SlideShare ist ein Scribd-Unternehmen logo
1 von 21
Downloaden Sie, um offline zu lesen
Company Presentation
Investment Highlights
 Leading developer of turnkey ocean wave power production systems focused
  on:

     $50 billion renewable segment of the $150 billion utility market

     $10 billion autonomous (non-grid) power delivery market

 Developing utility PowerBuoy projects in North America, Europe, Japan and
  Australia, and marketing autonomous PowerBuoy for multiple applications

 Strong partnerships in place: U.S. Navy, U.S. DOE, Lockheed Martin, PNGC
  Power, Mitsui (Japan), Iberdrola (Spain)

 Extensive in-ocean product performance, including successfully withstanding
  hurricanes and winter storms

 Solid balance sheet – foundation for growth



                                       2
Company Overview

Commenced Operations:    1994

Incorporation:           Delaware, USA

Operating Locations:     Pennington, NJ, USA and Warwick, UK

Total Employees:         50

Intellectual Property:   61 US patents issued or pending

Cash and Investments:    $43.1 million (as of July 31, 2011)

Public Listing:          Nasdaq (OPTT)




                                3
Recent Commercial Achievements
• FY 2011 revenues up by 31% to $6.7 million
• Completed grid connection of Hawaii PowerBuoy – first for wave
  energy devices in US
• Completed construction and deployed PB150 PowerBuoy for
  Scotland and progress made on construction of Oregon PB150
• Received Lloyd’s Register Certification of PB150 PowerBuoy
  design
• Signed ground-breaking agreement with 14 different stakeholders in
  our utility-scale Oregon project
• Expanded relationship with Mitsui Engineering & Shipbuilding
• Received $10.3 million in new orders
• Commenced development of PB500, with customer funding
• Successful deployment of LEAP PowerBuoy
• Launched new technology initiative under WavePort project in
  Spain
                                 4
PowerBuoy and Undersea Substation



                   Float




                                                        Cables from
                       Spar                             other
                                                        PowerBuoys
               (“Smart Part” Inside)
                                           Undersea
                                           Substation
             Heave Plate




                                            Cable to
 Sea Floor                                  Shore



                                       5
Wave Power Station




                 6
Autonomous PowerBuoys
Technology Readiness
      First autonomous PowerBuoy tested in 2004 off State of Washington under Lockheed contract
      PB40-rated system operated off New Jersey during 2005-2007
             Withstood Hurricane Wilma
      DWADS PowerBuoy prototype tested in 2010 demonstrating stationkeeping for US Navy
             Power generation in autonomous mode to maintain station and provide power intended for a
             sonar-based maritime security system
      LEAP PowerBuoy “mission proven” in 2011 in successful integration with US Navy’s radar-based,
       operational maritime security system
             Persistent power in all wave conditions, using proprietary power management system
             Withstood Hurricane Irene
Key Customers and Partners to Date
      US Navy
      Lockheed Martin
Targets/Near-Term Goals
      Report data following LEAP ocean performance
      Actively marketing to customers for maritime security applications and offshore oil and gas sector


                                                    7
LEAP PowerBuoy off New Jersey Coast




                                   LEAP PowerBuoy After Hurricane Irene
                                         Photo provided by Michael Woods
       LEAP PowerBuoy
  Deployed by US Coast Guard
                               8
Utility PowerBuoys
Technology Readiness
      Hawaii PB40 installed at Marine Corps Base 2009 – 2011 under US Navy contract
             Grid-connected in 2010
      Scotland PB150 underwent successful ocean trials in 2011
             Power output and overall system performance exceeded expectations
      PB150 to be in operation off Reedsport, Oregon by mid-2012
      Grid connection certified by Intertek for compliance with UL and IEEE standards
      PB150 structure and mooring design certified by Lloyd’s Register
      Independent Environmental Assessment in Hawaii under direction of US Navy resulted in
       “Finding of No Significant Impact” – highest rating
Key Customers and Partners to Date
      US Navy                                US Department of Energy          Leighton
      Mitsui Engineering & Shipbuilding      PNGC Power                       Iberdrola
      Lockheed Martin
Targets/Near-Term Goals
      Complete PB150 for Oregon; commence in-ocean operation in mid-2012
      Actively marketing in Japan, Australia, North America, Europe


                                                  9
Scotland Outperformed
PB150 – Scotland

 Attained Lloyd’s Register certification of PB150 design

 Ocean trials commenced April 2011, completed October 2011

 Achieved average electrical power of 45 kilowatts at wave heights as
  low as 2 meters, exceeding expectations

 Power take-off system performed well
 Capacity factor higher than generally seen in other renewables, such
  as wind and solar

 Seeking commercial partner or customer for next phase



                                   10
PB150 Scotland Deployment




                 11
PB150 Scotland Post Deployment




                 12
Wave Port Project. Spain




                  13
14
Ongoing Utility Marketing Initiatives




                                                        Europe
                North America                         30-140 MW
                                                                                     Japan
                 30-150 MW
                                                                                     1-5 MW




                                                                                   Australasia
                                                                                    15-20 MW




   Target sales price in production volumes is $4 million/MW (higher initially)

                                                             15
Spain




 16
Competitive Advantages
• PowerBuoy is based on ocean-going buoys, primarily below sea surface
• Electronic “tuning” capability optimizes power in dynamic wave conditions
• PowerBuoy sends grid-ready electrical power to shore, not pumped water
• Same PowerBuoy technology provides power for autonomous deep-sea
  applications and for grid-connected utility markets
• Power take-off is direct drive, not hydraulics-based
• Demonstrated robustness in hurricanes, winter storms, tsunamis
• Strong partners: Mitsui (Japan), Lockheed (US), US Navy, PNGC Power (US),
  Iberdrola (Spain)
• Third party commercial validation: environmental assessments, grid connection,
  PB150
• PowerBuoy produces power efficiently regardless of direction of incoming waves
• PowerBuoy open architecture can use different PTO’s; undersea substation pod
  serves all energy devices
• Strong capital base, cash balances
                                         17
Third Party Commercial Validation
       OPT’s technology has received more testing & validation by
        independent parties than any other wave energy company


• Certification by Lloyd’s Register of PB150 structure and mooring system

• Independent Environmental Assessments in Hawaii under direction of US Navy, and by
  US DoE for Reedsport, Oregon, project; both resulted in “Finding of No Significant
  Impact” – highest rating

• Grid connection certified by Intertek (IEEE and UL standards)

• PowerBuoys insured by Lloyd’s syndicates for over 13 years for property loss and third
  party liability

• US DoE has assessed PowerBuoy PB150 as highest-rated wave energy system for
  commercial readiness (TRL 7-8)




                                          18
Standard PowerBuoy Manufacturing Process


 Buoy fabricated near coastal site


 Power take-off and control system
  (“smart-part”) built in New Jersey

                                            PowerBuoy at Fabrication Site
 Integration and test of completed
  PowerBuoys at dockside near coastal
  site




                                            Power Take-Off & Control System
                                       19
PowerBuoy Deployment Process




                20
For More Information

                                Contact Us
  For more information on Ocean Power Technologies and our PowerBuoy® systems, please
                                      contact us at:

                            Ocean Power Technologies Ltd

                             Warwick Innovation Centre
                                      Gallows Hill
                                 Warwick CV34 6UW
                                          UK
                              Phone: +44 (0)1926 623370
                               Fax: +44 (0) 1926 408190


                           E-mail: info@oceanpowertech.com




                                        21

Weitere ähnliche Inhalte

Ähnlich wie Opt 2012 02 28_company presentation_bilbao

Wave Energy at its best
Wave Energy at its bestWave Energy at its best
Wave Energy at its best
Tev Tlov
 
ICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentationICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentation
Franklin Martin
 
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
Matthew Hannon
 
Oneia RWDI Presentation
Oneia RWDI PresentationOneia RWDI Presentation
Oneia RWDI Presentation
ONEIA
 
MicroCapClub Company Presentation: Acorn Energy (ACFN)
MicroCapClub Company Presentation: Acorn Energy (ACFN)MicroCapClub Company Presentation: Acorn Energy (ACFN)
MicroCapClub Company Presentation: Acorn Energy (ACFN)
Ian Cassel
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
Matthew Hannon
 
POWI investor presentation january 2014
POWI investor presentation january 2014POWI investor presentation january 2014
POWI investor presentation january 2014
Irpowerintegrations
 
IVEC RU presentation
IVEC RU presentationIVEC RU presentation
IVEC RU presentation
vik9144
 

Ähnlich wie Opt 2012 02 28_company presentation_bilbao (20)

Stonehenge/ Protean Wave Energy - Symposium Investor Roadshow November 2015
Stonehenge/ Protean Wave Energy - Symposium Investor Roadshow November 2015Stonehenge/ Protean Wave Energy - Symposium Investor Roadshow November 2015
Stonehenge/ Protean Wave Energy - Symposium Investor Roadshow November 2015
 
Ocean linx
Ocean linxOcean linx
Ocean linx
 
Wave Energy at its best
Wave Energy at its bestWave Energy at its best
Wave Energy at its best
 
Maritimes Wind Exports to New England
Maritimes Wind Exports to New EnglandMaritimes Wind Exports to New England
Maritimes Wind Exports to New England
 
ICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentationICOE 2012 & Float Inc OOES presentation
ICOE 2012 & Float Inc OOES presentation
 
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
Lost at sea? Charting wave energy’s difficult innovation journey towards comm...
 
Idealife dev.plan 2014
Idealife dev.plan 2014Idealife dev.plan 2014
Idealife dev.plan 2014
 
Oneia RWDI Presentation
Oneia RWDI PresentationOneia RWDI Presentation
Oneia RWDI Presentation
 
Painel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British ExperiencePainel 3 – Ocean Energy: The British Experience
Painel 3 – Ocean Energy: The British Experience
 
MicroCapClub Company Presentation: Acorn Energy (ACFN)
MicroCapClub Company Presentation: Acorn Energy (ACFN)MicroCapClub Company Presentation: Acorn Energy (ACFN)
MicroCapClub Company Presentation: Acorn Energy (ACFN)
 
20160615 EI Energy Systems final
20160615 EI Energy Systems final20160615 EI Energy Systems final
20160615 EI Energy Systems final
 
POWI investor presentation january 2014
POWI investor presentation january 2014POWI investor presentation january 2014
POWI investor presentation january 2014
 
Painel 3 – Hydrokinetic Energy Experience
Painel 3 – Hydrokinetic Energy ExperiencePainel 3 – Hydrokinetic Energy Experience
Painel 3 – Hydrokinetic Energy Experience
 
Sierra Geothermal Power
Sierra Geothermal PowerSierra Geothermal Power
Sierra Geothermal Power
 
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
Offshore Wind – A New Market for Land-Based Wind Developers and Their Supply ...
 
Sgcp12 beel-ofgem
Sgcp12 beel-ofgemSgcp12 beel-ofgem
Sgcp12 beel-ofgem
 
OCEANEERING UNDERWATER ROBOTICS WITHIN SUBSEA MINING
OCEANEERING UNDERWATER ROBOTICS WITHIN SUBSEA MININGOCEANEERING UNDERWATER ROBOTICS WITHIN SUBSEA MINING
OCEANEERING UNDERWATER ROBOTICS WITHIN SUBSEA MINING
 
Abb v2
Abb v2Abb v2
Abb v2
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
IVEC RU presentation
IVEC RU presentationIVEC RU presentation
IVEC RU presentation
 

Mehr von British Embassy Madrid

Mehr von British Embassy Madrid (10)

Wavegen presentation
Wavegen presentationWavegen presentation
Wavegen presentation
 
Pres. bilbao feb2012uniovi
Pres. bilbao feb2012unioviPres. bilbao feb2012uniovi
Pres. bilbao feb2012uniovi
 
Ppi engineering ltd feb 2012 - version 2.0
Ppi engineering ltd feb 2012 - version 2.0Ppi engineering ltd feb 2012 - version 2.0
Ppi engineering ltd feb 2012 - version 2.0
 
Pelamis bilbao ukti pwp 2012
Pelamis bilbao ukti pwp 2012Pelamis bilbao ukti pwp 2012
Pelamis bilbao ukti pwp 2012
 
Ih cantabria workshop bilbao 2012
Ih cantabria workshop bilbao 2012Ih cantabria workshop bilbao 2012
Ih cantabria workshop bilbao 2012
 
Hi pr wind_flyer
Hi pr wind_flyerHi pr wind_flyer
Hi pr wind_flyer
 
David brown
David brownDavid brown
David brown
 
Chas spradbery wgk bilbao
Chas spradbery  wgk bilbaoChas spradbery  wgk bilbao
Chas spradbery wgk bilbao
 
Ukti spain workshop expo tronic
Ukti spain workshop  expo tronicUkti spain workshop  expo tronic
Ukti spain workshop expo tronic
 
Ricardo presentation to ukti event bilbao 28 02_2012 final
Ricardo presentation to ukti event bilbao 28 02_2012 finalRicardo presentation to ukti event bilbao 28 02_2012 final
Ricardo presentation to ukti event bilbao 28 02_2012 final
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Cyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdfCyberprint. Dark Pink Apt Group [EN].pdf
Cyberprint. Dark Pink Apt Group [EN].pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 

Opt 2012 02 28_company presentation_bilbao

  • 2. Investment Highlights  Leading developer of turnkey ocean wave power production systems focused on:  $50 billion renewable segment of the $150 billion utility market  $10 billion autonomous (non-grid) power delivery market  Developing utility PowerBuoy projects in North America, Europe, Japan and Australia, and marketing autonomous PowerBuoy for multiple applications  Strong partnerships in place: U.S. Navy, U.S. DOE, Lockheed Martin, PNGC Power, Mitsui (Japan), Iberdrola (Spain)  Extensive in-ocean product performance, including successfully withstanding hurricanes and winter storms  Solid balance sheet – foundation for growth 2
  • 3. Company Overview Commenced Operations: 1994 Incorporation: Delaware, USA Operating Locations: Pennington, NJ, USA and Warwick, UK Total Employees: 50 Intellectual Property: 61 US patents issued or pending Cash and Investments: $43.1 million (as of July 31, 2011) Public Listing: Nasdaq (OPTT) 3
  • 4. Recent Commercial Achievements • FY 2011 revenues up by 31% to $6.7 million • Completed grid connection of Hawaii PowerBuoy – first for wave energy devices in US • Completed construction and deployed PB150 PowerBuoy for Scotland and progress made on construction of Oregon PB150 • Received Lloyd’s Register Certification of PB150 PowerBuoy design • Signed ground-breaking agreement with 14 different stakeholders in our utility-scale Oregon project • Expanded relationship with Mitsui Engineering & Shipbuilding • Received $10.3 million in new orders • Commenced development of PB500, with customer funding • Successful deployment of LEAP PowerBuoy • Launched new technology initiative under WavePort project in Spain 4
  • 5. PowerBuoy and Undersea Substation Float Cables from Spar other PowerBuoys (“Smart Part” Inside) Undersea Substation Heave Plate Cable to Sea Floor Shore 5
  • 7. Autonomous PowerBuoys Technology Readiness  First autonomous PowerBuoy tested in 2004 off State of Washington under Lockheed contract  PB40-rated system operated off New Jersey during 2005-2007 Withstood Hurricane Wilma  DWADS PowerBuoy prototype tested in 2010 demonstrating stationkeeping for US Navy Power generation in autonomous mode to maintain station and provide power intended for a sonar-based maritime security system  LEAP PowerBuoy “mission proven” in 2011 in successful integration with US Navy’s radar-based, operational maritime security system Persistent power in all wave conditions, using proprietary power management system Withstood Hurricane Irene Key Customers and Partners to Date  US Navy  Lockheed Martin Targets/Near-Term Goals  Report data following LEAP ocean performance  Actively marketing to customers for maritime security applications and offshore oil and gas sector 7
  • 8. LEAP PowerBuoy off New Jersey Coast LEAP PowerBuoy After Hurricane Irene Photo provided by Michael Woods LEAP PowerBuoy Deployed by US Coast Guard 8
  • 9. Utility PowerBuoys Technology Readiness  Hawaii PB40 installed at Marine Corps Base 2009 – 2011 under US Navy contract Grid-connected in 2010  Scotland PB150 underwent successful ocean trials in 2011 Power output and overall system performance exceeded expectations  PB150 to be in operation off Reedsport, Oregon by mid-2012  Grid connection certified by Intertek for compliance with UL and IEEE standards  PB150 structure and mooring design certified by Lloyd’s Register  Independent Environmental Assessment in Hawaii under direction of US Navy resulted in “Finding of No Significant Impact” – highest rating Key Customers and Partners to Date  US Navy  US Department of Energy  Leighton  Mitsui Engineering & Shipbuilding  PNGC Power  Iberdrola  Lockheed Martin Targets/Near-Term Goals  Complete PB150 for Oregon; commence in-ocean operation in mid-2012  Actively marketing in Japan, Australia, North America, Europe 9
  • 10. Scotland Outperformed PB150 – Scotland  Attained Lloyd’s Register certification of PB150 design  Ocean trials commenced April 2011, completed October 2011  Achieved average electrical power of 45 kilowatts at wave heights as low as 2 meters, exceeding expectations  Power take-off system performed well  Capacity factor higher than generally seen in other renewables, such as wind and solar  Seeking commercial partner or customer for next phase 10
  • 12. PB150 Scotland Post Deployment 12
  • 13. Wave Port Project. Spain 13
  • 14. 14
  • 15. Ongoing Utility Marketing Initiatives Europe North America 30-140 MW Japan 30-150 MW 1-5 MW Australasia 15-20 MW  Target sales price in production volumes is $4 million/MW (higher initially) 15
  • 17. Competitive Advantages • PowerBuoy is based on ocean-going buoys, primarily below sea surface • Electronic “tuning” capability optimizes power in dynamic wave conditions • PowerBuoy sends grid-ready electrical power to shore, not pumped water • Same PowerBuoy technology provides power for autonomous deep-sea applications and for grid-connected utility markets • Power take-off is direct drive, not hydraulics-based • Demonstrated robustness in hurricanes, winter storms, tsunamis • Strong partners: Mitsui (Japan), Lockheed (US), US Navy, PNGC Power (US), Iberdrola (Spain) • Third party commercial validation: environmental assessments, grid connection, PB150 • PowerBuoy produces power efficiently regardless of direction of incoming waves • PowerBuoy open architecture can use different PTO’s; undersea substation pod serves all energy devices • Strong capital base, cash balances 17
  • 18. Third Party Commercial Validation OPT’s technology has received more testing & validation by independent parties than any other wave energy company • Certification by Lloyd’s Register of PB150 structure and mooring system • Independent Environmental Assessments in Hawaii under direction of US Navy, and by US DoE for Reedsport, Oregon, project; both resulted in “Finding of No Significant Impact” – highest rating • Grid connection certified by Intertek (IEEE and UL standards) • PowerBuoys insured by Lloyd’s syndicates for over 13 years for property loss and third party liability • US DoE has assessed PowerBuoy PB150 as highest-rated wave energy system for commercial readiness (TRL 7-8) 18
  • 19. Standard PowerBuoy Manufacturing Process  Buoy fabricated near coastal site  Power take-off and control system (“smart-part”) built in New Jersey PowerBuoy at Fabrication Site  Integration and test of completed PowerBuoys at dockside near coastal site Power Take-Off & Control System 19
  • 21. For More Information Contact Us For more information on Ocean Power Technologies and our PowerBuoy® systems, please contact us at: Ocean Power Technologies Ltd Warwick Innovation Centre Gallows Hill Warwick CV34 6UW UK Phone: +44 (0)1926 623370 Fax: +44 (0) 1926 408190 E-mail: info@oceanpowertech.com 21