SlideShare ist ein Scribd-Unternehmen logo
1 von 7
RING-FRAME:-
R/F NO. = 1
Count = 30
TPI = 21.02
Speed = 15200
Effeciency = 95%
No. of spindle = 1008
No. of m/c = 27
Spindle speed * 60 * 8 * Effeciency
Production =
TPI * 36 * 840 * Count * 2.2
15200 * 60 * 8 * 0.95
=
21.02 * 36 * 840 * 30 * 2.2
= 165.215 gms/spindle/shift
Total production = 0.1652*27*3*1008
= 13489.4905 per day.
S/F Production required = 13489.4905/0.98
= 13764.786 per day.
SPEED-FRAME:-
Count- 0.78
TPI- 1.24
Speed- 1140
Eff.- 90%
No. of spindle- 120
No. of m/c- 7
spindle speed * 60* 8*eff.
Production =
TPI * 36*840*Count*2.2
1140*60*8*0.90
=
1.24*36*840*0.78*2.2
= 7.653 kg/spindle
= 918.436 kg/mc/shift.
No. of speed frame required = 13764.756 / 918.436 /3
= 4.99
Draw-frame production required = 13764.786/0.98
= 14045.7 per day.
DRAW-FRAME:-
Delivery speed 462.6 m/min
T.D 1.10
Eff. 85%
Sliver hank 0.1050
No. of m/c 5
Delivery speed*60*8*T.D*eff.
Production =
840 * sliver hank* 2.2
462.6 *60*8*1.1*0.85
=
840*0.1050*2.2
= 1069.95 kg/shift.
No. of Draw-Frame required = 14045.7/1069.95/3
= 4.375
Comber production required = 14045.7/0.98
= 14332.346 per day .
COMBER:-
Nip/min 400
Feed/nip 5.1
Lap weight(gm/mtr) 78
No. of head 8
T.D 1.1
Eff. 80%
Noil% 18
No. of m/c 13
(nip/min)*(feed/nip)*(lap weight)*no. of head *{(100-W)/100}*60*8*T.D*eff.
Production =
1000 * 1000
= 400*5.1*78*8*{(100-18)/100}*60*8*1.1*0.8
1000 * 1000
= 440.912 kg/shift.
No. of comber required = 14332.346/440.912/3
= 10.835
Unilap production required = 14332.346/0.98
= 14624.84
UNILAP:-
Delivery rate(m/min) 127
Lap weight(gm/mtr) 78
Effeciency 80%
No. of m/c 2
Delivery rate (m/min)*lap weight(gm/mtr)*60*8*eff.
production =
1000
127*78*60*8*0.8
=
1000
= 3803.904 kg/shift.
No. of unilap required = 14624.84/3803.904/3
= 1.281
Production required D/F = 14624.84/0.98
= 14923.306 per day.
DRAW-FRAME:-
Delivery speed 822 m/min
T.D 1.1
Effeciency 80%
Sliver hank 0.1020
No. of m/c 2
Delivery speed*60*8*T.D*eff.
Production =
840 * sliver hank* 2.2
= 822*60*8*1.1*0.80
840*0.1020*2.2
= 1842.016 kg/shift.
No. of draw-frame required = 14923.306/1842.016/3
= 2.7005
Card production required = 14923.306/0.98
= 15227.863 per day.
CARD:-
Delivery rate 174 m/min
Sliver weight 5.02
Effeciency 99%
No. of m/c 18
Delivery rate (m/min)*lap weight(gm/mtr)*60*8*eff.
production =
1000
174*5.02*60*8*0.99
=
1000
= 415.0776
No. of card required = 15227.863/415.077/3
= 12.228
B/R production required = 15227.863/0.98
= 15538.635 per day.

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Simplex machine. Roving, sliver
Simplex machine. Roving, sliverSimplex machine. Roving, sliver
Simplex machine. Roving, sliver
 
Carding (1)
Carding (1)Carding (1)
Carding (1)
 
Autoconer 21C
Autoconer 21CAutoconer 21C
Autoconer 21C
 
Change of fabric gsm vary with yarn count
Change of fabric gsm vary with yarn countChange of fabric gsm vary with yarn count
Change of fabric gsm vary with yarn count
 
Cotton Yarn Quality Depends on Mixing Strategy
Cotton Yarn Quality Depends on Mixing StrategyCotton Yarn Quality Depends on Mixing Strategy
Cotton Yarn Quality Depends on Mixing Strategy
 
Weaving calculation
Weaving calculationWeaving calculation
Weaving calculation
 
Warping
WarpingWarping
Warping
 
Roving
RovingRoving
Roving
 
Ring frame
Ring frame Ring frame
Ring frame
 
FRICTION SPINNING TECHNOLOGY, (M.S)
FRICTION SPINNING TECHNOLOGY, (M.S)FRICTION SPINNING TECHNOLOGY, (M.S)
FRICTION SPINNING TECHNOLOGY, (M.S)
 
Different parts of knitting machine and parameter
Different parts of knitting machine and parameterDifferent parts of knitting machine and parameter
Different parts of knitting machine and parameter
 
Shuttle less weaving
Shuttle less weavingShuttle less weaving
Shuttle less weaving
 
Important parts on ring frame
Important parts on ring frameImportant parts on ring frame
Important parts on ring frame
 
Production Calculation of s/j circular knitting m/c.
Production Calculation of s/j circular knitting m/c.Production Calculation of s/j circular knitting m/c.
Production Calculation of s/j circular knitting m/c.
 
Carding note
Carding noteCarding note
Carding note
 
Process parameter in blow room
Process parameter in blow roomProcess parameter in blow room
Process parameter in blow room
 
Projectile weaving
Projectile weavingProjectile weaving
Projectile weaving
 
Yarn Manufacturing Process : Comber Part I
Yarn Manufacturing Process : Comber Part IYarn Manufacturing Process : Comber Part I
Yarn Manufacturing Process : Comber Part I
 
Math problem of combing machine
Math problem of combing machineMath problem of combing machine
Math problem of combing machine
 
Knitting calculation
Knitting calculationKnitting calculation
Knitting calculation
 

Ähnlich wie CALCULATING PRODUCTION REQUIREMENTS FOR RING, SPEED, DRAW AND COMBER FRAMES

Production calculation.ppt
Production calculation.pptProduction calculation.ppt
Production calculation.pptJSathish3
 
Npm pf(c)25 specsheet
Npm pf(c)25 specsheetNpm pf(c)25 specsheet
Npm pf(c)25 specsheetElectromate
 
SMD Gearbox || Gearbox Manufacturer || Catalogue Download
SMD Gearbox || Gearbox Manufacturer || Catalogue DownloadSMD Gearbox || Gearbox Manufacturer || Catalogue Download
SMD Gearbox || Gearbox Manufacturer || Catalogue DownloadSMD Gearbox
 
Npm pf35 specsheet
Npm pf35 specsheetNpm pf35 specsheet
Npm pf35 specsheetElectromate
 
Harmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetHarmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetElectromate
 
104700-9190 104700-9191
104700-9190 104700-9191104700-9190 104700-9191
104700-9190 104700-9191Junior Iung
 
Calculo motor de passo
Calculo motor de passoCalculo motor de passo
Calculo motor de passoLuanMachado25
 
PROGRAME CNC FANUC VERIFICATE .pdf
PROGRAME CNC FANUC VERIFICATE .pdfPROGRAME CNC FANUC VERIFICATE .pdf
PROGRAME CNC FANUC VERIFICATE .pdfMiticaVlad1
 
Exemple programe cnc freza -fanuc
Exemple programe cnc  freza -fanuc Exemple programe cnc  freza -fanuc
Exemple programe cnc freza -fanuc Miticavlad Neamitica
 
Shimpo str series
Shimpo str seriesShimpo str series
Shimpo str seriesElectromate
 
Delta asda a2_r_catalog
Delta asda a2_r_catalogDelta asda a2_r_catalog
Delta asda a2_r_catalogElectromate
 
MTG R22 air cooled packaged unit (copeland)
MTG R22 air cooled packaged unit (copeland)MTG R22 air cooled packaged unit (copeland)
MTG R22 air cooled packaged unit (copeland)Ann Wee (RIGID HVAC)
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIYSagnik Datta
 
Akribis mgv brochure
Akribis mgv brochureAkribis mgv brochure
Akribis mgv brochureElectromate
 
Amp ht34 stepper_motor_specsheet
Amp ht34 stepper_motor_specsheetAmp ht34 stepper_motor_specsheet
Amp ht34 stepper_motor_specsheetElectromate
 
185619827-Training-Vibrasi.pdf
185619827-Training-Vibrasi.pdf185619827-Training-Vibrasi.pdf
185619827-Training-Vibrasi.pdfSoufianeAychour1
 
1_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec20101_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec2010CangTo Cheah
 
Npm pf(c)55 specsheet
Npm pf(c)55 specsheetNpm pf(c)55 specsheet
Npm pf(c)55 specsheetElectromate
 

Ähnlich wie CALCULATING PRODUCTION REQUIREMENTS FOR RING, SPEED, DRAW AND COMBER FRAMES (20)

Production calculation.ppt
Production calculation.pptProduction calculation.ppt
Production calculation.ppt
 
Npm pf(c)25 specsheet
Npm pf(c)25 specsheetNpm pf(c)25 specsheet
Npm pf(c)25 specsheet
 
SMD Gearbox || Gearbox Manufacturer || Catalogue Download
SMD Gearbox || Gearbox Manufacturer || Catalogue DownloadSMD Gearbox || Gearbox Manufacturer || Catalogue Download
SMD Gearbox || Gearbox Manufacturer || Catalogue Download
 
Npm pf35 specsheet
Npm pf35 specsheetNpm pf35 specsheet
Npm pf35 specsheet
 
Catalogo actual
Catalogo actualCatalogo actual
Catalogo actual
 
Delta ia mds-reg2000_c_en_20161124
Delta ia mds-reg2000_c_en_20161124Delta ia mds-reg2000_c_en_20161124
Delta ia mds-reg2000_c_en_20161124
 
Harmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheetHarmonic rh dc_servo_specsheet
Harmonic rh dc_servo_specsheet
 
104700-9190 104700-9191
104700-9190 104700-9191104700-9190 104700-9191
104700-9190 104700-9191
 
Calculo motor de passo
Calculo motor de passoCalculo motor de passo
Calculo motor de passo
 
PROGRAME CNC FANUC VERIFICATE .pdf
PROGRAME CNC FANUC VERIFICATE .pdfPROGRAME CNC FANUC VERIFICATE .pdf
PROGRAME CNC FANUC VERIFICATE .pdf
 
Exemple programe cnc freza -fanuc
Exemple programe cnc  freza -fanuc Exemple programe cnc  freza -fanuc
Exemple programe cnc freza -fanuc
 
Shimpo str series
Shimpo str seriesShimpo str series
Shimpo str series
 
Delta asda a2_r_catalog
Delta asda a2_r_catalogDelta asda a2_r_catalog
Delta asda a2_r_catalog
 
MTG R22 air cooled packaged unit (copeland)
MTG R22 air cooled packaged unit (copeland)MTG R22 air cooled packaged unit (copeland)
MTG R22 air cooled packaged unit (copeland)
 
PLANT AND MACHINARIY
PLANT AND MACHINARIYPLANT AND MACHINARIY
PLANT AND MACHINARIY
 
Akribis mgv brochure
Akribis mgv brochureAkribis mgv brochure
Akribis mgv brochure
 
Amp ht34 stepper_motor_specsheet
Amp ht34 stepper_motor_specsheetAmp ht34 stepper_motor_specsheet
Amp ht34 stepper_motor_specsheet
 
185619827-Training-Vibrasi.pdf
185619827-Training-Vibrasi.pdf185619827-Training-Vibrasi.pdf
185619827-Training-Vibrasi.pdf
 
1_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec20101_Wheatstone Summer_30Dec2010
1_Wheatstone Summer_30Dec2010
 
Npm pf(c)55 specsheet
Npm pf(c)55 specsheetNpm pf(c)55 specsheet
Npm pf(c)55 specsheet
 

Kürzlich hochgeladen

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Kürzlich hochgeladen (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

CALCULATING PRODUCTION REQUIREMENTS FOR RING, SPEED, DRAW AND COMBER FRAMES

  • 1. RING-FRAME:- R/F NO. = 1 Count = 30 TPI = 21.02 Speed = 15200 Effeciency = 95% No. of spindle = 1008 No. of m/c = 27 Spindle speed * 60 * 8 * Effeciency Production = TPI * 36 * 840 * Count * 2.2 15200 * 60 * 8 * 0.95 = 21.02 * 36 * 840 * 30 * 2.2 = 165.215 gms/spindle/shift Total production = 0.1652*27*3*1008 = 13489.4905 per day.
  • 2. S/F Production required = 13489.4905/0.98 = 13764.786 per day. SPEED-FRAME:- Count- 0.78 TPI- 1.24 Speed- 1140 Eff.- 90% No. of spindle- 120 No. of m/c- 7 spindle speed * 60* 8*eff. Production = TPI * 36*840*Count*2.2 1140*60*8*0.90 = 1.24*36*840*0.78*2.2 = 7.653 kg/spindle = 918.436 kg/mc/shift.
  • 3. No. of speed frame required = 13764.756 / 918.436 /3 = 4.99 Draw-frame production required = 13764.786/0.98 = 14045.7 per day. DRAW-FRAME:- Delivery speed 462.6 m/min T.D 1.10 Eff. 85% Sliver hank 0.1050 No. of m/c 5 Delivery speed*60*8*T.D*eff. Production = 840 * sliver hank* 2.2 462.6 *60*8*1.1*0.85 = 840*0.1050*2.2 = 1069.95 kg/shift.
  • 4. No. of Draw-Frame required = 14045.7/1069.95/3 = 4.375 Comber production required = 14045.7/0.98 = 14332.346 per day . COMBER:- Nip/min 400 Feed/nip 5.1 Lap weight(gm/mtr) 78 No. of head 8 T.D 1.1 Eff. 80% Noil% 18 No. of m/c 13 (nip/min)*(feed/nip)*(lap weight)*no. of head *{(100-W)/100}*60*8*T.D*eff. Production = 1000 * 1000 = 400*5.1*78*8*{(100-18)/100}*60*8*1.1*0.8 1000 * 1000 = 440.912 kg/shift.
  • 5. No. of comber required = 14332.346/440.912/3 = 10.835 Unilap production required = 14332.346/0.98 = 14624.84 UNILAP:- Delivery rate(m/min) 127 Lap weight(gm/mtr) 78 Effeciency 80% No. of m/c 2 Delivery rate (m/min)*lap weight(gm/mtr)*60*8*eff. production = 1000 127*78*60*8*0.8 = 1000 = 3803.904 kg/shift.
  • 6. No. of unilap required = 14624.84/3803.904/3 = 1.281 Production required D/F = 14624.84/0.98 = 14923.306 per day. DRAW-FRAME:- Delivery speed 822 m/min T.D 1.1 Effeciency 80% Sliver hank 0.1020 No. of m/c 2 Delivery speed*60*8*T.D*eff. Production = 840 * sliver hank* 2.2 = 822*60*8*1.1*0.80 840*0.1020*2.2 = 1842.016 kg/shift.
  • 7. No. of draw-frame required = 14923.306/1842.016/3 = 2.7005 Card production required = 14923.306/0.98 = 15227.863 per day. CARD:- Delivery rate 174 m/min Sliver weight 5.02 Effeciency 99% No. of m/c 18 Delivery rate (m/min)*lap weight(gm/mtr)*60*8*eff. production = 1000 174*5.02*60*8*0.99 = 1000 = 415.0776 No. of card required = 15227.863/415.077/3 = 12.228 B/R production required = 15227.863/0.98 = 15538.635 per day.