Net Gain of Ecological Function Observed on
            Bainbridge Island Shorelines from 1997 to 2010
              Compiled from Hydraulic Project Approvals (HPAs) issued by the
                        Washington Department of Fish & Wildlife.

                       by Albert Greiner for Bainbridge Shoreline Homeowners
                              with editorial assistance by Ken Sethney


Summary

New construction, damage repair, and restoration projects undertaken since our city’s Shoreline
Management Master Program was enacted, have resulted in a significant gain of shoreline
ecological function. When combining the data from overwater structures, shoreline modifications
and restoration projects, we have seen the following gains over the last thirteen years:

      • 750 linear feet reduction of hard shoreline armoring

      • 1,536 square feet reduction of opaque overwater structures

      • 523 feet of creosote treated wood bulkhead have been replaced

      • 583 creosote treated pilings have been or will be removed

      • 4,036 cubic yards of sand & gravel will nourish beaches

      • 28,518 square feet of native vegetation have been planted

      • 125,676 square feet of tideland have been or will be restored

      • 196,020 square feet of eelgrass have been or will be planted


Conclusion

“No net loss” was not the standard in 1996, but it is today. It is clear that existing policies are
more than adequate to mitigate loss and provide substantial gains.

During their presentation at City Hall, Department of Ecology representatives made it clear that
“no net loss” can be applied to an entire jurisdiction rather than a single project. Doing so
spreads the incentives for and benefits of restoration across the entire island instead of focusing
on individual homeowners or project developers.




Tuesday, March 1, 2011 c                           
                                              1 of 4
Docks and Overwater Structures

        • 52 HPAs were issued from 1997 to 2010

        • 8,796 square feet of opaque dock deck was replaced with grated deck

        • 7,260 square feet of new opaque deck was installed

        • 1,772 square feet of new grated deck was installed

        • 283 creosote treated pilings were removed

        • 381 non-toxic pilings were installed


According to the Army Corps. of Engineers, Washington Department of Fish & Wildlife (WDFW),
and local planners, grated decking is better than opaque decking. Since 1996, we have seen a
net reduction of 1,536 square feet of opaque overwater structures.1

While examining the HPA documents, we observed that most decks and floats are less than 60
feet long. The area of the island’s tidelands extending 60 feet from the ordinary high water mark
is approximately 16,790,400 square feet.2

New overwater structures, both opaque and grated, total 9,032 square feet.3 This constitutes a
change of about 0.054% or 5.4 hundredths of one percent in thirteen years, or 4 thousandths of
one percent per year.

That amounts to one square foot of new dock surface for every 1,859 square feet of tideland
area 60 feet from the OHWM.



          Summary:         Any loss of ecological function caused by such a minute yearly change is
                           far outweighed by the net reduction in opaque overwater structures.




1   7,260 square feet - 8,796 square feet = -1,536 square feet
2   53 miles X 5,280 feet/mile X 60 feet = 16,790,400 square feet
3   1,772 square feet + 7,260 square feet = 9,032 square feet

Tuesday, March 1, 2011 c                               
                                       2 of 4
Shoreline Modifications

We found shoreline modification permits for bulkhead repairs, removals, replacement and
installations, plus restoration permits for private shorelines.

        • 68 permits were issued from 1997 to 2010 4

        • 1,690 linear feet of new rock bulkhead was installed

        • 507 linear feet of soft armoring was installed

        • 405 linear feet of concrete bulkhead was replaced by lower reflectivity rock bulkhead

        • 523 feet of creosote treated wood bulkhead was replaced by rock bulkhead

        • 17,036 square feet of tideland gained due to bulkhead removals & landward relocations

        • 2,806 linear feet of beach was improved by installing large woody debris

        • 5,018 square feet of native vegetation was restored

        • 4,036 cubic yards of beach nourishment (aka “fish
          mix”) has been required as mitigation over various time
          periods

                This is equal to 230 tandem wheeled dump truck loads,
                        enough to spread 4.5 inches of sand and gravel
                                   over the island’s entire tideland area.


The net permitted gain of 1,690 feet of angular rock armoring is 0.6% of the island’s 53 miles of
shoreline.5 This is slightly more than 1/16th of an inch per foot of shoreline, and amounts to an
armoring rate of 130 feet per year.

Approximately 50 percent of Bainbridge Island’s shoreline has been modified in the past.6 At
130 feet per year, it would take 1,076 years to modify the remaining 50 percent if it were lawful
to do so.7 However, this ignores the restoration projects mentioned below which have (or will)
result in a 750 foot net reduction of shoreline armoring.


          Summary:         Any loss of ecological function caused by such a minute yearly change is
                           far outweighed by moving structures landward, installation of soft
                           armoring and woody debris, and beach nourishment requirements.




4   We noted a large spike in bulkhead repairs following the severe 2005-6 winter storm.
5   1,690 feet / ( 53 miles x 5,280 feet/mile ) = .006 = 0.6%
6   Herrera, Addendum to the Summary of Science Report for Bainbridge Island, pg 14
7   50% x (( 53 miles x 5,280 feet/mile ) / 130 feet/year ) = 1,076 years

Tuesday, March 1, 2011 c                                 
                                     3 of 4
Shoreline Restoration

The following were observed from sources reporting shoreline restorations on Bainbridge Island.
Most are classified as active projects. Blakely Harbor Park restoration goals are included but
that project is still being studied as to feasibility. We were unable to find data on the Waterfront
Park shoreline restoration, so bulkhead removal and shoreline restoration for that project is not
included in the following numbers.

      • 2,440 linear feet of shoreline armoring removed

      • 108,640 square feet of tidelands/marsh restored

      • 870 cubic yards of debris removed from tidelands

      • 23,500 square feet of nearshore vegetation restored to native species

      • 196,020 square feet of eelgrass planed

      • 300+ creosote treated pilings removed

      • 435 linear feet of shoreline received large woody debris

      • 265 feet of jetty to be removed (Blakely)

      • 2,750 square foot structure to be removed (Blakely)


        Summary:           Restoration is intended to cause a net gain of ecological function. With
                           limited information, we have been able to track these significant gains.


Limitations of Data Included

      • Hydraulic Project Approval (HPA) data was furnished under a public records request
        made to the Department of Fish and Wildlife.

      • All shoreline work requires an HPA before any city permit may be issued.

      • Many HPAs are not specific as to tideland gains, so only those gains cited or calculable
        from applications are included. There are more gains than totaled here.

      • Many HPOs do not specify numbers of piles removed, so only those pilings enumerated
        are included. More pilings have been removed than totaled here.

      • The permits mentioned were HPA permits, not Bainbridge Island city permits.

      • HPA permits do not show completion dates, so there is no confirmation that the
        permitted work was actually completed.

      • Personal communication from a COBI staff member indicates COBI has no reliable way
        of reporting project completion.


Tuesday, March 1, 2011 c                             
                                            4 of 4

Weitere ähnliche Inhalte

Was ist angesagt?

Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Ekonnect
 
Getting to know_your_watershed_bass_river
Getting to know_your_watershed_bass_riverGetting to know_your_watershed_bass_river
Getting to know_your_watershed_bass_river
CapeCodCommission
 
Coastal management integrated and sustainable management
Coastal management   integrated and sustainable managementCoastal management   integrated and sustainable management
Coastal management integrated and sustainable management
MrOH
 
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed LakesReconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
SERC at Carleton College
 

Was ist angesagt? (20)

2015 State of Buzzards Bay
2015 State of Buzzards Bay2015 State of Buzzards Bay
2015 State of Buzzards Bay
 
Cowell Beach Overview 11/14
Cowell Beach Overview 11/14Cowell Beach Overview 11/14
Cowell Beach Overview 11/14
 
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake RestorationPohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
Pohick Creek Watershed: Dam Rehabilitation Dredging and Lake Restoration
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
Dizak, Earth Conservancy, "AMD Treatment Alternatives and Reclamation of Mine...
 
Clad agm sepa_lorna
Clad agm sepa_lornaClad agm sepa_lorna
Clad agm sepa_lorna
 
Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration Woodglen Lake Dredging and Restoration
Woodglen Lake Dredging and Restoration
 
Municipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach CommunitiesMunicipal Adaptations to Create Resilient Beach Communities
Municipal Adaptations to Create Resilient Beach Communities
 
Independent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine SiteIndependent Review of Hydrological Issues: Deloro Mine Site
Independent Review of Hydrological Issues: Deloro Mine Site
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
 
Getting to know_your_watershed_bass_river
Getting to know_your_watershed_bass_riverGetting to know_your_watershed_bass_river
Getting to know_your_watershed_bass_river
 
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...Swim Drink Fish Canada submission for relicensing written hearing for the Del...
Swim Drink Fish Canada submission for relicensing written hearing for the Del...
 
Coastal management integrated and sustainable management
Coastal management   integrated and sustainable managementCoastal management   integrated and sustainable management
Coastal management integrated and sustainable management
 
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed LakesReconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
 
Navy Region Southwest Water Conservation - U.S. Navy
Navy Region Southwest Water Conservation -  U.S. NavyNavy Region Southwest Water Conservation -  U.S. Navy
Navy Region Southwest Water Conservation - U.S. Navy
 
The Shifting Sands of Noosa
The Shifting Sands of Noosa The Shifting Sands of Noosa
The Shifting Sands of Noosa
 
Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]Nov 16 2016 nps presentation west pond[2995]
Nov 16 2016 nps presentation west pond[2995]
 
Kenedy County GCD, Mary Sahs
Kenedy County GCD, Mary SahsKenedy County GCD, Mary Sahs
Kenedy County GCD, Mary Sahs
 
Royal Lake Dredging and Restoration
Royal Lake Dredging and RestorationRoyal Lake Dredging and Restoration
Royal Lake Dredging and Restoration
 
EdgeW
EdgeWEdgeW
EdgeW
 

Ähnlich wie Cumulative Impact Summary 1997-2010 HPAs

Cumulative Impact Net Gain
Cumulative Impact Net GainCumulative Impact Net Gain
Cumulative Impact Net Gain
BSH Admin
 
Cumulative Impact of Armoring Reduction
Cumulative Impact of Armoring ReductionCumulative Impact of Armoring Reduction
Cumulative Impact of Armoring Reduction
BSH Admin
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design Poster
Thomas Bryce
 

Ähnlich wie Cumulative Impact Summary 1997-2010 HPAs (20)

Orlando 2015
Orlando 2015Orlando 2015
Orlando 2015
 
Cumulative Impact Net Gain
Cumulative Impact Net GainCumulative Impact Net Gain
Cumulative Impact Net Gain
 
Cumulative Impact of Armoring Reduction
Cumulative Impact of Armoring ReductionCumulative Impact of Armoring Reduction
Cumulative Impact of Armoring Reduction
 
Babson Court Outfall Restoration
Babson Court Outfall RestorationBabson Court Outfall Restoration
Babson Court Outfall Restoration
 
Martecchini great marsh symposium presentation duxbury beach - 11-13-2014
Martecchini great marsh symposium presentation   duxbury beach - 11-13-2014Martecchini great marsh symposium presentation   duxbury beach - 11-13-2014
Martecchini great marsh symposium presentation duxbury beach - 11-13-2014
 
Boston Engineering and Design Poster
Boston Engineering and Design PosterBoston Engineering and Design Poster
Boston Engineering and Design Poster
 
Responses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at QuogueResponses to Public Comments About Beach Restoration at Quogue
Responses to Public Comments About Beach Restoration at Quogue
 
Harvest Green Project Completion
Harvest Green Project CompletionHarvest Green Project Completion
Harvest Green Project Completion
 
Lazy Creek Court Outfall Restoration
Lazy Creek Court Outfall RestorationLazy Creek Court Outfall Restoration
Lazy Creek Court Outfall Restoration
 
Bay Crest Dredging Presentation 1-24-2024
Bay Crest Dredging Presentation 1-24-2024Bay Crest Dredging Presentation 1-24-2024
Bay Crest Dredging Presentation 1-24-2024
 
Realities of Beach Restoration in Quogue
Realities of Beach Restoration in QuogueRealities of Beach Restoration in Quogue
Realities of Beach Restoration in Quogue
 
Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83Wetland and Stream Crossing Impacts of Proposed M-83
Wetland and Stream Crossing Impacts of Proposed M-83
 
Crestmont circle outfall restoration
Crestmont circle outfall restorationCrestmont circle outfall restoration
Crestmont circle outfall restoration
 
Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015Dannenbaum Engineering - River Update 9-19-2015
Dannenbaum Engineering - River Update 9-19-2015
 
4210 final presentation
4210 final presentation4210 final presentation
4210 final presentation
 
Green Hollow Court Outfall Restoration
Green Hollow Court Outfall RestorationGreen Hollow Court Outfall Restoration
Green Hollow Court Outfall Restoration
 
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach RenourishmentESTC 2011 Presentation by Scott Liggett, Beach Renourishment
ESTC 2011 Presentation by Scott Liggett, Beach Renourishment
 
Making Connections Across Our Watersheds
Making Connections Across Our WatershedsMaking Connections Across Our Watersheds
Making Connections Across Our Watersheds
 
Barnack Drive Outfall Restoration Project Completion
Barnack Drive Outfall Restoration Project CompletionBarnack Drive Outfall Restoration Project Completion
Barnack Drive Outfall Restoration Project Completion
 
Jamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdfJamaica Bay Task Force2- 10May22.pdf
Jamaica Bay Task Force2- 10May22.pdf
 

Mehr von BSH Admin

Kitsap draft smp conforming w highlights-1
Kitsap draft smp   conforming w highlights-1Kitsap draft smp   conforming w highlights-1
Kitsap draft smp conforming w highlights-1
BSH Admin
 
What does state law say about shoreline regulations?
What does state law say about shoreline regulations?What does state law say about shoreline regulations?
What does state law say about shoreline regulations?
BSH Admin
 
PSP Vital Signs
PSP Vital SignsPSP Vital Signs
PSP Vital Signs
BSH Admin
 
Save a salmon, lose your life savings.
Save a salmon, lose your life savings.Save a salmon, lose your life savings.
Save a salmon, lose your life savings.
BSH Admin
 
Save a salmon, lose your life savings.
Save a salmon, lose your life savings.Save a salmon, lose your life savings.
Save a salmon, lose your life savings.
BSH Admin
 
Rockaway Beach Road Erosion Control
Rockaway Beach Road Erosion ControlRockaway Beach Road Erosion Control
Rockaway Beach Road Erosion Control
BSH Admin
 
SMP Update Calendar 032911
SMP Update Calendar 032911SMP Update Calendar 032911
SMP Update Calendar 032911
BSH Admin
 
Rockaway Slip Sliding Away
Rockaway Slip Sliding AwayRockaway Slip Sliding Away
Rockaway Slip Sliding Away
BSH Admin
 
Rockaway Beach Road Erosion Control
Rockaway Beach Road Erosion ControlRockaway Beach Road Erosion Control
Rockaway Beach Road Erosion Control
BSH Admin
 
DOE Nonconforming Uses
DOE Nonconforming UsesDOE Nonconforming Uses
DOE Nonconforming Uses
BSH Admin
 

Mehr von BSH Admin (17)

PRSM Petition For Review
PRSM Petition For ReviewPRSM Petition For Review
PRSM Petition For Review
 
Dennis Reynolds Legal Implications of SMP Update
Dennis Reynolds Legal Implications of SMP UpdateDennis Reynolds Legal Implications of SMP Update
Dennis Reynolds Legal Implications of SMP Update
 
Kitsap draft smp conforming w highlights-1
Kitsap draft smp   conforming w highlights-1Kitsap draft smp   conforming w highlights-1
Kitsap draft smp conforming w highlights-1
 
Sandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. MitigationSandy Mackie on Restoration vs. Mitigation
Sandy Mackie on Restoration vs. Mitigation
 
What does state law say about shoreline regulations?
What does state law say about shoreline regulations?What does state law say about shoreline regulations?
What does state law say about shoreline regulations?
 
PSP Vital Signs
PSP Vital SignsPSP Vital Signs
PSP Vital Signs
 
Slide show with audio
Slide show with audioSlide show with audio
Slide show with audio
 
Residential Development and Buffers
Residential Development and BuffersResidential Development and Buffers
Residential Development and Buffers
 
Six BIG Problems with the SMP update.
Six BIG Problems with the SMP update.Six BIG Problems with the SMP update.
Six BIG Problems with the SMP update.
 
Save a salmon, lose your life savings.
Save a salmon, lose your life savings.Save a salmon, lose your life savings.
Save a salmon, lose your life savings.
 
Save a salmon, lose your life savings.
Save a salmon, lose your life savings.Save a salmon, lose your life savings.
Save a salmon, lose your life savings.
 
Rockaway Beach Road Erosion Control
Rockaway Beach Road Erosion ControlRockaway Beach Road Erosion Control
Rockaway Beach Road Erosion Control
 
SMP Update Calendar 032911
SMP Update Calendar 032911SMP Update Calendar 032911
SMP Update Calendar 032911
 
Rockaway Slip Sliding Away
Rockaway Slip Sliding AwayRockaway Slip Sliding Away
Rockaway Slip Sliding Away
 
Rockaway Beach Road Erosion Control
Rockaway Beach Road Erosion ControlRockaway Beach Road Erosion Control
Rockaway Beach Road Erosion Control
 
DOE Role in SMP Update
DOE Role in SMP UpdateDOE Role in SMP Update
DOE Role in SMP Update
 
DOE Nonconforming Uses
DOE Nonconforming UsesDOE Nonconforming Uses
DOE Nonconforming Uses
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
2024 02 15 AZ GOP LD4 Gen Meeting Minutes_FINAL_20240228.docx
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptxKAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
KAHULUGAN AT KAHALAGAHAN NG GAWAING PANSIBIKO.pptx
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
2024 03 13 AZ GOP LD4 Gen Meeting Minutes_FINAL.docx
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptxLorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
Lorenzo D'Emidio_Lavoro sullaNorth Korea .pptx
 
1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt1971 war india pakistan bangladesh liberation.ppt
1971 war india pakistan bangladesh liberation.ppt
 
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s LeadershipTDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
TDP As the Party of Hope For AP Youth Under N Chandrababu Naidu’s Leadership
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf05052024_First India Newspaper Jaipur.pdf
05052024_First India Newspaper Jaipur.pdf
 
Pakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdfPakistan PMLN Election Manifesto 2024.pdf
Pakistan PMLN Election Manifesto 2024.pdf
 
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
2024 04 03 AZ GOP LD4 Gen Meeting Minutes FINAL.docx
 

Cumulative Impact Summary 1997-2010 HPAs

  • 1. Net Gain of Ecological Function Observed on Bainbridge Island Shorelines from 1997 to 2010 Compiled from Hydraulic Project Approvals (HPAs) issued by the Washington Department of Fish & Wildlife. by Albert Greiner for Bainbridge Shoreline Homeowners with editorial assistance by Ken Sethney Summary New construction, damage repair, and restoration projects undertaken since our city’s Shoreline Management Master Program was enacted, have resulted in a significant gain of shoreline ecological function. When combining the data from overwater structures, shoreline modifications and restoration projects, we have seen the following gains over the last thirteen years: • 750 linear feet reduction of hard shoreline armoring • 1,536 square feet reduction of opaque overwater structures • 523 feet of creosote treated wood bulkhead have been replaced • 583 creosote treated pilings have been or will be removed • 4,036 cubic yards of sand & gravel will nourish beaches • 28,518 square feet of native vegetation have been planted • 125,676 square feet of tideland have been or will be restored • 196,020 square feet of eelgrass have been or will be planted Conclusion “No net loss” was not the standard in 1996, but it is today. It is clear that existing policies are more than adequate to mitigate loss and provide substantial gains. During their presentation at City Hall, Department of Ecology representatives made it clear that “no net loss” can be applied to an entire jurisdiction rather than a single project. Doing so spreads the incentives for and benefits of restoration across the entire island instead of focusing on individual homeowners or project developers. Tuesday, March 1, 2011 c 1 of 4
  • 2. Docks and Overwater Structures • 52 HPAs were issued from 1997 to 2010 • 8,796 square feet of opaque dock deck was replaced with grated deck • 7,260 square feet of new opaque deck was installed • 1,772 square feet of new grated deck was installed • 283 creosote treated pilings were removed • 381 non-toxic pilings were installed According to the Army Corps. of Engineers, Washington Department of Fish & Wildlife (WDFW), and local planners, grated decking is better than opaque decking. Since 1996, we have seen a net reduction of 1,536 square feet of opaque overwater structures.1 While examining the HPA documents, we observed that most decks and floats are less than 60 feet long. The area of the island’s tidelands extending 60 feet from the ordinary high water mark is approximately 16,790,400 square feet.2 New overwater structures, both opaque and grated, total 9,032 square feet.3 This constitutes a change of about 0.054% or 5.4 hundredths of one percent in thirteen years, or 4 thousandths of one percent per year. That amounts to one square foot of new dock surface for every 1,859 square feet of tideland area 60 feet from the OHWM. Summary: Any loss of ecological function caused by such a minute yearly change is far outweighed by the net reduction in opaque overwater structures. 1 7,260 square feet - 8,796 square feet = -1,536 square feet 2 53 miles X 5,280 feet/mile X 60 feet = 16,790,400 square feet 3 1,772 square feet + 7,260 square feet = 9,032 square feet Tuesday, March 1, 2011 c 2 of 4
  • 3. Shoreline Modifications We found shoreline modification permits for bulkhead repairs, removals, replacement and installations, plus restoration permits for private shorelines. • 68 permits were issued from 1997 to 2010 4 • 1,690 linear feet of new rock bulkhead was installed • 507 linear feet of soft armoring was installed • 405 linear feet of concrete bulkhead was replaced by lower reflectivity rock bulkhead • 523 feet of creosote treated wood bulkhead was replaced by rock bulkhead • 17,036 square feet of tideland gained due to bulkhead removals & landward relocations • 2,806 linear feet of beach was improved by installing large woody debris • 5,018 square feet of native vegetation was restored • 4,036 cubic yards of beach nourishment (aka “fish mix”) has been required as mitigation over various time periods This is equal to 230 tandem wheeled dump truck loads, enough to spread 4.5 inches of sand and gravel over the island’s entire tideland area. The net permitted gain of 1,690 feet of angular rock armoring is 0.6% of the island’s 53 miles of shoreline.5 This is slightly more than 1/16th of an inch per foot of shoreline, and amounts to an armoring rate of 130 feet per year. Approximately 50 percent of Bainbridge Island’s shoreline has been modified in the past.6 At 130 feet per year, it would take 1,076 years to modify the remaining 50 percent if it were lawful to do so.7 However, this ignores the restoration projects mentioned below which have (or will) result in a 750 foot net reduction of shoreline armoring. Summary: Any loss of ecological function caused by such a minute yearly change is far outweighed by moving structures landward, installation of soft armoring and woody debris, and beach nourishment requirements. 4 We noted a large spike in bulkhead repairs following the severe 2005-6 winter storm. 5 1,690 feet / ( 53 miles x 5,280 feet/mile ) = .006 = 0.6% 6 Herrera, Addendum to the Summary of Science Report for Bainbridge Island, pg 14 7 50% x (( 53 miles x 5,280 feet/mile ) / 130 feet/year ) = 1,076 years Tuesday, March 1, 2011 c 3 of 4
  • 4. Shoreline Restoration The following were observed from sources reporting shoreline restorations on Bainbridge Island. Most are classified as active projects. Blakely Harbor Park restoration goals are included but that project is still being studied as to feasibility. We were unable to find data on the Waterfront Park shoreline restoration, so bulkhead removal and shoreline restoration for that project is not included in the following numbers. • 2,440 linear feet of shoreline armoring removed • 108,640 square feet of tidelands/marsh restored • 870 cubic yards of debris removed from tidelands • 23,500 square feet of nearshore vegetation restored to native species • 196,020 square feet of eelgrass planed • 300+ creosote treated pilings removed • 435 linear feet of shoreline received large woody debris • 265 feet of jetty to be removed (Blakely) • 2,750 square foot structure to be removed (Blakely) Summary: Restoration is intended to cause a net gain of ecological function. With limited information, we have been able to track these significant gains. Limitations of Data Included • Hydraulic Project Approval (HPA) data was furnished under a public records request made to the Department of Fish and Wildlife. • All shoreline work requires an HPA before any city permit may be issued. • Many HPAs are not specific as to tideland gains, so only those gains cited or calculable from applications are included. There are more gains than totaled here. • Many HPOs do not specify numbers of piles removed, so only those pilings enumerated are included. More pilings have been removed than totaled here. • The permits mentioned were HPA permits, not Bainbridge Island city permits. • HPA permits do not show completion dates, so there is no confirmation that the permitted work was actually completed. • Personal communication from a COBI staff member indicates COBI has no reliable way of reporting project completion. Tuesday, March 1, 2011 c 4 of 4