2. It is also observed that the demand for electricity has been increased with a
rate of 5.43 percent per year whereas, the generation of electricity has been
increased with a rate of 5.37 percent per year.
The lower increasing rate of generation (5.37 percent) than that of the demand
(5.43 percent) has accelerated the rate of load shedding which has been increased
at a rate of 6.72 percent per annum during the same period.
3. Growth rate of Installed Capacity and Maximum Generation
between 2000-01 and 2010-2011
Current Situation and Future Projection of Electricity Demand,
Generation and Load Shedding.
Consumption of Electricity by Category (MKWH) and their
Corresponding Growth Rate from 2000-01 to 2007-08
Growth rate of Demand, Generation and Load Shedding
4. Although the government has taken several initiatives for reducing the crisis of
electricity, yet the crisis persists.
This is mainly due to the problems associated with
High gas dependency
Improper privatization policy
Lack of satisfactory and timely implementation of allocated money
Political reasons and
Over population.
5. Solar Energy Biogas
Generator Instant Power Supply (IPS)
6. IPS stands for “Instant power supply”.
It is an electrical device that can provide
electricity when the main supply is not available
IPS is the ideal solution for continuous power supply
facilities during load shedding.
A general IPS consists of a charger circuit, a battery,
an oscillator circuit and an output circuit
7. It is fully automatic.
It does not require any fuel as like a
generator.
It also does not produce any sound
pollution like a generator.
It is fully automatic .
It require fuel, generator at running.
It also produce sound pollution.
9. SerialSerial
numbernumber
SpecificationsSpecifications
11 Main voltageMain voltage 220 V, 50 Hz220 V, 50 Hz
22 Battery voltageBattery voltage 12V DC12V DC
33 TemperatureTemperature 0-70 Deg. F.0-70 Deg. F.
44 Output Voltage rangeOutput Voltage range 220V – 240V, 50Hz220V – 240V, 50Hz
55 PowerPower 200 watt200 watt
66 Back up timeBack up time Battery dependentBattery dependent
77 LoadLoad Tube light & fan.Tube light & fan.
10.
11.
12. The simplified block diagram of designed IPS is
shown in Fig. .This Transformer is Step down is
voltage range
Primary 220 V AC & secondary 12-0-12 V .The
220V AC supply is applied to the input (step down)
transformer.12-0-12 V AC from input transformer is
then enters in to the rectifier bridge which This
power convert that AC to DC.
This Instant Power supply DC battery 12 voltage
converting to the AC amplification high voltage 230 V.
This 12-20V DC is used to charge a 12V DC battery
through the charger circuit. 12V DC is supplied to the
oscillator circuit that converts it into 12V AC
This 12V AC is then amplified and transmitted to
the output (step up) transformer. 220V AC supply is
achieved from the output transformer.
14. Load priority means the load where is necessary to apply the power
immediately .
In this thesis we can try to develop one thing that in the period of the
power failing or load shading the IPS backup the power supply but not at
a time every room.
By the selection of us 1st time backup drawing room or kitchen room
and then other room.
To apply this process the IPS longevity would be higher than the
normal IPS which has not this load priority system.
After all we think this system to effective and acceptable to us.
15. In this Thesis program, we can understand the contraction of IPS
and know how can it works. We also understand it’s various
components. We should take care in the period of making and using of
this project.