BLOWOUT PREVENTER
Why Blowout Preventer are used?
• Kick : An influx of formation fluid into the wellbore

• Blowout : An uncontrolled flow of well fluids and/or
  formation fluid from the wellbore or into lower pressured
  sub-surface zones (underground blowout)

• Blowout Preventer : An assembly of valves attached
  to the casing head that allows the well to be sealed to
  confine the well fluids in the wellbore.

     Blowout preventer are of two types-
            i) Annular BOP
           ii) Ram BOP
CRITERIA FOR SELECTION OF
            BOP
  Selection of BOP determined by the following factors:
• Maximum anticipated surface pressure.
• Size of casing, casing hanger, bit and other drilling tools to
be lowered through the BOP stack.
• Space available between top of cellar pit and bottom of
rotary table.
• Matching flange connection according to the size and
pressure rating of wellhead flange.
• Service conditions.
BOP SPECIFICATION
Standard Sizes of BOP:
      71/16”, 9”, 11”, 135/8”, 16¾”, 18¾”, 21¼”, 26¾”, 28”,
291/2”, 30”
Size refers to - ID, Nominal Diameter, Through bore
Rated Working Pressure (RWP):
    2M, 3M, 5M, 10M, 15M, 20M
     The maximum pressure that the equipment can withstand
(contain) and control.
 Shell Test or Manufacturer Test or Body Test:
•Only once in the factory
•2M, 3M, 5M – 2 TIMES the RWP
•10M and above – 1.5 TIMES the RWP
BOP SPECIFICATION
• Closing Ratio               =    Well Bore Pressure
                                  Pr. Required to close
                                          RWP
• Min. Pr. Required to close =        Closing Ratio


• Opening Ratio
                                  Well Bore Pressure
  =                               Pr. Required to open

                                        RWP
• Min. Pr. Required to open          Opening Ratio
  =
RAM BOP
• Ram Preventers are designed to seal the annulus
  by forcing two front packing elements which make
  contact with each other and seal around the object
  in the well bore.

• Pipe Ram : It seals around the well bore and the
  fixed size of pipe.
• Blind Ram : It seals around the well if no pipe in the
  well bore.
• Variable Bore Ram : It seals around several pipe
  sizes depending on the range of variable bore ram.
• Shear Ram : It shear the pipe in the well and seal
  the wellbore simultaneously.
BASIC BOP OPERATION
CLOSING OF RAM BOP
Top seal energized by well bore
pressure at sealing surface of the
ram body                                        Front packer sealing against pipe




   Opening                                                                      Closing
   chamber                                                                      chamber
                                     Well Pressure
CLOSING OF RAM BOP
            TOP SEAL
                                      STEEL PLATE




                                               STEEL PLATE PUSHED BY
                                               OTHER SIDE PACKER
                                               STEEL PLATES



RAM BLOCK   PACKER RUBBER




                            Well Pressure
BLOCK ASSEMBLY
BLOCK ASSEMBLY
HYDRIL RAM PREVENTER
CAMERON RAM PREVENTER
RAM BOP SPECIFICATION
                                      RAM BLOWOUT PREVENTER
                                                           MAX. WORKING
MAKE               MODEL               BORE SIZE(INCHES)   PRESSURE(PSI)   CLOSING RATIO(C.R)   OPENING RATIO(O.R.)
                   U-PIPE                   7-1/16              ALL              6.90:1               2.20:1
                                              11              15000              9.80:1               2.20:1
CAMERON                                     13-5/8            15000             10.60:1               3.60:1
                  U-SHEAR                     11              15000             15.20:1               3.70:1
                                            13-5/8            15000             10.80:1               4.50:1
                                            7-1/16          3000/5000            4.80:1               1.50:1
                                            7-1/16            10000              7.70:1               1.70:1
              MANUAL LOCK PIPE                11            3000/5000            6.00:1               2.00:1
                                              11              10000              6.90:1               2.40:1
                                            13-5/8          3000/5000            4.80:1               2.10:1
                                            13-5/8            10000             10.20:1               3.80:1

                                              11             3000/5000           5.60:1               4.20:1
           MANUAL LOCK SHEAR PIPE             11               10000            11.70:1               4.00:1
                                            13-5/8           3000/5000          10.10:1               4.70:1
                                            13-5/8             10000            10.20:1               3.80:1

          MULTI POSITION LOCK PIPE          7-1/16           3000/5000           5.40:1               1.60:1
HYDRIL
                                              11               10000             8.20:1               1.70:1
                                            13-5/8              5000             5.20:1               2.10:1
                                            13-5/8             10000            10.60:1               3.80:1
          MULTI POSITION LOCK SHEAR
                     PIPE                     11             3000/5000           6.00:1                4.20:1
                                              11               10000            12.40:1                4.00:1
                                            13-5/8           3000/5000          10.60:1                4.70:1
                                            13-5/8             10000            10.60:1                3.80:1
                  SL w/14"                  7-1/16          10000/15000         13.90:1                7.14:1
                                              11               10000             7.11:1                7.62:1
                                              11               15000             7.11:1                2.80:1
                                            13-5/8              5000            10.85:1               10.02:1
                                            13-5/8             10000             7.11:1                2.14:1
ANNULAR BOP
A large circular valve used to control wellbore fluid.

• Rounded Elastomer with reinforced steel segments


• Deforms the rubber radially inwards and seals


• Can close around different shapes such as square and
hexagonal kelly, drill collars, tool joint etc including wire line.

• Can not close on stabiliser, bit and under reamer.


• Can close on open hole.
ANNULAR BOP
Piston Indicator Hole



                                 Wear Plate
                                 Element Segment
                                 Packing Element
                                 Latched Head
                                 Opening Chamber

                                 Piston
                                 Closing Chamber
                                 Piston Seals
CLOSING SEQUENCE OF ANNULAR BOP
ANNULAR BOP SPECIFICATION
                         ANNULAR BLOWOUT PREVENTER
  MAKE      MODEL              BORE SIZE(INCHES)   MAX. WORKING PRESSURE(PSI)
                                       7-1/16                 5000
MH KOOMEY           N
                                       7-1/16                10000
                                       7-1/16                 5000
                                       7-1/16                10000
                                         11                   5000
                    GK
  HYDRIL                                 11                  10000
                                       13-5/8                 5000
                                       13-5/8                10000
                    GL                 13-5/8                 5000
                                       7-1/16              3000/5000
                                       7-1/16                10000
                                         11                3000/5000
CAMERON             D
                                         11                  10000
                                       13-5/8              3000/5000
                                       13-5/8                10000
                                       7-1/16              3000/5000
                                       7-1/16                10000
                                         11                   5000
 SHAFFER            S
                                         11                  10000
                                       13-/58                 5000
                                       13-5/8                10000
FUNCTION TEST
•Performed to verify the component’s intended
operations
•The test should be conducted when the drill string is
inside casing
•Function test should be carried out alternatively from
main control unit/derrick floor panel/auxiliary panel
•Actuation time of each equipment should be within
the limits specified by API RP53
•Recorded final accumulator pressure after all the
functions should not be less than 1200 psi or 200 psi
above the pre charged pressure of accumulator which
ever is maximum
•At least once in a week
FUNCTION TEST PROCEDURE
•Record initial Accumulator pressure
•Turn off both electric and pneumatic pumps
•Close Annular BOP and Pipe Ram BOP and
open HCR one by one
•Wait till pressure is stabilized
•Record the closing time (closing time starts from
turning the control lever till pressure stabilized)
•Turn on electrical/Pneumatic pump and open all
the preventer
•Record the opening time
•Record final Accumulator pressure
•Record all the results in the prescribed format
BOP FUNCTION TEST REPORT
RIG
                                                               DATE
WELL
                                                               PROJECT
BOP STACK DETAIL
1. Annular BOP
2. Single & Double ram type BOP
3. Upper pipe ram size
4. Lower pipe ram size

Sl. No.   Description      Function Time Accumulator        Accumulator      Remarks
                                         Initial Pressure   Final Pressure
1.        Annular
2.        Lower pipe
3.        Upper pipe
4.        Blind/Shear
5.        Hyd. Valve on
          Choke line
6.        Hyd. Valve on
          kill line
BOP PRESSURE TEST
 (i) Low Pressure Test : 200 – 300 psi should be applied for a low
pressure test and the period is at least 5 minutes.
(ii) High Pressure Test :
 High pressure test for RAMS and auxiliary equipment
      High pressure test to rated working pressure of RAMS BOP and
auxiliary equipment OR rated working pressure of your wellhead. Select
the lower number. For example, you BOP is rated for 5000 psi and your
wellhead is rated for 3000 psi. Your high pressure test for the RAMS
BOP and auxiliary equipment must be only 3000 psi.
     Pressure duration at least 5 minutes.
High pressure test for Annular Preventer
     High pressure test should apply to 70% of rated working pressure or
RAMS test pressure. Select the lower number. For example, you test
your ram at 3000 psi and the annular working pressure is 5000 psi. You
need to test your annular to 3000 psi (70% of annular RWP is 3500
psi).Pressure duration at least 5 minutes.
BOP PRESSURE TEST
PRESSURE TEST
•To check the integrity of all the joints in BOP stack,
BOP seals and Valves.
•Clear water is considered as the best test fluid
•A stable low test pressure as well as stable high test
pressure should be maintained for at least 5
minutes.

PRESSURE TEST FREQUENCY
•Prior to Spud or upon Installation
•After repairs – Limited to the affected component
•Not to exceed 21 Days
TEST EQUIPMENT
PRESSURE TESTING
CUP TESTER                        TEST PLUG

The cup of the tester gives       Designed to seat in well head
effective sealing in the casing   and seal

Limited to 70-80% of the burst Can be tested up to RWP of
of upper part of casing        Ram BOP

Yield strength of drill pipe      Different makes of well head
may limit the test pressures.     have different types of test
rams                              plugs
Can not be used to test blind/ Blind/ Shear Blind Rams can
shear blind                    be tested.
BOP PRESSURE TEST
1. Run-in 2-3 stands of HWDP
2. Make-up Test Plug
3. Make-up 1 single of 5” D/P
4. Make-up Kelly
5. Open McEvoy valve and keep it in open position
6. Make-up 2” hole fill-up line
7. Close Annular or Ram BOP (whichever is tested)
8. Flushed all the lines(through choke manifold)
9. Start pump and raise pressure to 200 psi
10. Wait for at least 5 mins, observe if any pressure drop.
11. If positive, check for any leakage
12. If negative, increase pressure to 300 psi
13. Repeat step 10 and 11, if negative
14. Increase pressure in increment of 100 psi up to the desired value and repeat
  step 10 and 11 after every increment
15. Record the test readings
16. Bleed off pressure.
PROJECT:                           TEST FLUID- WATER/NITROGEN   WELL NO.:
RIG:                                                            DATE:
TEST EQUIPMENT- TEST PUMP/CEMENTING UNIT
Sl.   TYPE OF BOP           TEST PRESSURE & DURATION                               Rem
No.                         Low Pressure Duration High Pressure         Duration   arks

       Annular BOP
       Upper pipe ram
       Lower pipe ram
       Blind/Shear ram
       Choke manifold
       Kill manifold
       Hyd Valve on choke line
       Hyd Valve on kill line
       HP Valves on choke & kill
       manifold
       UKC
       LKC
       FOSV
       Inside BOP
IMPORTANT POINTS
• Prior to conducting Pressure Test inform every single person
  on Rig i.e. Pre-operation meeting
• Do not allow any person to go near cellar area or below
  derrick floor
• Before conducting test, discuss with DIC
• Take care test plug properly sit on well head, preferably test
  plug and well head make are same.
• Make sure McEvoy valve is opened before conducting test, as
  casing will get pressurized if closed and leakage is there.
• Anchor 2” hole fill-up line properly before conducting test
• Conduct test in presence of at least one experience person
• If pressure test is conducted with test plug, take care of
  Riser(as test plug might get stuck during pulling out). Conduct
  test, if possible before R/up of Riser.

Weitere ähnliche Inhalte

Was ist angesagt?

Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreMohamed Abdelshafy Abozeima
 
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLS
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLSGUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLS
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLSMohan Doshi
 
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxWaledFekry1
 
02 wireline
02 wireline02 wireline
02 wirelineJohan RC
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)danperth
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1Elsayed Amer
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequanceElsayed Amer
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1Elsayed Amer
 
Well control equipment
Well control equipmentWell control equipment
Well control equipmentSARWAR SALAM
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Dr. Arzu Javadova
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1Elsayed Amer
 

Was ist angesagt? (20)

Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
Mudline Suspension (MLS)
Mudline Suspension (MLS)Mudline Suspension (MLS)
Mudline Suspension (MLS)
 
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLS
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLSGUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLS
GUIDELINES FOR EFFECTIVE HOLE CLEANING IN DIRECTIONAL WELLS
 
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptxunlocked-461fd952f4656fee70de599ef77bd2ba.pptx
unlocked-461fd952f4656fee70de599ef77bd2ba.pptx
 
Well completion fundamentals
Well completion fundamentalsWell completion fundamentals
Well completion fundamentals
 
02 wireline
02 wireline02 wireline
02 wireline
 
Blow out preventer (bop)
Blow out preventer (bop)Blow out preventer (bop)
Blow out preventer (bop)
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
blow out preventer system
blow out preventer systemblow out preventer system
blow out preventer system
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Well control equipment
Well control equipmentWell control equipment
Well control equipment
 
Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)
 
Squeeze cementing
Squeeze cementingSqueeze cementing
Squeeze cementing
 
2.1 rig types
2.1 rig types2.1 rig types
2.1 rig types
 
well control (1)
 well control (1) well control (1)
well control (1)
 
Stuck pipe
Stuck pipeStuck pipe
Stuck pipe
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 

Ähnlich wie BOP Guide: Everything You Need to Know About Blowout Preventers

reverse osmosis
reverse osmosisreverse osmosis
reverse osmosisANAND2446
 
ماكينات المصاعد
ماكينات المصاعدماكينات المصاعد
ماكينات المصاعدfreemadoo
 
Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performanceAndi Anriansyah
 
Pabrik kabel indonesia katalog low voltage eleqcable com
Pabrik kabel indonesia katalog low voltage eleqcable comPabrik kabel indonesia katalog low voltage eleqcable com
Pabrik kabel indonesia katalog low voltage eleqcable comTOKO BUNGA ONLINE JAKARTA
 
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...Lambda Technologies Group
 
Catalog compresoare cu piston CECCATO
Catalog compresoare cu piston CECCATOCatalog compresoare cu piston CECCATO
Catalog compresoare cu piston CECCATOColinGroup Craiova
 
Pool Filtration pdf document Aqua Middle East FZC
Pool Filtration pdf document Aqua Middle East FZCPool Filtration pdf document Aqua Middle East FZC
Pool Filtration pdf document Aqua Middle East FZCAdolfsmith69
 
Ind sphinx-pcb-drills
Ind sphinx-pcb-drillsInd sphinx-pcb-drills
Ind sphinx-pcb-drillsGiac Tran
 
YOUJI1
YOUJI1YOUJI1
YOUJI1? ?
 
General Catalogue
General CatalogueGeneral Catalogue
General CatalogueRajan Shah
 
GWC Valve International Threaded & Socketweld Ball Valves
GWC Valve International Threaded & Socketweld Ball ValvesGWC Valve International Threaded & Socketweld Ball Valves
GWC Valve International Threaded & Socketweld Ball ValvesGWC Valve International
 
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM GroupWMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Groupwomgroup
 
Flowline Equipment - Worldwide Oilfield Machine
Flowline Equipment - Worldwide Oilfield MachineFlowline Equipment - Worldwide Oilfield Machine
Flowline Equipment - Worldwide Oilfield Machinewomgroup
 

Ähnlich wie BOP Guide: Everything You Need to Know About Blowout Preventers (20)

reverse osmosis
reverse osmosisreverse osmosis
reverse osmosis
 
ماكينات المصاعد
ماكينات المصاعدماكينات المصاعد
ماكينات المصاعد
 
Structural insulated panels sips house technical data
Structural insulated panels sips house technical dataStructural insulated panels sips house technical data
Structural insulated panels sips house technical data
 
filters
filtersfilters
filters
 
Monitor drilling performance
Monitor drilling performanceMonitor drilling performance
Monitor drilling performance
 
Pabrik kabel indonesia katalog low voltage eleqcable com
Pabrik kabel indonesia katalog low voltage eleqcable comPabrik kabel indonesia katalog low voltage eleqcable com
Pabrik kabel indonesia katalog low voltage eleqcable com
 
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...
Lambda Technologies: Reduce Gas Turbine Operational Costs with Engineered Res...
 
Enerpac Hydraulic Equipment
Enerpac Hydraulic EquipmentEnerpac Hydraulic Equipment
Enerpac Hydraulic Equipment
 
Catalog compresoare cu piston CECCATO
Catalog compresoare cu piston CECCATOCatalog compresoare cu piston CECCATO
Catalog compresoare cu piston CECCATO
 
Nk
Nk   Nk
Nk
 
E 01
E 01E 01
E 01
 
Pool Filtration pdf document Aqua Middle East FZC
Pool Filtration pdf document Aqua Middle East FZCPool Filtration pdf document Aqua Middle East FZC
Pool Filtration pdf document Aqua Middle East FZC
 
Ind sphinx-pcb-drills
Ind sphinx-pcb-drillsInd sphinx-pcb-drills
Ind sphinx-pcb-drills
 
Drilling operations
Drilling operationsDrilling operations
Drilling operations
 
YOUJI1
YOUJI1YOUJI1
YOUJI1
 
General Catalogue
General CatalogueGeneral Catalogue
General Catalogue
 
GWC Valve International Threaded & Socketweld Ball Valves
GWC Valve International Threaded & Socketweld Ball ValvesGWC Valve International Threaded & Socketweld Ball Valves
GWC Valve International Threaded & Socketweld Ball Valves
 
Triplex Plunger Pumps By PEC PUMPS INDIA
Triplex Plunger Pumps By PEC PUMPS INDIATriplex Plunger Pumps By PEC PUMPS INDIA
Triplex Plunger Pumps By PEC PUMPS INDIA
 
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM GroupWMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
WMSP Diverter, WMSP Diverter Oilfield Equipment - WOM Group
 
Flowline Equipment - Worldwide Oilfield Machine
Flowline Equipment - Worldwide Oilfield MachineFlowline Equipment - Worldwide Oilfield Machine
Flowline Equipment - Worldwide Oilfield Machine
 

Kürzlich hochgeladen

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 

Kürzlich hochgeladen (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 

BOP Guide: Everything You Need to Know About Blowout Preventers

  • 1. BLOWOUT PREVENTER Why Blowout Preventer are used? • Kick : An influx of formation fluid into the wellbore • Blowout : An uncontrolled flow of well fluids and/or formation fluid from the wellbore or into lower pressured sub-surface zones (underground blowout) • Blowout Preventer : An assembly of valves attached to the casing head that allows the well to be sealed to confine the well fluids in the wellbore. Blowout preventer are of two types- i) Annular BOP ii) Ram BOP
  • 2. CRITERIA FOR SELECTION OF BOP Selection of BOP determined by the following factors: • Maximum anticipated surface pressure. • Size of casing, casing hanger, bit and other drilling tools to be lowered through the BOP stack. • Space available between top of cellar pit and bottom of rotary table. • Matching flange connection according to the size and pressure rating of wellhead flange. • Service conditions.
  • 3. BOP SPECIFICATION Standard Sizes of BOP: 71/16”, 9”, 11”, 135/8”, 16¾”, 18¾”, 21¼”, 26¾”, 28”, 291/2”, 30” Size refers to - ID, Nominal Diameter, Through bore Rated Working Pressure (RWP): 2M, 3M, 5M, 10M, 15M, 20M The maximum pressure that the equipment can withstand (contain) and control. Shell Test or Manufacturer Test or Body Test: •Only once in the factory •2M, 3M, 5M – 2 TIMES the RWP •10M and above – 1.5 TIMES the RWP
  • 4. BOP SPECIFICATION • Closing Ratio = Well Bore Pressure Pr. Required to close RWP • Min. Pr. Required to close = Closing Ratio • Opening Ratio Well Bore Pressure = Pr. Required to open RWP • Min. Pr. Required to open Opening Ratio =
  • 5. RAM BOP • Ram Preventers are designed to seal the annulus by forcing two front packing elements which make contact with each other and seal around the object in the well bore. • Pipe Ram : It seals around the well bore and the fixed size of pipe. • Blind Ram : It seals around the well if no pipe in the well bore. • Variable Bore Ram : It seals around several pipe sizes depending on the range of variable bore ram. • Shear Ram : It shear the pipe in the well and seal the wellbore simultaneously.
  • 7. CLOSING OF RAM BOP Top seal energized by well bore pressure at sealing surface of the ram body Front packer sealing against pipe Opening Closing chamber chamber Well Pressure
  • 8. CLOSING OF RAM BOP TOP SEAL STEEL PLATE STEEL PLATE PUSHED BY OTHER SIDE PACKER STEEL PLATES RAM BLOCK PACKER RUBBER Well Pressure
  • 13. RAM BOP SPECIFICATION RAM BLOWOUT PREVENTER MAX. WORKING MAKE MODEL BORE SIZE(INCHES) PRESSURE(PSI) CLOSING RATIO(C.R) OPENING RATIO(O.R.) U-PIPE 7-1/16 ALL 6.90:1 2.20:1 11 15000 9.80:1 2.20:1 CAMERON 13-5/8 15000 10.60:1 3.60:1 U-SHEAR 11 15000 15.20:1 3.70:1 13-5/8 15000 10.80:1 4.50:1 7-1/16 3000/5000 4.80:1 1.50:1 7-1/16 10000 7.70:1 1.70:1 MANUAL LOCK PIPE 11 3000/5000 6.00:1 2.00:1 11 10000 6.90:1 2.40:1 13-5/8 3000/5000 4.80:1 2.10:1 13-5/8 10000 10.20:1 3.80:1 11 3000/5000 5.60:1 4.20:1 MANUAL LOCK SHEAR PIPE 11 10000 11.70:1 4.00:1 13-5/8 3000/5000 10.10:1 4.70:1 13-5/8 10000 10.20:1 3.80:1 MULTI POSITION LOCK PIPE 7-1/16 3000/5000 5.40:1 1.60:1 HYDRIL 11 10000 8.20:1 1.70:1 13-5/8 5000 5.20:1 2.10:1 13-5/8 10000 10.60:1 3.80:1 MULTI POSITION LOCK SHEAR PIPE 11 3000/5000 6.00:1 4.20:1 11 10000 12.40:1 4.00:1 13-5/8 3000/5000 10.60:1 4.70:1 13-5/8 10000 10.60:1 3.80:1 SL w/14" 7-1/16 10000/15000 13.90:1 7.14:1 11 10000 7.11:1 7.62:1 11 15000 7.11:1 2.80:1 13-5/8 5000 10.85:1 10.02:1 13-5/8 10000 7.11:1 2.14:1
  • 14. ANNULAR BOP A large circular valve used to control wellbore fluid. • Rounded Elastomer with reinforced steel segments • Deforms the rubber radially inwards and seals • Can close around different shapes such as square and hexagonal kelly, drill collars, tool joint etc including wire line. • Can not close on stabiliser, bit and under reamer. • Can close on open hole.
  • 15. ANNULAR BOP Piston Indicator Hole Wear Plate Element Segment Packing Element Latched Head Opening Chamber Piston Closing Chamber Piston Seals
  • 16. CLOSING SEQUENCE OF ANNULAR BOP
  • 17. ANNULAR BOP SPECIFICATION ANNULAR BLOWOUT PREVENTER MAKE MODEL BORE SIZE(INCHES) MAX. WORKING PRESSURE(PSI) 7-1/16 5000 MH KOOMEY N 7-1/16 10000 7-1/16 5000 7-1/16 10000 11 5000 GK HYDRIL 11 10000 13-5/8 5000 13-5/8 10000 GL 13-5/8 5000 7-1/16 3000/5000 7-1/16 10000 11 3000/5000 CAMERON D 11 10000 13-5/8 3000/5000 13-5/8 10000 7-1/16 3000/5000 7-1/16 10000 11 5000 SHAFFER S 11 10000 13-/58 5000 13-5/8 10000
  • 18. FUNCTION TEST •Performed to verify the component’s intended operations •The test should be conducted when the drill string is inside casing •Function test should be carried out alternatively from main control unit/derrick floor panel/auxiliary panel •Actuation time of each equipment should be within the limits specified by API RP53 •Recorded final accumulator pressure after all the functions should not be less than 1200 psi or 200 psi above the pre charged pressure of accumulator which ever is maximum •At least once in a week
  • 19. FUNCTION TEST PROCEDURE •Record initial Accumulator pressure •Turn off both electric and pneumatic pumps •Close Annular BOP and Pipe Ram BOP and open HCR one by one •Wait till pressure is stabilized •Record the closing time (closing time starts from turning the control lever till pressure stabilized) •Turn on electrical/Pneumatic pump and open all the preventer •Record the opening time •Record final Accumulator pressure •Record all the results in the prescribed format
  • 20. BOP FUNCTION TEST REPORT RIG DATE WELL PROJECT BOP STACK DETAIL 1. Annular BOP 2. Single & Double ram type BOP 3. Upper pipe ram size 4. Lower pipe ram size Sl. No. Description Function Time Accumulator Accumulator Remarks Initial Pressure Final Pressure 1. Annular 2. Lower pipe 3. Upper pipe 4. Blind/Shear 5. Hyd. Valve on Choke line 6. Hyd. Valve on kill line
  • 21. BOP PRESSURE TEST (i) Low Pressure Test : 200 – 300 psi should be applied for a low pressure test and the period is at least 5 minutes. (ii) High Pressure Test : High pressure test for RAMS and auxiliary equipment High pressure test to rated working pressure of RAMS BOP and auxiliary equipment OR rated working pressure of your wellhead. Select the lower number. For example, you BOP is rated for 5000 psi and your wellhead is rated for 3000 psi. Your high pressure test for the RAMS BOP and auxiliary equipment must be only 3000 psi. Pressure duration at least 5 minutes. High pressure test for Annular Preventer High pressure test should apply to 70% of rated working pressure or RAMS test pressure. Select the lower number. For example, you test your ram at 3000 psi and the annular working pressure is 5000 psi. You need to test your annular to 3000 psi (70% of annular RWP is 3500 psi).Pressure duration at least 5 minutes.
  • 22. BOP PRESSURE TEST PRESSURE TEST •To check the integrity of all the joints in BOP stack, BOP seals and Valves. •Clear water is considered as the best test fluid •A stable low test pressure as well as stable high test pressure should be maintained for at least 5 minutes. PRESSURE TEST FREQUENCY •Prior to Spud or upon Installation •After repairs – Limited to the affected component •Not to exceed 21 Days
  • 24. PRESSURE TESTING CUP TESTER TEST PLUG The cup of the tester gives Designed to seat in well head effective sealing in the casing and seal Limited to 70-80% of the burst Can be tested up to RWP of of upper part of casing Ram BOP Yield strength of drill pipe Different makes of well head may limit the test pressures. have different types of test rams plugs Can not be used to test blind/ Blind/ Shear Blind Rams can shear blind be tested.
  • 25. BOP PRESSURE TEST 1. Run-in 2-3 stands of HWDP 2. Make-up Test Plug 3. Make-up 1 single of 5” D/P 4. Make-up Kelly 5. Open McEvoy valve and keep it in open position 6. Make-up 2” hole fill-up line 7. Close Annular or Ram BOP (whichever is tested) 8. Flushed all the lines(through choke manifold) 9. Start pump and raise pressure to 200 psi 10. Wait for at least 5 mins, observe if any pressure drop. 11. If positive, check for any leakage 12. If negative, increase pressure to 300 psi 13. Repeat step 10 and 11, if negative 14. Increase pressure in increment of 100 psi up to the desired value and repeat step 10 and 11 after every increment 15. Record the test readings 16. Bleed off pressure.
  • 26. PROJECT: TEST FLUID- WATER/NITROGEN WELL NO.: RIG: DATE: TEST EQUIPMENT- TEST PUMP/CEMENTING UNIT Sl. TYPE OF BOP TEST PRESSURE & DURATION Rem No. Low Pressure Duration High Pressure Duration arks Annular BOP Upper pipe ram Lower pipe ram Blind/Shear ram Choke manifold Kill manifold Hyd Valve on choke line Hyd Valve on kill line HP Valves on choke & kill manifold UKC LKC FOSV Inside BOP
  • 27. IMPORTANT POINTS • Prior to conducting Pressure Test inform every single person on Rig i.e. Pre-operation meeting • Do not allow any person to go near cellar area or below derrick floor • Before conducting test, discuss with DIC • Take care test plug properly sit on well head, preferably test plug and well head make are same. • Make sure McEvoy valve is opened before conducting test, as casing will get pressurized if closed and leakage is there. • Anchor 2” hole fill-up line properly before conducting test • Conduct test in presence of at least one experience person • If pressure test is conducted with test plug, take care of Riser(as test plug might get stuck during pulling out). Conduct test, if possible before R/up of Riser.