SlideShare ist ein Scribd-Unternehmen logo
1 von 24
Synchronization in GrameenPhone Network Presented by: Md. Asif Matin Rocky
The Objective of Network Synchronization If the node clocks in a telecommunication network operate  asynchronously then the transmit and receive rates of telecommunication systems in each node would be different to the other nodes. In this case causing data errors commonly referred to as “slips”. Slips per day = frequency difference x traffic frames/second x seconds/day (86400) The object of network synchronization is therefore to avoid and to minimize slips. This can only be achieved by synchronizing all the node clocks, and hence all the telecommunication systems, to the nearly master clock.
Overhead byte for synchronization  in STM frame Fig. 8 Assignment of SSM bit patterns (TR3272EU00TR_0401 Synchronization, 10) S1 byte, the quality of Synchronization Message, indicates the type of clock source used to time the transmitted STM-n signal.
Assignment of SSM bit patterns SSM (Synchronization Status Message):  Contains the timing quality of the reference timing of a received STM signal. It is 4 bits wide. Q6   DNU 1111 Q4 4.6x10℮-6 (lowest quality) SEC 1011 Q3 2x10℮-08 per day SSU Local 1000 Q2 1x10℮-09 per day SSU Transit 0100 Q1 1x10℮-11 PRC (highest quality) 0010 Q5   Quality unknown 0000 Q-level Accuracy Description S1 byte, bit 5-8
Reason: Timing loops occur, when a chain of slave-clocks forms a loop, so that the active reference input of any of the clocks is actually locked indirectly to the output of that same clock. Result: The clocks on the timing loop then are not locked to a PRC anymore, the loop’s clock frequency diverges, thus causing catastrophic degradation of traffic performance . Timing Loop
Potential Timing Loop Holdover P2 selected P2 selected P2 selected P2 selected P1 selected P1 selected Sync loop created (NE04-NE03-NE01-NE02-NE04) Priority 1 Signal, P1   Priority 2 Signal, P2  
Better Design Priority 1 Signal, P1   Priority 2 Signal, P2   Holdover P2 selected P2 selected P2 selected P2 selected No Sync Loop for Every Possible Fiber Cut P1 selected
[object Object],[object Object],[object Object],[object Object],The Goal:  Get PRC/G8.11 reference at all nodes. Result:  All network element internal oscillators elevated to the same level  as the reference. TimeSource 3600
Antenna and TS 3600 installed at LKB
Hardware View Power Source B Power Source A IF Cable to roof antenna 2 MHz output (Wire wrap type) Ethernet port LCT port
The Antenna ,[object Object],[object Object],[object Object],[object Object],The antenna type is roof antenna. It includes a GPS receiver,  amplifier, and Intermediate-Frequency (IF) downconverter .
The TimeSource 3600 tracks all satellites within its field of view. The performance of each tracked satellite is observed and compared to the others, and available for use in the timing solution. A satellite with unacceptable performance data is dropped from the timing solution. GPS  Tracking
Key features Power redundancy:   Has two separate power sources A and B. Bit rate:   2.048 Mb/s Frequency accuracy:   1x10 GPS Holdover Stability:   1x10  for 72 hours.     1x10  for 30 days. Efficiency:   Low installation cost and maintenance free. High Performing:   BESTIME technology. -12 -11 -10
Detail view: Output ,[object Object]
Block Diagram
PRC PRC PRC PRC PRC PRC DHKJT DHLKB SYJGB CGPTL BSCOS BOBET Method of Distribution P1 P2 P3
LCT and NMS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
TimeScan NMS
TimeScan Craft
Ethernet Administration
1) Trouble shooting with Front panel alarms: Front panel alarms Alarm handling The system has been in holdover per the user  alarm setting, or there is a hardware fault.   n/a.   Output signal is PRS.   System is in warm-up mode or is  not powered. OFF Status SYS A GPS event, which has existed per the user alarm setting,  has escalated to a major alarm.   A minor GPS event has occurred.   GPS successfully tracking satellites.   System is not powered. OFF Status GPS Description Status Name
Description Status Name Antenna failed. An event (GPS error, temperature error) escalated to a minor alarm. A software download is required. Power A or B has failed.   There is no minor alarm OFF Alarms MIN The system has been in holdover per the user alarm setting.   There is no major alarm OFF Alarms MAJ A major alarm has occurred due to any hardware fault.   There is no critical alarm OFF Alarms CRIT   Alarm handling
2) Trouble shooting with Error Messages: The system is in a power up state when it shouldn’t be. Perform the same action as stated in GPS ERROR message. Minor BT3 Warm-up ,[object Object],[object Object],Minor High/Low current fault ,[object Object],[object Object],[object Object],Minor GPS Error Troubleshoot and repair the specified power input. Minor PWR Fail A/B Troubleshoot the GPS section. Major Holdover Download, and install, the GPS receiver (GPS) software Minor GPS download required Reset the plug-in card, if problem persists replace it. Critical Hardware Fault Action Category Message Alarm handling
Thank You !

Weitere ähnliche Inhalte

Was ist angesagt?

Pdh and sdh1
Pdh and sdh1Pdh and sdh1
Pdh and sdh1
Khant Oo
 

Was ist angesagt? (20)

SDH/SONET alarms & performance monitoring
SDH/SONET alarms & performance monitoringSDH/SONET alarms & performance monitoring
SDH/SONET alarms & performance monitoring
 
Synchronization and timing loop presentation -mapyourtech
Synchronization and timing loop presentation -mapyourtechSynchronization and timing loop presentation -mapyourtech
Synchronization and timing loop presentation -mapyourtech
 
Introductin sdh-pdh
Introductin sdh-pdhIntroductin sdh-pdh
Introductin sdh-pdh
 
SDH Principle - Huawei
SDH Principle - HuaweiSDH Principle - Huawei
SDH Principle - Huawei
 
SDH and TDM telecom
SDH and TDM telecomSDH and TDM telecom
SDH and TDM telecom
 
DMRC SDH theory
DMRC SDH theoryDMRC SDH theory
DMRC SDH theory
 
Pdh and sdh1
Pdh and sdh1Pdh and sdh1
Pdh and sdh1
 
Fundamentals of sdh
Fundamentals of sdhFundamentals of sdh
Fundamentals of sdh
 
Zte 3g
Zte 3gZte 3g
Zte 3g
 
5G massive mimo & planning.pdf
5G massive mimo & planning.pdf5G massive mimo & planning.pdf
5G massive mimo & planning.pdf
 
05 a rrm ul dl scheduler
05 a rrm ul dl scheduler05 a rrm ul dl scheduler
05 a rrm ul dl scheduler
 
LTE RACH Procedure
LTE RACH ProcedureLTE RACH Procedure
LTE RACH Procedure
 
The need for Synchronisation in Telecommunications
The need for Synchronisation in TelecommunicationsThe need for Synchronisation in Telecommunications
The need for Synchronisation in Telecommunications
 
Ip ran v1.1
Ip ran v1.1Ip ran v1.1
Ip ran v1.1
 
SDH ALARMS
SDH ALARMSSDH ALARMS
SDH ALARMS
 
Drx in rrc idle
Drx in rrc idleDrx in rrc idle
Drx in rrc idle
 
Huawei - Making the World Smaller with Small Cell
Huawei  - Making the World Smaller with Small CellHuawei  - Making the World Smaller with Small Cell
Huawei - Making the World Smaller with Small Cell
 
Minilink TN Ethernet Config.pdf
Minilink TN Ethernet Config.pdfMinilink TN Ethernet Config.pdf
Minilink TN Ethernet Config.pdf
 
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
422738668-LTE-Downlink-Throughput-Optimization-Based-on-Performance-Data [Rep...
 
Digital network lecturer1
Digital network  lecturer1Digital network  lecturer1
Digital network lecturer1
 

Ähnlich wie Synchronization in SDH network

Metrofile111111111 150706071159-lva1-app6892
Metrofile111111111 150706071159-lva1-app6892Metrofile111111111 150706071159-lva1-app6892
Metrofile111111111 150706071159-lva1-app6892
yogeshingle4
 
04352464
0435246404352464
04352464
iiui
 
ENGR543_FinalReport_TungNguyen
ENGR543_FinalReport_TungNguyenENGR543_FinalReport_TungNguyen
ENGR543_FinalReport_TungNguyen
Tung Nguyen
 

Ähnlich wie Synchronization in SDH network (20)

3 g by pasha
3 g by pasha3 g by pasha
3 g by pasha
 
Network time sync for power generation, transmission and distribution
Network time sync for power generation, transmission and distributionNetwork time sync for power generation, transmission and distribution
Network time sync for power generation, transmission and distribution
 
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
IRJET- Performance Analysis of Clock and Data Recovery Circuits using Multile...
 
Tyco a1029a
Tyco a1029aTyco a1029a
Tyco a1029a
 
Metro Train Automation & display System
Metro Train Automation & display SystemMetro Train Automation & display System
Metro Train Automation & display System
 
Metrofile111111111 150706071159-lva1-app6892
Metrofile111111111 150706071159-lva1-app6892Metrofile111111111 150706071159-lva1-app6892
Metrofile111111111 150706071159-lva1-app6892
 
JamesEndl
JamesEndlJamesEndl
JamesEndl
 
INTELIGENT RAILWAY SYSTEM
INTELIGENT RAILWAY SYSTEMINTELIGENT RAILWAY SYSTEM
INTELIGENT RAILWAY SYSTEM
 
Gas sensor
Gas sensorGas sensor
Gas sensor
 
UCTTintro
UCTTintroUCTTintro
UCTTintro
 
Zigbee 802-15-4
Zigbee 802-15-4Zigbee 802-15-4
Zigbee 802-15-4
 
Link adaptation
Link adaptationLink adaptation
Link adaptation
 
Fairness of the WiMAX System
Fairness of the WiMAX SystemFairness of the WiMAX System
Fairness of the WiMAX System
 
Samsung_EnodeLSMR__Integration_Module__V1.pdf (1).pdf
Samsung_EnodeLSMR__Integration_Module__V1.pdf (1).pdfSamsung_EnodeLSMR__Integration_Module__V1.pdf (1).pdf
Samsung_EnodeLSMR__Integration_Module__V1.pdf (1).pdf
 
04352464
0435246404352464
04352464
 
Digital Implementation of Costas Loop with Carrier Recovery
Digital Implementation of Costas Loop with Carrier RecoveryDigital Implementation of Costas Loop with Carrier Recovery
Digital Implementation of Costas Loop with Carrier Recovery
 
ENGR543_FinalReport_TungNguyen
ENGR543_FinalReport_TungNguyenENGR543_FinalReport_TungNguyen
ENGR543_FinalReport_TungNguyen
 
Self Organizing Network
Self Organizing NetworkSelf Organizing Network
Self Organizing Network
 
Implementation of an Improved Microcontroller Based Moving Message Display Sy...
Implementation of an Improved Microcontroller Based Moving Message Display Sy...Implementation of an Improved Microcontroller Based Moving Message Display Sy...
Implementation of an Improved Microcontroller Based Moving Message Display Sy...
 
Implementation of an Improved Microcontroller Based Moving Message Display Sy...
Implementation of an Improved Microcontroller Based Moving Message Display Sy...Implementation of an Improved Microcontroller Based Moving Message Display Sy...
Implementation of an Improved Microcontroller Based Moving Message Display Sy...
 

Kürzlich hochgeladen

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Kürzlich hochgeladen (20)

Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Synchronization in SDH network

  • 1. Synchronization in GrameenPhone Network Presented by: Md. Asif Matin Rocky
  • 2. The Objective of Network Synchronization If the node clocks in a telecommunication network operate asynchronously then the transmit and receive rates of telecommunication systems in each node would be different to the other nodes. In this case causing data errors commonly referred to as “slips”. Slips per day = frequency difference x traffic frames/second x seconds/day (86400) The object of network synchronization is therefore to avoid and to minimize slips. This can only be achieved by synchronizing all the node clocks, and hence all the telecommunication systems, to the nearly master clock.
  • 3. Overhead byte for synchronization in STM frame Fig. 8 Assignment of SSM bit patterns (TR3272EU00TR_0401 Synchronization, 10) S1 byte, the quality of Synchronization Message, indicates the type of clock source used to time the transmitted STM-n signal.
  • 4. Assignment of SSM bit patterns SSM (Synchronization Status Message): Contains the timing quality of the reference timing of a received STM signal. It is 4 bits wide. Q6   DNU 1111 Q4 4.6x10℮-6 (lowest quality) SEC 1011 Q3 2x10℮-08 per day SSU Local 1000 Q2 1x10℮-09 per day SSU Transit 0100 Q1 1x10℮-11 PRC (highest quality) 0010 Q5   Quality unknown 0000 Q-level Accuracy Description S1 byte, bit 5-8
  • 5. Reason: Timing loops occur, when a chain of slave-clocks forms a loop, so that the active reference input of any of the clocks is actually locked indirectly to the output of that same clock. Result: The clocks on the timing loop then are not locked to a PRC anymore, the loop’s clock frequency diverges, thus causing catastrophic degradation of traffic performance . Timing Loop
  • 6. Potential Timing Loop Holdover P2 selected P2 selected P2 selected P2 selected P1 selected P1 selected Sync loop created (NE04-NE03-NE01-NE02-NE04) Priority 1 Signal, P1  Priority 2 Signal, P2 
  • 7. Better Design Priority 1 Signal, P1  Priority 2 Signal, P2  Holdover P2 selected P2 selected P2 selected P2 selected No Sync Loop for Every Possible Fiber Cut P1 selected
  • 8.
  • 9. Antenna and TS 3600 installed at LKB
  • 10. Hardware View Power Source B Power Source A IF Cable to roof antenna 2 MHz output (Wire wrap type) Ethernet port LCT port
  • 11.
  • 12. The TimeSource 3600 tracks all satellites within its field of view. The performance of each tracked satellite is observed and compared to the others, and available for use in the timing solution. A satellite with unacceptable performance data is dropped from the timing solution. GPS Tracking
  • 13. Key features Power redundancy: Has two separate power sources A and B. Bit rate: 2.048 Mb/s Frequency accuracy: 1x10 GPS Holdover Stability: 1x10 for 72 hours. 1x10 for 30 days. Efficiency: Low installation cost and maintenance free. High Performing: BESTIME technology. -12 -11 -10
  • 14.
  • 16. PRC PRC PRC PRC PRC PRC DHKJT DHLKB SYJGB CGPTL BSCOS BOBET Method of Distribution P1 P2 P3
  • 17.
  • 21. 1) Trouble shooting with Front panel alarms: Front panel alarms Alarm handling The system has been in holdover per the user alarm setting, or there is a hardware fault.   n/a.   Output signal is PRS.   System is in warm-up mode or is not powered. OFF Status SYS A GPS event, which has existed per the user alarm setting, has escalated to a major alarm.   A minor GPS event has occurred.   GPS successfully tracking satellites.   System is not powered. OFF Status GPS Description Status Name
  • 22. Description Status Name Antenna failed. An event (GPS error, temperature error) escalated to a minor alarm. A software download is required. Power A or B has failed.   There is no minor alarm OFF Alarms MIN The system has been in holdover per the user alarm setting.   There is no major alarm OFF Alarms MAJ A major alarm has occurred due to any hardware fault.   There is no critical alarm OFF Alarms CRIT   Alarm handling
  • 23.