The document discusses how system engineering tools and techniques, specifically progressive assurance, can help project managers deliver complex railway safety projects. It outlines how signalling systems have evolved from mechanical to software-based systems over the past 200 years. Progressive assurance uses configuration control, online design reviews, and requirements scheduling to provide real-time management and reporting throughout the project lifecycle rather than just at the end, reducing reliance on paper-based design submissions. This streamlines the design governance process and enables assurance to be progressively built in as the project progresses.