There are growing infrastructure requirements needed to meet the demand for electric vehicles in the United States. The more infrastructure required for EVs, the more energy will be needed to power the charging stations for the EVs. Collaboration among stakeholders is key in the adoption of mass scale EV infrastructure in communities across the country. Learn more about the integration of energy and transportation here: https://www.bv.com/markets/mobility
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Priming the U.S. Grid for High-Powered Electric Vehicle Charging
1.
2. Presenter: 2Paul Stith, Black & VeatchPaul Stith, Black & Veatch
Priming the United States Grid for
High-Powered
Electric Vehicle Charging
Paul Stith
Director, Strategy & Innovation
Transformative Technologies
Stuttgart, Germany - October 9, 2017
3. Presenter: 3Paul Stith, Black & Veatch
About Black & Veatch
Vehicles, duty cycle and battery sizes
Growing infrastructure requirements
Getting energy where it’s needed
Collaboration & Recommendations
Questions & Answers
Priming the US Grid for
High-Powered EV Charging
Agenda
4. Presenter: 4Paul Stith, Black & Veatch
10,000+
Professionals
$3.2B
Revenue
Transportation &
Transformative
Technologies
Distributed
Infrastructure &
Mission Critical
Facilities
Power Infrastructure,
Renewables & Sustainability
About Black & Veatch
5. Presenter: 5Paul Stith, Black & Veatch
Scaling Distributed Clean
Energy Infrastructure
Electric Vehicle Infrastructure
Hydrogen Infrastructure
Energy Storage Networks
Emerging Distributed
Technology
Autonomous, Connected Vehicle
Infrastructure
We build complex networks faster
6. Presenter: 6Paul Stith, Black & Veatch
Based on 2014 U.S. Department of Transportation, Bureau of Transportation Statistics
US Fleet Energy Consumption
Vehicle Class
Vehicles
(Millions)
Energy Used
(Tbtu)
Electricity
(TWh)
Light Duty Vehicles 240.2 14,630 4,300.0 92.7 463.3 926.6
Sedans 187.6 10,300 3,030.0 72.4 361.8 723.7
Pickups 52.6 4,330 1,270.0 20.3 101.5 202.9
Medium & Heavy Duty 10.9 5,460 1,600.0 45.0 225.0 450.0
Total Vehicles 251.1 20,090 5,900.0 137.7 688.3 1,376.6
Energy Used (TWh) (% of Fleet)
10% 50% 100%
7. Presenter: Paul Stith, Black & Veatch 7
As battery technologies progress it becomes
more economical to use larger batteries
More applications and duty cycles can be
electrified
Requires more infrastructure and power to
deliver the energy
Vehicles, Duty Cycle and Battery Size
“Businesses that do not
electrify will be at a competitive
disadvantage…”
8. Presenter: Paul Stith, Black & Veatch 8
High Power Corridor Charging
High Utilization Vehicles
Urban Charging Hubs & Depots
High power On-route
Capital Requirements
Facility and Network Roadmaps
Optimize for least regret investments
while scaling to meet requirements
Step Change in Infrastructure Requirements
Transit: 250KWh Per Day Per Bus
9. Presenter: Paul Stith, Black & Veatch 9
Cooling, Cables & Compounds
Multiple Low Voltage Transformers
Medium Voltage Utility Service
Switch Gear Capacity
Centralized Power Conversion
DC Power Utility Delivery
Inductive Charging
Designs shaped by new technologies
and utility service provisioning
Implications for Site Design, Power Delivery
Enabling Corridor Travel
10. Presenter: 10Paul Stith, Black & Veatch
$0
$50,000
$100,000
$150,000
$200,000
$250,000
1 4 16
Transformer
Switch Gear
Land Use
Commissioning
Cable/Conduit/Trenching
Charger
High Power Charging Deployments Scenarios
Relative, Per
Charger Costs
Number of Chargers
11. Presenter: 11Paul Stith, Black & Veatch
$-
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
1 4 16 48 100 200
Substation
Feeder
Transformer
Switch Gear
Land Use
Commissioning
Cable/Conduit/Trenching
Charger
Scaling Up Requires Significant Capital
Relative, Per
Charger Costs
Number of Chargers
12. Presenter: 12Paul Stith, Black & Veatch
125KW Per Charger, Medium voltage grid supply for 4MW and larger
configurations, 1 Mile of Feeder, New Substation
Scenario Assumptions
Ports
Power
(MW)
Medium
Voltage
Feeder
Upgrade
New
Feeder
Substation
1 0.125
4 0.50
16 2.00
48 6.00 n
100 12.50 n n
200 25.00 n n n
13. Presenter: 13Paul Stith, Black & Veatch
Engineering,
Design
Project Start 12 Months 24 Months +
Grid Upgrades Can Require Significant Time
Site Acquisition
& Land Use
Distribution
Grid Upgrades
Engineering
& Design
Permitting
& Approvals
Construction &
Commissioning
Equipment
Procurement
14. Presenter: Paul Stith, Black & Veatch 14
Power Availability, Energy Delivery, Resilience
Siting decision factors:
Can you locate near power?
Cost to bring power?
Energy Management Tools:
Distributed Generation
Energy Storage
Smart Charging
Microgrids
The Grid has enough energy but not always in the right places.
15. Presenter: Paul Stith, Black & Veatch 15
Storage with & without wheels
Access to more value streams
the closer to the grid edge
Multiple roles & Network Effect
Variable Renewables Energy
Integration
Geographic, Locational Value
Autonomous Vehicles, Car Share
Behind the Meter Energy Storage
Energy Storage, DER & Value Streams
17. Presenter: 17Paul Stith, Black & Veatch
Engineering,
Design
Stakeholders - Collaboration, Recommendations
Policymakers &
Regulators
Vehicle OEMs Technology
Integrators
Utilities
Vehicle OEMs - Continue developing compelling vehicles and:
Communicate infrastructure requirements
Build awareness and drive new applications
Exchange information with all stakeholders
Educate and inform consumers & fleets
18. Presenter: 18Paul Stith, Black & Veatch
Engineering,
Design
Stakeholders - Collaboration, Recommendations
Policymakers &
Regulators
Vehicle OEMs Technology
Integrators
Utilities
Utilities evolve and integrate EVs through:
Engaging with customers
Incorporating EVs into every aspect of business processes
Providing rates and incentives that drive behaviors and adoption
Invest in distribution grid modernization to integrate EVs and unlock value
Creative infrastructure financing programs
19. Presenter: 19Paul Stith, Black & Veatch
Technology Integrators – Advancing EV adoption through:
Business innovation, organization and program development
Modeling to support complex grid planning
Coordinate between utility, vehicle OEMs, and charging providers
Scalable engineering, land use and construction solutions to build
complex networks faster
Stakeholders - Collaboration, Recommendations
Policymakers &
Regulators
Vehicle OEMs Technology
Integrators
Utilities
20. Presenter: 20Paul Stith, Black & Veatch
Questions?
Paul Stith
Director, Strategy & Innovation
Transformative Technologies
+1 913-458-8747 | stithp@bv.com
21. Presenter: 21Paul Stith, Black & Veatch
Paul Stith
Director, Strategy & Innovation
Transformative Technologies
+1 913-458-8747 | stithp@bv.com
@Black_Veatch & @BVSII
Thank you! Learn more at bv.com.