SlideShare ist ein Scribd-Unternehmen logo
1 von 19
PREPARED BY: FARDHAH MANIRAH BINTI AZMAN
SUPERVISED BY: IR AZHAR AHMAD
SKAA 4034 FINAL YEAR PROJECT
Piles Eccentricity Analysis For Two
Columns Combined Pile Cap
INTRODUCTION
– One type of failure for piled foundation is eccentricity.
– Pile eccentricity happens when there is short comings of
driving pre-designated piles at exactly correct position
on the ground.
– The deviation of these piles may jeopardize the integrity
of pile cap.
PROBLEM STATEMENT
The short comings of driving pre-designated piles at
exactly correct position has introduced the ‘pile
eccentricity’. The issues addressed are:
– Does the pile eccentricity influences the overall pile
group centroid and reliability of load carrying
capacity?
– What is the allowable maximum eccentricity for the
pile cap to be safe and reliable?
– What happens when there is an excessive eccentricities
occur?
OBJECTIVES
The objectives of this study are:
1. To develop Microsoft Excel Spreadsheet for
analyzing two columns combined pile cap with zero
and non-zero pile eccentricity.
2. To establish Net Pile Group Eccentricity Limit
Chart that can be used on site for immediate checking.
3. To establish an Optimum Add-On Pile Location
Chart for cases where excessive eccentricities occur.
SCOPE OF STUDY
In order to ensure the results obtained can help achieve
the objectives of this study, the scope has been limited
to:
– Two columns combined pile cap.
– Spacing between column: 1.75 m.
– Type of pile: Pre-cast Square RC Pile.
– Working load is 300 kN for 300 × 300 mm pile.
– Range of pile group: 4-9 piles.
– Type of failure: Eccentricity.
METHODOLOGY
Piles Eccentricity Analysis for Two Columns Combined Pile Cap
Analysis
Zero Eccentricity Non-Zero Eccentricity
Load Balance Check
Establish Net Pile Group
Eccentricity Limit Chart
Establish Optimum Add-
On Pile Location
Load on column 1 & 2, k, conversion factor, eccentricity value
User input
verified
outside safe zone
Centroid Loading, Pile Arrangement & Load Distribution
Location Add-On Pile
to determine
to obtain
checking, < 300 kN
OBJECTIVE 1
OBJECTIVE 2
OBJECTIVE 3
RESULTS & ANALYSIS
1. Microsoft Excel Spreadsheet Program
User Key-In Value:
Results Obtained from Program:
1000 kN 1100 kN
1750 mm
Fixed Parameters
Spacing between pile cap = 1.75 m
Ø RC Pile = 300 × 300 mm
Pile Working Load = 300 kN
Number of Pile = 6
Size of Pile Cap = 1800 × 3000 × 1100 mm
Total Service Load + Self-weight Pile Cap = 1648.50 kN
Position of each piles
Value of Net Eccentricity
Centroid point for loading and pile group
k = 4
Conversion factor = 1.4
RESULTS & ANALYSIS
Pile group with zero eccentricity:
P1 P2 P3
P4 P5 P6
C1 C2
Centroid line for loading and pile group align on the same line at
(0.00, 0.00) indicates that there is no eccentricity occur.
Legend
Centroid line (PG)
Centroid line (Loading)
P1 P2 P3 P4 P5 P6 C1 C2
X-Coordinate -1200.00 0.00 1200.00 -1200.00 0.00 1200.00 -916.67 833.33
Y-Coordinate 600.00 600.00 600.00 -600.00 -600.00 -600.00 0.00 0.00
RESULTS & ANALYSIS
Pile group with eccentricity:
Centroid line for pile group has been deviated from its original position.
The new centroid point of pile group is (-39.67, 14.00) while the
centroid point for loading remains the same (0.00, 0.00).
Legend
Centroid line (PG)
Centroid line (Loading)
25.00
75.00
98.00
75.00
15.00
100.00
45.00
150.00
34.00
125.00
Net
Eccentricity
(-238.00, 84.00)
P1 P2 P3 P4 P5 P6 C1 C2
X-Coordinate -1125.00 -98.00 1215.00 -1155.00 -150.00 1075.00 -916.67 833.33
Y-Coordinate 625.00 525.00 600.00 -500.00 -566.00 -600.00 0.00 0.00
My
Mx
RESULTS & ANALYSIS
Loading distribution for zero and non-zero eccentricity:
Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!)
P1 274.75 7.21 13.51 254.03 OK!
P2 275.75 6.03 0.73 267.99 OK!
P3 274.75 6.92 15.61 283.45 OK!
P4 274.75 6.07 13.88 266.94 OK!
P5 274.75 6.85 1.37 280.22 OK!
P6 274.75 7.25 13.87 295.87 OK!
Total Load 1648.50 BALANCED
Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!)
P1 274.75 0.00 0.00 274.75 OK!
P2 275.75 0.00 0.00 275.75 OK!
P3 274.75 0.00 0.00 274.75 OK!
P4 274.75 0.00 0.00 274.75 OK!
P5 274.75 0.00 0.00 274.75 OK!
P6 274.75 0.00 0.00 274.75 OK!
Total Load 1648.50 BALANCED
Zero eccentricity:
Non-zero eccentricity:
Total Service Load + Self-weight of Pile Cap = Total Load per Pile subjected to Moment
RESULTS & ANALYSIS
2. Net Pile Group Eccentricity Limit Chart
RESULTS & ANALYSIS
The highlighted zone is called safe zone which means any points located inside the
safe zone, the structure is considered safe and reliable to use.
Safe zone
Nultimate = 2100 kN
Ratio = 5.5
Net Pile Group
Eccentricity
X = -238.00 mm
Y= 84.00 mm
RESULTS & ANALYSIS
3. Additional Pile Procedure
The ultimate load is changed from 2100 kN to 2205 kN while other parameters
remains. The area of safe zone became smaller due to increase in loading.
Safe zone
Nultimate = 2205 kN
Ratio = 5.75
Net Pile Group
Eccentricity
X = -238.00 mm
Y= 84.00 mm
RESULTS & ANALYSIS
– Since the net pile group eccentricity is located outside the safe zone, some pile
may subjected to failure. Table below shows the distribution of loading for
ultimate load 2205 kN with same value set of eccentricity.
Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!)
P1 287.25 7.54 14.12 265.59 OK!
P2 287.25 6.31 0.76 280.19 OK!
P3 287.25 7.23 16.33 296.34 OK!
P4 287.25 6.34 14.51 279.08 OK!
P5 287.75 7.16 1.44 292.97 OK!
P6 287.75 7.58 14.50 309.33 FAILED!
Total Load 1723.50 BALANCED
Total Service Load + Self-weight Pile Cap = 1723.50 kN
RESULTS & ANALYSIS
– Since Pile 6 exceeds pile working load, a new pile is added to the structure.
– The location of pile is determined from Optimum Position of Add-On Single
Pile chart below.
238.00
-84.00
14.00
-39.67
P1
P2
P3
P4
P5 P6
C1 C2
Add-On
Pile
(238.00, -84.00)
Failed Pile
RESULTS & ANALYSIS
– Pile capacity checking is performed as shown in the table below after
additional pile. Pile working load is reduced about 15% from 300 kN to 255
kN.
Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 255 kN, OK!)
P1 246.21 0.00 0.00 246.21 OK!
P2 246.21 0.00 0.00 246.21 OK!
P3 246.21 0.00 0.00 246.21 OK!
P4 246.21 0.00 0.00 246.21 OK!
P5 246.21 0.00 0.00 246.21 OK!
P6 246.21 0.00 0.00 246.21 OK!
Add-On Pile 246.21 0.00 0.00 246.21 OK!
Total Load 1723.50 BALANCED
CONCLUSION
This program serves to reduce time and save cost to solve problem
regarding pile eccentricity for engineers. Findings conforming to the
objectives of this study can be summarized as below:
1. A program for analyzing two columns combined pile cap with zero
and non-zero eccentricity using Microsoft Excel Spreadsheet was
developed.
2. A Net Pile Group Eccentricity Limit Chart to determine the
maximum allowable net eccentricity was established. The chart can be
used on site for immediate checking.
3. An Optimum Add-On Pile Location Chart was established. Load
balance check was conducted for verification.
FUTURE STUDY
Include design stage for two column
combined pile cap.
Multiple number of additional pile for
excessive eccentricity.
1
2
Thank You!

Weitere ähnliche Inhalte

Was ist angesagt?

Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculation
adiq1901
 

Was ist angesagt? (20)

The Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul LeslieThe Pushover Analysis from basics - Rahul Leslie
The Pushover Analysis from basics - Rahul Leslie
 
Padeye design calculation
Padeye design calculationPadeye design calculation
Padeye design calculation
 
Design of One-Way Slab
Design of One-Way SlabDesign of One-Way Slab
Design of One-Way Slab
 
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
CSI ETABS & SAFE MANUAL: Slab Analysis and Design to EC2
 
Wind loading
Wind loadingWind loading
Wind loading
 
Structural Analysis, Hibbeler, 8th ed Textbook
Structural Analysis, Hibbeler, 8th ed Textbook Structural Analysis, Hibbeler, 8th ed Textbook
Structural Analysis, Hibbeler, 8th ed Textbook
 
Machine Foundation Design
Machine Foundation Design Machine Foundation Design
Machine Foundation Design
 
ACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdfACI 318-19 Ingles.pdf
ACI 318-19 Ingles.pdf
 
Is 1893-part-4-2015
Is 1893-part-4-2015Is 1893-part-4-2015
Is 1893-part-4-2015
 
Design of pile cap
Design of  pile capDesign of  pile cap
Design of pile cap
 
seismic ubc -97
seismic ubc -97seismic ubc -97
seismic ubc -97
 
800
800800
800
 
Moment Resisting Frame.pdf
Moment Resisting Frame.pdfMoment Resisting Frame.pdf
Moment Resisting Frame.pdf
 
Tower design-Chapter 2-pile caps design
Tower design-Chapter 2-pile caps designTower design-Chapter 2-pile caps design
Tower design-Chapter 2-pile caps design
 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating Machines
 
report
reportreport
report
 
Prestressed Concrete Design
Prestressed Concrete DesignPrestressed Concrete Design
Prestressed Concrete Design
 
Design of pile foundation
Design of pile foundationDesign of pile foundation
Design of pile foundation
 
Steel design-examples
Steel design-examplesSteel design-examples
Steel design-examples
 
Design of isolated footing by ACI code
Design of isolated footing by ACI codeDesign of isolated footing by ACI code
Design of isolated footing by ACI code
 

Ähnlich wie Pile Eccentricity Analysis for 2 Columns Combined Pilecap

The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. fellenius
cfpbolivia
 
CIVE702 Midterm Report Combined
CIVE702 Midterm Report CombinedCIVE702 Midterm Report Combined
CIVE702 Midterm Report Combined
Cyle Teal
 
Team 32 Midterm Final Report
Team 32 Midterm  Final ReportTeam 32 Midterm  Final Report
Team 32 Midterm Final Report
Samuel Trejo
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf
ephrem53
 

Ähnlich wie Pile Eccentricity Analysis for 2 Columns Combined Pilecap (20)

gantry crane report
gantry crane reportgantry crane report
gantry crane report
 
Analysis of Lifting Machine
Analysis of Lifting MachineAnalysis of Lifting Machine
Analysis of Lifting Machine
 
The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. fellenius
 
FEA_project1
FEA_project1FEA_project1
FEA_project1
 
The_Engineer_Candidate_Assignment_Hospital
The_Engineer_Candidate_Assignment_HospitalThe_Engineer_Candidate_Assignment_Hospital
The_Engineer_Candidate_Assignment_Hospital
 
IRJET-Fatigue Analysis of Crawler Chassis
IRJET-Fatigue Analysis of Crawler ChassisIRJET-Fatigue Analysis of Crawler Chassis
IRJET-Fatigue Analysis of Crawler Chassis
 
Design of bala school
Design of bala schoolDesign of bala school
Design of bala school
 
CIVE702 Midterm Report Combined
CIVE702 Midterm Report CombinedCIVE702 Midterm Report Combined
CIVE702 Midterm Report Combined
 
Kope winder or friction winder ppt
Kope winder or friction winder pptKope winder or friction winder ppt
Kope winder or friction winder ppt
 
CTA - LST - AZIMUTH SYSTEM 20160607
CTA - LST - AZIMUTH SYSTEM 20160607CTA - LST - AZIMUTH SYSTEM 20160607
CTA - LST - AZIMUTH SYSTEM 20160607
 
Analysis and design of high rise rc building under seismic load
Analysis and design of high rise rc building under seismic loadAnalysis and design of high rise rc building under seismic load
Analysis and design of high rise rc building under seismic load
 
Team 32 Midterm Final Report
Team 32 Midterm  Final ReportTeam 32 Midterm  Final Report
Team 32 Midterm Final Report
 
140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf140204-5-PTI EDC-130-Continuous Members-41.pdf
140204-5-PTI EDC-130-Continuous Members-41.pdf
 
Staircase Design Report
Staircase Design ReportStaircase Design Report
Staircase Design Report
 
Pile load test
Pile load testPile load test
Pile load test
 
structure analysis
structure analysisstructure analysis
structure analysis
 
Design And Analysis of Test Rig for Rudder Pedal
Design And Analysis of Test Rig for Rudder PedalDesign And Analysis of Test Rig for Rudder Pedal
Design And Analysis of Test Rig for Rudder Pedal
 
F0366041045
F0366041045F0366041045
F0366041045
 
G.p presentation
G.p presentationG.p presentation
G.p presentation
 
Precast driven pile 450 x450
Precast driven pile 450 x450Precast driven pile 450 x450
Precast driven pile 450 x450
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 

Pile Eccentricity Analysis for 2 Columns Combined Pilecap

  • 1. PREPARED BY: FARDHAH MANIRAH BINTI AZMAN SUPERVISED BY: IR AZHAR AHMAD SKAA 4034 FINAL YEAR PROJECT Piles Eccentricity Analysis For Two Columns Combined Pile Cap
  • 2. INTRODUCTION – One type of failure for piled foundation is eccentricity. – Pile eccentricity happens when there is short comings of driving pre-designated piles at exactly correct position on the ground. – The deviation of these piles may jeopardize the integrity of pile cap.
  • 3. PROBLEM STATEMENT The short comings of driving pre-designated piles at exactly correct position has introduced the ‘pile eccentricity’. The issues addressed are: – Does the pile eccentricity influences the overall pile group centroid and reliability of load carrying capacity? – What is the allowable maximum eccentricity for the pile cap to be safe and reliable? – What happens when there is an excessive eccentricities occur?
  • 4. OBJECTIVES The objectives of this study are: 1. To develop Microsoft Excel Spreadsheet for analyzing two columns combined pile cap with zero and non-zero pile eccentricity. 2. To establish Net Pile Group Eccentricity Limit Chart that can be used on site for immediate checking. 3. To establish an Optimum Add-On Pile Location Chart for cases where excessive eccentricities occur.
  • 5. SCOPE OF STUDY In order to ensure the results obtained can help achieve the objectives of this study, the scope has been limited to: – Two columns combined pile cap. – Spacing between column: 1.75 m. – Type of pile: Pre-cast Square RC Pile. – Working load is 300 kN for 300 × 300 mm pile. – Range of pile group: 4-9 piles. – Type of failure: Eccentricity.
  • 6. METHODOLOGY Piles Eccentricity Analysis for Two Columns Combined Pile Cap Analysis Zero Eccentricity Non-Zero Eccentricity Load Balance Check Establish Net Pile Group Eccentricity Limit Chart Establish Optimum Add- On Pile Location Load on column 1 & 2, k, conversion factor, eccentricity value User input verified outside safe zone Centroid Loading, Pile Arrangement & Load Distribution Location Add-On Pile to determine to obtain checking, < 300 kN OBJECTIVE 1 OBJECTIVE 2 OBJECTIVE 3
  • 7. RESULTS & ANALYSIS 1. Microsoft Excel Spreadsheet Program User Key-In Value: Results Obtained from Program: 1000 kN 1100 kN 1750 mm Fixed Parameters Spacing between pile cap = 1.75 m Ø RC Pile = 300 × 300 mm Pile Working Load = 300 kN Number of Pile = 6 Size of Pile Cap = 1800 × 3000 × 1100 mm Total Service Load + Self-weight Pile Cap = 1648.50 kN Position of each piles Value of Net Eccentricity Centroid point for loading and pile group k = 4 Conversion factor = 1.4
  • 8. RESULTS & ANALYSIS Pile group with zero eccentricity: P1 P2 P3 P4 P5 P6 C1 C2 Centroid line for loading and pile group align on the same line at (0.00, 0.00) indicates that there is no eccentricity occur. Legend Centroid line (PG) Centroid line (Loading) P1 P2 P3 P4 P5 P6 C1 C2 X-Coordinate -1200.00 0.00 1200.00 -1200.00 0.00 1200.00 -916.67 833.33 Y-Coordinate 600.00 600.00 600.00 -600.00 -600.00 -600.00 0.00 0.00
  • 9. RESULTS & ANALYSIS Pile group with eccentricity: Centroid line for pile group has been deviated from its original position. The new centroid point of pile group is (-39.67, 14.00) while the centroid point for loading remains the same (0.00, 0.00). Legend Centroid line (PG) Centroid line (Loading) 25.00 75.00 98.00 75.00 15.00 100.00 45.00 150.00 34.00 125.00 Net Eccentricity (-238.00, 84.00) P1 P2 P3 P4 P5 P6 C1 C2 X-Coordinate -1125.00 -98.00 1215.00 -1155.00 -150.00 1075.00 -916.67 833.33 Y-Coordinate 625.00 525.00 600.00 -500.00 -566.00 -600.00 0.00 0.00 My Mx
  • 10. RESULTS & ANALYSIS Loading distribution for zero and non-zero eccentricity: Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!) P1 274.75 7.21 13.51 254.03 OK! P2 275.75 6.03 0.73 267.99 OK! P3 274.75 6.92 15.61 283.45 OK! P4 274.75 6.07 13.88 266.94 OK! P5 274.75 6.85 1.37 280.22 OK! P6 274.75 7.25 13.87 295.87 OK! Total Load 1648.50 BALANCED Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!) P1 274.75 0.00 0.00 274.75 OK! P2 275.75 0.00 0.00 275.75 OK! P3 274.75 0.00 0.00 274.75 OK! P4 274.75 0.00 0.00 274.75 OK! P5 274.75 0.00 0.00 274.75 OK! P6 274.75 0.00 0.00 274.75 OK! Total Load 1648.50 BALANCED Zero eccentricity: Non-zero eccentricity: Total Service Load + Self-weight of Pile Cap = Total Load per Pile subjected to Moment
  • 11. RESULTS & ANALYSIS 2. Net Pile Group Eccentricity Limit Chart
  • 12. RESULTS & ANALYSIS The highlighted zone is called safe zone which means any points located inside the safe zone, the structure is considered safe and reliable to use. Safe zone Nultimate = 2100 kN Ratio = 5.5 Net Pile Group Eccentricity X = -238.00 mm Y= 84.00 mm
  • 13. RESULTS & ANALYSIS 3. Additional Pile Procedure The ultimate load is changed from 2100 kN to 2205 kN while other parameters remains. The area of safe zone became smaller due to increase in loading. Safe zone Nultimate = 2205 kN Ratio = 5.75 Net Pile Group Eccentricity X = -238.00 mm Y= 84.00 mm
  • 14. RESULTS & ANALYSIS – Since the net pile group eccentricity is located outside the safe zone, some pile may subjected to failure. Table below shows the distribution of loading for ultimate load 2205 kN with same value set of eccentricity. Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 300kN, OK!) P1 287.25 7.54 14.12 265.59 OK! P2 287.25 6.31 0.76 280.19 OK! P3 287.25 7.23 16.33 296.34 OK! P4 287.25 6.34 14.51 279.08 OK! P5 287.75 7.16 1.44 292.97 OK! P6 287.75 7.58 14.50 309.33 FAILED! Total Load 1723.50 BALANCED Total Service Load + Self-weight Pile Cap = 1723.50 kN
  • 15. RESULTS & ANALYSIS – Since Pile 6 exceeds pile working load, a new pile is added to the structure. – The location of pile is determined from Optimum Position of Add-On Single Pile chart below. 238.00 -84.00 14.00 -39.67 P1 P2 P3 P4 P5 P6 C1 C2 Add-On Pile (238.00, -84.00) Failed Pile
  • 16. RESULTS & ANALYSIS – Pile capacity checking is performed as shown in the table below after additional pile. Pile working load is reduced about 15% from 300 kN to 255 kN. Pile Service Load+Sw/n Mxy/Ix Myx/Iy Load per Pile (kN) Checking (< 255 kN, OK!) P1 246.21 0.00 0.00 246.21 OK! P2 246.21 0.00 0.00 246.21 OK! P3 246.21 0.00 0.00 246.21 OK! P4 246.21 0.00 0.00 246.21 OK! P5 246.21 0.00 0.00 246.21 OK! P6 246.21 0.00 0.00 246.21 OK! Add-On Pile 246.21 0.00 0.00 246.21 OK! Total Load 1723.50 BALANCED
  • 17. CONCLUSION This program serves to reduce time and save cost to solve problem regarding pile eccentricity for engineers. Findings conforming to the objectives of this study can be summarized as below: 1. A program for analyzing two columns combined pile cap with zero and non-zero eccentricity using Microsoft Excel Spreadsheet was developed. 2. A Net Pile Group Eccentricity Limit Chart to determine the maximum allowable net eccentricity was established. The chart can be used on site for immediate checking. 3. An Optimum Add-On Pile Location Chart was established. Load balance check was conducted for verification.
  • 18. FUTURE STUDY Include design stage for two column combined pile cap. Multiple number of additional pile for excessive eccentricity. 1 2