VALIDATION OF 
WATER SUPPLY SYSTEM 
MALIBA PHARMACY COLLEGE.
CONTENTS 
2 
 Objectives 
 Introduction 
 Validation & System Qualification 
 Monitoring 
 Maintenance 
 Revalidation & Change control 
 Validation documentation 
 Summary
OBJECTIVE 
3 
To understand: 
1. The need for water quality manual 
2. reason for usage of pharmaceutical water 
supply systems. 
3. The technical requirements for water supply 
systems. 
4. Different types of water supply systems. 
5. Validation requirements. 
6. Qualification & inspection requirement
INTRODUCTION 
4 
High-quality water is essential for the manufacturing of 
pharmaceuticals. Water is the most commonly used raw 
material in pharmaceutical manufacturing. 
water is directly or indirectly used in the pharmaceutical 
manufacturing such as a major component in injectable 
products and in cleaning of manufacturing equipment. 
It is one of the raw material that is usually processed by the 
pharmaceutical manufacturer prior to use because it cannot be 
supplied by the vendor. 
Water is thus an important raw material in GMP and in 
validating the manufacturing process.
INTRODUCTION 
5 
Why purification? 
o Although tap water is reasonably pure, it is 
always variable due to seasonal variations, 
regional variation in quality. 
o One must remove impurities and control microbes 
to avoid contamination of products. 
o Pretreatment depends on quality of feed water.
INTRODUCTION 
6 
Quality of water should be specific for product 
quality. 
Water contains, 
 Organic and inorganic impurities 
 Microbial contamination 
 Endotoxin 
 Particulate contamination 
Low quality of water can lead to 
 product degradation 
 product contamination 
 loss of product and profit
TYPES OF WATER 
7 
Different grades of Water for Pharmaceutical 
Purposes-each 
type has its on characteristic for all parameters. 
Potable water 
Purified water 
Water for injection(WFI) 
Sterile water for injection, inhalation, irrigation 
Sterile bacteriostatic water for injection
8
9
DIFFERENT TECHNIQUES USED FOR 
WATER TREATMENT 
10 
De-chlorination (Sodium Bisulphite, 
Carbon Filter) 
Filtration 
Ultra Filtration 
Softening 
Demineralization 
Reverse Osmosis 
UV Treatment 
Deionization 
Ozonization
DIFFERENT EQUIPMENTS AND 
COMPONENTS FOR WATER SYSTEM 
11 
Piping 
Valves 
Pumps 
Pressure gauges 
Heat exchangers 
Distillation unit 
Filters 
Deionizers 
Sensors 
Auxiliary equipment
WATER STORAGE AND 
DISTRIBUTION – CONSIDERATIONS 
12 
Materials of Construction (Chemical and Heat 
Compatibility) 
Stainless Steel (316 or 316L) 
Teflon, Silicone, Viton (gaskets, diaphragms) 
Minimize Dead Legs (<= 2 pipe diameters) 
Smooth Surfaces (Mechanical Polish , Electropolish) 
Clean joints (sanitary Tri®Clamp, automatic orbital 
welding) 
 Passivate interior surfaces to form barrier between 
water and free iron (0.5 to 1% alkali at 160ºF for 30 
minutes followed by 1% Phosphoric Acid or Nitric Acid 
at 150ºF to 180º F for 10 minutes.)
Conti…. 
13 
Design of the following should be appropriate to 
prevent recontamination after treatment- 
Vent filter 
Sanitary overflow 
Tank UV light 
Conical Bottom 
Steam sterilization 
Combination of on-line (TOC, Conductivity meter etc.) 
and off-line monitoring (lab testing by proper sampling) 
to ensure compliance with water specification
VALIDATION CONCEPT 
14 
To prove the performance of processes or systems under 
all conditions expected to be encountered during future 
operations. 
To prove the performance, one must demonstrate 
(document) that the processes or systems consistently 
produce the specified qquuaannttiittyy aanndd qquuaalliittyy of water when 
operated and maintained according to specific written 
operating and maintenance procedures. 
validation involves proving- 
1. Engineering design 
2.Operating procedures and acceptable ranges for control 
parameters 
3. Maintenance procedures to accomplish it
Conti.. 
15 
the system must be carefully, 
-designed 
-installed 
-tested during processing, after construction, and 
under all operating conditions. 
Variations in daily, weekly and annual system 
usage patterns must be validated.
WHY VALIDATION OF WATER 
SYSTEM? 
16 
Most widely used and sometimes most expensive 
ingredient 
Drug component even if not in product 
Generally reviewed in depth by Regulators 
Many recalls water related 
Always considered direct impact system 
To ensure reliable, consistent production of water of 
required quality 
To operate system within design capacity 
To prevent unacceptable microbial, chemical and 
physical contamination during production, storage 
and distribution 
To monitor system performance, storage and 
distribution systems
VALIDATION CYCLE: 
17 
It includes four major steps- 
Determination of Quality Attributes 
The Validation Protocol 
Steps of Validation 
Control during routine operation
DETERMINATION OF QUALITY ATTRIBUTES 
18 
The quality attributes, is gaining a clear 
understanding of the required quality of water and 
its intended use 
Should be determined before starting the 
validation. 
 Without defining required quality attributes, we 
cannot establish validation protocols.
THE VALIDATION PROTOCOL 
19 
A written plan stating how validation will be 
ccoonndduucctteedd and defining aacccceeppttaannccee ccrriitteerriiaa for 
quality. 
For example, the protocol for a manufacturing 
process-it 
identifies -process equipment 
-critical process parameters 
-product characteristics, 
-sampling, 
-test data to be collected, 
-number of validation runs 
-acceptable test results
STEPS OF VALIDATION 
20 
Establishing standards for quality attributes 
Defining system and subsystem 
Designing equipment, control, & monitoring 
technologies 
Establishing standards for operating parameters 
Developing an IQ stage & OQ stage 
Establishing alert and action levels 
Developing a prospective PQ stage 
Completing protocols and documenting each 
steps
Conti… 
21
ALERT AND ACTION LEVELS: 
22 
Alert and action levels are distinct from process 
parameters and product specifications. 
They are used for monitoring and control rather than 
accept or reject decisions. 
The levels should be determined based on the statistical 
analysis of the data obtained by monitoring at the PQ 
step. 
Alert levels are levels or ranges that when exceeded 
indicate that a process may have drifted from its normal 
operation condition. 
 Alert levels indicate a warning and do not necessarily 
require a corrective action. Exceeding an action level 
indicates that corrective action should be taken to bring 
the process back into its normal operating range.
SYSTEM QUALIFICATION 
23 
Validation Master Plan 
User Requirement Specification 
Design Qualification 
Installation Qualification 
Operation Qualification 
Performance Qualification 
Re- Qualification.
DESIGN QUALIFICATION OF WATER SYSTEM 
24 
Based on the URS, supplier designs the equipment. 
 This is 1st step in the qualification of new water supply 
systems. 
 Define process schematically by use of PFD and P&IDs. 
 It is documented the design of the system & will include : 
-Functional Specification.(Storage, purification, etc) 
-Technical/Performance specification for equipment. 
(requirements of water volume and flow, define pumps and 
pipe sizes ) 
-Detailed layout of the system. 
Design must be in compliance with GMPs and other regulatory 
requirements.
INSTALLATION QUALIFICATION 
25 
IQ is in the form of checklist and it should include- 
 Instrumentation checked against current engineering 
drawings and specifications 
 Review of P&ID 
 Verification of materials of construction 
 Installation of equipment with piping 
 Calibration of measuring instruments 
 Collection and collation of supplier operating and 
working instructions and maintenance requirements
Conti… 
26 
Installation of system as per Design requirements. 
Installation Verification- 
Systematic range of adjustments, measurements 
and tests should be carried out to ensure proper 
installation. 
Documentation include details of completed 
installation.
27 
Conti… 
• IQ Document should contain, 
Instrument name, model, I.D. No., Personnel 
responsible for activities and Date. 
A fully verified installation that complies with the 
documented design. (all deviations will have been 
recorded and assessed.) 
 All equipment documentation and maintenance 
requirements would be documented. 
 Completed calibration of measuring 
instruments. 
 Verification of Materials of construction.
OPERATION QUALIFICATION 
28 
Definition : The purpose of OQ is to establish, through 
documented testing, that all critical components are 
capable of operating within established limits and 
tolerances. 
 it is the functional testing of system components 
mainly the critical components. 
The purpose of OQ is also to verify and document that 
the water supply system provides acceptable operational 
control under “at-rest” conditions.
29 
Conti… 
Operation Qualification Checks- 
Ability to provide water of sufficient quality and 
quantity to ensure achievement of specifications. 
Ability to maintain general parameters like 
temperature, pressure, flow at set points. 
Ability to maintain any critical parameters(pH, 
TOC, endotoxin, microbial level, conductivity etc ).
30 
Conti… 
Includes the tests that have been developed from 
knowledge of processes, systems and equipment. 
Tests include a condition or a set of conditions with 
upper and lower operating limits, sometimes referred 
to as ‘worst case’ conditions.
31 
PERFORMANCE QUALIFICATION 
The purpose of PQ is to verify and document that 
water supply system provides acceptable control 
under ‘ Full Operational ‘ conditions. 
PQ should follow successful completion of IQ 
and OQ. 
PQ verifies that over time, the critical 
parameters, as defined in the DQ are being 
achieved.
32 
Conti… 
According to the FDA’s advice: 
“The observed variability of the equipment 
between and within runs can be used as a basis 
for determining the total number of trials 
selected for the subsequent PQ studies of the 
process.”
33 
Conti… 
PQ is used to demonstrate consistent achievement of 
critical parameters over time. 
(such as pH, TOC, conductivity) 
PQ and OQ tests are sometimes performed in 
conjunction with one another.
QUALIFICATION PHASES 
34 
Three phase approach recommended according to 
WHO Technical Report Series 929 to prove 
reliability and robustness. 
Phase 1 (investigational phase): 
A test period of 2-4 weeks – monitor the system 
System to operate continuously without failure or 
performance deviation 
Chemical and microbiological testing should 
include in accordance with a defined plan
Conti… 
35 
Sample daily from- 
incoming feed-water 
after each step in the purification process 
each point of use and at other defined sample 
points 
Develop: 
appropriate operating ranges 
and finalize operating, cleaning, sanitizing 
and maintenance procedures
Conti… 
36 
Demonstrate production and delivery of water of 
the required quality and quantity 
Use and define the standard operating procedures 
(SOPs) for operation, maintenance, sanitization 
and troubleshooting 
Verify provisional alert and action levels 
Develop and define test-failure procedure
37 
Phase 2(verification step) 
A further test period of 2-4 weeks – further intensive 
monitoring of the system 
Utilization of all the SOPs after the satisfactory 
completion of phase 1 
Sampling scheme generally the same as in phase 1 
Water can be used for manufacturing purposes during 
this phase
Conti.. 
38 
Phase-2 demonstrates: 
Consistent operation within established ranges. so 
it demostrate that the system is in control. 
Consistent production and delivery of water of the 
required quantity and quality when the system is 
operated in accordance with the SOPs.
39 
Phase 3 
Over 1 year after the satisfactory completion of 
phase 2 
Water can be used for manufacturing purposes 
during this phase 
Demonstrate: 
extended reliable performance 
that seasonal variations are evaluated 
Sample locations, sampling frequencies and tests 
should be reduced to the normal routine pattern 
based on established procedures proven during 
phases 1 and 2
MONITORING 
40 
 Monitoring and feed back data are important in maintaining 
the performance systems. Monitoring parameters include: 
Flow, pressure, temperature, conductivity, TOC 
 Samples taken: 
From points of use, and specific sample points 
In a similar way how water is used in service 
 Tests should include physical, chemical and microbial 
attributes 
 For example, stable state can be achieved by applying 
automatic continuous monitoring of TOC and conductivity of 
the water system. They are the major quality attributes of 
water by which organic and inorganic impurities can be 
determined.
MAINTENANCE 
41 
A controlled, documented maintenance covering : 
 Defined frequency with plan and instructions 
 Calibration programme 
 SOPs for tasks 
 Control of approved spares 
 Record and review of problems and faults during 
maintenance
MAINTENANCE 
System sanitization and bioburden control 
Systems in place to control proliferation of microbes 
Techniques for sanitizing or sterilization 
Consideration already during design stage – then 
validated 
Special precautions if water not kept in the range of 
70 to 80 degrees Celsius
REVALIDATION & CHANGE CONTROL 
43 
Once the validation is completed, the standard operating 
procedures (SOPs) are formalized. 
Routine operation should be performed according to the 
established SOP. 
If any deviation from SOP observed, determine the change 
and their impact on whole system 
Revalidation and evaluation should be performed 
depending upon the impact of the change on system.
VALIDATION REPORT 
44 
Written at the conclusion of the equipment IQ, OQ 
and at completion of process validation. 
Will serve as primary documentation for FDA 
regulatory inspection 
Will serve as reference document when changes to 
the system are occurred and revalidation is needed.
VALIDATION REPORT 
45 
STANDARD FORMAT 
1. Executive summary 
2. Discussion 
3. Conclusions & recommendation 
4. List of attachment 
 Topic should be presented in the order in which they 
appear in the protocol. 
 Protocol deviation are fully explained & justified. 
 The report is signed & dated by designated representatives 
of each unit involved in water system validation.
46 
Complete Documentation 
Verification of design documentation, including 
◦ Description of installation and functions 
◦ Specification of the requirements 
Instructions for performance control 
Operating procedures 
Maintenance instructions 
Maintenance records 
Training of personnel (program and records) 
Environmental records 
Inspection of plant 
Finally certification (Sign Off) by Engineering, 
User (Production) and QA Heads.
SUMMARY 
47 
Water supply systems, 
 Play a major role in the quality of 
pharmaceuticals. 
 Must be designed properly by professionals. 
 Must be validated as a critical system.
48 
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Validation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamValidation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamJp Prakash
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipmentsPranali Polshettiwar
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachRx Ayush Sharma
 
Qualification Of Autoclave
Qualification Of AutoclaveQualification Of Autoclave
Qualification Of Autoclave8669290285
 
Auditing of microbiology laboratory
Auditing of microbiology laboratoryAuditing of microbiology laboratory
Auditing of microbiology laboratoryNikita Amane
 
Manufacturing operation and control
Manufacturing operation and controlManufacturing operation and control
Manufacturing operation and controlMalay Pandya
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instrumentsFaris ameen
 
validation of analytical method used in cleaning
validation of analytical method used in cleaningvalidation of analytical method used in cleaning
validation of analytical method used in cleaningKUNDLAJAYALAKSHMI
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualificationShihabPatel
 
CLEANING VALIDATION for M.pharm and industry person
CLEANING VALIDATION  for M.pharm and industry personCLEANING VALIDATION  for M.pharm and industry person
CLEANING VALIDATION for M.pharm and industry personabhishek pandey
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxDhruvi50
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 

Was ist angesagt? (20)

Requalification
RequalificationRequalification
Requalification
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
Validation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steamValidation of pharaceutical water system and pure steam
Validation of pharaceutical water system and pure steam
 
CLEANING METHOD DEVELOPMENT
CLEANING METHOD DEVELOPMENT CLEANING METHOD DEVELOPMENT
CLEANING METHOD DEVELOPMENT
 
Qualification of laboratory equipments
Qualification of laboratory equipmentsQualification of laboratory equipments
Qualification of laboratory equipments
 
USFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approachUSFDA guidelines on process validation a life cycle approach
USFDA guidelines on process validation a life cycle approach
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 
Qualification of Dry Powder Mixture
Qualification of Dry Powder Mixture Qualification of Dry Powder Mixture
Qualification of Dry Powder Mixture
 
Qualification Of Autoclave
Qualification Of AutoclaveQualification Of Autoclave
Qualification Of Autoclave
 
Auditing of microbiology laboratory
Auditing of microbiology laboratoryAuditing of microbiology laboratory
Auditing of microbiology laboratory
 
Computer system validations
Computer system validationsComputer system validations
Computer system validations
 
Qualification
QualificationQualification
Qualification
 
Manufacturing operation and control
Manufacturing operation and controlManufacturing operation and control
Manufacturing operation and control
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instruments
 
validation of analytical method used in cleaning
validation of analytical method used in cleaningvalidation of analytical method used in cleaning
validation of analytical method used in cleaning
 
Vendor qualification
Vendor qualificationVendor qualification
Vendor qualification
 
CLEANING VALIDATION for M.pharm and industry person
CLEANING VALIDATION  for M.pharm and industry personCLEANING VALIDATION  for M.pharm and industry person
CLEANING VALIDATION for M.pharm and industry person
 
SITE ACCEPTANCE TEST
SITE ACCEPTANCE TESTSITE ACCEPTANCE TEST
SITE ACCEPTANCE TEST
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptx
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 

Andere mochten auch (20)

Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
 
Presentation of industrial pharmacy 2
Presentation  of industrial pharmacy 2Presentation  of industrial pharmacy 2
Presentation of industrial pharmacy 2
 
Validation of sterelization_equipment
Validation of sterelization_equipmentValidation of sterelization_equipment
Validation of sterelization_equipment
 
Purified Water System in Pharmaceuticals
Purified Water System in PharmaceuticalsPurified Water System in Pharmaceuticals
Purified Water System in Pharmaceuticals
 
Sterile process validation
Sterile process validationSterile process validation
Sterile process validation
 
mlt
mltmlt
mlt
 
Mlt
MltMlt
Mlt
 
Test for sterility for parentrals
Test for sterility for parentralsTest for sterility for parentrals
Test for sterility for parentrals
 
Cleaning Validation in Pharmaceuticals
Cleaning Validation in PharmaceuticalsCleaning Validation in Pharmaceuticals
Cleaning Validation in Pharmaceuticals
 
Bioburden Testing 101
Bioburden Testing 101Bioburden Testing 101
Bioburden Testing 101
 
Bioburden method validation
Bioburden method validationBioburden method validation
Bioburden method validation
 
Optimization in pharmaceutics & processing
Optimization in pharmaceutics & processingOptimization in pharmaceutics & processing
Optimization in pharmaceutics & processing
 
Drug design intro
Drug design introDrug design intro
Drug design intro
 
Packaging designs and specifications
Packaging designs and specificationsPackaging designs and specifications
Packaging designs and specifications
 
2 genomes
2 genomes2 genomes
2 genomes
 
Optimization in pharmaceutics & processing
Optimization in pharmaceutics & processingOptimization in pharmaceutics & processing
Optimization in pharmaceutics & processing
 
Who
WhoWho
Who
 
Validation03
Validation03Validation03
Validation03
 
Bio info statistical-methods[1]
Bio info statistical-methods[1]Bio info statistical-methods[1]
Bio info statistical-methods[1]
 
Who
WhoWho
Who
 

Ähnlich wie Water system validation

Validation of water
Validation of waterValidation of water
Validation of wateranilak123
 
Water system validation by- Akshay kakde
Water system validation by- Akshay kakdeWater system validation by- Akshay kakde
Water system validation by- Akshay kakdeAkshay Kakde
 
Validation of utilities
Validation of utilitiesValidation of utilities
Validation of utilitiesMasarrat Khan
 
Support and utilities validation
Support and utilities validationSupport and utilities validation
Support and utilities validationVaishali Dudhabale
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)magareasmi
 
Validation utility system
Validation utility systemValidation utility system
Validation utility systemPRANJAY PATIL
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationMayur Unde
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT HemlataMore3
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdfAmitMasand5
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfAkashChaudhary749568
 
Facility and ahu validation
Facility and ahu validationFacility and ahu validation
Facility and ahu validationshankar roy
 
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxABG
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptxPawanDhamala1
 

Ähnlich wie Water system validation (20)

Validation of water
Validation of waterValidation of water
Validation of water
 
Water system validation by- Akshay kakde
Water system validation by- Akshay kakdeWater system validation by- Akshay kakde
Water system validation by- Akshay kakde
 
Validation of utilities
Validation of utilitiesValidation of utilities
Validation of utilities
 
Support and utilities validation
Support and utilities validationSupport and utilities validation
Support and utilities validation
 
Validation
ValidationValidation
Validation
 
Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)Support utilities validation.pptx (asmita magare)
Support utilities validation.pptx (asmita magare)
 
Water system validation.
Water system validation.Water system validation.
Water system validation.
 
instrument validation
instrument validationinstrument validation
instrument validation
 
Validation utility system
Validation utility systemValidation utility system
Validation utility system
 
Validation and qualification
Validation and qualificationValidation and qualification
Validation and qualification
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC Qualification
 
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
AUDITING OF AUALITY ASSURANCE AND ENGINEERING DEPARTMENT
 
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
1581995753943audit-221215085248-ec81c6e4 (1) (1).pdf
 
4 validation jntu pharmacy
4 validation jntu pharmacy4 validation jntu pharmacy
4 validation jntu pharmacy
 
Jatin validation
Jatin validationJatin validation
Jatin validation
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
validationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdfvalidationksd-140930004558-phpapp01 (1).pdf
validationksd-140930004558-phpapp01 (1).pdf
 
Facility and ahu validation
Facility and ahu validationFacility and ahu validation
Facility and ahu validation
 
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
 
validation ppt.pptx
 validation ppt.pptx validation ppt.pptx
validation ppt.pptx
 

Mehr von Malla Reddy College of Pharmacy (20)

Rna secondary structure prediction
Rna secondary structure predictionRna secondary structure prediction
Rna secondary structure prediction
 
Proteomics
ProteomicsProteomics
Proteomics
 
Proteins basics
Proteins basicsProteins basics
Proteins basics
 
Protein structure classification
Protein structure classificationProtein structure classification
Protein structure classification
 
Protein identication characterization
Protein identication characterizationProtein identication characterization
Protein identication characterization
 
Protein modeling
Protein modelingProtein modeling
Protein modeling
 
Primerdesign
PrimerdesignPrimerdesign
Primerdesign
 
Phylogenetic studies
Phylogenetic studiesPhylogenetic studies
Phylogenetic studies
 
Multiple sequence alignment
Multiple sequence alignmentMultiple sequence alignment
Multiple sequence alignment
 
Homology modeling tools
Homology modeling toolsHomology modeling tools
Homology modeling tools
 
Homology modeling
Homology modelingHomology modeling
Homology modeling
 
Genome assembly
Genome assemblyGenome assembly
Genome assembly
 
Genome analysis2
Genome analysis2Genome analysis2
Genome analysis2
 
Genome analysis
Genome analysisGenome analysis
Genome analysis
 
Fasta
FastaFasta
Fasta
 
Drug design
Drug designDrug design
Drug design
 
Data retrieval
Data retrievalData retrieval
Data retrieval
 
Blast
BlastBlast
Blast
 
Biological databases
Biological databasesBiological databases
Biological databases
 
Bioinfo intro
Bioinfo introBioinfo intro
Bioinfo intro
 

Kürzlich hochgeladen

Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...aartirawatdelhi
 
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...astropune
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeCall Girls Delhi
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipurparulsinha
 
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Kochi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...narwatsonia7
 
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Tirupati Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...Call Girls in Nagpur High Profile
 
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bangalore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore EscortsCall Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escortsvidya singh
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...Taniya Sharma
 
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...Taniya Sharma
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...astropune
 
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...narwatsonia7
 
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...CALL GIRLS
 

Kürzlich hochgeladen (20)

Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Mumbai Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Varanasi Just Call 9907093804 Top Class Call Girl Service Available
 
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
Night 7k to 12k Navi Mumbai Call Girl Photo 👉 BOOK NOW 9833363713 👈 ♀️ night ...
 
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
Best Rate (Hyderabad) Call Girls Jahanuma ⟟ 8250192130 ⟟ High Class Call Girl...
 
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any TimeTop Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
Top Quality Call Girl Service Kalyanpur 6378878445 Available Call Girls Any Time
 
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Faridabad Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Siliguri Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls JaipurCall Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
Call Girls Service Jaipur Grishma WhatsApp ❤8445551418 VIP Call Girls Jaipur
 
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Kochi Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Kochi Just Call 9907093804 Top Class Call Girl Service Available
 
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
Top Rated Bangalore Call Girls Mg Road ⟟ 8250192130 ⟟ Call Me For Genuine Sex...
 
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Bhubaneswar Just Call 9907093804 Top Class Call Girl Service Avail...
 
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Tirupati Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Tirupati Just Call 9907093804 Top Class Call Girl Service Available
 
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
Book Paid Powai Call Girls Mumbai 𖠋 9930245274 𖠋Low Budget Full Independent H...
 
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Bangalore Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Bangalore Just Call 9907093804 Top Class Call Girl Service Available
 
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore EscortsCall Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
Call Girls Horamavu WhatsApp Number 7001035870 Meeting With Bangalore Escorts
 
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
(👑VVIP ISHAAN ) Russian Call Girls Service Navi Mumbai🖕9920874524🖕Independent...
 
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
💎VVIP Kolkata Call Girls Parganas🩱7001035870🩱Independent Girl ( Ac Rooms Avai...
 
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
♛VVIP Hyderabad Call Girls Chintalkunta🖕7001035870🖕Riya Kappor Top Call Girl ...
 
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...
Top Rated Bangalore Call Girls Richmond Circle ⟟ 8250192130 ⟟ Call Me For Gen...
 
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...
Call Girls Service Surat Samaira ❤️🍑 8250192130 👄 Independent Escort Service ...
 

Water system validation

  • 1. 1 VALIDATION OF WATER SUPPLY SYSTEM MALIBA PHARMACY COLLEGE.
  • 2. CONTENTS 2  Objectives  Introduction  Validation & System Qualification  Monitoring  Maintenance  Revalidation & Change control  Validation documentation  Summary
  • 3. OBJECTIVE 3 To understand: 1. The need for water quality manual 2. reason for usage of pharmaceutical water supply systems. 3. The technical requirements for water supply systems. 4. Different types of water supply systems. 5. Validation requirements. 6. Qualification & inspection requirement
  • 4. INTRODUCTION 4 High-quality water is essential for the manufacturing of pharmaceuticals. Water is the most commonly used raw material in pharmaceutical manufacturing. water is directly or indirectly used in the pharmaceutical manufacturing such as a major component in injectable products and in cleaning of manufacturing equipment. It is one of the raw material that is usually processed by the pharmaceutical manufacturer prior to use because it cannot be supplied by the vendor. Water is thus an important raw material in GMP and in validating the manufacturing process.
  • 5. INTRODUCTION 5 Why purification? o Although tap water is reasonably pure, it is always variable due to seasonal variations, regional variation in quality. o One must remove impurities and control microbes to avoid contamination of products. o Pretreatment depends on quality of feed water.
  • 6. INTRODUCTION 6 Quality of water should be specific for product quality. Water contains,  Organic and inorganic impurities  Microbial contamination  Endotoxin  Particulate contamination Low quality of water can lead to  product degradation  product contamination  loss of product and profit
  • 7. TYPES OF WATER 7 Different grades of Water for Pharmaceutical Purposes-each type has its on characteristic for all parameters. Potable water Purified water Water for injection(WFI) Sterile water for injection, inhalation, irrigation Sterile bacteriostatic water for injection
  • 8. 8
  • 9. 9
  • 10. DIFFERENT TECHNIQUES USED FOR WATER TREATMENT 10 De-chlorination (Sodium Bisulphite, Carbon Filter) Filtration Ultra Filtration Softening Demineralization Reverse Osmosis UV Treatment Deionization Ozonization
  • 11. DIFFERENT EQUIPMENTS AND COMPONENTS FOR WATER SYSTEM 11 Piping Valves Pumps Pressure gauges Heat exchangers Distillation unit Filters Deionizers Sensors Auxiliary equipment
  • 12. WATER STORAGE AND DISTRIBUTION – CONSIDERATIONS 12 Materials of Construction (Chemical and Heat Compatibility) Stainless Steel (316 or 316L) Teflon, Silicone, Viton (gaskets, diaphragms) Minimize Dead Legs (<= 2 pipe diameters) Smooth Surfaces (Mechanical Polish , Electropolish) Clean joints (sanitary Tri®Clamp, automatic orbital welding)  Passivate interior surfaces to form barrier between water and free iron (0.5 to 1% alkali at 160ºF for 30 minutes followed by 1% Phosphoric Acid or Nitric Acid at 150ºF to 180º F for 10 minutes.)
  • 13. Conti…. 13 Design of the following should be appropriate to prevent recontamination after treatment- Vent filter Sanitary overflow Tank UV light Conical Bottom Steam sterilization Combination of on-line (TOC, Conductivity meter etc.) and off-line monitoring (lab testing by proper sampling) to ensure compliance with water specification
  • 14. VALIDATION CONCEPT 14 To prove the performance of processes or systems under all conditions expected to be encountered during future operations. To prove the performance, one must demonstrate (document) that the processes or systems consistently produce the specified qquuaannttiittyy aanndd qquuaalliittyy of water when operated and maintained according to specific written operating and maintenance procedures. validation involves proving- 1. Engineering design 2.Operating procedures and acceptable ranges for control parameters 3. Maintenance procedures to accomplish it
  • 15. Conti.. 15 the system must be carefully, -designed -installed -tested during processing, after construction, and under all operating conditions. Variations in daily, weekly and annual system usage patterns must be validated.
  • 16. WHY VALIDATION OF WATER SYSTEM? 16 Most widely used and sometimes most expensive ingredient Drug component even if not in product Generally reviewed in depth by Regulators Many recalls water related Always considered direct impact system To ensure reliable, consistent production of water of required quality To operate system within design capacity To prevent unacceptable microbial, chemical and physical contamination during production, storage and distribution To monitor system performance, storage and distribution systems
  • 17. VALIDATION CYCLE: 17 It includes four major steps- Determination of Quality Attributes The Validation Protocol Steps of Validation Control during routine operation
  • 18. DETERMINATION OF QUALITY ATTRIBUTES 18 The quality attributes, is gaining a clear understanding of the required quality of water and its intended use Should be determined before starting the validation.  Without defining required quality attributes, we cannot establish validation protocols.
  • 19. THE VALIDATION PROTOCOL 19 A written plan stating how validation will be ccoonndduucctteedd and defining aacccceeppttaannccee ccrriitteerriiaa for quality. For example, the protocol for a manufacturing process-it identifies -process equipment -critical process parameters -product characteristics, -sampling, -test data to be collected, -number of validation runs -acceptable test results
  • 20. STEPS OF VALIDATION 20 Establishing standards for quality attributes Defining system and subsystem Designing equipment, control, & monitoring technologies Establishing standards for operating parameters Developing an IQ stage & OQ stage Establishing alert and action levels Developing a prospective PQ stage Completing protocols and documenting each steps
  • 22. ALERT AND ACTION LEVELS: 22 Alert and action levels are distinct from process parameters and product specifications. They are used for monitoring and control rather than accept or reject decisions. The levels should be determined based on the statistical analysis of the data obtained by monitoring at the PQ step. Alert levels are levels or ranges that when exceeded indicate that a process may have drifted from its normal operation condition.  Alert levels indicate a warning and do not necessarily require a corrective action. Exceeding an action level indicates that corrective action should be taken to bring the process back into its normal operating range.
  • 23. SYSTEM QUALIFICATION 23 Validation Master Plan User Requirement Specification Design Qualification Installation Qualification Operation Qualification Performance Qualification Re- Qualification.
  • 24. DESIGN QUALIFICATION OF WATER SYSTEM 24 Based on the URS, supplier designs the equipment.  This is 1st step in the qualification of new water supply systems.  Define process schematically by use of PFD and P&IDs.  It is documented the design of the system & will include : -Functional Specification.(Storage, purification, etc) -Technical/Performance specification for equipment. (requirements of water volume and flow, define pumps and pipe sizes ) -Detailed layout of the system. Design must be in compliance with GMPs and other regulatory requirements.
  • 25. INSTALLATION QUALIFICATION 25 IQ is in the form of checklist and it should include-  Instrumentation checked against current engineering drawings and specifications  Review of P&ID  Verification of materials of construction  Installation of equipment with piping  Calibration of measuring instruments  Collection and collation of supplier operating and working instructions and maintenance requirements
  • 26. Conti… 26 Installation of system as per Design requirements. Installation Verification- Systematic range of adjustments, measurements and tests should be carried out to ensure proper installation. Documentation include details of completed installation.
  • 27. 27 Conti… • IQ Document should contain, Instrument name, model, I.D. No., Personnel responsible for activities and Date. A fully verified installation that complies with the documented design. (all deviations will have been recorded and assessed.)  All equipment documentation and maintenance requirements would be documented.  Completed calibration of measuring instruments.  Verification of Materials of construction.
  • 28. OPERATION QUALIFICATION 28 Definition : The purpose of OQ is to establish, through documented testing, that all critical components are capable of operating within established limits and tolerances.  it is the functional testing of system components mainly the critical components. The purpose of OQ is also to verify and document that the water supply system provides acceptable operational control under “at-rest” conditions.
  • 29. 29 Conti… Operation Qualification Checks- Ability to provide water of sufficient quality and quantity to ensure achievement of specifications. Ability to maintain general parameters like temperature, pressure, flow at set points. Ability to maintain any critical parameters(pH, TOC, endotoxin, microbial level, conductivity etc ).
  • 30. 30 Conti… Includes the tests that have been developed from knowledge of processes, systems and equipment. Tests include a condition or a set of conditions with upper and lower operating limits, sometimes referred to as ‘worst case’ conditions.
  • 31. 31 PERFORMANCE QUALIFICATION The purpose of PQ is to verify and document that water supply system provides acceptable control under ‘ Full Operational ‘ conditions. PQ should follow successful completion of IQ and OQ. PQ verifies that over time, the critical parameters, as defined in the DQ are being achieved.
  • 32. 32 Conti… According to the FDA’s advice: “The observed variability of the equipment between and within runs can be used as a basis for determining the total number of trials selected for the subsequent PQ studies of the process.”
  • 33. 33 Conti… PQ is used to demonstrate consistent achievement of critical parameters over time. (such as pH, TOC, conductivity) PQ and OQ tests are sometimes performed in conjunction with one another.
  • 34. QUALIFICATION PHASES 34 Three phase approach recommended according to WHO Technical Report Series 929 to prove reliability and robustness. Phase 1 (investigational phase): A test period of 2-4 weeks – monitor the system System to operate continuously without failure or performance deviation Chemical and microbiological testing should include in accordance with a defined plan
  • 35. Conti… 35 Sample daily from- incoming feed-water after each step in the purification process each point of use and at other defined sample points Develop: appropriate operating ranges and finalize operating, cleaning, sanitizing and maintenance procedures
  • 36. Conti… 36 Demonstrate production and delivery of water of the required quality and quantity Use and define the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting Verify provisional alert and action levels Develop and define test-failure procedure
  • 37. 37 Phase 2(verification step) A further test period of 2-4 weeks – further intensive monitoring of the system Utilization of all the SOPs after the satisfactory completion of phase 1 Sampling scheme generally the same as in phase 1 Water can be used for manufacturing purposes during this phase
  • 38. Conti.. 38 Phase-2 demonstrates: Consistent operation within established ranges. so it demostrate that the system is in control. Consistent production and delivery of water of the required quantity and quality when the system is operated in accordance with the SOPs.
  • 39. 39 Phase 3 Over 1 year after the satisfactory completion of phase 2 Water can be used for manufacturing purposes during this phase Demonstrate: extended reliable performance that seasonal variations are evaluated Sample locations, sampling frequencies and tests should be reduced to the normal routine pattern based on established procedures proven during phases 1 and 2
  • 40. MONITORING 40  Monitoring and feed back data are important in maintaining the performance systems. Monitoring parameters include: Flow, pressure, temperature, conductivity, TOC  Samples taken: From points of use, and specific sample points In a similar way how water is used in service  Tests should include physical, chemical and microbial attributes  For example, stable state can be achieved by applying automatic continuous monitoring of TOC and conductivity of the water system. They are the major quality attributes of water by which organic and inorganic impurities can be determined.
  • 41. MAINTENANCE 41 A controlled, documented maintenance covering :  Defined frequency with plan and instructions  Calibration programme  SOPs for tasks  Control of approved spares  Record and review of problems and faults during maintenance
  • 42. MAINTENANCE System sanitization and bioburden control Systems in place to control proliferation of microbes Techniques for sanitizing or sterilization Consideration already during design stage – then validated Special precautions if water not kept in the range of 70 to 80 degrees Celsius
  • 43. REVALIDATION & CHANGE CONTROL 43 Once the validation is completed, the standard operating procedures (SOPs) are formalized. Routine operation should be performed according to the established SOP. If any deviation from SOP observed, determine the change and their impact on whole system Revalidation and evaluation should be performed depending upon the impact of the change on system.
  • 44. VALIDATION REPORT 44 Written at the conclusion of the equipment IQ, OQ and at completion of process validation. Will serve as primary documentation for FDA regulatory inspection Will serve as reference document when changes to the system are occurred and revalidation is needed.
  • 45. VALIDATION REPORT 45 STANDARD FORMAT 1. Executive summary 2. Discussion 3. Conclusions & recommendation 4. List of attachment  Topic should be presented in the order in which they appear in the protocol.  Protocol deviation are fully explained & justified.  The report is signed & dated by designated representatives of each unit involved in water system validation.
  • 46. 46 Complete Documentation Verification of design documentation, including ◦ Description of installation and functions ◦ Specification of the requirements Instructions for performance control Operating procedures Maintenance instructions Maintenance records Training of personnel (program and records) Environmental records Inspection of plant Finally certification (Sign Off) by Engineering, User (Production) and QA Heads.
  • 47. SUMMARY 47 Water supply systems,  Play a major role in the quality of pharmaceuticals.  Must be designed properly by professionals.  Must be validated as a critical system.