SlideShare ist ein Scribd-Unternehmen logo
1 von 29
Power, politics and stakeholder management

1
Stakeholders
Stakeholders are any individuals or groups
who can affect or will be affected by the
outcome of a change.

2
Power and politics
– When thinking about managing change, some people
assume that organisations are well integrated entities
within which everybody works harmoniously
together.
– Some also believe that decisions are made logically
and rationally, that people share similar views of the
world around them and that they act to promote the
interests of the organization as a whole.
This is rarely the case.

3
Organisations are political arenas
– Organizations can be conceptualised as a collection of
individuals, groups and communities of practice, each
pursuing their own objectives.
● When there is a conflict of interests it is the power and
influence of those involved that determines the outcome
rather than logic and rational argument.
● Consequently, those responsible for managing change
cannot afford to ignore issues of power and influence.

4
Political behaviour is most intense in times of
change
 Change upsets the balance of power
Some will defend the status quo and others will seek
change to improve their position
 People will resist change because of:
• Threat from anticipated future state
• Threat from process used to secure change

5
Implications for change managers
– In order to manage change successfully change
managers need to be alert to the identity of
important stakeholders and to their predisposition
to either support or resist the change.

6
Power and authority

– Some stakeholders are more powerful than others and
they are able to act in ways that will either support or
block a change.
● This power is not confined to those who have been given
the authority to determine how certain things will be done.
● Sometimes individuals and groups who do not have any
legitimate authority have more power than legitimately
appointed managers.

7
• Who are the most powerful
individuals or groups in your
organisation?
• Why? - what is the basis of their
power?

8
The constituencies or stakeholder groups that
are most powerful are those that:
– are in a position to deal with important problems facing
the organisation
– have control over significant resources valued by others
– are lucky or skilled enough to bring problems and
resources together at the same time
– are centrally connected in the work flow of the
organisation
– are not easily replaced
– have successfully used power in the past.

9
?
Should change managers take account
of all or only selected groups of
stakeholders?

10
Which stakeholders are most
important?

• Normative theories.

– According to normative or ethics-based theories of stakeholder
management the interests of all stakeholders have intrinsic value and
should be taken into account when planning and implementing
change.
 Instrumental

theories.

● The basic premise of instrumental theories is that managers will only
attend to the interests of stakeholders to the extent that those
stakeholders can affect their interests.
● Managers are selective in who they attend to and are not motivated by
a concern for the welfare of stakeholders in general.

11
A life cycle approach to stakeholder
management

– The underlying premise is that an organisation faces
different pressures and threats at different stages in its
life cycle.
● Consequently, over time, certain stakeholders become
more important than others because of their ability to
satisfy critical organisational needs.

12
The contribution of resource
dependence theory
– Change managers pay most attention to those
stakeholder groups who control resources critical to
the organisation's survival.
● It is possible to identify four ways of attending to
stakeholders:
• Proacting
• Accommodating
• Defending
• Ignoring

13
The contribution of prospect theory
– “… in the context of gains, individuals will be risk
averse and choose the option with a certain outcome
over a risky option, whereas in the context of losses,
individuals will be risk seeking and choose the risky
option over the option with a certain outcome.”
(Jawahare and McLaughlin)
Proactively addressing the concerns of all stakeholders is a 'certain' or
risk-averse option because it is likely to persuade all stakeholders to
provide the organisation with the required resources.
Proactively addressing the concerns of only some stakeholders and
ignoring the concerns of others is a more 'risky' option.

14
Two theorems
– In the absence of threats to organizational survival, a
gain frame will be adopted, and the organization will
follow a risk-averse strategy and actively address all
stakeholder issues.
● In the presence of threats to organisational survival, a loss
frame will be adopted, and the organisation will pursue a
risky strategy that involves addressing the concerns of only
those stakeholders who are relevant to the immediate loss
threat, while at the same time defending or denying any
responsibility for the concerns of other stakeholders.

15
The contribution of organisational life
cycle models
– Resource requirements will vary depending on the stage of the
change project life cycle
– When the fulfilment of resource requirements is threatened change
managers adopt a loss frame and interact proactively with those
stakeholders who control the critical resources.
... and ignore or act in a defensive mode towards other stakeholders
● When the flow of resources is not threatened, change managers adopt
a gain frame, pursue a risk-averse strategy, and actively address the
concerns of all stakeholders.

16
Jawahare and McLaughlin's
stakeholder theory
– At any given life cycle stage certain stakeholders
become more important than others because of their
potential to satisfy critical organizational needs,
● It is possible to identify which stakeholders are likely to be
more or less important at each stage of the life cycle.
● The strategy that will be used to deal with each stakeholder
will depend on the importance of that stakeholder relative
to other stakeholders.

17
Managing stakeholders
Key steps are:
– a stakeholder analysis to identify important
stakeholders
– the development of a strategy for persuading
influential stakeholders to support the change.

18
Identifying the power and
commitment of stakeholders
1. stakeholder brainstorm

19
Identifying the power and
commitment of stakeholders

2. assess how much power and influence each
stakeholder has.
3. assessing stakeholders’ attitudes towards the
Positive attitude
proposed change.
(Potential sponsors)
Weak support

Strong support
(champions)

Low
power
Weak
opposition

Strong
opposition
(blockers)

High
power

Negative attitude
(Potential blockers)
20
Influencing stakeholders to support
the change

21
Winning the support of those who oppose the change
and who have the power to influence the outcome

Attitude

Power

22
Increasing the influence of those stakeholders who are
already supportive

Attitude
Weak
sponsors

Power

23
Reducing the influence of powerful blockers

Attitude

Power
Blockers

24
Building a coalition of supportive stakeholders who will
be prepared to work together to support the change

Attitude

supportive
coalition

Power

25
Fragmenting existing coalitions who are antagonistic
towards the change

Attitude

Power
Coalition of
blockers

26
Bringing new sponsors or champions into play

Attitude

N
sp ew
on
so
r

Power

27
Changes over time
– An Important point to remember is that as a
change project unfolds and as circumstances
change the identity of key stakeholders may also
change.

28
It was noted that

Summary

• At any given stage in a change project certain stakeholders
emerge as more important than others because of their potential
to satisfy critical organizational needs,
• It is possible to identify which stakeholders are likely to be more
or less important at each stage.
• The strategy that will be used to deal with each stakeholder will
depend on the importance of that stakeholder relative to other
stakeholders.
• The stakeholder grid was introduced as a useful tool for
identifying the power of stakeholders and their predisposition to
support or oppose the change.

29

Weitere ähnliche Inhalte

Was ist angesagt?

Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
sonips
 
Chapter 8 managing change and innovation
Chapter 8   managing change and innovationChapter 8   managing change and innovation
Chapter 8 managing change and innovation
Việt Hoàng Dương
 

Was ist angesagt? (20)

Strategic Thinking
Strategic Thinking Strategic Thinking
Strategic Thinking
 
Change management strategy ppt
Change management strategy pptChange management strategy ppt
Change management strategy ppt
 
Chapter 8 managing change and innovation
Chapter 8   managing change and innovationChapter 8   managing change and innovation
Chapter 8 managing change and innovation
 
Operations strategy or Strategy || Development and Implementation of Strategy...
Operations strategy or Strategy || Development and Implementation of Strategy...Operations strategy or Strategy || Development and Implementation of Strategy...
Operations strategy or Strategy || Development and Implementation of Strategy...
 
Strategic Planning
Strategic PlanningStrategic Planning
Strategic Planning
 
Managing Stakeholder Relationships
Managing Stakeholder RelationshipsManaging Stakeholder Relationships
Managing Stakeholder Relationships
 
Stakeholder analysis
Stakeholder analysisStakeholder analysis
Stakeholder analysis
 
Strategic thinking (slides)
Strategic thinking (slides)Strategic thinking (slides)
Strategic thinking (slides)
 
Strategy Review, Evaluation, and Control
Strategy Review, Evaluation, and ControlStrategy Review, Evaluation, and Control
Strategy Review, Evaluation, and Control
 
Strategic Management Chapter 2
Strategic Management Chapter 2Strategic Management Chapter 2
Strategic Management Chapter 2
 
Stakeholder Mapping
Stakeholder MappingStakeholder Mapping
Stakeholder Mapping
 
Change management
Change managementChange management
Change management
 
Strategic planning model
Strategic planning modelStrategic planning model
Strategic planning model
 
Managing Stakeholders
Managing StakeholdersManaging Stakeholders
Managing Stakeholders
 
Chapter 1 the nature of strategic management
Chapter 1   the nature of strategic managementChapter 1   the nature of strategic management
Chapter 1 the nature of strategic management
 
Strategic+thinking +dr.behboudi-session1
Strategic+thinking +dr.behboudi-session1Strategic+thinking +dr.behboudi-session1
Strategic+thinking +dr.behboudi-session1
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Strategy review, evaluation and control
Strategy review, evaluation and controlStrategy review, evaluation and control
Strategy review, evaluation and control
 
Entrepreneurship development
Entrepreneurship developmentEntrepreneurship development
Entrepreneurship development
 
How to do Stakeholder Analysis
How to do Stakeholder AnalysisHow to do Stakeholder Analysis
How to do Stakeholder Analysis
 

Andere mochten auch

STAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policySTAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policy
Deanne Mitzi Somollo
 
Power & politics in organizations
Power & politics in organizationsPower & politics in organizations
Power & politics in organizations
mdfaizan
 
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and StressChapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
dpd
 
Selecting interventions
Selecting interventionsSelecting interventions
Selecting interventions
azmatmengal
 
High performance management
High performance managementHigh performance management
High performance management
azmatmengal
 
Recognising the need for change and starting the change process
Recognising the need for change and starting the change processRecognising the need for change and starting the change process
Recognising the need for change and starting the change process
azmatmengal
 
Shaping implementation strategies
Shaping implementation strategiesShaping implementation strategies
Shaping implementation strategies
azmatmengal
 
Diagnosing external alignment
Diagnosing external alignmentDiagnosing external alignment
Diagnosing external alignment
azmatmengal
 
2 hrly gs ch 08 vertebrates part 2
2 hrly gs ch 08 vertebrates part 22 hrly gs ch 08 vertebrates part 2
2 hrly gs ch 08 vertebrates part 2
azmatmengal
 
Based on a scientific tradition
Based on a scientific traditionBased on a scientific tradition
Based on a scientific tradition
azmatmengal
 

Andere mochten auch (20)

STAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policySTAKEHOLDERS : their role and influence in public policy
STAKEHOLDERS : their role and influence in public policy
 
Power & politics in organizations
Power & politics in organizationsPower & politics in organizations
Power & politics in organizations
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
The theory and practice of change managemen
The theory and practice of change managemenThe theory and practice of change managemen
The theory and practice of change managemen
 
Introduction to Stakeholder Analysis
Introduction to Stakeholder AnalysisIntroduction to Stakeholder Analysis
Introduction to Stakeholder Analysis
 
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and StressChapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
Chapter 8 - Organizational Behavior: Power, Politics, Conflict, and Stress
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Understanding Technology Stakeholders
Understanding Technology StakeholdersUnderstanding Technology Stakeholders
Understanding Technology Stakeholders
 
Tci Ch1
Tci Ch1Tci Ch1
Tci Ch1
 
C4 - Power Politics
C4 - Power PoliticsC4 - Power Politics
C4 - Power Politics
 
List of urban development authorities in india
List of urban development authorities in indiaList of urban development authorities in india
List of urban development authorities in india
 
Selecting interventions
Selecting interventionsSelecting interventions
Selecting interventions
 
High performance management
High performance managementHigh performance management
High performance management
 
Recognising the need for change and starting the change process
Recognising the need for change and starting the change processRecognising the need for change and starting the change process
Recognising the need for change and starting the change process
 
Shaping implementation strategies
Shaping implementation strategiesShaping implementation strategies
Shaping implementation strategies
 
Business ethics unit 2
Business ethics unit 2Business ethics unit 2
Business ethics unit 2
 
Diagnosing external alignment
Diagnosing external alignmentDiagnosing external alignment
Diagnosing external alignment
 
2 hrly gs ch 08 vertebrates part 2
2 hrly gs ch 08 vertebrates part 22 hrly gs ch 08 vertebrates part 2
2 hrly gs ch 08 vertebrates part 2
 
Based on a scientific tradition
Based on a scientific traditionBased on a scientific tradition
Based on a scientific tradition
 
Organisational analysis - course summary
Organisational analysis - course summaryOrganisational analysis - course summary
Organisational analysis - course summary
 

Ähnlich wie Power, politics and stakeholder management

Stake holder and issues
Stake holder and issues  Stake holder and issues
Stake holder and issues
Faisal Qayyum
 
Mary hickey stakeholder analysis
Mary hickey stakeholder analysisMary hickey stakeholder analysis
Mary hickey stakeholder analysis
hslgcommittee
 
PMI Conclave - Vijaya Devi
PMI Conclave - Vijaya DeviPMI Conclave - Vijaya Devi
PMI Conclave - Vijaya Devi
Vijaya Devi S
 

Ähnlich wie Power, politics and stakeholder management (20)

Lecture 7 Stakeholder engagement.pptx
Lecture 7 Stakeholder engagement.pptxLecture 7 Stakeholder engagement.pptx
Lecture 7 Stakeholder engagement.pptx
 
Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders Health Systems Identifying and Managing Stakeholders
Health Systems Identifying and Managing Stakeholders
 
Leadership and strategic_change_10
Leadership and strategic_change_10Leadership and strategic_change_10
Leadership and strategic_change_10
 
Organisational Culture and Organisational Change
Organisational Culture and Organisational ChangeOrganisational Culture and Organisational Change
Organisational Culture and Organisational Change
 
Introduction to Organizational Culture And Organizational Change
Introduction to Organizational Culture And Organizational ChangeIntroduction to Organizational Culture And Organizational Change
Introduction to Organizational Culture And Organizational Change
 
Week12 rainey chapter_13
Week12 rainey chapter_13Week12 rainey chapter_13
Week12 rainey chapter_13
 
Choosing Strategies for Change
Choosing Strategies for Change Choosing Strategies for Change
Choosing Strategies for Change
 
Strategies for-change HBR
Strategies for-change HBRStrategies for-change HBR
Strategies for-change HBR
 
Leading strategic change
Leading strategic changeLeading strategic change
Leading strategic change
 
Module 18 - Stakeholder Management.pptx
Module 18 - Stakeholder Management.pptxModule 18 - Stakeholder Management.pptx
Module 18 - Stakeholder Management.pptx
 
Stakeholder management and reporting
Stakeholder management and reportingStakeholder management and reporting
Stakeholder management and reporting
 
The Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and EthicsThe Stakeholder approach to Business , society, and Ethics
The Stakeholder approach to Business , society, and Ethics
 
Planning new venture
Planning new venturePlanning new venture
Planning new venture
 
Stake holder and issues
Stake holder and issues  Stake holder and issues
Stake holder and issues
 
Mary hickey stakeholder analysis
Mary hickey stakeholder analysisMary hickey stakeholder analysis
Mary hickey stakeholder analysis
 
Stakeholder Analysis
Stakeholder AnalysisStakeholder Analysis
Stakeholder Analysis
 
Stakeholders Analysis
Stakeholders AnalysisStakeholders Analysis
Stakeholders Analysis
 
PMI Conclave - Vijaya Devi
PMI Conclave - Vijaya DeviPMI Conclave - Vijaya Devi
PMI Conclave - Vijaya Devi
 
Managing stakeholders from the disengaged to the difficult
Managing stakeholders from the disengaged to the difficultManaging stakeholders from the disengaged to the difficult
Managing stakeholders from the disengaged to the difficult
 
Bcu msc cg week 12 euc 020912
Bcu msc cg week 12 euc 020912Bcu msc cg week 12 euc 020912
Bcu msc cg week 12 euc 020912
 

Mehr von azmatmengal

2 hrly gs ch 08 vertebrates part 1
2 hrly gs ch 08 vertebrates part 12 hrly gs ch 08 vertebrates part 1
2 hrly gs ch 08 vertebrates part 1
azmatmengal
 
1 hrly gs ch 01 solar system part 2
1 hrly gs ch 01 solar system part 21 hrly gs ch 01 solar system part 2
1 hrly gs ch 01 solar system part 2
azmatmengal
 
1 hrly gs ch 01 solar system part 1
1 hrly gs ch 01 solar system part 11 hrly gs ch 01 solar system part 1
1 hrly gs ch 01 solar system part 1
azmatmengal
 
Final gs ch p the energy crisis in pakistan
Final gs ch p the energy crisis in pakistanFinal gs ch p the energy crisis in pakistan
Final gs ch p the energy crisis in pakistan
azmatmengal
 
Final gs ch p telepathy madiha ashraf
Final gs ch p telepathy madiha ashrafFinal gs ch p telepathy madiha ashraf
Final gs ch p telepathy madiha ashraf
azmatmengal
 
Final gs ch p smoking
Final gs ch p smokingFinal gs ch p smoking
Final gs ch p smoking
azmatmengal
 
Final gs ch p negative effects of technology on human's wildlife
Final gs ch p negative effects of technology on human's wildlifeFinal gs ch p negative effects of technology on human's wildlife
Final gs ch p negative effects of technology on human's wildlife
azmatmengal
 
Final gs ch p dreams
Final gs ch p dreamsFinal gs ch p dreams
Final gs ch p dreams
azmatmengal
 
Final gs ch p digestion
Final gs ch p digestionFinal gs ch p digestion
Final gs ch p digestion
azmatmengal
 
Final gs ch 11 light pollution
Final gs ch 11 light pollutionFinal gs ch 11 light pollution
Final gs ch 11 light pollution
azmatmengal
 
Final gs ch 10 noise pollution
Final gs ch 10 noise pollutionFinal gs ch 10 noise pollution
Final gs ch 10 noise pollution
azmatmengal
 
Final gs ch 09 photosynthesis
Final gs ch 09 photosynthesisFinal gs ch 09 photosynthesis
Final gs ch 09 photosynthesis
azmatmengal
 
2hrly gs ch p wind energy
2hrly gs ch p wind energy2hrly gs ch p wind energy
2hrly gs ch p wind energy
azmatmengal
 
2hrly gs ch p supernatural belief vs science perspective
2hrly gs ch p supernatural belief vs science perspective2hrly gs ch p supernatural belief vs science perspective
2hrly gs ch p supernatural belief vs science perspective
azmatmengal
 
2 hrly gs ch p psychological issues and youth amber alitaf shaikh
2 hrly gs ch p psychological issues and youth   amber alitaf shaikh2 hrly gs ch p psychological issues and youth   amber alitaf shaikh
2 hrly gs ch p psychological issues and youth amber alitaf shaikh
azmatmengal
 
2hrly gs ch p personality
2hrly gs ch p personality2hrly gs ch p personality
2hrly gs ch p personality
azmatmengal
 
2hrly gs ch p perception
2hrly gs ch p perception2hrly gs ch p perception
2hrly gs ch p perception
azmatmengal
 
2hrly gs ch p facts about human skeleton
2hrly gs ch p facts about human skeleton2hrly gs ch p facts about human skeleton
2hrly gs ch p facts about human skeleton
azmatmengal
 
2hrly gs ch p bermuda triangle
2hrly gs ch p bermuda triangle2hrly gs ch p bermuda triangle
2hrly gs ch p bermuda triangle
azmatmengal
 
2 hrly gs ch 07 food & nutrition
2 hrly gs ch 07 food & nutrition2 hrly gs ch 07 food & nutrition
2 hrly gs ch 07 food & nutrition
azmatmengal
 

Mehr von azmatmengal (20)

2 hrly gs ch 08 vertebrates part 1
2 hrly gs ch 08 vertebrates part 12 hrly gs ch 08 vertebrates part 1
2 hrly gs ch 08 vertebrates part 1
 
1 hrly gs ch 01 solar system part 2
1 hrly gs ch 01 solar system part 21 hrly gs ch 01 solar system part 2
1 hrly gs ch 01 solar system part 2
 
1 hrly gs ch 01 solar system part 1
1 hrly gs ch 01 solar system part 11 hrly gs ch 01 solar system part 1
1 hrly gs ch 01 solar system part 1
 
Final gs ch p the energy crisis in pakistan
Final gs ch p the energy crisis in pakistanFinal gs ch p the energy crisis in pakistan
Final gs ch p the energy crisis in pakistan
 
Final gs ch p telepathy madiha ashraf
Final gs ch p telepathy madiha ashrafFinal gs ch p telepathy madiha ashraf
Final gs ch p telepathy madiha ashraf
 
Final gs ch p smoking
Final gs ch p smokingFinal gs ch p smoking
Final gs ch p smoking
 
Final gs ch p negative effects of technology on human's wildlife
Final gs ch p negative effects of technology on human's wildlifeFinal gs ch p negative effects of technology on human's wildlife
Final gs ch p negative effects of technology on human's wildlife
 
Final gs ch p dreams
Final gs ch p dreamsFinal gs ch p dreams
Final gs ch p dreams
 
Final gs ch p digestion
Final gs ch p digestionFinal gs ch p digestion
Final gs ch p digestion
 
Final gs ch 11 light pollution
Final gs ch 11 light pollutionFinal gs ch 11 light pollution
Final gs ch 11 light pollution
 
Final gs ch 10 noise pollution
Final gs ch 10 noise pollutionFinal gs ch 10 noise pollution
Final gs ch 10 noise pollution
 
Final gs ch 09 photosynthesis
Final gs ch 09 photosynthesisFinal gs ch 09 photosynthesis
Final gs ch 09 photosynthesis
 
2hrly gs ch p wind energy
2hrly gs ch p wind energy2hrly gs ch p wind energy
2hrly gs ch p wind energy
 
2hrly gs ch p supernatural belief vs science perspective
2hrly gs ch p supernatural belief vs science perspective2hrly gs ch p supernatural belief vs science perspective
2hrly gs ch p supernatural belief vs science perspective
 
2 hrly gs ch p psychological issues and youth amber alitaf shaikh
2 hrly gs ch p psychological issues and youth   amber alitaf shaikh2 hrly gs ch p psychological issues and youth   amber alitaf shaikh
2 hrly gs ch p psychological issues and youth amber alitaf shaikh
 
2hrly gs ch p personality
2hrly gs ch p personality2hrly gs ch p personality
2hrly gs ch p personality
 
2hrly gs ch p perception
2hrly gs ch p perception2hrly gs ch p perception
2hrly gs ch p perception
 
2hrly gs ch p facts about human skeleton
2hrly gs ch p facts about human skeleton2hrly gs ch p facts about human skeleton
2hrly gs ch p facts about human skeleton
 
2hrly gs ch p bermuda triangle
2hrly gs ch p bermuda triangle2hrly gs ch p bermuda triangle
2hrly gs ch p bermuda triangle
 
2 hrly gs ch 07 food & nutrition
2 hrly gs ch 07 food & nutrition2 hrly gs ch 07 food & nutrition
2 hrly gs ch 07 food & nutrition
 

Kürzlich hochgeladen

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Kürzlich hochgeladen (20)

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
Bangalore Call Girl Just Call♥️ 8084732287 ♥️Top Class Call Girl Service Avai...
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 

Power, politics and stakeholder management

  • 1. Power, politics and stakeholder management 1
  • 2. Stakeholders Stakeholders are any individuals or groups who can affect or will be affected by the outcome of a change. 2
  • 3. Power and politics – When thinking about managing change, some people assume that organisations are well integrated entities within which everybody works harmoniously together. – Some also believe that decisions are made logically and rationally, that people share similar views of the world around them and that they act to promote the interests of the organization as a whole. This is rarely the case. 3
  • 4. Organisations are political arenas – Organizations can be conceptualised as a collection of individuals, groups and communities of practice, each pursuing their own objectives. ● When there is a conflict of interests it is the power and influence of those involved that determines the outcome rather than logic and rational argument. ● Consequently, those responsible for managing change cannot afford to ignore issues of power and influence. 4
  • 5. Political behaviour is most intense in times of change  Change upsets the balance of power Some will defend the status quo and others will seek change to improve their position  People will resist change because of: • Threat from anticipated future state • Threat from process used to secure change 5
  • 6. Implications for change managers – In order to manage change successfully change managers need to be alert to the identity of important stakeholders and to their predisposition to either support or resist the change. 6
  • 7. Power and authority – Some stakeholders are more powerful than others and they are able to act in ways that will either support or block a change. ● This power is not confined to those who have been given the authority to determine how certain things will be done. ● Sometimes individuals and groups who do not have any legitimate authority have more power than legitimately appointed managers. 7
  • 8. • Who are the most powerful individuals or groups in your organisation? • Why? - what is the basis of their power? 8
  • 9. The constituencies or stakeholder groups that are most powerful are those that: – are in a position to deal with important problems facing the organisation – have control over significant resources valued by others – are lucky or skilled enough to bring problems and resources together at the same time – are centrally connected in the work flow of the organisation – are not easily replaced – have successfully used power in the past. 9
  • 10. ? Should change managers take account of all or only selected groups of stakeholders? 10
  • 11. Which stakeholders are most important? • Normative theories. – According to normative or ethics-based theories of stakeholder management the interests of all stakeholders have intrinsic value and should be taken into account when planning and implementing change.  Instrumental theories. ● The basic premise of instrumental theories is that managers will only attend to the interests of stakeholders to the extent that those stakeholders can affect their interests. ● Managers are selective in who they attend to and are not motivated by a concern for the welfare of stakeholders in general. 11
  • 12. A life cycle approach to stakeholder management – The underlying premise is that an organisation faces different pressures and threats at different stages in its life cycle. ● Consequently, over time, certain stakeholders become more important than others because of their ability to satisfy critical organisational needs. 12
  • 13. The contribution of resource dependence theory – Change managers pay most attention to those stakeholder groups who control resources critical to the organisation's survival. ● It is possible to identify four ways of attending to stakeholders: • Proacting • Accommodating • Defending • Ignoring 13
  • 14. The contribution of prospect theory – “… in the context of gains, individuals will be risk averse and choose the option with a certain outcome over a risky option, whereas in the context of losses, individuals will be risk seeking and choose the risky option over the option with a certain outcome.” (Jawahare and McLaughlin) Proactively addressing the concerns of all stakeholders is a 'certain' or risk-averse option because it is likely to persuade all stakeholders to provide the organisation with the required resources. Proactively addressing the concerns of only some stakeholders and ignoring the concerns of others is a more 'risky' option. 14
  • 15. Two theorems – In the absence of threats to organizational survival, a gain frame will be adopted, and the organization will follow a risk-averse strategy and actively address all stakeholder issues. ● In the presence of threats to organisational survival, a loss frame will be adopted, and the organisation will pursue a risky strategy that involves addressing the concerns of only those stakeholders who are relevant to the immediate loss threat, while at the same time defending or denying any responsibility for the concerns of other stakeholders. 15
  • 16. The contribution of organisational life cycle models – Resource requirements will vary depending on the stage of the change project life cycle – When the fulfilment of resource requirements is threatened change managers adopt a loss frame and interact proactively with those stakeholders who control the critical resources. ... and ignore or act in a defensive mode towards other stakeholders ● When the flow of resources is not threatened, change managers adopt a gain frame, pursue a risk-averse strategy, and actively address the concerns of all stakeholders. 16
  • 17. Jawahare and McLaughlin's stakeholder theory – At any given life cycle stage certain stakeholders become more important than others because of their potential to satisfy critical organizational needs, ● It is possible to identify which stakeholders are likely to be more or less important at each stage of the life cycle. ● The strategy that will be used to deal with each stakeholder will depend on the importance of that stakeholder relative to other stakeholders. 17
  • 18. Managing stakeholders Key steps are: – a stakeholder analysis to identify important stakeholders – the development of a strategy for persuading influential stakeholders to support the change. 18
  • 19. Identifying the power and commitment of stakeholders 1. stakeholder brainstorm 19
  • 20. Identifying the power and commitment of stakeholders 2. assess how much power and influence each stakeholder has. 3. assessing stakeholders’ attitudes towards the Positive attitude proposed change. (Potential sponsors) Weak support Strong support (champions) Low power Weak opposition Strong opposition (blockers) High power Negative attitude (Potential blockers) 20
  • 21. Influencing stakeholders to support the change 21
  • 22. Winning the support of those who oppose the change and who have the power to influence the outcome Attitude Power 22
  • 23. Increasing the influence of those stakeholders who are already supportive Attitude Weak sponsors Power 23
  • 24. Reducing the influence of powerful blockers Attitude Power Blockers 24
  • 25. Building a coalition of supportive stakeholders who will be prepared to work together to support the change Attitude supportive coalition Power 25
  • 26. Fragmenting existing coalitions who are antagonistic towards the change Attitude Power Coalition of blockers 26
  • 27. Bringing new sponsors or champions into play Attitude N sp ew on so r Power 27
  • 28. Changes over time – An Important point to remember is that as a change project unfolds and as circumstances change the identity of key stakeholders may also change. 28
  • 29. It was noted that Summary • At any given stage in a change project certain stakeholders emerge as more important than others because of their potential to satisfy critical organizational needs, • It is possible to identify which stakeholders are likely to be more or less important at each stage. • The strategy that will be used to deal with each stakeholder will depend on the importance of that stakeholder relative to other stakeholders. • The stakeholder grid was introduced as a useful tool for identifying the power of stakeholders and their predisposition to support or oppose the change. 29