SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Ashish Kumar
V.P.O.Lahla, Teh. Palampur,
Distt. Kangra -176059
Contact No. +91-9805319946
Email-id: - ashish.ashish.koundal@gmail.com
[18.06.2016]
To
Human Resource Manager
Re: - Assistant Electrical Engineer (Operation & Maintenance)
Dear Hiring Manager,
Kindly accept this application from a talented and capable applicant whowishes to apply foryour As an
Assistant ElectricalEngineer.
As you can judge from my enclosed CV I possess extensive A competent professional with 6.4+ years of
experience in Hydro power plant such as Operation & Maintenance of 3125KVA Alternator, PLC governed
Peloton Turbine, 7.5MVA Power Transformer, 250KVA Auxiliary Transformer & 35KW Brushless Exciter and
HT & LT Panel. My key areas of expertise include, but are not limited to the following;
 Handling of electrical load as per requirement.
 To maintain the DPR.
 To check the entire work as according to approved drawings.
 To provide the entire electrical solutions as per requirement.
Right now I want to join a company like yourswhere Iwill have the opportunity to grow and advance from
within the company.
I hope that after reviewing my attached resume you willbe convincedof my potential and invite me for an
interview to discuss my application in further detail.
Yours sincerely,
Ashish Kumar
ASHISH KUMAR
V.P.O.Lahla, Teh. Palampur Mobile No. +91-9805319946
Distt. Kangra -176059 E-mail:- ashish.ashish.koundal@gmail.com
Assistant Electrical Engineer (O & M)
Diploma in Electronics Engineering with 6.4 Years of experience in Power Plant. I am comfortable with both
managing and doing. I am an expert at maximizing resources and optimizing budgets to ensure that all work
is achieved within the constraints of expenditure, time, quality and health & safety. In My present job I am
looked to for guidance as well as decision making.
PROFESSIONAL STRENGTHS INCLUDE
 Planning and implementing preventive maintenance schedules of various machineries and
instruments to increase machine uptime and equipment reliability.
 Proactively identify areas of obstruction/breakdowns and take steps to rectify the
equipment’s through application of trouble shooting tools.
 Executing cost saving and energy saving techniques/measures and modifications to achieve
substantial reduction in Operations & Maintenance expenditures.
EDUCATION
Diploma in Electronics Engineering
Punjab State Board of Technical Education and Industrial Training in 2006-09
PROFESSIONAL EXPERIENCE
SinceApril 2011to TillDate–WorkingwithAnubhav Hydel Power Pvt. LtdinKangraas an Assistant Electrical
Engineer
Client:- 5 MWBinuaParaiHimachalPradesh
ProjectDescription:- 5 MWBinua Paraismallhydroelectricprojectforagridsystem,HimachalPradesh,India
at Kangra District,Tehsil:Baijnath,Village:Tar,HimachalPradeshby M/sAnubhav
HydelPowerPrivateLimited.
RESPONSIBILITIES:-
 Workmajorly coversOperation&Maintenanceof 3125KVAAlternator,PLCgovernedPeltonTurbine,
7.5MVAPowerTransformer,250KVAAuxiliaryTransformer&35KWBrushlessExciter.
 Tofindoutlocationof Fault.
 Troubleshootingof TG&its auxiliaries,Electricalswitchgearslike36KV/2500ASF6circuitbreaker,
12KV/1250Avacuumcircuitbreaker,6.6KVvacuumcontactor.
 Emergency conditionoperationsliketrips.
 Tosupervisein shiftjobs& carry outtherunning maintenance,periodically routine&preventive
maintenanceetc.
 Attendthe H.T.(33KV)&L.T.(440V)lineworkonACSR conductor,isolators,jumperspintype
insulators,LighteningArrester,SAG line & etc.
 Tomaintain allDocumentof theUnit.
From January 2010 to April 2011–Worked with Sri Sai Krishna Hydro Energies Pvt. Ltd as an Assistant
Electrical Engineer
Client: - 2 x 2.5 =5 MW Luni-II HEP
Project Description: -The site of Luni-II HEP can be approached through Baijnath-Karnathu road. Karnathu
village is at a distance of 10KM from Baijnath Town. From Karnathu village the length
of project is 6.5KM upto Luni-II Power House
RESPONSIBILITIES:-
 Breakdown maintenance and continuous improvement activities of Electrical & Instrumentation.
 Identifying & maintaining critical spare & updating records as per the audit requirements.
 Updating Daily break down data’s.
 Handle all activities of Operation & Good record as shift in charge.
 Responsible for maintaining the checklists and relevant documents like as (Generation, Breakdown,
equipment hysitory record, counter record, maintenance record etc.)
 Improved the safety environment in the entire plant.
 Problem solving and organizational abilities.
PERSONAL DETAILS
FathersName : Mr.OnkarChand
Dateof Birth : 25th January,1988
Nationality : Indian.
Language Known : English,Hindi, Punjabi.
DECLARATION:-
I certify thatalltheinformationaboveiscorrectandreferencesareavailableif they areneededhoping thatmy
experiencewillbeusefultoyou.
Date:- 18.06.2016
Place:-Palampur (Ashish Kumar)

Weitere ähnliche Inhalte

Was ist angesagt? (20)

KHILAVAN R
KHILAVAN RKHILAVAN R
KHILAVAN R
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
Prasenjit adhikary resume
Prasenjit adhikary resume Prasenjit adhikary resume
Prasenjit adhikary resume
 
Resume
ResumeResume
Resume
 
kapilumak
kapilumakkapilumak
kapilumak
 
Babban_Pandey-3
Babban_Pandey-3Babban_Pandey-3
Babban_Pandey-3
 
Lkp cv
Lkp cvLkp cv
Lkp cv
 
attach (1)
attach (1)attach (1)
attach (1)
 
Ac motor electrical engineer job ref 1301 19
Ac motor electrical engineer job ref 1301 19Ac motor electrical engineer job ref 1301 19
Ac motor electrical engineer job ref 1301 19
 
Shijin CV
Shijin CVShijin CV
Shijin CV
 
AVINASH KUMAR RESUME 2016 NEW BANGALORE
AVINASH KUMAR RESUME 2016  NEW BANGALOREAVINASH KUMAR RESUME 2016  NEW BANGALORE
AVINASH KUMAR RESUME 2016 NEW BANGALORE
 
B.E in electrical engineering with 6 years experience
B.E in electrical engineering with 6 years experienceB.E in electrical engineering with 6 years experience
B.E in electrical engineering with 6 years experience
 
Resume-Sagar-1
Resume-Sagar-1Resume-Sagar-1
Resume-Sagar-1
 
AAmir PDF
AAmir PDFAAmir PDF
AAmir PDF
 
Saladin c.v
Saladin c.vSaladin c.v
Saladin c.v
 
Resume Nov.26. '16
Resume Nov.26. '16Resume Nov.26. '16
Resume Nov.26. '16
 
ResumeFeb2015
ResumeFeb2015ResumeFeb2015
ResumeFeb2015
 
Hari prasad cv ppt
Hari prasad cv pptHari prasad cv ppt
Hari prasad cv ppt
 
AKM
AKMAKM
AKM
 

Andere mochten auch

Noć muzeja, Hrvatska udruga likovnih umjetnika, Split
Noć muzeja, Hrvatska udruga likovnih umjetnika, SplitNoć muzeja, Hrvatska udruga likovnih umjetnika, Split
Noć muzeja, Hrvatska udruga likovnih umjetnika, SplitBoris Aračić
 
Estatutoak(2)
Estatutoak(2)Estatutoak(2)
Estatutoak(2)Irunberri
 
Dormer Pramet Turning, Boring and Parting Kits
Dormer Pramet Turning, Boring and Parting KitsDormer Pramet Turning, Boring and Parting Kits
Dormer Pramet Turning, Boring and Parting KitsERIKS UK
 
Weight Loss 'Idealiss'
Weight Loss 'Idealiss'Weight Loss 'Idealiss'
Weight Loss 'Idealiss'Bena25
 
Boost Your Energy .
Boost Your Energy .Boost Your Energy .
Boost Your Energy .Bena25
 
Presentation11
Presentation11Presentation11
Presentation11xuan huong
 
Fast Weight Loss .
Fast Weight Loss .Fast Weight Loss .
Fast Weight Loss .Bena25
 
Abeceda škole života
Abeceda škole životaAbeceda škole života
Abeceda škole životarader1
 
Integrativni pristup u nastavi
Integrativni pristup u nastaviIntegrativni pristup u nastavi
Integrativni pristup u nastaviSava Kovačević
 
Cumulus Linux CAPEX and OPEX savings
Cumulus Linux  CAPEX and OPEX savingsCumulus Linux  CAPEX and OPEX savings
Cumulus Linux CAPEX and OPEX savingsAdam Lorts
 
Foundation for Offshore wind turbine.
Foundation for Offshore wind turbine.Foundation for Offshore wind turbine.
Foundation for Offshore wind turbine.MD SHARIQUE BEG
 
Social Marketing Strategy for Clean Cook Stoves
Social Marketing Strategy for Clean Cook StovesSocial Marketing Strategy for Clean Cook Stoves
Social Marketing Strategy for Clean Cook StovesKusorgbor Raymond
 
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)Menadžment Centar Beograd
 
Gartner magic quadrant 2015
Gartner magic quadrant 2015Gartner magic quadrant 2015
Gartner magic quadrant 2015Satya Harish
 
Blood vessels the aorta and its branches,
Blood vessels  the aorta and its branches,Blood vessels  the aorta and its branches,
Blood vessels the aorta and its branches,kashif Anwer
 
Brands & Bloggers: Why they need each other
Brands & Bloggers: Why they need each otherBrands & Bloggers: Why they need each other
Brands & Bloggers: Why they need each otherPrashanth Challapalli
 
Tempo October 2015
Tempo October 2015Tempo October 2015
Tempo October 2015Tempoplanet
 

Andere mochten auch (20)

Noć muzeja, Hrvatska udruga likovnih umjetnika, Split
Noć muzeja, Hrvatska udruga likovnih umjetnika, SplitNoć muzeja, Hrvatska udruga likovnih umjetnika, Split
Noć muzeja, Hrvatska udruga likovnih umjetnika, Split
 
Estatutoak(2)
Estatutoak(2)Estatutoak(2)
Estatutoak(2)
 
Dormer Pramet Turning, Boring and Parting Kits
Dormer Pramet Turning, Boring and Parting KitsDormer Pramet Turning, Boring and Parting Kits
Dormer Pramet Turning, Boring and Parting Kits
 
Weight Loss 'Idealiss'
Weight Loss 'Idealiss'Weight Loss 'Idealiss'
Weight Loss 'Idealiss'
 
Boost Your Energy .
Boost Your Energy .Boost Your Energy .
Boost Your Energy .
 
Moeez Ali
Moeez Ali Moeez Ali
Moeez Ali
 
Presentation11
Presentation11Presentation11
Presentation11
 
Fast Weight Loss .
Fast Weight Loss .Fast Weight Loss .
Fast Weight Loss .
 
Abeceda škole života
Abeceda škole životaAbeceda škole života
Abeceda škole života
 
Integrativni pristup u nastavi
Integrativni pristup u nastaviIntegrativni pristup u nastavi
Integrativni pristup u nastavi
 
Cumulus Linux CAPEX and OPEX savings
Cumulus Linux  CAPEX and OPEX savingsCumulus Linux  CAPEX and OPEX savings
Cumulus Linux CAPEX and OPEX savings
 
Foundation for Offshore wind turbine.
Foundation for Offshore wind turbine.Foundation for Offshore wind turbine.
Foundation for Offshore wind turbine.
 
Social Marketing Strategy for Clean Cook Stoves
Social Marketing Strategy for Clean Cook StovesSocial Marketing Strategy for Clean Cook Stoves
Social Marketing Strategy for Clean Cook Stoves
 
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)
4.ICV kongres controllera 2016 - STRAUSS ADRIATIC (Dragan Radosavljević)
 
IzbornaNastava-TK-7.raz
IzbornaNastava-TK-7.razIzbornaNastava-TK-7.raz
IzbornaNastava-TK-7.raz
 
Gartner magic quadrant 2015
Gartner magic quadrant 2015Gartner magic quadrant 2015
Gartner magic quadrant 2015
 
Blood vessels the aorta and its branches,
Blood vessels  the aorta and its branches,Blood vessels  the aorta and its branches,
Blood vessels the aorta and its branches,
 
IzbornaNastava-TK-5.raz
IzbornaNastava-TK-5.razIzbornaNastava-TK-5.raz
IzbornaNastava-TK-5.raz
 
Brands & Bloggers: Why they need each other
Brands & Bloggers: Why they need each otherBrands & Bloggers: Why they need each other
Brands & Bloggers: Why they need each other
 
Tempo October 2015
Tempo October 2015Tempo October 2015
Tempo October 2015
 

Ähnlich wie Ashish Kumar Presentation

Ähnlich wie Ashish Kumar Presentation (20)

KJVYAS_SCL
KJVYAS_SCLKJVYAS_SCL
KJVYAS_SCL
 
Sanjay Mondal Presentation
Sanjay Mondal PresentationSanjay Mondal Presentation
Sanjay Mondal Presentation
 
1. Ikram up date cv
1. Ikram up date cv1. Ikram up date cv
1. Ikram up date cv
 
Sanjeev resume (1)
Sanjeev resume (1)Sanjeev resume (1)
Sanjeev resume (1)
 
cv 2016
cv 2016cv 2016
cv 2016
 
Resume Power project planning & maintenance.
Resume Power project planning & maintenance.Resume Power project planning & maintenance.
Resume Power project planning & maintenance.
 
CV_akhilesh
CV_akhileshCV_akhilesh
CV_akhilesh
 
New resume kamlesh
New resume kamleshNew resume kamlesh
New resume kamlesh
 
Abdul Qayyom (Resume)
Abdul Qayyom (Resume)Abdul Qayyom (Resume)
Abdul Qayyom (Resume)
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
Sanjeev resume
Sanjeev resumeSanjeev resume
Sanjeev resume
 
M.Talal cv version 7
M.Talal cv version 7M.Talal cv version 7
M.Talal cv version 7
 
Resume
ResumeResume
Resume
 
Arun resume
Arun resumeArun resume
Arun resume
 
Nagaganesh M_original
Nagaganesh M_originalNagaganesh M_original
Nagaganesh M_original
 
Vishnu Resume
Vishnu ResumeVishnu Resume
Vishnu Resume
 
JIGNESH RESUME
JIGNESH RESUMEJIGNESH RESUME
JIGNESH RESUME
 
Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_Sedrick Cueto_CV&Cover Letter_
Sedrick Cueto_CV&Cover Letter_
 
c.v of rana
c.v of ranac.v of rana
c.v of rana
 
ALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CVALBARICK POWER PLANT NEW CV
ALBARICK POWER PLANT NEW CV
 

Ashish Kumar Presentation

  • 1. Ashish Kumar V.P.O.Lahla, Teh. Palampur, Distt. Kangra -176059 Contact No. +91-9805319946 Email-id: - ashish.ashish.koundal@gmail.com [18.06.2016] To Human Resource Manager Re: - Assistant Electrical Engineer (Operation & Maintenance) Dear Hiring Manager, Kindly accept this application from a talented and capable applicant whowishes to apply foryour As an Assistant ElectricalEngineer. As you can judge from my enclosed CV I possess extensive A competent professional with 6.4+ years of experience in Hydro power plant such as Operation & Maintenance of 3125KVA Alternator, PLC governed Peloton Turbine, 7.5MVA Power Transformer, 250KVA Auxiliary Transformer & 35KW Brushless Exciter and HT & LT Panel. My key areas of expertise include, but are not limited to the following;  Handling of electrical load as per requirement.  To maintain the DPR.  To check the entire work as according to approved drawings.  To provide the entire electrical solutions as per requirement. Right now I want to join a company like yourswhere Iwill have the opportunity to grow and advance from within the company. I hope that after reviewing my attached resume you willbe convincedof my potential and invite me for an interview to discuss my application in further detail. Yours sincerely, Ashish Kumar
  • 2. ASHISH KUMAR V.P.O.Lahla, Teh. Palampur Mobile No. +91-9805319946 Distt. Kangra -176059 E-mail:- ashish.ashish.koundal@gmail.com Assistant Electrical Engineer (O & M) Diploma in Electronics Engineering with 6.4 Years of experience in Power Plant. I am comfortable with both managing and doing. I am an expert at maximizing resources and optimizing budgets to ensure that all work is achieved within the constraints of expenditure, time, quality and health & safety. In My present job I am looked to for guidance as well as decision making. PROFESSIONAL STRENGTHS INCLUDE  Planning and implementing preventive maintenance schedules of various machineries and instruments to increase machine uptime and equipment reliability.  Proactively identify areas of obstruction/breakdowns and take steps to rectify the equipment’s through application of trouble shooting tools.  Executing cost saving and energy saving techniques/measures and modifications to achieve substantial reduction in Operations & Maintenance expenditures. EDUCATION Diploma in Electronics Engineering Punjab State Board of Technical Education and Industrial Training in 2006-09 PROFESSIONAL EXPERIENCE SinceApril 2011to TillDate–WorkingwithAnubhav Hydel Power Pvt. LtdinKangraas an Assistant Electrical Engineer Client:- 5 MWBinuaParaiHimachalPradesh ProjectDescription:- 5 MWBinua Paraismallhydroelectricprojectforagridsystem,HimachalPradesh,India at Kangra District,Tehsil:Baijnath,Village:Tar,HimachalPradeshby M/sAnubhav HydelPowerPrivateLimited. RESPONSIBILITIES:-  Workmajorly coversOperation&Maintenanceof 3125KVAAlternator,PLCgovernedPeltonTurbine, 7.5MVAPowerTransformer,250KVAAuxiliaryTransformer&35KWBrushlessExciter.  Tofindoutlocationof Fault.  Troubleshootingof TG&its auxiliaries,Electricalswitchgearslike36KV/2500ASF6circuitbreaker, 12KV/1250Avacuumcircuitbreaker,6.6KVvacuumcontactor.  Emergency conditionoperationsliketrips.  Tosupervisein shiftjobs& carry outtherunning maintenance,periodically routine&preventive maintenanceetc.  Attendthe H.T.(33KV)&L.T.(440V)lineworkonACSR conductor,isolators,jumperspintype insulators,LighteningArrester,SAG line & etc.  Tomaintain allDocumentof theUnit.
  • 3. From January 2010 to April 2011–Worked with Sri Sai Krishna Hydro Energies Pvt. Ltd as an Assistant Electrical Engineer Client: - 2 x 2.5 =5 MW Luni-II HEP Project Description: -The site of Luni-II HEP can be approached through Baijnath-Karnathu road. Karnathu village is at a distance of 10KM from Baijnath Town. From Karnathu village the length of project is 6.5KM upto Luni-II Power House RESPONSIBILITIES:-  Breakdown maintenance and continuous improvement activities of Electrical & Instrumentation.  Identifying & maintaining critical spare & updating records as per the audit requirements.  Updating Daily break down data’s.  Handle all activities of Operation & Good record as shift in charge.  Responsible for maintaining the checklists and relevant documents like as (Generation, Breakdown, equipment hysitory record, counter record, maintenance record etc.)  Improved the safety environment in the entire plant.  Problem solving and organizational abilities. PERSONAL DETAILS FathersName : Mr.OnkarChand Dateof Birth : 25th January,1988 Nationality : Indian. Language Known : English,Hindi, Punjabi. DECLARATION:- I certify thatalltheinformationaboveiscorrectandreferencesareavailableif they areneededhoping thatmy experiencewillbeusefultoyou. Date:- 18.06.2016 Place:-Palampur (Ashish Kumar)