The document calculates production requirements and machine needs for various spinning processes. It determines that a ring frame with 1008 spindles producing 165.215 grams per spindle per shift is needed. 4.99 speed frames producing 918.436 kg per machine per shift and 4.375 draw frames producing 1069.95 kg per shift are required. 10.835 combers producing 440.912 kg per shift and 1.281 unilaps producing 3803.904 kg per shift are also needed. Additional machines include 2.7005 draw frames producing 1842.016 kg per shift and 12.228 cards producing 415.0776 kg per shift to reach a total blended ring production requirement of 15538.635 kg per day