Cost Engineering Knowledgebases
Cost Engineering Knowledgebases


> Cost Engineering Knowledgebases contain the 
  cost assemblies based on DACE
> Each assembly is built up of details for material, 
  labour and rental
> Multi‐disciplinary (piping, E&I, Equipment, Civil, 
  etc.)
> Allows for fast estimating, while maintaining the 
  details
> Based on detailed data qualifications
> Quick‐reference card

                 >www.costengineering.eu
Cost Assembly




www.costengineering.eu
Unit-Rate


>   General description
>   Direct hours
>   Activity
>   Rate
>   Productivity
>   Indirect




                      >www.costengineering.eu
DACE
Publication




              6
Standardisation of “Labour norms”



> Initiative of the DACE workgroup
> Improve communication between 
  involved parties
> Avoid discussion by definitions
> Evolved from Linde’s dataset



                 www.costengineering.eu
Data Qualifications



>   Direct labour norms: activity description
>   Only hours, no pricing or rates
>   Definition of indirect costs
>   Composition of labour rates
>   Applicable factors 
>   Europe



                       www.costengineering.eu
Data Qualifications
Construction of the hourly rate
The hourly rate included:
   > The direct costs of the relevant staff till the range or 
     position of the cooperating foreman, including payroll 
     tax, social security, holiday pay, holidays, ATV days as 
     well as health insurance, accident and pension 
     insurance, profit, bonuses, transport costs, travel time, 
     normal travel expenses  commuter traffic and all further 
     indirect costs.
   > The costs for the use of normal hand tools and 
     protective clothing.
   > The costs for the use personal safety, such as safety 
     shoes, helmets, safety glass, gloves and work clothing
Productivity / efficiency
Productivity


  Definition
> Labour productivity is a relative measure for the labour 
  efficiency against a norm has been established based on 
  experience. It is a common misconception that labour 
  productivity really means “working hard”.

> Labour productivity is a function based on a number of specific 
  variables such as the organisation, the equipment and the 
  motivation of the people involved.
Productivity / efficiency, Bedaux
Productivity


  Specific site conditions
> Material costs have a tendency to be 5‐10% higher on a 
  renovation project than in greenfield development.
> Man hours can be 10‐50% higher and  detail engineering can be 
  about 50% higher.
> The unexpected cost is also in need of a much higher 
  percentage.
Cost Engineering
Knowledgebases




                   15

Weitere ähnliche Inhalte

Was ist angesagt?

Cost Engineering for Turn Arounds
Cost Engineering for Turn AroundsCost Engineering for Turn Arounds
Cost Engineering for Turn AroundsMartin van Vliet
 
Cost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostCost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostYudi Setiawan
 
AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01John Blodgett
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity SurveyingLIJI A
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimateArpit Sethia
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9Moustafa Ismail Abu Dief
 
Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricingAjinkya Deshpande
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorSyafiq Deen
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimateLIJI A
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1ArunRavi43
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 

Was ist angesagt? (20)

Cost Engineering for Turn Arounds
Cost Engineering for Turn AroundsCost Engineering for Turn Arounds
Cost Engineering for Turn Arounds
 
Cost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total CostCost Estimators Cost Engineeringand Total Cost
Cost Estimators Cost Engineeringand Total Cost
 
AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01AACE Cost Engineering Journal ce15-01
AACE Cost Engineering Journal ce15-01
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
Marta Gou Presentation
Marta Gou PresentationMarta Gou Presentation
Marta Gou Presentation
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Chris Wright CV December 2015
Chris Wright CV December 2015Chris Wright CV December 2015
Chris Wright CV December 2015
 
Paint Shop Mods
Paint Shop ModsPaint Shop Mods
Paint Shop Mods
 
Costing_Actual spendings & pricing
Costing_Actual spendings & pricingCosting_Actual spendings & pricing
Costing_Actual spendings & pricing
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Ppv ppt
Ppv pptPpv ppt
Ppv ppt
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Contract costing
Contract costingContract costing
Contract costing
 
2# types of estimate
2# types of estimate2# types of estimate
2# types of estimate
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 

Ähnlich wie Cleopatra Enterprise and DACE Labour Norms

Economic justification of npd project and financial tools
Economic justification of npd project and financial toolsEconomic justification of npd project and financial tools
Economic justification of npd project and financial toolsOmid Aminzadeh Gohari
 
Airways (case study)
Airways (case study)Airways (case study)
Airways (case study)Intergen
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimationBich Lien Pham
 
UNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxUNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxENOCK13
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimatesnagashree123
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineeringAnirudh Goyal
 
Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance TECOSIM Group
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cnAmr elmasry
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docselam49
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docselam49
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureLaurianneSchillesDur
 
Md Danish Resume
Md Danish ResumeMd Danish Resume
Md Danish ResumeDanish Zia
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10Moustafa Ismail Abu Dief
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 

Ähnlich wie Cleopatra Enterprise and DACE Labour Norms (20)

Economic justification of npd project and financial tools
Economic justification of npd project and financial toolsEconomic justification of npd project and financial tools
Economic justification of npd project and financial tools
 
Cost accounting
Cost accountingCost accounting
Cost accounting
 
Chapter 07
Chapter 07Chapter 07
Chapter 07
 
COST ACCOUNTING.pptx
COST ACCOUNTING.pptxCOST ACCOUNTING.pptx
COST ACCOUNTING.pptx
 
Airways (case study)
Airways (case study)Airways (case study)
Airways (case study)
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
Chapter 15 cost estimation
Chapter 15   cost estimationChapter 15   cost estimation
Chapter 15 cost estimation
 
UNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptxUNIT 1 JOB COSTING (1).pptx
UNIT 1 JOB COSTING (1).pptx
 
MBA Presentation
MBA PresentationMBA Presentation
MBA Presentation
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Maintenance engineering
Maintenance engineeringMaintenance engineering
Maintenance engineering
 
Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance Facts and Figures 2015 - TECOSIM at a glance
Facts and Figures 2015 - TECOSIM at a glance
 
Amr Said_CV_2017cn
Amr Said_CV_2017cnAmr Said_CV_2017cn
Amr Said_CV_2017cn
 
MBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.docMBA UNIT 7 PROJECT FINANCE.doc
MBA UNIT 7 PROJECT FINANCE.doc
 
MBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.docMBA UNIT VII PROJECT FINANCE-1.doc
MBA UNIT VII PROJECT FINANCE-1.doc
 
Cost Estimation
Cost EstimationCost Estimation
Cost Estimation
 
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable futureEngineering & Construction 4.0 – A Digital pathway to a more profitable future
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
 
Md Danish Resume
Md Danish ResumeMd Danish Resume
Md Danish Resume
 
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10 Ss 05 Cost engineering management  training- nov 2017 - moustafa part ii ch 10
Ss 05 Cost engineering management training- nov 2017 - moustafa part ii ch 10
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 

Kürzlich hochgeladen

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 

Kürzlich hochgeladen (20)

CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 

Cleopatra Enterprise and DACE Labour Norms

  • 2. Cost Engineering Knowledgebases > Cost Engineering Knowledgebases contain the  cost assemblies based on DACE > Each assembly is built up of details for material,  labour and rental > Multi‐disciplinary (piping, E&I, Equipment, Civil,  etc.) > Allows for fast estimating, while maintaining the  details > Based on detailed data qualifications > Quick‐reference card >www.costengineering.eu
  • 4. Unit-Rate > General description > Direct hours > Activity > Rate > Productivity > Indirect >www.costengineering.eu
  • 6. Standardisation of “Labour norms” > Initiative of the DACE workgroup > Improve communication between  involved parties > Avoid discussion by definitions > Evolved from Linde’s dataset www.costengineering.eu
  • 7. Data Qualifications > Direct labour norms: activity description > Only hours, no pricing or rates > Definition of indirect costs > Composition of labour rates > Applicable factors  > Europe www.costengineering.eu
  • 9. Construction of the hourly rate The hourly rate included: > The direct costs of the relevant staff till the range or  position of the cooperating foreman, including payroll  tax, social security, holiday pay, holidays, ATV days as  well as health insurance, accident and pension  insurance, profit, bonuses, transport costs, travel time,  normal travel expenses  commuter traffic and all further  indirect costs. > The costs for the use of normal hand tools and  protective clothing. > The costs for the use personal safety, such as safety  shoes, helmets, safety glass, gloves and work clothing
  • 11. Productivity Definition > Labour productivity is a relative measure for the labour  efficiency against a norm has been established based on  experience. It is a common misconception that labour  productivity really means “working hard”. > Labour productivity is a function based on a number of specific  variables such as the organisation, the equipment and the  motivation of the people involved.
  • 13. Productivity Specific site conditions > Material costs have a tendency to be 5‐10% higher on a  renovation project than in greenfield development. > Man hours can be 10‐50% higher and  detail engineering can be  about 50% higher. > The unexpected cost is also in need of a much higher  percentage.