SlideShare ist ein Scribd-Unternehmen logo
1 von 20
MM CUSTOMIZATION
MM consultant job
1. Define Plants
Path: SPRO-Enterprise structure- Definition –Logistic general-Define copy,
delete check plant.
Double click on define plant
Select new entries button
Plant :BILP
Name :BIL HYD Factory plant
Factory calendar :Select B2 or 01 (B2=BIL HYD Factory Calendar)
Save (01=Standard calendar)
Give the name :BIL Hyderabad factory plant
Country :IN
Enter
Select create request button
Short description :MM customization for BIL
Press enter
Enter once again to save in the request
Define division:
Path :Up to logistic –General the path is same-Define copy, Delete, check
division.
Double click on define division
Select new entries button
Division :BS (It is a text filed)
Name :Steel Division
Save
Press enter to save in your request
Maintain storage location
Path :SPRO-Enterprise structure –Definition- materials management –
Maintain storage location (OX09)
Give the plant :BILP
Enter
Select new entries button
Give the storage location :HYD
Description :Hyderabad storage location
Save
Press enter to save in your request
Maintain purchasing organization
Same path
Select new entries button
Purchase organization :BIR
Description :BIL Purchase organization
Save
Press enter to save in your request
Assign plant to company code:
Path : SPRO-Enterprise structure –Assignment- logistics General –Assign
plant to company code ( Tr code is OX18)
Select new entries button
Company code :BIL
Plant :BILP
Save
Press enter to save in your request
Assign business area to plant/valuation area and division
Path :Same path -Select plant /valuation area –Division button
Select new entries button
Plant :BILP
Division :BS
Business area :BILH
Save
Press enter to save in your request
Assign purchasing organization to company code
Path :Up to assignment the path is same –Materials management –Assign
purchasing organization to company code
Select position button :Give the purchase org:BILR
Enter
For BILR for assign company code BIL
Save
Press enter to save in your request
Assign purchasing organization to plant:
Same path
Select new entries button
Purchasing org :BILR
Plant :BILP
Save
Press enter to save in your request
Create purchasing groups
Path :SPRO-Materials management –Purchasing –Create purchasing groups.
Select new entries button
Purchasing group :BIL
Description :BIL RM purchasing group
Save
Press entr to save in your request
Define material groups:( OMSF)
Path :SPRO-Logistic general –Material master-Settings for key fields –Define
Material groups.
Select new entries button
Material group :BILC
Material groups description :Chemicals
Press enter to save in your request
Maintain company code for material management:
Path :SPRO-Logistic General –Material master-Basic settings-Maintain
company code for materials management(OMSY)
Select position button
Give the comp code :BIL
Enter
Year :2008
Period :7 (October)
Note : This period enter carefully, if you once enter not modified
Select ABP check box (ABP stands for Allow Back Period Posting)
Note: September entries allowed
Save
Ignore the warning message press enter
Press enter to save in your request
Define attributes of material types:
Path:up to the material master the path is same – Basic settings –Material type-
Define attributes of material types.
Select position button
Select material type :ROH (Raw materials)
Enter
Select ROH
Double click on quantity / Value updating folder
Select position button
Valuation area :BILP ( Nothing but plant)
Enter
For BILP select quantity updating, value update check box
Save
Press enter to save in your request
Select back arrow
Select material FERT for finished product
Double click quantity / value updating folder
Select position button
Valuation area :BILP
Enter
For BILP select quantity updating check box value updating check box
Save
Set tolerance limits for price variance for purchase order
Path: SPRO-Material management –Purchasing –Purchase order –set
tolerance limits for price variance
Select TIKY :PE & SE for company code 1000
Select copy as button
Enter the company code to BIL
For tolerance key : PE
Enter
Change the company code to: BIL
For tolerance key : SE
Enter and save
Press enter to save in your request
Plant parameters:
Path :SPRO-Materials management –Inventories management –Physical
inventory –Plant parameters
Select plant: 1000
Select copy as button
Change the plant to BILP
Enter and save
Press enter to save in your request
Set tolerance limits for goods receipt
Path :Up to inventory management and physical inventory the path is same
-Goods receipt-Set tolerance limits
Select tolerance key B1,B2,VP for company code 1000
Select copy as button
Change the company code to BIL for B1
Enter
Change the company code BIL for B2
Enter
Change the company code to BIL for VP
Enter and save
Press enter to save in your request
Maintain default values for tax codes
Path: SPRO- Materials management –Logistics invoice verification-Incoming
invoice maintain default values for tax codes
Select new entries button
Company code :BIL
Save
Press enter to save in your request
Set tolerance units for invoice verification
Path:Up to logistics invoice verification the path is same – Invoice block-Set
tolerance limits
select tolerance key BD, ST for company code 1000
select copy as button
change the company code to BIL for BD
enter
change the company code to BIL for ST
save
Define automatic status change
Path :Up to the logistic invoice verification the path is same – Invoice
verification in back ground –Define automatic status change
Select new entries button
Company code :BIL
Select save button or Ctrl+S
Press enter to save in your request
Group together valuation areas:
Path :SPRO-Material management –Valuation and account assignment-
Account determination-Account determination without wizard-Group
togather valuation areas.(omwd)
Select position button
Valuation :BILP
Enter
Give the valuation grouping code :X
Save
Press enter to save in your request
Define valuation classes:
Path :Same path – Select valuation class button
Select valuation class 3000 Raw materials local
Select valuation class 7920 Finished products
Select copy as button
Change valuation class 3000 to BIL1
Change the description to Raw materials local
Change valuation class 7920 to BIL2 – Finished product
Enter and save
Press enter to save in your request
FI consultants job:
1. Creation of GL masters FS00
A) Inventory RM local Current assets loans & advances
B) Inventory finished goods -do-
C) GR/IR clearing RM local Current liabilities & Provisions
D) RM consumption local RM Consumption
E) INC/DEC in stocks FG Increase /Dec in stocks
Give the GL account no. 200121
Company code BIL
Select with template button
Give the GL account no.200120 Inventory RM
Company code :BIL
Enter
Change the short text to Inventory RM local
Change the GL a/c long text also inventory RM local
Select control data tab
Tax category :select * (All tax allowed)
Select posting without tax allowed check box
Select create/Bank/Interest tab
Field status group change to G006 Material accounts
Save
Note :Before post select automatically only check box 200121
Ignore the warning message press enter
GL account no. :200122
Company code :BIL
Select with template button
Give the GL a/c no.200121
Company code :BIL
Enter
Select type/description tab
Change short text and GL a/c long text to inventory FG
Save
GL account :100520
Company code :BIL
Select with template button
GL account :100500 outstanding exp.
Company code :BIL
Enter
Change short text and GL account and long text to GR/IR clearing RM local
Select control data tab
Tax category :*
Select posting without tax allowed check
Sort key :014 Purchase order
Select create /bank /interest tab
Field status group change to G045 goods/Invoice received clearing accounts
Save
G/L account :400000
Company code :BIL
Select with template button
Give the GL account no.400100 Salaries a/c
Company code :BIL
Enter
Select type/description tab
Change the account group to RM consumption
Change short text and GL account long text to RM consumption local
Select create /bank /interest tab
Field status group to change to G003 Material consumption accounts
Save
Select edit cost element button
Valid from :01.04.2008
Enter
Cost element category :Select 01
Save
GL account :300200
Company code :BIL
Select with template button
Change the GL a/c no.300100 Exchange gain
Company code :BIL
Enter
Select type/Description tab
Change account group to Increase /Decrease stocks
Change short text and GL account long text to Increase/Decrease in stocks FG
Select create/Bank/Interest tab
Change field status group to G030 change in stock accounts
Save
*Assignment of accounts for automatic postings
Path :Up to account determination without wizard the path is same – Configure
automatic postings (Tr code is OBYC) (MM to FI Integration )
Select cancel button
Select account assignment button
Double click on transaction BSX inventory posting
Give your Chart of Accounts :BIL
enter
Select valuation modifier check box
Select valuation class check box
Save
Valuation modified Valuation class Account
X BIL1 RM local 200121 Inventory RM local
X BIL2 Finished products 200122 Inventory FG
Save
Press enter to save in your request
Select back arrow
Double click on transaction WRX GR/IR clearing account
Select valuation modifier check box
Select valuation class check box
Save
Valuation modifier :X
Valuation class :BIL1 RM local
Account no. :100520 GR/IR clearing local
Save
Press enter to save in your request
Select back arrow
Double click on GBB offsetting entry for Inventory posting
Select General modification check box
Valuation modifier check box
Valuation class check box
Save
Valuation
modifier
General modification Valuation class Account
X VBR (consumption) BIL1 RM local 400000 RM
consumption local
X ZOF (Production receipt
without production order)
BIL2 Finished
products
300200 Increase /
Decrease stocks FG
X AUF with production BIL2 300200
X VAY (Delivery where
sales account is created as
revenue element
Co implemented)
BIL2 300200
X VAX Delivery where is
sales account is not created
BIL2 300200
as revenue element
CO not implemented
Save
Press enter to save in your request
Document types and no.ranges (OBA7)
WE :Goods receipt(50 num range)
WA :Goods issue(49 num range)
RE :Grass invoice receipt(51 num range)
Tr code is OBA7
Select WE :Goods receipt
Select details button
Number rage :50
Select number range information button
Company code :BIL
Select change intervals button
Select interval button
No.range :50
Year :2008
From no. :800001
To no. :900000
Enter and save
Ignore the warning message press enter
Select back arrow 3 times
Select type WA Goods issue
Select details button
Number range :49
Select no.range information button
Company code :BIL
Select change intervals button
Select interval button
No.range :49
Year :2008
From no. :900001
To no. :1000000
Enter and save
Ignore the warning message press enter
Select back arrow three times
Select RE gross invoice receipt
Select details button
No. range :51
Select no.range information button
Company code :BIL
Select change intervals button
No.range :51
Year :2008
From no. :1000001
To no. :1100000
Enter and save
Ignore the warning message press enter
MM end user area
Creation of vendor master XK01
Give the company code :BIL
Purchasing organization :BILR
Account group :BIL2 MM vendors for BIL
Enter
Give the name :Nagarjuna Steels Limited
Country :IN
Select next screen button 3 times
Reconciliation account :select 100501 Sundry credit RM
Sort key :012 vendor
Select next screen button
Payment terms :0001
Select next screen button 2 times
Order currency :INR
Select GR based invoice verification check box
Save
Creation of RM material master
Path :Logistics –Materials management –Material master-material-
Create(Genral) –Immediately (Transaction code MM01)
Material :BILRM1
Industry sector :Mechanical engineering
Material type :Raw material
Press select views button
Select basic data1, purchasing, general plant data/storage1/accounting1
Select organization levels button (bottom side)
Give the plant :BILP
Storage location :HYD
Enter
Give the description :Raw material 1
Basic unit of measurement :KG
Material group :BILC (Chemicals)
Division :BS (Steel)
Select purchasing tab
Purchasing group :BIL
Select accounting one tab
Valuation class :select BIL1 (RM local)
Price control :select V moving average price
Moving price :50
Select save button or Ctrl+S
To open material periods for November:
Up to material master the path is same –Other-Close period (Transaction code
is MMPV)
From company code :BIL
Give the period :8 (November)
Fiscal year :2008
Select check and close period radio button
Execute
Purchase order creation
Path :Logistics – Material management –Purchasing –Purchase order-Create-
Vendor/supplying plant known (The transaction code is ME 21N)
Give the purchasing organization :BILR
Company code :BIL
Enter
Give the purchasing group :BIL
Item :10
Material :BILRM1
PO quantity :100 Kg
net price :75
Plant :BILP
Give the currency :INR
Vendor no. :2001
Save
Note the purchase order no.4500017092
Goods receipt:
Path :Logistics –Material management –Inventory management –Goods
movement –Goods receipt- for purchase order –PO number known (The
transaction code is MIGO)
Select goods receipt
Give purchase order no.4500017092
Enter
Storage location select :HYD
Select quantity tab
Quantity in delivery note :100
Select item ok check box
Select save button or Ctrl+S
Select display button
Enter
Select document information tab
Select FI documents button
BSX
200121 Inventory RM local 7500 BILRM1 BIL1
WRX
100520 GR/IR CLRG RM local -7500 BILRM1 BIL1
Qty .Received(GR) *Rate as per PO
100*75
Note: change USTAX to GTAX
Invoice verification:
Path :Logistics –Materials management –Logistics-Invoice verification –
Document entry-Enter invoice (Transaction code is MIRO)
Give the invoice date :Today’s date
Reference :Party bill no.1234
Text :Invoice verification
Purchase order :4500017092
Select payment tab
Payment terms :0001
Baseline date :today’s date
Select base data tab
Tax code :select V0
Enter
Business area :BILH
Select beside data tab
Amount :7500
Enter
Select save button or Ctrl+s
From the menu select invoice document –Display
Select follow on document button
2001 Nagarjuna Steels Limited 7500 –From party no is taken
100520 GR/IR CLRG RM local 7500 BILRM1 BIL1
Raw material consumption
Path :Logistics –Materials management –Inventory management –goods
movement –goods issue (Transaction code is MB1A)
Movement type :201
Plant :BILP
Storage location :HYD
Enter
Give the cost center :Dept A
Material :BILRM1
Quantity :30
Select save button or Ctrl+S
From the menu select goods –Issue display
Enter
Select accounting documents button
Select accounting document number
BSX
200121 Inventory RM local 2250-BILRM1 BIL1
GBB VBR
400000 RM consumption LCL 2250-BILRM1 BIL1
Qty consumed * moving average price
30*75
To view stock ledger
Path :Logistics –Materials management –Inventory management –
Environment –Stock for posting date (Transaction code is MB5B)
Material no. :BILRM1
Company code :BIL
Plant :BILP
Selection date :01.04.2008 to 31.03.2009
Select valuated stock radio button
Execute
MM END USER AREA
Creation of material master (MM01)
A) Raw material 2
B) Finished product 1
Give the material :BILRM2
Industry sector :Mechanical Engineering
Material type :Raw material
Press select view button
Select basic data1 :Select purchasing Select general plant data /storage /Accounting
Select organization levels button
Plant :BILP
Storage location :Hyderabad
Enter
Give the description :Raw material 2
Base unit of measurement :KG
Material group :BILC
Division :BS
Select purchasing tab
Purchasing group :BIL
Select accounting 1 tab
Valuation class :BIL1 RM Local
Price control :select V moving
Moving price :150
Save
One more material :BILFG1
Industry section :Mechanical engineering
Material type :Finished product
Press select view button
Select basic data1, MRP1, MRP2,MRP3, Work scheduling, general plant data /storage1,
accounting , Costing 1
Select organizational levels button /enter
Enter
Plant :BILP
Storage location :Hyderabad
Enter
Description :Finished product 1
Base unit measurement :KG
Division :BS
Select MRP1 tab
MRP type :select PD (MRP)
MRP controller :A
Lot size :select EX lot for –lot order quantity
Select MRP 2 tab
In –house production :0 days
Schedule margin key :select BIL
Select MPR 3 tab
Ignore the warning message press enter
Availability check :select KP (no check )
Select work scheduling tab
Production scheduler :B
Select accounting tab
Valuation class :BIL2 Finished products
Price control :S (Standard price)
Standard price :300
Select costing one tab
Overhead group :select BIL1
Save
Note :BOM=Bill of Material

Weitere ähnliche Inhalte

Was ist angesagt?

Sap fi-gl-enduser-step-by-step-material
Sap fi-gl-enduser-step-by-step-materialSap fi-gl-enduser-step-by-step-material
Sap fi-gl-enduser-step-by-step-materialKishore Venkata
 
Sapficocoursecontent 130302033528-phpapp02
Sapficocoursecontent 130302033528-phpapp02Sapficocoursecontent 130302033528-phpapp02
Sapficocoursecontent 130302033528-phpapp02sap fi-co
 
Fi arapconcept
Fi arapconceptFi arapconcept
Fi arapconceptshijo
 
Sapficocoursecontent
Sapficocoursecontent Sapficocoursecontent
Sapficocoursecontent Thanusha154
 
Quick sap co configuration Internal Order
Quick sap co configuration Internal OrderQuick sap co configuration Internal Order
Quick sap co configuration Internal OrderCapgemini
 
Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAPRajesh Shanbhag
 
VAT configuration for TAXINN
VAT configuration for TAXINNVAT configuration for TAXINN
VAT configuration for TAXINNBvdv Prasad
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingDhaval Gala
 
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE MSND Prasad
 
Scm2008 Phelan Undocumented Advice To Help You Better Final
Scm2008 Phelan Undocumented Advice To Help You Better FinalScm2008 Phelan Undocumented Advice To Help You Better Final
Scm2008 Phelan Undocumented Advice To Help You Better FinalDennis Phelan
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsMangesh Ambardekar
 
Ahlstrom Q2/2016 interim report
Ahlstrom Q2/2016 interim reportAhlstrom Q2/2016 interim report
Ahlstrom Q2/2016 interim reportAhlstrom-Munksjö
 
Cin Training 5
Cin Training 5Cin Training 5
Cin Training 5deep123
 
Document splitting-in-new-general-ledger
Document splitting-in-new-general-ledgerDocument splitting-in-new-general-ledger
Document splitting-in-new-general-ledgerRajeev Kumar
 

Was ist angesagt? (18)

Sap fi-gl-enduser-step-by-step-material
Sap fi-gl-enduser-step-by-step-materialSap fi-gl-enduser-step-by-step-material
Sap fi-gl-enduser-step-by-step-material
 
Sapficocoursecontent 130302033528-phpapp02
Sapficocoursecontent 130302033528-phpapp02Sapficocoursecontent 130302033528-phpapp02
Sapficocoursecontent 130302033528-phpapp02
 
Fi arapconcept
Fi arapconceptFi arapconcept
Fi arapconcept
 
Sapficocoursecontent
Sapficocoursecontent Sapficocoursecontent
Sapficocoursecontent
 
Quick sap co configuration Internal Order
Quick sap co configuration Internal OrderQuick sap co configuration Internal Order
Quick sap co configuration Internal Order
 
Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
 
VAT configuration for TAXINN
VAT configuration for TAXINNVAT configuration for TAXINN
VAT configuration for TAXINN
 
SAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accountingSAP HANA Product Costing / Cost center accounting
SAP HANA Product Costing / Cost center accounting
 
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE
SAP ACCOUNTS RECEIVABLE & ACCOUNTS PAYABLE
 
Sap class
Sap classSap class
Sap class
 
Scm2008 Phelan Undocumented Advice To Help You Better Final
Scm2008 Phelan Undocumented Advice To Help You Better FinalScm2008 Phelan Undocumented Advice To Help You Better Final
Scm2008 Phelan Undocumented Advice To Help You Better Final
 
SAP CONTROLLING
SAP CONTROLLINGSAP CONTROLLING
SAP CONTROLLING
 
Inter Company Billing in SAP -Basics
Inter Company Billing in SAP -BasicsInter Company Billing in SAP -Basics
Inter Company Billing in SAP -Basics
 
Sd CIN
Sd CINSd CIN
Sd CIN
 
Q1 2009 Earning Report of Gardner Denver, Inc.
Q1 2009 Earning Report of Gardner Denver, Inc.Q1 2009 Earning Report of Gardner Denver, Inc.
Q1 2009 Earning Report of Gardner Denver, Inc.
 
Ahlstrom Q2/2016 interim report
Ahlstrom Q2/2016 interim reportAhlstrom Q2/2016 interim report
Ahlstrom Q2/2016 interim report
 
Cin Training 5
Cin Training 5Cin Training 5
Cin Training 5
 
Document splitting-in-new-general-ledger
Document splitting-in-new-general-ledgerDocument splitting-in-new-general-ledger
Document splitting-in-new-general-ledger
 

Ähnlich wie Mm customization

Maheshbook 130417131655-phpapp01
Maheshbook 130417131655-phpapp01Maheshbook 130417131655-phpapp01
Maheshbook 130417131655-phpapp01varsha nihanth lade
 
Fico notes
Fico notesFico notes
Fico notestoomravi
 
Asset Accouting Configuration.pdf
Asset Accouting Configuration.pdfAsset Accouting Configuration.pdf
Asset Accouting Configuration.pdfSrinivasan N
 
Conotesmsn478141345715141 130221132620-phpapp01 (1)
Conotesmsn478141345715141 130221132620-phpapp01 (1)Conotesmsn478141345715141 130221132620-phpapp01 (1)
Conotesmsn478141345715141 130221132620-phpapp01 (1)varsha nihanth lade
 
Conotesmsn478141345715141 130221132620-phpapp01
Conotesmsn478141345715141 130221132620-phpapp01Conotesmsn478141345715141 130221132620-phpapp01
Conotesmsn478141345715141 130221132620-phpapp01varsha nihanth lade
 
Sap fico Online training | sap fico Training Online
Sap fico  Online training | sap fico Training Online    Sap fico  Online training | sap fico Training Online
Sap fico Online training | sap fico Training Online BigClasses.com
 
Fb50 posting gl document
Fb50 posting gl documentFb50 posting gl document
Fb50 posting gl documentFarooq Wangde
 
Fbr2 posting with reference document
Fbr2 posting with reference documentFbr2 posting with reference document
Fbr2 posting with reference documentVaishali Ketkar
 
Fbr2 posting with reference document
Fbr2 posting with reference documentFbr2 posting with reference document
Fbr2 posting with reference documentFarooq Wangde
 
Sap -how to start fico must see
Sap -how to start fico must seeSap -how to start fico must see
Sap -how to start fico must seersnmurthy
 
SAP FI-MM Integration presentation which includes all steps
SAP FI-MM Integration presentation which includes all stepsSAP FI-MM Integration presentation which includes all steps
SAP FI-MM Integration presentation which includes all stepsaraniyapinak
 
SAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSandeep Mahindra
 
SAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSandeep Mahindra
 
333144677 sap-gst-draft-solution-proposal-v1
333144677 sap-gst-draft-solution-proposal-v1333144677 sap-gst-draft-solution-proposal-v1
333144677 sap-gst-draft-solution-proposal-v1Mandeep SINGH
 
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptx
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptxSAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptx
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptxAndr61
 
Enterprise structure in sap fico
Enterprise structure in sap ficoEnterprise structure in sap fico
Enterprise structure in sap ficoRitesh Solanki
 

Ähnlich wie Mm customization (20)

Maheshbook 130417131655-phpapp01
Maheshbook 130417131655-phpapp01Maheshbook 130417131655-phpapp01
Maheshbook 130417131655-phpapp01
 
Fico notes
Fico notesFico notes
Fico notes
 
Asset Accouting Configuration.pdf
Asset Accouting Configuration.pdfAsset Accouting Configuration.pdf
Asset Accouting Configuration.pdf
 
Conotesmsn478141345715141 130221132620-phpapp01 (1)
Conotesmsn478141345715141 130221132620-phpapp01 (1)Conotesmsn478141345715141 130221132620-phpapp01 (1)
Conotesmsn478141345715141 130221132620-phpapp01 (1)
 
Conotesmsn478141345715141 130221132620-phpapp01
Conotesmsn478141345715141 130221132620-phpapp01Conotesmsn478141345715141 130221132620-phpapp01
Conotesmsn478141345715141 130221132620-phpapp01
 
GENERAL LEDGER.pdf
GENERAL LEDGER.pdfGENERAL LEDGER.pdf
GENERAL LEDGER.pdf
 
Fi
FiFi
Fi
 
Sap fico Online training | sap fico Training Online
Sap fico  Online training | sap fico Training Online    Sap fico  Online training | sap fico Training Online
Sap fico Online training | sap fico Training Online
 
Fb50 posting gl document
Fb50 posting gl documentFb50 posting gl document
Fb50 posting gl document
 
Sap ent structure
Sap ent structureSap ent structure
Sap ent structure
 
Fbr2 posting with reference document
Fbr2 posting with reference documentFbr2 posting with reference document
Fbr2 posting with reference document
 
Fbr2 posting with reference document
Fbr2 posting with reference documentFbr2 posting with reference document
Fbr2 posting with reference document
 
Sap -how to start fico must see
Sap -how to start fico must seeSap -how to start fico must see
Sap -how to start fico must see
 
Managerial accounting-v1.3
Managerial accounting-v1.3Managerial accounting-v1.3
Managerial accounting-v1.3
 
SAP FI-MM Integration presentation which includes all steps
SAP FI-MM Integration presentation which includes all stepsSAP FI-MM Integration presentation which includes all steps
SAP FI-MM Integration presentation which includes all steps
 
SAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSAP Draft Solution for GST India
SAP Draft Solution for GST India
 
SAP Draft Solution for GST India
SAP Draft Solution for GST IndiaSAP Draft Solution for GST India
SAP Draft Solution for GST India
 
333144677 sap-gst-draft-solution-proposal-v1
333144677 sap-gst-draft-solution-proposal-v1333144677 sap-gst-draft-solution-proposal-v1
333144677 sap-gst-draft-solution-proposal-v1
 
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptx
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptxSAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptx
SAP FICO Config step-by-step-sap-fi-basic-configuration-settings.pptx
 
Enterprise structure in sap fico
Enterprise structure in sap ficoEnterprise structure in sap fico
Enterprise structure in sap fico
 

Kürzlich hochgeladen

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxAmita Gupta
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...Nguyen Thanh Tu Collection
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxAmanpreet Kaur
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 

Kürzlich hochgeladen (20)

On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 

Mm customization

  • 1. MM CUSTOMIZATION MM consultant job 1. Define Plants Path: SPRO-Enterprise structure- Definition –Logistic general-Define copy, delete check plant. Double click on define plant Select new entries button Plant :BILP Name :BIL HYD Factory plant Factory calendar :Select B2 or 01 (B2=BIL HYD Factory Calendar) Save (01=Standard calendar) Give the name :BIL Hyderabad factory plant Country :IN Enter Select create request button Short description :MM customization for BIL Press enter Enter once again to save in the request Define division: Path :Up to logistic –General the path is same-Define copy, Delete, check division. Double click on define division Select new entries button Division :BS (It is a text filed) Name :Steel Division Save Press enter to save in your request
  • 2. Maintain storage location Path :SPRO-Enterprise structure –Definition- materials management – Maintain storage location (OX09) Give the plant :BILP Enter Select new entries button Give the storage location :HYD Description :Hyderabad storage location Save Press enter to save in your request Maintain purchasing organization Same path Select new entries button Purchase organization :BIR Description :BIL Purchase organization Save Press enter to save in your request Assign plant to company code: Path : SPRO-Enterprise structure –Assignment- logistics General –Assign plant to company code ( Tr code is OX18) Select new entries button Company code :BIL Plant :BILP Save Press enter to save in your request Assign business area to plant/valuation area and division Path :Same path -Select plant /valuation area –Division button
  • 3. Select new entries button Plant :BILP Division :BS Business area :BILH Save Press enter to save in your request Assign purchasing organization to company code Path :Up to assignment the path is same –Materials management –Assign purchasing organization to company code Select position button :Give the purchase org:BILR Enter For BILR for assign company code BIL Save Press enter to save in your request Assign purchasing organization to plant: Same path Select new entries button Purchasing org :BILR Plant :BILP Save Press enter to save in your request Create purchasing groups Path :SPRO-Materials management –Purchasing –Create purchasing groups. Select new entries button Purchasing group :BIL Description :BIL RM purchasing group Save Press entr to save in your request Define material groups:( OMSF)
  • 4. Path :SPRO-Logistic general –Material master-Settings for key fields –Define Material groups. Select new entries button Material group :BILC Material groups description :Chemicals Press enter to save in your request Maintain company code for material management: Path :SPRO-Logistic General –Material master-Basic settings-Maintain company code for materials management(OMSY) Select position button Give the comp code :BIL Enter Year :2008 Period :7 (October) Note : This period enter carefully, if you once enter not modified Select ABP check box (ABP stands for Allow Back Period Posting) Note: September entries allowed Save Ignore the warning message press enter Press enter to save in your request Define attributes of material types: Path:up to the material master the path is same – Basic settings –Material type- Define attributes of material types. Select position button Select material type :ROH (Raw materials) Enter Select ROH Double click on quantity / Value updating folder Select position button
  • 5. Valuation area :BILP ( Nothing but plant) Enter For BILP select quantity updating, value update check box Save Press enter to save in your request Select back arrow Select material FERT for finished product Double click quantity / value updating folder Select position button Valuation area :BILP Enter For BILP select quantity updating check box value updating check box Save Set tolerance limits for price variance for purchase order Path: SPRO-Material management –Purchasing –Purchase order –set tolerance limits for price variance Select TIKY :PE & SE for company code 1000 Select copy as button Enter the company code to BIL For tolerance key : PE Enter Change the company code to: BIL For tolerance key : SE Enter and save Press enter to save in your request Plant parameters: Path :SPRO-Materials management –Inventories management –Physical inventory –Plant parameters Select plant: 1000
  • 6. Select copy as button Change the plant to BILP Enter and save Press enter to save in your request Set tolerance limits for goods receipt Path :Up to inventory management and physical inventory the path is same -Goods receipt-Set tolerance limits Select tolerance key B1,B2,VP for company code 1000 Select copy as button Change the company code to BIL for B1 Enter Change the company code BIL for B2 Enter Change the company code to BIL for VP Enter and save Press enter to save in your request Maintain default values for tax codes Path: SPRO- Materials management –Logistics invoice verification-Incoming invoice maintain default values for tax codes Select new entries button Company code :BIL Save Press enter to save in your request Set tolerance units for invoice verification Path:Up to logistics invoice verification the path is same – Invoice block-Set tolerance limits select tolerance key BD, ST for company code 1000 select copy as button change the company code to BIL for BD
  • 7. enter change the company code to BIL for ST save Define automatic status change Path :Up to the logistic invoice verification the path is same – Invoice verification in back ground –Define automatic status change Select new entries button Company code :BIL Select save button or Ctrl+S Press enter to save in your request Group together valuation areas: Path :SPRO-Material management –Valuation and account assignment- Account determination-Account determination without wizard-Group togather valuation areas.(omwd) Select position button Valuation :BILP Enter Give the valuation grouping code :X Save Press enter to save in your request Define valuation classes: Path :Same path – Select valuation class button Select valuation class 3000 Raw materials local Select valuation class 7920 Finished products Select copy as button Change valuation class 3000 to BIL1 Change the description to Raw materials local
  • 8. Change valuation class 7920 to BIL2 – Finished product Enter and save Press enter to save in your request FI consultants job: 1. Creation of GL masters FS00 A) Inventory RM local Current assets loans & advances B) Inventory finished goods -do- C) GR/IR clearing RM local Current liabilities & Provisions D) RM consumption local RM Consumption E) INC/DEC in stocks FG Increase /Dec in stocks Give the GL account no. 200121 Company code BIL Select with template button Give the GL account no.200120 Inventory RM Company code :BIL Enter Change the short text to Inventory RM local Change the GL a/c long text also inventory RM local Select control data tab Tax category :select * (All tax allowed) Select posting without tax allowed check box Select create/Bank/Interest tab Field status group change to G006 Material accounts Save Note :Before post select automatically only check box 200121 Ignore the warning message press enter GL account no. :200122 Company code :BIL Select with template button Give the GL a/c no.200121
  • 9. Company code :BIL Enter Select type/description tab Change short text and GL a/c long text to inventory FG Save GL account :100520 Company code :BIL Select with template button GL account :100500 outstanding exp. Company code :BIL Enter Change short text and GL account and long text to GR/IR clearing RM local Select control data tab Tax category :* Select posting without tax allowed check Sort key :014 Purchase order Select create /bank /interest tab Field status group change to G045 goods/Invoice received clearing accounts Save G/L account :400000 Company code :BIL Select with template button Give the GL account no.400100 Salaries a/c Company code :BIL Enter Select type/description tab Change the account group to RM consumption Change short text and GL account long text to RM consumption local Select create /bank /interest tab Field status group to change to G003 Material consumption accounts Save
  • 10. Select edit cost element button Valid from :01.04.2008 Enter Cost element category :Select 01 Save GL account :300200 Company code :BIL Select with template button Change the GL a/c no.300100 Exchange gain Company code :BIL Enter Select type/Description tab Change account group to Increase /Decrease stocks Change short text and GL account long text to Increase/Decrease in stocks FG Select create/Bank/Interest tab Change field status group to G030 change in stock accounts Save *Assignment of accounts for automatic postings Path :Up to account determination without wizard the path is same – Configure automatic postings (Tr code is OBYC) (MM to FI Integration ) Select cancel button Select account assignment button Double click on transaction BSX inventory posting Give your Chart of Accounts :BIL enter Select valuation modifier check box Select valuation class check box Save
  • 11. Valuation modified Valuation class Account X BIL1 RM local 200121 Inventory RM local X BIL2 Finished products 200122 Inventory FG Save Press enter to save in your request Select back arrow Double click on transaction WRX GR/IR clearing account Select valuation modifier check box Select valuation class check box Save Valuation modifier :X Valuation class :BIL1 RM local Account no. :100520 GR/IR clearing local Save Press enter to save in your request Select back arrow Double click on GBB offsetting entry for Inventory posting Select General modification check box Valuation modifier check box Valuation class check box Save Valuation modifier General modification Valuation class Account X VBR (consumption) BIL1 RM local 400000 RM consumption local X ZOF (Production receipt without production order) BIL2 Finished products 300200 Increase / Decrease stocks FG X AUF with production BIL2 300200 X VAY (Delivery where sales account is created as revenue element Co implemented) BIL2 300200 X VAX Delivery where is sales account is not created BIL2 300200
  • 12. as revenue element CO not implemented Save Press enter to save in your request Document types and no.ranges (OBA7) WE :Goods receipt(50 num range) WA :Goods issue(49 num range) RE :Grass invoice receipt(51 num range) Tr code is OBA7 Select WE :Goods receipt Select details button Number rage :50 Select number range information button Company code :BIL Select change intervals button Select interval button No.range :50 Year :2008 From no. :800001 To no. :900000 Enter and save Ignore the warning message press enter Select back arrow 3 times Select type WA Goods issue Select details button Number range :49 Select no.range information button Company code :BIL Select change intervals button
  • 13. Select interval button No.range :49 Year :2008 From no. :900001 To no. :1000000 Enter and save Ignore the warning message press enter Select back arrow three times Select RE gross invoice receipt Select details button No. range :51 Select no.range information button Company code :BIL Select change intervals button No.range :51 Year :2008 From no. :1000001 To no. :1100000 Enter and save Ignore the warning message press enter MM end user area Creation of vendor master XK01 Give the company code :BIL Purchasing organization :BILR Account group :BIL2 MM vendors for BIL Enter Give the name :Nagarjuna Steels Limited Country :IN Select next screen button 3 times
  • 14. Reconciliation account :select 100501 Sundry credit RM Sort key :012 vendor Select next screen button Payment terms :0001 Select next screen button 2 times Order currency :INR Select GR based invoice verification check box Save Creation of RM material master Path :Logistics –Materials management –Material master-material- Create(Genral) –Immediately (Transaction code MM01) Material :BILRM1 Industry sector :Mechanical engineering Material type :Raw material Press select views button Select basic data1, purchasing, general plant data/storage1/accounting1 Select organization levels button (bottom side) Give the plant :BILP Storage location :HYD Enter Give the description :Raw material 1 Basic unit of measurement :KG Material group :BILC (Chemicals) Division :BS (Steel) Select purchasing tab Purchasing group :BIL Select accounting one tab Valuation class :select BIL1 (RM local) Price control :select V moving average price Moving price :50
  • 15. Select save button or Ctrl+S To open material periods for November: Up to material master the path is same –Other-Close period (Transaction code is MMPV) From company code :BIL Give the period :8 (November) Fiscal year :2008 Select check and close period radio button Execute Purchase order creation Path :Logistics – Material management –Purchasing –Purchase order-Create- Vendor/supplying plant known (The transaction code is ME 21N) Give the purchasing organization :BILR Company code :BIL Enter Give the purchasing group :BIL Item :10 Material :BILRM1 PO quantity :100 Kg net price :75 Plant :BILP Give the currency :INR Vendor no. :2001 Save Note the purchase order no.4500017092 Goods receipt: Path :Logistics –Material management –Inventory management –Goods movement –Goods receipt- for purchase order –PO number known (The transaction code is MIGO)
  • 16. Select goods receipt Give purchase order no.4500017092 Enter Storage location select :HYD Select quantity tab Quantity in delivery note :100 Select item ok check box Select save button or Ctrl+S Select display button Enter Select document information tab Select FI documents button BSX 200121 Inventory RM local 7500 BILRM1 BIL1 WRX 100520 GR/IR CLRG RM local -7500 BILRM1 BIL1 Qty .Received(GR) *Rate as per PO 100*75 Note: change USTAX to GTAX Invoice verification: Path :Logistics –Materials management –Logistics-Invoice verification – Document entry-Enter invoice (Transaction code is MIRO) Give the invoice date :Today’s date Reference :Party bill no.1234 Text :Invoice verification Purchase order :4500017092 Select payment tab Payment terms :0001 Baseline date :today’s date Select base data tab
  • 17. Tax code :select V0 Enter Business area :BILH Select beside data tab Amount :7500 Enter Select save button or Ctrl+s From the menu select invoice document –Display Select follow on document button 2001 Nagarjuna Steels Limited 7500 –From party no is taken 100520 GR/IR CLRG RM local 7500 BILRM1 BIL1 Raw material consumption Path :Logistics –Materials management –Inventory management –goods movement –goods issue (Transaction code is MB1A) Movement type :201 Plant :BILP Storage location :HYD Enter Give the cost center :Dept A Material :BILRM1 Quantity :30 Select save button or Ctrl+S From the menu select goods –Issue display Enter Select accounting documents button Select accounting document number BSX 200121 Inventory RM local 2250-BILRM1 BIL1 GBB VBR
  • 18. 400000 RM consumption LCL 2250-BILRM1 BIL1 Qty consumed * moving average price 30*75 To view stock ledger Path :Logistics –Materials management –Inventory management – Environment –Stock for posting date (Transaction code is MB5B) Material no. :BILRM1 Company code :BIL Plant :BILP Selection date :01.04.2008 to 31.03.2009 Select valuated stock radio button Execute MM END USER AREA Creation of material master (MM01) A) Raw material 2 B) Finished product 1 Give the material :BILRM2 Industry sector :Mechanical Engineering Material type :Raw material Press select view button Select basic data1 :Select purchasing Select general plant data /storage /Accounting Select organization levels button Plant :BILP Storage location :Hyderabad Enter Give the description :Raw material 2 Base unit of measurement :KG Material group :BILC Division :BS
  • 19. Select purchasing tab Purchasing group :BIL Select accounting 1 tab Valuation class :BIL1 RM Local Price control :select V moving Moving price :150 Save One more material :BILFG1 Industry section :Mechanical engineering Material type :Finished product Press select view button Select basic data1, MRP1, MRP2,MRP3, Work scheduling, general plant data /storage1, accounting , Costing 1 Select organizational levels button /enter Enter Plant :BILP Storage location :Hyderabad Enter Description :Finished product 1 Base unit measurement :KG Division :BS Select MRP1 tab MRP type :select PD (MRP) MRP controller :A Lot size :select EX lot for –lot order quantity Select MRP 2 tab In –house production :0 days Schedule margin key :select BIL
  • 20. Select MPR 3 tab Ignore the warning message press enter Availability check :select KP (no check ) Select work scheduling tab Production scheduler :B Select accounting tab Valuation class :BIL2 Finished products Price control :S (Standard price) Standard price :300 Select costing one tab Overhead group :select BIL1 Save Note :BOM=Bill of Material