PHARMACEUTICAL VALIDATION
SEMINAR
DEFINITION OF QUALIFICATION & VALIDATION
STREAMLINING OF QUALIFICATION & VALIDATION PROCESS
VALIDATION MASTER PLAN
PRESENTED BY
B VENU G
M PHARM
QUALIFICATION:
 Action of proving and documenting that equipment or
ancillary systems are properly installed, work correctly, and
actually lead to the expected results.
VALIDATION:
 Action of proving and documenting specific system process or
facility will consistently produce a product meeting its
predetermined specifications and quality attributes.
QUALIFICATION
 Documented evidence –equpiment is fit for intended use.
 Qualified before use.
 Part of validation.
 Validation is assurance that process or method complies to GMP, whereas
qualification is assurance for an equipment to work properly.
 Establish confidence-equipment consistently operates –expected results.
 Completed before validation starts.
AIM
Document the original installation condition.
Establish that the equipment –fit for use.
Required by FDA/ other regulatory agencies.
Good business sense.
Assure -Equipment functions as required.
Easy to track and fix problems..
Check received as ordered.
Ensure product’s quality.
Utilities:
 Direct or indierct contact with product.
 Examples: HVAC system, boiler system and electrical power.
 They may not affect the product directly but affect operators
comfort.
Equipment:
 Prevent cross contamination.
 Support equipments: pump, agitators ets are also qualified.
TYPES
DESIGN QUALIFICATION
 Documented evidence-proposed design of the equipment is suitable for
the intended purpose.
 Defines functional and operational specification of instrument
 Conscious decision in selecting vendor.
Ensure
 All requirements for the final systems have been clearly
defined at the beginning.
 Equipment has required function to perform.
Responsibility: vendor and the user
User:
 Describe the use , environment , problem analysis.
 Functional and operational specification.
Vendor:
Manufacture instrument in QC environment (ISO 9000 standards).
Develop functional and operational product specification
Information on validation and operation.
DQ is a verification that the design meets user requirements that relate to GMP and
product quality .
INSTALLATION QUALIFICATION
 Document that equipments are properly installed in accordance
with URS & PO.
 Check whether equipments are properly delivered.
 Verification of installation location meets GMP.
 Unpacking the instrument & cross checking contents.
 Pre shipping inspection at vendor’s location with vendor audits.
It should contain
SYSTEM DESCRIPITION:
 Description on instrument, Manufacture & Model no.
 Ensures-arrived as per PO with out any damage.
UTILITIES/FACILITIES:
 Installation site-as per vendor’s specification (ie Humidity, temperature,
electric power, location, Network & data)
ASSEMBLY & INSTALLATION :
 Done by vendor/ specialized engineers
 Simple-User
Verify installation done as per specification.
 Peace of mind to the user.
 Verify-satisfies all requirements.
 New equipment is installed.
 Moved to new site.
 Computer software has upgraded.
OPERATIONAL QUALIFICATION
Document that test all operating characteristics of equipment.
 Check whether the equipment functions as described by the manufacturer &
required by the user.
Performed before the use of equipment.
 Example: specification –50 to 150 rpm (verify that rpm is achieved)
 Check
 Process control limits.
Raw material specification.
Process operating procedure.
Material handling requirement.
 Training the personnel-documenting.
 Develop, Review and finalize SOP (Use, maintainace and cleaning)
 Brief description on operation.
 Verify all loop installation
 Testing alarms, interlocks & power loss recovery.
 Problem developed in this process –identified-CAPA.
PERFORMANCE QUALIFICATION
Determine that the system runs as expected.
 Part of validation.
 Done at regular intervals –ensure reproducibility.
Performed on daily basis Everyday. Every time, Before/after or between runs.
Difference between PQ and OQ is that
 PQ is done over a extended period-REPRODUCIBILITY.
 Whereas OQ is done to check the operational function of the respective
equipment.
 Process repetebility.
 Acceptability of product.
 Product quality.
 Handle multiple user without significant system lap.
 Long term process stability (consistency of product to stay within control limits).
 PQ done frequently on working instrument not only on new instrument
 Preventive Maintainance & Repair :
PQ done to prevent repairs. If repaired PQ performed again Instrurment qualified .
 MAINTAINACE OF SOP:
Operation, calibration & maintainace are recorded on log book.
EXAMPLE PQ: AUTOCLAVE
1. Chamber Vacuum leak test : Check integrity of chamber.
2. Empty chamber heat distribution : Even heat distribution of heat in sterilizer.
3. Heat penetration studies : On loaded .
REQUALIFICATION
 Ensures that equipment is still in qualified state.
When???
I. After any incident.
II. Significant change in batch size.
III. New accessories have been fitted.
IV. Equipment / system has been upgraded/ Service.
V. Equipment used for new purpose / new way.
Scope of Performance Qualification:
 According to regulatory documents, like FDA guidelines, the scope of PQ is some
what limited.
 It represents the final qualification, including any requalification of the system and
equipment that you use in your business.
Typically, the scope of PQ extends to include the following scenarios:
 New systems being delivered and operated for the first time
 Existing systems in use (as part of a regular maintenance schedule)
 Systems that have been modified to any degree
 Equipment/systems which have been used more than they normally would be
 After a system has been expanded in order to increase its capacity
Frequency of Performing Performance Qualification :
 The objective of PQ is to provide quality assurance that the system is capable of
being subsequently validated. GMP and other such guidelines might not specify the
frequency of performing PQ, so the schedule or frequency you choose depends on a
lot of factors.
This will typically be one or more of the following:
 Everyday
 Each time the equipment or system is used
 Before, after, or even during, a series of operations
 Other periodic schedule, or as needed
VALIDATION
 Validation is an integral part of quality assurance; it involves the systematic study of
systems, facilities and processes aimed at determining whether they perform their
intended functions adequately and consistently as specified.
 A validated process is one which has been demonstrated to provide a high degree of
assurance that uniform batches will be produced that meet the required
specifications and has therefore been formally approved.
 Validation in itself does not improve processes but confirms that the processes have
been properly developed and are under control.
Definitions :
 According to ISO: “Validation is the confirmation by examination and the
provision of objective evidence that the particular requirements for a specific
intended use are fulfilled.”
 According to US FDA, the goal of validation is to: “Establish documented
evidence which provides a high degree of assurance that a specific process will
consistently produce a product meeting its predetermined specifications and quality
attributes.”
 According to European commission: “Action providing in accordance with the
principles of GMP, that any procedure, process, equipment, material, activity or
system actually lead to the expected results.”
Adequate validation is beneficial to the manufacturer in
many ways:
 It deepens the understanding of processes; decreases the risk of preventing
problems and thus assures the smooth running of the process.
 It decreases the risk of defect costs.
 It decreases the risk of regulatory noncompliance.
 A fully validated process may require less in-process controls and end product
testing.
Scope of validation
 Validation requires an appropriate and sufficient infrastructure including: –
organization, documentation, personnel and finances
 Involvement of management and quality assurance personnel
 Personnel with appropriate qualifications and experience
 Extensive preparation and planning before validation is performed
 Validation should be performed:
 – for new premises, equipment, utilities and systems, and processes and procedures;
 – at periodic intervals; and
 – when major changes have been made.
 Validation in accordance with written protocols.
Importance of Validation
1.Assurance of quality
2. Time bound
3. Process optimization
4. Reduction of quality cost.
5. Minimal batch failures, improved efficiently and productivity.
6. Reduction in rejections.
7. Increased output.
8. Fewer complaints about process related failures.
9. Reduced testing in process and in finished goods.
10. More rapid and reliable start-up of new equipments
11. Easier maintenance of equipment.
12. Improved employee awareness of processes.
13. More rapid automation.
14. Government regulation (Compliance with validation requirements is necessary for obtaining approval to
manufacture and to introduce new products)
Departments responsible
 Site validation committee: - Develop site master validation plan.
 Manufacturing department: - Prepares the batches as though their routine
production batches.
 Quality assurance: - Ensure compliance and that documentation, procedures are in
place. Approves protocols and reports.
 Quality controls: - Perform testing contracts validation testing and reviews
protocol and report as needed.
 Research and development: - Deals with product design.
 Engineering department: - Installation, quality and certify plant, facilities,
equipment and support systems.
ORGANIZATION FOR VALIDATION
VALIDATION MASTER PLAN
 The validation master plan should provide an overview of the entire validation operation,
its organizational structure, its content and planning.
 The main elements of it being them list/inventory of the items to be validated and the
planning schedule.
 All validation activities relating to critical technical operations, relevant to product and
process controls within a firm should be included in the validation master plan.
 It should comprise all prospective, concurrent and retrospective validations as well as
revalidation.
 The Validation Master Plan should be a summary document and should therefore be brief,
concise and clear.
 It should not repeat information documented elsewhere but should refer to existing
documents such as policy documents, SOP‟s and validation protocols and reports.
The format and content should include:
 Introduction: validation policy, scope, location and schedule.
 Organizational structure: personnel responsibilities.
 Plant/process/product description: rational for inclusions or exclusions and extent of
validation.
 Specific process considerations that are critical and those requiring extra attention.
 Key acceptance criteria.
 Documentation format.
 Reference to the required SOPs.
 Time plans of each validation project and sub-project.
 List of products/ processes/ systems to be validated, summarized in a matrix format,
validation approach.
 Re-validation activities, actual status and future planning
VALIDATION PROTOCOL
 A written plan stating how validation will be conducted, including test parameters,
product characteristics, production and packaging equipment, and decision points on
what constitutes acceptable test results.
 This document should give details of critical steps of the manufacturing process that
should be measured, the allowable range of variability and the manner in which the
system will be tested.
 The protocol should list the selected process and control parameters, state the
number of batches to be included in the study, and specify how the data, once
assembled, will be treated for relevance. The date of approval by the validation team
should also be noted.
The validation protocol should be numbered, signed and dated, and should contain as a
minimum the following information:
 objectives, scope of coverage of the validation study
 validation team membership, their qualifications and responsibilities
 type of validation: prospective, concurrent, retrospective, revalidation
 number and selection of batches to be on the validation study
 a list of all equipment to be used; their normal and worst case operating parameters
 outcome of IQ, OQ for critical equipments requirements for qualification calibration of
all measuring devices
 critical process parameters and their respective tolerances
 description of the processing steps: copy of the master documents for the product
 sampling points, stages of sampling, methods of sampling, sampling plans
 statistical tools to be used in the analysis of data
TYPES OF VALIDATION
Prospective validation
 It is defined as the established documented evidence that a system does what it purports
to do based on a pre-planned protocol.
 This validation usually carried out prior to distribution either of a new product or a
product made under a revised manufacturing process.
 Performed on at least three successive production-size (Consecutive batches).
 The objective of the prospective validation is to prove or demonstrate that the process
will work in accordance with validation protocol prepared for the pilot production trials.
Prospective validation should normally be completed prior to the distribution and sale of
the medicinal product.
 In Prospective Validation, the validation protocol is executed before the process is put
into commercial use.
Concurrent validation
 It is a process where current production batches are used to monitor processing
parameters.
 Concurrent Validation means establishing documented evidence a process does what it is
supposed to based on data generated during actual implementation of the process.
 It is important in these cases when the systems and equipment to be used have been fully
validated previously.
 It is similar to prospective, except the operating firm will sell the product during the
qualification runs, to the public at its market price, and also similar to retrospective
validation.
 This validation involves in-process monitoring of critical processing steps and product
testing. This helps to generate and documented evidence to show that the production
process is in a state of control.
Retrospective validation
 It is defined as the established documented evidence that a system does what it
purports to do on the review and analysis of historical information. This type of
validation of a process is for a product already in distribution.
 Retrospective validation is only acceptable for well-established processes and will
be inappropriate where there have been recent changes in the composition of the
product, operating procedures or equipment.
 Validation of such processes should be based on historical data.
 For retrospective validation, generally data from ten to thirty consecutive batches
should be examined to access process consistency, but fewer batches may be
examined if justified.
Revalidation
 Re-validation provides the evidence that changes in a process and /or the process
environment that are introduced do not adversely affect process characteristics and
product quality. Documentation requirements will be the same as for the initial validation
of the process.
 Re-validation becomes necessary in certain situations. Some of the changes that require
validation are as follows:
 Changes in raw materials (physical properties such as density, viscosity, particle size
distribution etc., that may affect the process or product).
 Changes in the source of active raw material manufacturer.
 Changes in packaging material (primary container/closure system)
 Changes in the process (e.g., mixing time, drying temperatures and batch size)
 Changes in the equipment (e.g., addition of automatic detection system).
 Changes in the plant/facility.
STREAMLINING VALIDATION OPERATIONS
 The best approach to avoiding needless and expensive technical delays is to work in
parallel. The key elements at this important stage of the overall process are the API,
analytical test methods, and the drug product (pharmaceutical dosage form). An
integrated and parallel way of getting these three vitally important functions to work
together is depicted in Figure below.
 Figure shows that the use of a single analytical methods testing function is an
important technical bridge between the API and the drug product development
functions as the latter two move through the various stages of development, clinical
study, process development, and process validation and into production.
REFERNCES
 An Overview Of Analytical Instrument Qualification With Reference Of
Pharmaceutical Industry Devesh Kapoor, Ruchi B. Vyas , Diwaker Dadrwal Journal
of Drug Delivery & Therapeutics. 2018; 8(5):99-103
 Nash. A. Robertand Wachter H. Alfred “Pharmaceutical Process Validation” an
international 3rd edition Pg no 507-518
 Industrial pharmacy , A Comprehensive approach, by D.K Tripathi , Pg no: 671-699
 Pharmaceutical process validation : An overview , by M.d Shoaib Alametal; Journal
of advanced pharmacy education & research ,oct-dec2012,vol 2, issue 4, pg no: 190-
196
 Validation of pharmaceutical process by Frederick J,carleton, JamesP, Agalloco, 3rd
edition, pg no 129-137.
 Validation and Calibration of Analytical InstrumentD.Gowrisankar, K.Abbulu,
O.BalaSouri, K.Sujana, D.Gowrisankar et al / J Biomed Sciand Res., Vol2 (2), 2010,89-
99.
 ICH Guidelines Q2BValidation of Analytical Procedures: Methodology (1996).
 Overview of Validation and Basic Concepts of Process Validation
 Dr. KeyurB. Ahir, KhushbooD. Singh, SushmaP. Yadav, HetalS.
 Patel, ChetanB. Poyahari, Scholars Academic Journal of Pharmacy (SAJP) Sch. Acad. J.
Pharm., 2014; 3(2): 178-190.
 Kaur H, Singh G, Seth N; Pharmaceutical Process Validation: A Review. 2013; 3 (4):
189-194.
Pharmaceutical validation, Quantification, streamlining, validation masterplan.

Weitere ähnliche Inhalte

Was ist angesagt?

Validation of utility system (water system)
Validation of utility system (water system)Validation of utility system (water system)
Validation of utility system (water system)ShameerAbid
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instrumentsSanathoiba Singha
 
ICH guidelines on impurities in new drug products.pptx
ICH guidelines on impurities in new drug products.pptxICH guidelines on impurities in new drug products.pptx
ICH guidelines on impurities in new drug products.pptxDivya Pushp
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 
Analytical methods validation as per ich & usp
Analytical methods validation as per ich & uspAnalytical methods validation as per ich & usp
Analytical methods validation as per ich & uspGANESH NIGADE
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.KhushbooKunkulol
 
Concept & evolution of qa & qc
Concept & evolution of qa & qcConcept & evolution of qa & qc
Concept & evolution of qa & qcChowdaryPavani
 
Qualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniQualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniMayuri Soni
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalganpat420
 

Was ist angesagt? (20)

QUALIFICATION OF HPTLC,HPTLC
QUALIFICATION  OF HPTLC,HPTLCQUALIFICATION  OF HPTLC,HPTLC
QUALIFICATION OF HPTLC,HPTLC
 
CLEANING METHOD DEVELOPMENT
CLEANING METHOD DEVELOPMENT CLEANING METHOD DEVELOPMENT
CLEANING METHOD DEVELOPMENT
 
Validation of utility system (water system)
Validation of utility system (water system)Validation of utility system (water system)
Validation of utility system (water system)
 
Computer system validations
Computer system validationsComputer system validations
Computer system validations
 
FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST FACTORY ACCEPTANCE TEST
FACTORY ACCEPTANCE TEST
 
Pharmaceutical validation of water system
Pharmaceutical validation of  water system Pharmaceutical validation of  water system
Pharmaceutical validation of water system
 
Qualification of high performance liquid chromatography
Qualification of high performance liquid chromatographyQualification of high performance liquid chromatography
Qualification of high performance liquid chromatography
 
Qualification of analytical instruments
Qualification of analytical instrumentsQualification of analytical instruments
Qualification of analytical instruments
 
ICH guidelines on impurities in new drug products.pptx
ICH guidelines on impurities in new drug products.pptxICH guidelines on impurities in new drug products.pptx
ICH guidelines on impurities in new drug products.pptx
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Qualification Of HPTLC
Qualification Of HPTLCQualification Of HPTLC
Qualification Of HPTLC
 
Qualification of Weights and Measures
Qualification of Weights and MeasuresQualification of Weights and Measures
Qualification of Weights and Measures
 
Computerized system validation
Computerized system validationComputerized system validation
Computerized system validation
 
Analytical methods validation as per ich & usp
Analytical methods validation as per ich & uspAnalytical methods validation as per ich & usp
Analytical methods validation as per ich & usp
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Qualification of manufacturing equipment.
Qualification of manufacturing equipment.Qualification of manufacturing equipment.
Qualification of manufacturing equipment.
 
Qualification Of HPLC
Qualification Of HPLCQualification Of HPLC
Qualification Of HPLC
 
Concept & evolution of qa & qc
Concept & evolution of qa & qcConcept & evolution of qa & qc
Concept & evolution of qa & qc
 
Qualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri SoniQualification of laboratory equipments by Mayuri Soni
Qualification of laboratory equipments by Mayuri Soni
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
 

Ähnlich wie Pharmaceutical validation, Quantification, streamlining, validation masterplan.

calibration-and-validation
calibration-and-validationcalibration-and-validation
calibration-and-validationSUJITHA MARY
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom QualificationAnwar Munjewar
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation Pramod Pal
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Sanathoiba Singha
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxMariaSaifee
 
Validation of equipments
Validation of equipmentsValidation of equipments
Validation of equipmentssuhasini
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONManikant Prasad Shah
 
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptPHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptrjshaha58
 

Ähnlich wie Pharmaceutical validation, Quantification, streamlining, validation masterplan. (20)

Validation
ValidationValidation
Validation
 
Pharmaceutical validation
Pharmaceutical validation Pharmaceutical validation
Pharmaceutical validation
 
Validation (1).pptx
Validation (1).pptxValidation (1).pptx
Validation (1).pptx
 
calibration-and-validation
calibration-and-validationcalibration-and-validation
calibration-and-validation
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
Bioprocess Validation
Bioprocess Validation Bioprocess Validation
Bioprocess Validation
 
Process validation ppt.
Process validation ppt.Process validation ppt.
Process validation ppt.
 
Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation' Notes for the subject 'Pharmaceutical Validation'
Notes for the subject 'Pharmaceutical Validation'
 
4 validation jntu pharmacy
4 validation jntu pharmacy4 validation jntu pharmacy
4 validation jntu pharmacy
 
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptxPharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
Pharmaceutical Validation ( As per M.Pharm 1st sem Syllabus).pptx
 
Validation
ValidationValidation
Validation
 
Validation
ValidationValidation
Validation
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Validation of equipments
Validation of equipmentsValidation of equipments
Validation of equipments
 
Validation
ValidationValidation
Validation
 
Jatin validation
Jatin validationJatin validation
Jatin validation
 
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATIONValidation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
Validation, scope of validation, URS , WHO GUIDELINES FOR VALIDATION
 
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptPHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
 

Kürzlich hochgeladen

ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 

Kürzlich hochgeladen (20)

ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 

Pharmaceutical validation, Quantification, streamlining, validation masterplan.

  • 1. PHARMACEUTICAL VALIDATION SEMINAR DEFINITION OF QUALIFICATION & VALIDATION STREAMLINING OF QUALIFICATION & VALIDATION PROCESS VALIDATION MASTER PLAN PRESENTED BY B VENU G M PHARM
  • 2. QUALIFICATION:  Action of proving and documenting that equipment or ancillary systems are properly installed, work correctly, and actually lead to the expected results. VALIDATION:  Action of proving and documenting specific system process or facility will consistently produce a product meeting its predetermined specifications and quality attributes.
  • 3. QUALIFICATION  Documented evidence –equpiment is fit for intended use.  Qualified before use.  Part of validation.  Validation is assurance that process or method complies to GMP, whereas qualification is assurance for an equipment to work properly.  Establish confidence-equipment consistently operates –expected results.  Completed before validation starts.
  • 4. AIM Document the original installation condition. Establish that the equipment –fit for use. Required by FDA/ other regulatory agencies. Good business sense. Assure -Equipment functions as required. Easy to track and fix problems.. Check received as ordered. Ensure product’s quality.
  • 5. Utilities:  Direct or indierct contact with product.  Examples: HVAC system, boiler system and electrical power.  They may not affect the product directly but affect operators comfort. Equipment:  Prevent cross contamination.  Support equipments: pump, agitators ets are also qualified.
  • 7. DESIGN QUALIFICATION  Documented evidence-proposed design of the equipment is suitable for the intended purpose.  Defines functional and operational specification of instrument  Conscious decision in selecting vendor.
  • 8. Ensure  All requirements for the final systems have been clearly defined at the beginning.  Equipment has required function to perform.
  • 9. Responsibility: vendor and the user User:  Describe the use , environment , problem analysis.  Functional and operational specification. Vendor: Manufacture instrument in QC environment (ISO 9000 standards). Develop functional and operational product specification Information on validation and operation. DQ is a verification that the design meets user requirements that relate to GMP and product quality .
  • 10.
  • 11. INSTALLATION QUALIFICATION  Document that equipments are properly installed in accordance with URS & PO.  Check whether equipments are properly delivered.  Verification of installation location meets GMP.  Unpacking the instrument & cross checking contents.  Pre shipping inspection at vendor’s location with vendor audits.
  • 12. It should contain SYSTEM DESCRIPITION:  Description on instrument, Manufacture & Model no.  Ensures-arrived as per PO with out any damage. UTILITIES/FACILITIES:  Installation site-as per vendor’s specification (ie Humidity, temperature, electric power, location, Network & data) ASSEMBLY & INSTALLATION :  Done by vendor/ specialized engineers  Simple-User
  • 13. Verify installation done as per specification.  Peace of mind to the user.  Verify-satisfies all requirements.  New equipment is installed.  Moved to new site.  Computer software has upgraded.
  • 14. OPERATIONAL QUALIFICATION Document that test all operating characteristics of equipment.  Check whether the equipment functions as described by the manufacturer & required by the user. Performed before the use of equipment.  Example: specification –50 to 150 rpm (verify that rpm is achieved)
  • 15.  Check  Process control limits. Raw material specification. Process operating procedure. Material handling requirement.  Training the personnel-documenting.  Develop, Review and finalize SOP (Use, maintainace and cleaning)
  • 16.  Brief description on operation.  Verify all loop installation  Testing alarms, interlocks & power loss recovery.  Problem developed in this process –identified-CAPA.
  • 17. PERFORMANCE QUALIFICATION Determine that the system runs as expected.  Part of validation.  Done at regular intervals –ensure reproducibility. Performed on daily basis Everyday. Every time, Before/after or between runs.
  • 18. Difference between PQ and OQ is that  PQ is done over a extended period-REPRODUCIBILITY.  Whereas OQ is done to check the operational function of the respective equipment.  Process repetebility.  Acceptability of product.  Product quality.  Handle multiple user without significant system lap.  Long term process stability (consistency of product to stay within control limits).
  • 19.  PQ done frequently on working instrument not only on new instrument  Preventive Maintainance & Repair : PQ done to prevent repairs. If repaired PQ performed again Instrurment qualified .  MAINTAINACE OF SOP: Operation, calibration & maintainace are recorded on log book.
  • 20. EXAMPLE PQ: AUTOCLAVE 1. Chamber Vacuum leak test : Check integrity of chamber. 2. Empty chamber heat distribution : Even heat distribution of heat in sterilizer. 3. Heat penetration studies : On loaded .
  • 21. REQUALIFICATION  Ensures that equipment is still in qualified state. When??? I. After any incident. II. Significant change in batch size. III. New accessories have been fitted. IV. Equipment / system has been upgraded/ Service. V. Equipment used for new purpose / new way.
  • 22. Scope of Performance Qualification:  According to regulatory documents, like FDA guidelines, the scope of PQ is some what limited.  It represents the final qualification, including any requalification of the system and equipment that you use in your business. Typically, the scope of PQ extends to include the following scenarios:  New systems being delivered and operated for the first time  Existing systems in use (as part of a regular maintenance schedule)  Systems that have been modified to any degree  Equipment/systems which have been used more than they normally would be  After a system has been expanded in order to increase its capacity
  • 23. Frequency of Performing Performance Qualification :  The objective of PQ is to provide quality assurance that the system is capable of being subsequently validated. GMP and other such guidelines might not specify the frequency of performing PQ, so the schedule or frequency you choose depends on a lot of factors. This will typically be one or more of the following:  Everyday  Each time the equipment or system is used  Before, after, or even during, a series of operations  Other periodic schedule, or as needed
  • 24. VALIDATION  Validation is an integral part of quality assurance; it involves the systematic study of systems, facilities and processes aimed at determining whether they perform their intended functions adequately and consistently as specified.  A validated process is one which has been demonstrated to provide a high degree of assurance that uniform batches will be produced that meet the required specifications and has therefore been formally approved.  Validation in itself does not improve processes but confirms that the processes have been properly developed and are under control.
  • 25. Definitions :  According to ISO: “Validation is the confirmation by examination and the provision of objective evidence that the particular requirements for a specific intended use are fulfilled.”  According to US FDA, the goal of validation is to: “Establish documented evidence which provides a high degree of assurance that a specific process will consistently produce a product meeting its predetermined specifications and quality attributes.”  According to European commission: “Action providing in accordance with the principles of GMP, that any procedure, process, equipment, material, activity or system actually lead to the expected results.”
  • 26. Adequate validation is beneficial to the manufacturer in many ways:  It deepens the understanding of processes; decreases the risk of preventing problems and thus assures the smooth running of the process.  It decreases the risk of defect costs.  It decreases the risk of regulatory noncompliance.  A fully validated process may require less in-process controls and end product testing.
  • 27. Scope of validation  Validation requires an appropriate and sufficient infrastructure including: – organization, documentation, personnel and finances  Involvement of management and quality assurance personnel  Personnel with appropriate qualifications and experience  Extensive preparation and planning before validation is performed  Validation should be performed:  – for new premises, equipment, utilities and systems, and processes and procedures;  – at periodic intervals; and  – when major changes have been made.  Validation in accordance with written protocols.
  • 28. Importance of Validation 1.Assurance of quality 2. Time bound 3. Process optimization 4. Reduction of quality cost. 5. Minimal batch failures, improved efficiently and productivity. 6. Reduction in rejections. 7. Increased output. 8. Fewer complaints about process related failures. 9. Reduced testing in process and in finished goods. 10. More rapid and reliable start-up of new equipments 11. Easier maintenance of equipment. 12. Improved employee awareness of processes. 13. More rapid automation. 14. Government regulation (Compliance with validation requirements is necessary for obtaining approval to manufacture and to introduce new products)
  • 29. Departments responsible  Site validation committee: - Develop site master validation plan.  Manufacturing department: - Prepares the batches as though their routine production batches.  Quality assurance: - Ensure compliance and that documentation, procedures are in place. Approves protocols and reports.  Quality controls: - Perform testing contracts validation testing and reviews protocol and report as needed.  Research and development: - Deals with product design.  Engineering department: - Installation, quality and certify plant, facilities, equipment and support systems.
  • 31. VALIDATION MASTER PLAN  The validation master plan should provide an overview of the entire validation operation, its organizational structure, its content and planning.  The main elements of it being them list/inventory of the items to be validated and the planning schedule.  All validation activities relating to critical technical operations, relevant to product and process controls within a firm should be included in the validation master plan.  It should comprise all prospective, concurrent and retrospective validations as well as revalidation.  The Validation Master Plan should be a summary document and should therefore be brief, concise and clear.  It should not repeat information documented elsewhere but should refer to existing documents such as policy documents, SOP‟s and validation protocols and reports.
  • 32. The format and content should include:  Introduction: validation policy, scope, location and schedule.  Organizational structure: personnel responsibilities.  Plant/process/product description: rational for inclusions or exclusions and extent of validation.  Specific process considerations that are critical and those requiring extra attention.  Key acceptance criteria.  Documentation format.  Reference to the required SOPs.  Time plans of each validation project and sub-project.  List of products/ processes/ systems to be validated, summarized in a matrix format, validation approach.  Re-validation activities, actual status and future planning
  • 33. VALIDATION PROTOCOL  A written plan stating how validation will be conducted, including test parameters, product characteristics, production and packaging equipment, and decision points on what constitutes acceptable test results.  This document should give details of critical steps of the manufacturing process that should be measured, the allowable range of variability and the manner in which the system will be tested.  The protocol should list the selected process and control parameters, state the number of batches to be included in the study, and specify how the data, once assembled, will be treated for relevance. The date of approval by the validation team should also be noted.
  • 34. The validation protocol should be numbered, signed and dated, and should contain as a minimum the following information:  objectives, scope of coverage of the validation study  validation team membership, their qualifications and responsibilities  type of validation: prospective, concurrent, retrospective, revalidation  number and selection of batches to be on the validation study  a list of all equipment to be used; their normal and worst case operating parameters  outcome of IQ, OQ for critical equipments requirements for qualification calibration of all measuring devices  critical process parameters and their respective tolerances  description of the processing steps: copy of the master documents for the product  sampling points, stages of sampling, methods of sampling, sampling plans  statistical tools to be used in the analysis of data
  • 35. TYPES OF VALIDATION Prospective validation  It is defined as the established documented evidence that a system does what it purports to do based on a pre-planned protocol.  This validation usually carried out prior to distribution either of a new product or a product made under a revised manufacturing process.  Performed on at least three successive production-size (Consecutive batches).  The objective of the prospective validation is to prove or demonstrate that the process will work in accordance with validation protocol prepared for the pilot production trials. Prospective validation should normally be completed prior to the distribution and sale of the medicinal product.  In Prospective Validation, the validation protocol is executed before the process is put into commercial use.
  • 36. Concurrent validation  It is a process where current production batches are used to monitor processing parameters.  Concurrent Validation means establishing documented evidence a process does what it is supposed to based on data generated during actual implementation of the process.  It is important in these cases when the systems and equipment to be used have been fully validated previously.  It is similar to prospective, except the operating firm will sell the product during the qualification runs, to the public at its market price, and also similar to retrospective validation.  This validation involves in-process monitoring of critical processing steps and product testing. This helps to generate and documented evidence to show that the production process is in a state of control.
  • 37. Retrospective validation  It is defined as the established documented evidence that a system does what it purports to do on the review and analysis of historical information. This type of validation of a process is for a product already in distribution.  Retrospective validation is only acceptable for well-established processes and will be inappropriate where there have been recent changes in the composition of the product, operating procedures or equipment.  Validation of such processes should be based on historical data.  For retrospective validation, generally data from ten to thirty consecutive batches should be examined to access process consistency, but fewer batches may be examined if justified.
  • 38. Revalidation  Re-validation provides the evidence that changes in a process and /or the process environment that are introduced do not adversely affect process characteristics and product quality. Documentation requirements will be the same as for the initial validation of the process.  Re-validation becomes necessary in certain situations. Some of the changes that require validation are as follows:  Changes in raw materials (physical properties such as density, viscosity, particle size distribution etc., that may affect the process or product).  Changes in the source of active raw material manufacturer.  Changes in packaging material (primary container/closure system)  Changes in the process (e.g., mixing time, drying temperatures and batch size)  Changes in the equipment (e.g., addition of automatic detection system).  Changes in the plant/facility.
  • 39. STREAMLINING VALIDATION OPERATIONS  The best approach to avoiding needless and expensive technical delays is to work in parallel. The key elements at this important stage of the overall process are the API, analytical test methods, and the drug product (pharmaceutical dosage form). An integrated and parallel way of getting these three vitally important functions to work together is depicted in Figure below.  Figure shows that the use of a single analytical methods testing function is an important technical bridge between the API and the drug product development functions as the latter two move through the various stages of development, clinical study, process development, and process validation and into production.
  • 40.
  • 41. REFERNCES  An Overview Of Analytical Instrument Qualification With Reference Of Pharmaceutical Industry Devesh Kapoor, Ruchi B. Vyas , Diwaker Dadrwal Journal of Drug Delivery & Therapeutics. 2018; 8(5):99-103  Nash. A. Robertand Wachter H. Alfred “Pharmaceutical Process Validation” an international 3rd edition Pg no 507-518  Industrial pharmacy , A Comprehensive approach, by D.K Tripathi , Pg no: 671-699  Pharmaceutical process validation : An overview , by M.d Shoaib Alametal; Journal of advanced pharmacy education & research ,oct-dec2012,vol 2, issue 4, pg no: 190- 196
  • 42.  Validation of pharmaceutical process by Frederick J,carleton, JamesP, Agalloco, 3rd edition, pg no 129-137.  Validation and Calibration of Analytical InstrumentD.Gowrisankar, K.Abbulu, O.BalaSouri, K.Sujana, D.Gowrisankar et al / J Biomed Sciand Res., Vol2 (2), 2010,89- 99.  ICH Guidelines Q2BValidation of Analytical Procedures: Methodology (1996).  Overview of Validation and Basic Concepts of Process Validation  Dr. KeyurB. Ahir, KhushbooD. Singh, SushmaP. Yadav, HetalS.  Patel, ChetanB. Poyahari, Scholars Academic Journal of Pharmacy (SAJP) Sch. Acad. J. Pharm., 2014; 3(2): 178-190.  Kaur H, Singh G, Seth N; Pharmaceutical Process Validation: A Review. 2013; 3 (4): 189-194.