Water Industry Process Automation & Control Monthly - April 2024
electrical engineer
1. BHASKAR ETHIRAJULU
Bangalore, Karnataka, India.
Cell No.: +91-9742606321; E-Mail:bhaskarethirajulu@gmail.com
PASSPORT NO : P5888603
EDUCATION: B.Tech- Electrical,2009: BitInstitute of Technology (AffiliationwithJntuAnantapur University)
M.tech–Electronics andDrives,2012: KonerlakshmiyaInstituteof Technology (Affiliation with KL
University)
SUMMARY
A highlyexuberantEngineer&EstimationEngineer with more than 3+ years of experience
in the field of Electrical designing & Estimation with specialization in the domain of
planning&supervisionwellversedwiththe engineeringtechniquesandcapable of ensuring
flawless project managements.
Company:Primetech Acculators Pvt Ltd, Bangalore, Karnataka, India
Work Experience: Electrical Engineer Period:March 2009 to Sep 2010 (1 Year and 6 Months)
PRIME make TubularPlate range of Industrial batteries and Solar batteriesare designed
and Manufacture for better performance and long service life even under rigorous
usage conditions.
Responsible for all engineering works.
Providedtechnical supportforcustomerson Design, operational, maintenance aspects
of the services being provided.
Solid experience in battery circuit design.
Maintained and serviced uninterruptible power systems.
Excellent working knowledge and understanding of inverters, battery units and
UPS/INVERTER systems.
Performed preventative Maintenance, and Design, Remedial service, and emergency
repair services on various brands of UPS Systems, batteries. Coordinated, troubleshot
and repaired UPS equipment.
Company:Emarga Technology Services Pvt Ltd, Bangalore, karnataka, India
Work Experience: Electrical Coordinator Period: june2013 –July 2014 (1 Years)
Preparedthe Electrical LoadCalculation,Electrical LayoutDrawing,SinglelineDiagram
Using AutoCAD.
Developedinitial drawingsanddesignsusingMicrostation
Discussedpossible modificationswithelectrical engineersandarchitects and
implementedthemaccordingly
Providedmaterial specificationsandcoordinatedwiththe warehousingdepartmentto
ensure quickdeliveryof the material
Oversawthe installationproceduretoensure thatitisidentical tothe blueprint
Followedsafetyanddesignstandardsthroughoutthe project
Performeddifferentteststoensure safetyandfunctionalityof the installedsystems
2. Maintainedprojectreportsandothertechnical documents
Company:The Chancery Pavilion, Bangalore, Karnataka, India
Work Experience: Maintenance Engineer Period: june2015 – present (1.5 Years)
Maintain and check the DG 1010KVA,750KVA in every 12 hours of working condition
process
Taking the KWH bescom1600KVA transformer reading.
Take care of the overall condition of the facility.
We will ensure that the walls, ceilings, fixtures, electrical systems, elevators, parking
lots, etc. are in good condition and there is no complaint from guests for whatever
reason.
Goingthe roundsfromtop to bottominthe buildingall majorcomplaintswill notice and
disuse with higher officials and give the suggestion in the briefing and allocate the
complaints for consultant persons.
Through knowledge of plant operations and national fire codes
Repair, replace, and maintain the entire plant systems of the facility
Observing the Vacuum circuit breaker every day.
Document parts replaced and repaired.
KEYSKILLS
Auto CAD, Electrical CAD, Or-CAD
Proficiency in entire MS-Office
Windows XP , Win-7 & 8 , Linux
IEC & IS Standards Experience
Solarsystems
Inverters
Converters
Powerelectronics
Power systems
ACADEMY PROJECTS
M.TECH
A THERE –PHASE FIVE –LEVEL PWM DC-DC CONVERTER USING H-BRIDGE
The major reason is that three –phase DC-DC converters can achieve lower power
components current stress and also considerably reduce input and output filter
requirements, when compared single phase topologies
B.TECH
POWER UPGRADING OFTRANSMISSION LINES BY COMBINING AC-DCTRANSMISSION
This project proposes a long extra high voltage (EHV) ac line cannot be loaded to their
thermal limits in order to keep sufficient margin against transient instability. With the
scheme proposed in the project ,it is possible to load these lines very close to their
thermal limits. the conductors are allowed to carry usual AC along with DC
superimposedonitforthe particularsystemstudied,there issubstantial increase(about
83.45%) in the load abilityof the line .the DC power flow does not impose any stability
problem.
3. ACHIEVEMENTS:
Cost reducedof lightingfixtures,lightingpoles&lightingcablesbychanginglighting design
Cost reduced of power & control cables by changing cable route
Designed MCC Panel with changing separate compartment for Digital Input (DI), Digital
Output (DO), power cables & control cables.
PERSONAL DETAILS:
Father Name : E.Rama Krishna
DOB : 10th mar 1987
Gender : Male
Nationality : Indian
Marital Status : Single
Languages : English,Telugu,kannada,Hindi
PASSPORT NO : P5888603
DECLARATION:
I considermyself familiarwithdesign&detail engineeringaspects.i am also confident of my ability to work
in a team.
I hereby declare that the information furnished above is true to the best of my knowledge and belief.
(Bhaskar.E)