualVMWorld 2004 - Justifying the transition from Physical to Virtual
VMWorld 2004 - Justifying the transition from Physical to Virtual
David Kent
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docx
stirlingvwriters
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol
TatianaMajor22
 
It Project Workflow Document
It Project Workflow DocumentIt Project Workflow Document
It Project Workflow Document
cacmk5
 

Ähnlich wie Ccna 4 Chapter 9 V4.0 Answers (20)

FinalDocument
FinalDocumentFinalDocument
FinalDocument
 
IT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docxIT327-1404A-01 Implementing, Managing and Mainta.docx
IT327-1404A-01 Implementing, Managing and Mainta.docx
 
Running head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docxRunning head CIS 532 Term PaperAssignment 5 .docx
Running head CIS 532 Term PaperAssignment 5 .docx
 
Network upgrade
Network upgradeNetwork upgrade
Network upgrade
 
181472589 basis project report
181472589  basis project report181472589  basis project report
181472589 basis project report
 
Solution scope
Solution scopeSolution scope
Solution scope
 
Ccna 4 Chapter 3 V4.0 Answers
Ccna 4 Chapter 3 V4.0 AnswersCcna 4 Chapter 3 V4.0 Answers
Ccna 4 Chapter 3 V4.0 Answers
 
Project Plan
Project PlanProject Plan
Project Plan
 
Network Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping QuarterNetwork Developement Capstone Project 2009 Sping Quarter
Network Developement Capstone Project 2009 Sping Quarter
 
VMWorld 2004 - Justifying the transition from Physical to Virtual
VMWorld 2004 - Justifying the transition from Physical to VirtualVMWorld 2004 - Justifying the transition from Physical to Virtual
VMWorld 2004 - Justifying the transition from Physical to Virtual
 
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
IRJET-  	  Implementation of Dynamic Internetworking in the Real World it DomainIRJET-  	  Implementation of Dynamic Internetworking in the Real World it Domain
IRJET- Implementation of Dynamic Internetworking in the Real World it Domain
 
Cis 293 Extraordinary Success/newtonhelp.com
Cis 293 Extraordinary Success/newtonhelp.com  Cis 293 Extraordinary Success/newtonhelp.com
Cis 293 Extraordinary Success/newtonhelp.com
 
Capstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docxCapstone project IT Management 17 page due in 48 hours.docx
Capstone project IT Management 17 page due in 48 hours.docx
 
Ccna 4 Chapter 4 V4.0 Answers
Ccna 4 Chapter 4 V4.0 AnswersCcna 4 Chapter 4 V4.0 Answers
Ccna 4 Chapter 4 V4.0 Answers
 
Device Programmability with Cisco Plug-n-Play Solution
Device Programmability with Cisco Plug-n-Play SolutionDevice Programmability with Cisco Plug-n-Play Solution
Device Programmability with Cisco Plug-n-Play Solution
 
Cis 175 Enthusiastic Study / snaptutorial.com
Cis 175 Enthusiastic Study / snaptutorial.comCis 175 Enthusiastic Study / snaptutorial.com
Cis 175 Enthusiastic Study / snaptutorial.com
 
Cis 175 Success Begins / snaptutorial.com
Cis 175 Success Begins / snaptutorial.comCis 175 Success Begins / snaptutorial.com
Cis 175 Success Begins / snaptutorial.com
 
1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol1. Final Project - This project provides you an opportunity to sol
1. Final Project - This project provides you an opportunity to sol
 
CIS 293 Imagine Your Future/newtonhelp.com   
CIS 293 Imagine Your Future/newtonhelp.com   CIS 293 Imagine Your Future/newtonhelp.com   
CIS 293 Imagine Your Future/newtonhelp.com   
 
It Project Workflow Document
It Project Workflow DocumentIt Project Workflow Document
It Project Workflow Document
 

Mehr von ccna4discovery

Mehr von ccna4discovery (7)

Ccna 4 Chapter 1 V4.0 Answers
Ccna 4 Chapter 1 V4.0 AnswersCcna 4 Chapter 1 V4.0 Answers
Ccna 4 Chapter 1 V4.0 Answers
 
Ccna 3 Final V4.0 Answers
Ccna 3 Final V4.0 AnswersCcna 3 Final V4.0 Answers
Ccna 3 Final V4.0 Answers
 
Ccna 3 Chapter 9 V4.0 Answers
Ccna 3 Chapter 9 V4.0 AnswersCcna 3 Chapter 9 V4.0 Answers
Ccna 3 Chapter 9 V4.0 Answers
 
Ccna 3 Chapter 6 V4.0 Answers
Ccna 3 Chapter 6 V4.0 AnswersCcna 3 Chapter 6 V4.0 Answers
Ccna 3 Chapter 6 V4.0 Answers
 
Ccna 2 Chapter 8 V4.1 Answers
Ccna 2 Chapter 8 V4.1 AnswersCcna 2 Chapter 8 V4.1 Answers
Ccna 2 Chapter 8 V4.1 Answers
 
Ccna 2 Chapter 8 V4.0 Answers
Ccna 2 Chapter 8 V4.0 AnswersCcna 2 Chapter 8 V4.0 Answers
Ccna 2 Chapter 8 V4.0 Answers
 
Ccna 1 Chapter 1 V4.0 Answers
Ccna 1 Chapter 1 V4.0 AnswersCcna 1 Chapter 1 V4.0 Answers
Ccna 1 Chapter 1 V4.0 Answers
 

Kürzlich hochgeladen

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Kürzlich hochgeladen (20)

Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

Ccna 4 Chapter 9 V4.0 Answers

  • 1. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ CCNA 4 Chapter 9 V4.0 Labels: CCNA 4 Chapter 9 V4.0 1 Which two statements describe factors that influence the layout of a proposal? (Choose two.) Proposal layouts are required to use sans serif typefaces. A specific proposal layout is followed when one is specified in the RFP. A designer chooses the layout if a written RFP does not specify an outline. The software that is used to create the proposal dictates the proposal layouts. Proposal layouts are required to use a format that is designed by the network engineer. 2 What two items are typically included in the executive summary of a proposal? (Choose two.) project scope summary high-level implementation plan quotes for all needed equipment technical requirements for the design emphasis on the benefits that meet the goals of the customer 3 Which proposal section describes the intended routing protocol, security mechanisms, and addressing for the planned network? logical design physical design executive summary implementation plan network requirements
  • 2. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ 4 Which occurrence would indicate a failure of the design phase? The incorrect model switches were ordered. There is no customer signoff for task completion. New requirements are identified after implementation begins. The new network capacity is inadequate to support required traffic. 5 A network installation team is assigned to replace all core switches in an existing data center. No other upgrades are planned. Which kind of installation is this? a new installation a fork-lift installation a phased installation a green field installation 6 What service is provided Cisco standard warranty? software application maintenance replacement of defected hardware next business day delivery of replacement parts access to the Cisco Technical Assistance Center (TAC) 24 hours a day, 7 days a week 7 An upgraded version of the Cisco IOS has been purchased. However, the CD arrived damaged. How will this loss be covered? a hardware warranty a software warranty the Cisco SMARTnet Service an additional service contract
  • 3. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ 8 A company informs the account manager that the installation of a new edge router at the customer remote branch location cannot be done at the scheduled time because of a large order that the branch office needs to complete. As a result, the end date of the project must be adjusted to accommodate the additional time. What is the action should the account manager take? Cancel the order for the new edge router. Work with designer to redesign the branch network. Instruct the technician to complete the install of the router at on the date in the contract. Adjust the timeline documentation to show the company how the delay will affect the project completion date. 9 NetworkingCompany completes the installation of a network upgrade for a retail customer. All of the onsite tests complete successfully and the customer IT staff approves the results of the tests. The manager of the retail store contacts NetworkingCompany to inform the company that the store will not pay for the upgrade until a recently purchased software package is installed and tested on the network. Which two items that are contained in the proposal can the account manager refer to when discussing this issue with the store manager?(Choose two.) the project scope the bill-of-material the project timeline the terms and conditions the business goals of the customer the evaluation of the current network
  • 4. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ 10 The operation of a new branch location network is delayed because a VPN cannot be configured and established between the branch location and the main office. It is determined that the router at the main office does not have enough memory and does not have the correct Cisco IOS version image to support the VPN features. To prevent this delay, this problem should have been identified and corrected during which part of the design project? the preparation of the business case the prioritizing of the technical goals the characterization of the existing network the implementation of the approved design 11 The NetworkingCompany team is tasked to prepare an implementation schedule for a customer. It is determined that the new firewalls and wireless controllers that are specified in the design cannot be delivered and installed within the agreed upon time frame. The NetworkingCompany informs the customer of the problem. What two options can the NetworkingCompany team take to ensure the success of the project? (Choose two.) plan to add additional staff and resources to shorten the installation time after the new equipment is delivered eliminate redundancy in the design to reduce the amount of equipment that is needed renegotiate a new time frame with the customer to accommodate the delay delay the installation of the security devices and controllers until a later time redesign the network to use only readily available equipment and software 12 AAA Financial Services Company is performing implementation planning for a core switch upgrade. The company has 200 financial software programmers that work billable hours during the week. They have critical, scheduled money transfer transmissions that
  • 5. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ occur at hourly intervals every night. There are two, two-hour long IT maintenance windows scheduled for software upgrades, one on Saturday and one on Sunday. The bank advertises online banking as available 24 hours on business days and 21 hours on the weekends. However, a network upgrade that is necessary to replace some switches is expected to take four hours. Because of rack constraints, this time includes three hours to remove the old switches before the new switches can be installed and one hour to test the logical configuration. How should the implementation scheduling be handled Defer the software upgrades. Use the Saturday window to perform the hardware installation. Use the Sunday window to perform the logical testing. Coordinate and publish a separate four-hour downtime during Friday to perform the complete switch installation and testing process. Use the Saturday and Sunday windows to correct any outage problems after the Friday window. Coordinate and publish two, four-hour downtimes incorporating the published Saturday and Sunday windows. Defer any software upgrades until the new network is proven to be working correctly with the old software. Use the Sunday window as a fallback scheduling period if there are problems necessitating backing out of the Saturday window. Coordinate and publish an eight-hour downtime incorporating the Saturday window. This will allow four hours for installation and logical testing, one hour for troubleshooting and decision, and three hours to roll back to the previous configuration if the new switching cannot pass the logical testing. Defer any software upgrades until the new network is proven to be working correctly with the old software. 13 Included in a Bill of Materials (BOM) for a SOHO wired implementation is a Cisco 2811 router, Catalyst 2560 switch, four PCs, three laptops, and a networked printer. Wireless LAN capability will be implemented on this network. Which two equipment types must be added to the BOM to implement this request? (Choose two.)
  • 6. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ DNS server LAN switch wireless NICs DHCP server wireless access points 14 A customer has just taken delivery of a Cisco 2811 router and Catalyst 3560 switch. Included with the purchase is the SMARTnet Service. Which two resources are included with SMARTnet Service? (Choose two.) signature file updates technical support from TAC maintenance releases for OS software application major releases software application maintenance and minor releases 15 A Cisco 1841 router has been purchased without an agreement for SMARTnet Service. What two items are guaranteed under the standard warranty? (Choose two.) access to TAC replacement of defective physical media advanced replacement of hardware parts access to a renewable standard warranty contract under normal use, replacement of defective hardware 16 Upon completion of a proposal, a network design team must sell their ideas to two key stakeholders. Who are these two stakeholders? (Choose two.)
  • 7. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ customers licensing boards cabling contractors internal management project implementation team 17 What are two important guidelines when creating a slide presentation for a meeting with a customer? (Choose two.) Use all capital letters on words and phrases when possible for added emphasis. Provide varied background graphics to enhance viewer interest. Use contrasting colors for background and text to aid visibility. Change fonts frequently to denote differences in subject matter. Use bulleted text to lead the discussion. 18 In order to finalize a project proposal, an account manager of a networking company creates the terms and conditions section. What are two clauses that should be included in this section? (Choose two.) cost summary installation steps change order procedures problem resolution process maintenance contract quotation 19 Which two items will a systems engineer include in an implementation plan? (Choose two.)
  • 8. CCNA Discovery 4.1 - CCNA Discovery Answers http://ccna-discovery-4.blogspot.com/ references to design documents the business goals of the customer diagrams of the existing traffic flows the steps to install and test the network cost of each network device and component 20 Which statement describes a phased installation into an existing network? A phased installation generally takes less time and expense than a green-field installation. A phased installation is not suitable for large, multi-site network installations or upgrades. A phased installation requires detailed planning in order to avoid disruption of user services. A phased installation involves building an entire replacement network and migrating users over to it.