SCOPE OF WORKSCOPE OF WORK
FORFOR
CIVIL ENGINEERCIVIL ENGINEER
COMPANY : OPCLCOMPANY : OPCL
JOB PROFILEJOB PROFILE
PLANNINGPLANNING
ENGINEERENGINEER
SITESITE
ENGINEERENGINEER
DESIGNDESIGN
ENGINEERENGINEER
INFRAINFRA
STRUCTURESTRUCTURE
BUILDINGBUILDING
Scope of Planning engineeringScope of Planning engineering
worksworks
 Planning engineers engage in the Planning ofPlanning engineers engage in the Planning of
structures temporary, cost estimating, planning andstructures temporary, cost estimating, planning and
scheduling, materials procurement, selection of Bestscheduling, materials procurement, selection of Best
& cost effective construction practice control.& cost effective construction practice control.
Scope of Infra Site engineeringScope of Infra Site engineering
worksworks Infra Site engineering is aInfra Site engineering is a professional engineeringprofessional engineering
discipline that deals with the construction ofdiscipline that deals with the construction of publicpublic
andand private sectorprivate sector works such asworks such as bridgesbridges,, roadsroads,,
damsdams..
 Infra Site engineers work closely with surveyorsInfra Site engineers work closely with surveyors
and specialized civil engineers to fit and serveand specialized civil engineers to fit and serve
fixed projects within their given site, communityfixed projects within their given site, community
and terrain by designing grading, drainage,and terrain by designing grading, drainage,
pavementpavement, water supply, sewer service, electric, water supply, sewer service, electric
and communications supply and land (realand communications supply and land (real
property) divisions.property) divisions.
Building Site Engineering WorksBuilding Site Engineering Works
Structure, Electrical, Plumbing,Structure, Electrical, Plumbing,
Architecture, Land Scapping, FireArchitecture, Land Scapping, Fire
Fighting, InteriorFighting, Interior
Design Engineering WorksDesign Engineering Works
Structure DesignStructure Design
Architecture & Plumbing DesignArchitecture & Plumbing Design
Electrical DesignElectrical Design
Measurement for Civil
Engineering Works
 The civil works measurement referred to a document called 'CivilThe civil works measurement referred to a document called 'Civil
Engineering Standard Method of Measurement '(CESMM).Engineering Standard Method of Measurement '(CESMM).
 Before this document is produced, the party who responsible for theBefore this document is produced, the party who responsible for the
working measurement refers to the method adopted in the Unitedworking measurement refers to the method adopted in the United
Kingdom namedKingdom named ‘CESMM 2nd Edition or 3rd Edition’.
 There are a large part of the measurement refer to methods used inThere are a large part of the measurement refer to methods used in
building works or more unfortunate, they use their ownbuilding works or more unfortunate, they use their own
measurement system. This led to inconsistencies in measurementmeasurement system. This led to inconsistencies in measurement
procedures. As a result, contractors have difficulty to appreciateprocedures. As a result, contractors have difficulty to appreciate
the tender.the tender.
 The actual measurement work must take into account the level ofThe actual measurement work must take into account the level of
complexity of work undertaken. Work measurement for any onecomplexity of work undertaken. Work measurement for any one
item of work is also closely related to the methodology anditem of work is also closely related to the methodology and
construction activitiesconstruction activities
Contract Documentation for Civil
Engineering
1.1. Conditions of contractConditions of contract ––a written agreement intended toa written agreement intended to
be enforceable by law to bind the appointed contractor withbe enforceable by law to bind the appointed contractor with
the employer based on an agreed conditions.the employer based on an agreed conditions.
2.2. Contract DrawingsContract Drawings –– technical / detailed constructiontechnical / detailed construction
drawings for measurement / costing by QS / engineers –drawings for measurement / costing by QS / engineers –
prepared by architect / engineers.prepared by architect / engineers.
3.3. Specification / PreamblesSpecification / Preambles -- A concise description ofA concise description of
materials and workmanship, standard or quality ofmaterials and workmanship, standard or quality of
workmanship. It must convey the architect and engineer’sworkmanship. It must convey the architect and engineer’s
requirements.requirements.
4.4. Bill of QuantitiesBill of Quantities –– prepared by Quantity Surveyor basedprepared by Quantity Surveyor based
on measurement from the construction drawings / buildingon measurement from the construction drawings / building
plans This document were itemized all the quantities for eachplans This document were itemized all the quantities for each
categories of works applied in constructing the buildings. E.g.categories of works applied in constructing the buildings. E.g.
building works, mechanical, electrical works, civil, structuralbuilding works, mechanical, electrical works, civil, structural
works, infrastructure works, etc. The contractor willworks, infrastructure works, etc. The contractor will
priced /estimate all the works associated in completing thepriced /estimate all the works associated in completing the
buildings during pre-construction stage.buildings during pre-construction stage.
Reasons for Bills of QuantitiesReasons for Bills of Quantities
 All tendering contractors base their prices on the sameAll tendering contractors base their prices on the same
information & therefore tenders are strictly comparableinformation & therefore tenders are strictly comparable
(even if an error exists in the Bill)(even if an error exists in the Bill)
 Contractors are saved the costly exercise of each having toContractors are saved the costly exercise of each having to
take off quantities for themselves.take off quantities for themselves.
 Bills provide a fair basis for valuing variations andBills provide a fair basis for valuing variations and
adjustments for the final account.adjustments for the final account.
 Bills may provide a convenient basis for valuation ofBills may provide a convenient basis for valuation of
certificated stage payments during the contract, before thecertificated stage payments during the contract, before the
accurate re-measurement figures are available.accurate re-measurement figures are available.
 Bills provide an approximate checklist for the contractor toBills provide an approximate checklist for the contractor to
order materials and other resources.order materials and other resources.
 Bills can provide data for cost analysis for use in costBills can provide data for cost analysis for use in cost
planning of future projects.planning of future projects.
Scope of measurement basedScope of measurement based
on CESMMon CESMM
 Various civil engineering works includingVarious civil engineering works including
roads, railway, bridges, artificial channels,roads, railway, bridges, artificial channels,
canals and drainage, shipyard, ports, bases,canals and drainage, shipyard, ports, bases,
embankments, structure-breaking waves andembankments, structure-breaking waves and
drainage work.drainage work.
 Apart from that it also includes projects suchApart from that it also includes projects such
as structural engineering among others, metalas structural engineering among others, metal
work, reinforced concrete work, stone work,work, reinforced concrete work, stone work,
wood work and brick workwood work and brick work
Procedures and Practices ofProcedures and Practices of
CESMMCESMM
 Include the scope of most project management such as:Include the scope of most project management such as:

selection types of contracts,selection types of contracts,

documentation,documentation,

preparation of drawings,preparation of drawings,

specifications,specifications,

project information,project information,

contract terms and list of quantities,contract terms and list of quantities,

preparation of list of material requirements / quantities,preparation of list of material requirements / quantities,

Method statement - detailed list of detailed constructionMethod statement - detailed list of detailed construction
work with short explanation with quantity measured bywork with short explanation with quantity measured by
CESMMCESMM

Explanation on the scope of work that will be implementedExplanation on the scope of work that will be implemented
by the contractor and then be the basis for pricing theby the contractor and then be the basis for pricing the
tender.tender.
Purpose of CESMMPurpose of CESMM
 The main purpose of the measurementThe main purpose of the measurement
based on CESMM is forbased on CESMM is for coordinating andcoordinating and
planning of the quantity list, to list theplanning of the quantity list, to list the
details of work to ensure consistencydetails of work to ensure consistency
and systematic and to state the newand systematic and to state the new
techniques of construction clearly.techniques of construction clearly.
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 1CESMM; Section 1
DefinitionsDefinitions
 A number of definitions are contained.A number of definitions are contained.
 Referring to words / expression that will beReferring to words / expression that will be
defined in the CESMM and preparation of bill ofdefined in the CESMM and preparation of bill of
Quantities.Quantities.
 Words and expression defined in the CESMMWords and expression defined in the CESMM
shall have the same meaning when defining theshall have the same meaning when defining the
words / expression in the Conditions of Contractwords / expression in the Conditions of Contract
and the Specificationsand the Specifications
 Please refer toPlease refer to CESMM-Section 1: definitionsCESMM-Section 1: definitions..
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 2CESMM; Section 2
General PrinciplesGeneral Principles
 In this section , it clarify the following:In this section , it clarify the following:

The application and extent of CESMMThe application and extent of CESMM

Objective of CESMMObjective of CESMM

Objectives of the Bill of QuantitiesObjectives of the Bill of Quantities
 Malaysian Standard Method ofMalaysian Standard Method of
Measurement for Civil Engineering WorksMeasurement for Civil Engineering Works
(CESMM) to be used in conjunction with the(CESMM) to be used in conjunction with the
conditions of contract for Civil Engineeringconditions of contract for Civil Engineering
works.works.
 Refer to CESMM-SECTION 2Refer to CESMM-SECTION 2
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 3CESMM; Section 3
Application of the Work ClassificationApplication of the Work Classification
 Work classification divides work intoWork classification divides work into 1818 mainmain
classes; Class A- Class Rclasses; Class A- Class R
 Each class comprises up toEach class comprises up to 3 division3 division which classifywhich classify
work at successive level of detail.work at successive level of detail.

First divisionFirst division

Second divisionSecond division

Third divisionThird division
 Each division comprises a list of up toEach division comprises a list of up to 8 descriptive8 descriptive
features of work.features of work.
 Each item description shall identify the componentEach item description shall identify the component
of work covered with respect to one feature fromof work covered with respect to one feature from
each division of the relevant class.each division of the relevant class.
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 4CESMM; Section 4
Coding & Numbering of ItemsCoding & Numbering of Items
 Each item in the work classification has been placed withEach item in the work classification has been placed with
the code and numbering system thatthe code and numbering system that alphabeticallyalphabetically andand notnot
more than three digitsmore than three digits..
 The letter corresponds to the class in the workThe letter corresponds to the class in the work
classification in which the items occurs and the digits giveclassification in which the items occurs and the digits give
the position of the item in the first, second and thirdthe position of the item in the first, second and third
divisions of the class.divisions of the class.
 E.g. CodeE.g. Code F.3.1.0F.3.1.0 identifies an item asidentifies an item as
Class F concrete worksClass F concrete works
11stst
Division 3 precast concreteDivision 3 precast concrete
22ndnd
Division 1 beamsDivision 1 beams
33rdrd
Divison 0Divison 0
 DescriptionDescription: F.3.1.0 - Precast concrete, in beams: F.3.1.0 - Precast concrete, in beams
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 4CESMM; Section 4
Coding & Numbering of ItemsCoding & Numbering of Items
 ReasonsReasons::

It gives an advantage to the tendered contractors dueIt gives an advantage to the tendered contractors due
to bills that have code.to bills that have code.

Quantity surveyor feels that they are assisted by theQuantity surveyor feels that they are assisted by the
code and numbering system and can be used as a briefcode and numbering system and can be used as a brief
reference to the file system and data costs.reference to the file system and data costs.
 Each class work contains a set of measurements,Each class work contains a set of measurements,
definitions, coverage, additional rules of measurementdefinitions, coverage, additional rules of measurement
that expands and clarify all information and evidence.that expands and clarify all information and evidence.
 Every classification of work explains every units for eachEvery classification of work explains every units for each
item of work, within the total allocation and numberingitem of work, within the total allocation and numbering
system for each item, the items in units of meters long, insystem for each item, the items in units of meters long, in
units of square meters of area (hectares for cleaning site),units of square meters of area (hectares for cleaning site),
unit volume and weight and metric units.unit volume and weight and metric units.
CESMM; SECTION 4CESMM; SECTION 4
(Code & Numbering of Items)(Code & Numbering of Items)
Applications for Bridge WorkApplications for Bridge Work
CESMM; SECTION 4CESMM; SECTION 4
(Code & Numbering of Items)(Code & Numbering of Items)
Applications for Road worksApplications for Road works
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 5CESMM; Section 5
Preparations of the Bill of QuantitiesPreparations of the Bill of Quantities
 The preparation of BQ shall be started priorThe preparation of BQ shall be started prior
to the completion of measurement works.to the completion of measurement works.
 Section of the bill of Quantities:Section of the bill of Quantities:

PreamblePreamble

Work items – division of the BQ into parts.Work items – division of the BQ into parts.

Day work scheduleDay work schedule

Grand summary / tender summaryGrand summary / tender summary
Form & Setting of BQForm & Setting of BQ
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 6CESMM; Section 6
Completion, Pricing and Use of the BQCompletion, Pricing and Use of the BQ
 Rates and prices shall be inserted in theRates and prices shall be inserted in the
rate column inrate column in Ringgit MalaysiaRinggit Malaysia withwith SenSen
inserted as decimal fractions of oneinserted as decimal fractions of one
Ringgit.Ringgit.
 Each part of the BQ shall be totaledEach part of the BQ shall be totaled
and the total carried to the Grandand the total carried to the Grand
SummarySummary
FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM
CESMM; Section 7CESMM; Section 7
Method-Related ChargesMethod-Related Charges
 Meaning: the sum for an item inserted in the BQ by aMeaning: the sum for an item inserted in the BQ by a
tenderer.tenderer.
 Two types:Two types:

Time-related chargesTime-related charges – a method-related charge for– a method-related charge for
work, the cost of which is to be considered aswork, the cost of which is to be considered as
proportional to the length of time taken to execute theproportional to the length of time taken to execute the
workwork

Fixed charge-Fixed charge- a method-related charge which is not aa method-related charge which is not a
time related charge.time related charge.
 A tenderer may insert in the BQ the method related chargesA tenderer may insert in the BQ the method related charges
as he may decide to cover items of works relating to hisas he may decide to cover items of works relating to his
intended method of executing the works, the cost of whichintended method of executing the works, the cost of which
are not to be considered as proportional to the quantities ofare not to be considered as proportional to the quantities of
the other items and for which he has not allowed in the ratesthe other items and for which he has not allowed in the rates
and prices for the other items.and prices for the other items.
Planning, Scheduling and Management form the basis for any construction activity. ThoughPlanning, Scheduling and Management form the basis for any construction activity. Though
discussiondiscussion
here is about construction, the same principles hold good for any organisation.here is about construction, the same principles hold good for any organisation.
PlanningPlanning
Planning is the decision-making process about What, Where, Who and How (WWWH) to start aPlanning is the decision-making process about What, Where, Who and How (WWWH) to start a
project.project.
What:What:
An individual or a group of enterprising people plan to start a project. They form a groupAn individual or a group of enterprising people plan to start a project. They form a group
of high level managers. They identify goals, frame the objective and identify opportunities. Theof high level managers. They identify goals, frame the objective and identify opportunities. The
planningplanning
done by them may be called as strategic planning.done by them may be called as strategic planning.
Where:Where:
The strategic planners decide the lime and the place of starting the organisation.The strategic planners decide the lime and the place of starting the organisation.
Who:Who:
The strategic planners identify the middle level managers and operational level plannersThe strategic planners identify the middle level managers and operational level planners
to carry out the task. The middle level management deals with financial management andto carry out the task. The middle level management deals with financial management and
coordinatescoordinates
with operational planners and strategic planners.with operational planners and strategic planners.
How:How:
The operational planners have to work at minute details of the work assigned, find theThe operational planners have to work at minute details of the work assigned, find the
requirement of machinery and work force and plan day to day activities. They should be readyrequirement of machinery and work force and plan day to day activities. They should be ready
withwith
alternative plans, if uncertainity creeps in at any stage.alternative plans, if uncertainity creeps in at any stage.
PLANNING ENGINEERPLANNING ENGINEER

Weitere ähnliche Inhalte

Was ist angesagt?

Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management Rajat Nainwal
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.pptMUST
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesSlideTeam
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Project management in construction
Project management in constructionProject management in construction
Project management in constructionNAVNEET KUMAR JHA
 
Construction Project management
Construction Project management Construction Project management
Construction Project management Anupama holla
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture) Muhammad Aljalali
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial buildinglckr117
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN PanigrahiSN Panigrahi, PMP
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract managementVISHAKA BOTHRA
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.Aszahari Aie
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in WorksDr K M SONI
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project PresentationWayne Holley
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONSANJEEV Wazir
 

Was ist angesagt? (20)

Construction Project Management
Construction Project Management Construction Project Management
Construction Project Management
 
Contract management.ppt
Contract management.pptContract management.ppt
Contract management.ppt
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Construction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation SlidesConstruction Project Management Powerpoint Presentation Slides
Construction Project Management Powerpoint Presentation Slides
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Quality management
Quality managementQuality management
Quality management
 
Project management in construction
Project management in constructionProject management in construction
Project management in construction
 
Construction Project management
Construction Project management Construction Project management
Construction Project management
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi# FIDIC Payment Flow Charts # By SN Panigrahi
# FIDIC Payment Flow Charts # By SN Panigrahi
 
contract management, stages of contract management
 contract management, stages of contract management contract management, stages of contract management
contract management, stages of contract management
 
Lecture 1 introduction to construction procurement process.
Lecture 1   introduction to construction procurement process.Lecture 1   introduction to construction procurement process.
Lecture 1 introduction to construction procurement process.
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Advance Payments in Works
Advance Payments in WorksAdvance Payments in Works
Advance Payments in Works
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
 
Quality control IN CONSTRUCTION
Quality control IN CONSTRUCTIONQuality control IN CONSTRUCTION
Quality control IN CONSTRUCTION
 

Andere mochten auch

Synopsis on SMS Based Appliances Control
Synopsis on SMS Based Appliances ControlSynopsis on SMS Based Appliances Control
Synopsis on SMS Based Appliances ControlTarun Sharma
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadgopichand's
 
Exploring Wakad The Promising City in Pune
Exploring Wakad The Promising City in PuneExploring Wakad The Promising City in Pune
Exploring Wakad The Promising City in Punenittipurohit
 
Energy principle in structure analysis in civil engineering
Energy principle in structure analysis in civil engineeringEnergy principle in structure analysis in civil engineering
Energy principle in structure analysis in civil engineeringNagma Modi
 
Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)Gautam Sharma
 
Statnamic testing of soils
Statnamic testing of soilsStatnamic testing of soils
Statnamic testing of soilsSravan Muguda
 
Synopsis on sms based home appliances control
Synopsis on sms based home appliances controlSynopsis on sms based home appliances control
Synopsis on sms based home appliances controlTarun Sharma
 
Park lighting, architecture of lighting, yazoo park
Park lighting, architecture of lighting, yazoo parkPark lighting, architecture of lighting, yazoo park
Park lighting, architecture of lighting, yazoo parkRiya Bagchi
 
Ghandhara Style of Architectuure
Ghandhara Style of ArchitectuureGhandhara Style of Architectuure
Ghandhara Style of ArchitectuureJyoti Ahlawat
 
Influence line for structure analysis in civil engineering
Influence line for structure analysis in civil engineeringInfluence line for structure analysis in civil engineering
Influence line for structure analysis in civil engineeringNagma Modi
 
design philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringdesign philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringNagma Modi
 
Hafeez Contractor An Indian Architect
Hafeez Contractor An Indian ArchitectHafeez Contractor An Indian Architect
Hafeez Contractor An Indian Architectnittipurohit
 

Andere mochten auch (20)

Scope of work
Scope of workScope of work
Scope of work
 
Gopi frc
Gopi frcGopi frc
Gopi frc
 
Solution guide
Solution guideSolution guide
Solution guide
 
Synopsis on SMS Based Appliances Control
Synopsis on SMS Based Appliances ControlSynopsis on SMS Based Appliances Control
Synopsis on SMS Based Appliances Control
 
Al bahr
Al bahrAl bahr
Al bahr
 
Solar
SolarSolar
Solar
 
Design and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staadDesign and analasys of a g+3 residential building using staad
Design and analasys of a g+3 residential building using staad
 
Exploring Wakad The Promising City in Pune
Exploring Wakad The Promising City in PuneExploring Wakad The Promising City in Pune
Exploring Wakad The Promising City in Pune
 
Energy principle in structure analysis in civil engineering
Energy principle in structure analysis in civil engineeringEnergy principle in structure analysis in civil engineering
Energy principle in structure analysis in civil engineering
 
Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)Methodology including all enclosures(modified 18-5-10)
Methodology including all enclosures(modified 18-5-10)
 
Statnamic testing of soils
Statnamic testing of soilsStatnamic testing of soils
Statnamic testing of soils
 
Synopsis on sms based home appliances control
Synopsis on sms based home appliances controlSynopsis on sms based home appliances control
Synopsis on sms based home appliances control
 
Vivek Mishra
Vivek MishraVivek Mishra
Vivek Mishra
 
Surat Residency Green Building Concept PPT
 Surat Residency Green Building Concept PPT Surat Residency Green Building Concept PPT
Surat Residency Green Building Concept PPT
 
Park lighting, architecture of lighting, yazoo park
Park lighting, architecture of lighting, yazoo parkPark lighting, architecture of lighting, yazoo park
Park lighting, architecture of lighting, yazoo park
 
Ghandhara Style of Architectuure
Ghandhara Style of ArchitectuureGhandhara Style of Architectuure
Ghandhara Style of Architectuure
 
Northern plains
Northern plainsNorthern plains
Northern plains
 
Influence line for structure analysis in civil engineering
Influence line for structure analysis in civil engineeringInfluence line for structure analysis in civil engineering
Influence line for structure analysis in civil engineering
 
design philosophy in structure design in civil engineering
design philosophy in structure design in civil engineeringdesign philosophy in structure design in civil engineering
design philosophy in structure design in civil engineering
 
Hafeez Contractor An Indian Architect
Hafeez Contractor An Indian ArchitectHafeez Contractor An Indian Architect
Hafeez Contractor An Indian Architect
 

Ähnlich wie Scope of work

Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)Waqas Aslam
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for buildingHimani762003
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfkripeshdubey1
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptTauheedKhan45
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdfhitusp
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Padmasinh Patil
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing2cd
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing Vijay325
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce Brown
 
Transmision line construction
Transmision line constructionTransmision line construction
Transmision line constructionmuhammad Taupik
 
Integrated project
Integrated projectIntegrated project
Integrated projectisyroc
 
Integrated project
Integrated projectIntegrated project
Integrated projectLee Fong Yen
 

Ähnlich wie Scope of work (20)

95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt95123497-CESMM-Malaysia.ppt
95123497-CESMM-Malaysia.ppt
 
NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
Estimation
EstimationEstimation
Estimation
 
Estimation (power point)
Estimation (power point)Estimation (power point)
Estimation (power point)
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Unit 1 - General Items used for building
Unit 1 - General Items used for buildingUnit 1 - General Items used for building
Unit 1 - General Items used for building
 
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
 
Quantity Surveying & valuation.ppt
Quantity Surveying & valuation.pptQuantity Surveying & valuation.ppt
Quantity Surveying & valuation.ppt
 
CE6704_uw.pdf
CE6704_uw.pdfCE6704_uw.pdf
CE6704_uw.pdf
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Ecv
EcvEcv
Ecv
 
Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2Estimation Costing and Valuation Unit 2
Estimation Costing and Valuation Unit 2
 
lecture ppt for contract administration and governing
lecture ppt for contract administration and governinglecture ppt for contract administration and governing
lecture ppt for contract administration and governing
 
ESTIMATING.pdf
ESTIMATING.pdfESTIMATING.pdf
ESTIMATING.pdf
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
Transmision line construction
Transmision line constructionTransmision line construction
Transmision line construction
 
Integrated project
Integrated projectIntegrated project
Integrated project
 
Integrated project
Integrated projectIntegrated project
Integrated project
 
Ecm442 lecture 1 latest
Ecm442 lecture 1 latestEcm442 lecture 1 latest
Ecm442 lecture 1 latest
 

Kürzlich hochgeladen

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Kürzlich hochgeladen (20)

Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Scope of work

  • 1. SCOPE OF WORKSCOPE OF WORK FORFOR CIVIL ENGINEERCIVIL ENGINEER COMPANY : OPCLCOMPANY : OPCL
  • 3. Scope of Planning engineeringScope of Planning engineering worksworks  Planning engineers engage in the Planning ofPlanning engineers engage in the Planning of structures temporary, cost estimating, planning andstructures temporary, cost estimating, planning and scheduling, materials procurement, selection of Bestscheduling, materials procurement, selection of Best & cost effective construction practice control.& cost effective construction practice control.
  • 4. Scope of Infra Site engineeringScope of Infra Site engineering worksworks Infra Site engineering is aInfra Site engineering is a professional engineeringprofessional engineering discipline that deals with the construction ofdiscipline that deals with the construction of publicpublic andand private sectorprivate sector works such asworks such as bridgesbridges,, roadsroads,, damsdams..  Infra Site engineers work closely with surveyorsInfra Site engineers work closely with surveyors and specialized civil engineers to fit and serveand specialized civil engineers to fit and serve fixed projects within their given site, communityfixed projects within their given site, community and terrain by designing grading, drainage,and terrain by designing grading, drainage, pavementpavement, water supply, sewer service, electric, water supply, sewer service, electric and communications supply and land (realand communications supply and land (real property) divisions.property) divisions.
  • 5. Building Site Engineering WorksBuilding Site Engineering Works Structure, Electrical, Plumbing,Structure, Electrical, Plumbing, Architecture, Land Scapping, FireArchitecture, Land Scapping, Fire Fighting, InteriorFighting, Interior
  • 6. Design Engineering WorksDesign Engineering Works Structure DesignStructure Design Architecture & Plumbing DesignArchitecture & Plumbing Design Electrical DesignElectrical Design
  • 7. Measurement for Civil Engineering Works  The civil works measurement referred to a document called 'CivilThe civil works measurement referred to a document called 'Civil Engineering Standard Method of Measurement '(CESMM).Engineering Standard Method of Measurement '(CESMM).  Before this document is produced, the party who responsible for theBefore this document is produced, the party who responsible for the working measurement refers to the method adopted in the Unitedworking measurement refers to the method adopted in the United Kingdom namedKingdom named ‘CESMM 2nd Edition or 3rd Edition’.  There are a large part of the measurement refer to methods used inThere are a large part of the measurement refer to methods used in building works or more unfortunate, they use their ownbuilding works or more unfortunate, they use their own measurement system. This led to inconsistencies in measurementmeasurement system. This led to inconsistencies in measurement procedures. As a result, contractors have difficulty to appreciateprocedures. As a result, contractors have difficulty to appreciate the tender.the tender.  The actual measurement work must take into account the level ofThe actual measurement work must take into account the level of complexity of work undertaken. Work measurement for any onecomplexity of work undertaken. Work measurement for any one item of work is also closely related to the methodology anditem of work is also closely related to the methodology and construction activitiesconstruction activities
  • 8. Contract Documentation for Civil Engineering 1.1. Conditions of contractConditions of contract ––a written agreement intended toa written agreement intended to be enforceable by law to bind the appointed contractor withbe enforceable by law to bind the appointed contractor with the employer based on an agreed conditions.the employer based on an agreed conditions. 2.2. Contract DrawingsContract Drawings –– technical / detailed constructiontechnical / detailed construction drawings for measurement / costing by QS / engineers –drawings for measurement / costing by QS / engineers – prepared by architect / engineers.prepared by architect / engineers. 3.3. Specification / PreamblesSpecification / Preambles -- A concise description ofA concise description of materials and workmanship, standard or quality ofmaterials and workmanship, standard or quality of workmanship. It must convey the architect and engineer’sworkmanship. It must convey the architect and engineer’s requirements.requirements. 4.4. Bill of QuantitiesBill of Quantities –– prepared by Quantity Surveyor basedprepared by Quantity Surveyor based on measurement from the construction drawings / buildingon measurement from the construction drawings / building plans This document were itemized all the quantities for eachplans This document were itemized all the quantities for each categories of works applied in constructing the buildings. E.g.categories of works applied in constructing the buildings. E.g. building works, mechanical, electrical works, civil, structuralbuilding works, mechanical, electrical works, civil, structural works, infrastructure works, etc. The contractor willworks, infrastructure works, etc. The contractor will priced /estimate all the works associated in completing thepriced /estimate all the works associated in completing the buildings during pre-construction stage.buildings during pre-construction stage.
  • 9. Reasons for Bills of QuantitiesReasons for Bills of Quantities  All tendering contractors base their prices on the sameAll tendering contractors base their prices on the same information & therefore tenders are strictly comparableinformation & therefore tenders are strictly comparable (even if an error exists in the Bill)(even if an error exists in the Bill)  Contractors are saved the costly exercise of each having toContractors are saved the costly exercise of each having to take off quantities for themselves.take off quantities for themselves.  Bills provide a fair basis for valuing variations andBills provide a fair basis for valuing variations and adjustments for the final account.adjustments for the final account.  Bills may provide a convenient basis for valuation ofBills may provide a convenient basis for valuation of certificated stage payments during the contract, before thecertificated stage payments during the contract, before the accurate re-measurement figures are available.accurate re-measurement figures are available.  Bills provide an approximate checklist for the contractor toBills provide an approximate checklist for the contractor to order materials and other resources.order materials and other resources.  Bills can provide data for cost analysis for use in costBills can provide data for cost analysis for use in cost planning of future projects.planning of future projects.
  • 10. Scope of measurement basedScope of measurement based on CESMMon CESMM  Various civil engineering works includingVarious civil engineering works including roads, railway, bridges, artificial channels,roads, railway, bridges, artificial channels, canals and drainage, shipyard, ports, bases,canals and drainage, shipyard, ports, bases, embankments, structure-breaking waves andembankments, structure-breaking waves and drainage work.drainage work.  Apart from that it also includes projects suchApart from that it also includes projects such as structural engineering among others, metalas structural engineering among others, metal work, reinforced concrete work, stone work,work, reinforced concrete work, stone work, wood work and brick workwood work and brick work
  • 11. Procedures and Practices ofProcedures and Practices of CESMMCESMM  Include the scope of most project management such as:Include the scope of most project management such as:  selection types of contracts,selection types of contracts,  documentation,documentation,  preparation of drawings,preparation of drawings,  specifications,specifications,  project information,project information,  contract terms and list of quantities,contract terms and list of quantities,  preparation of list of material requirements / quantities,preparation of list of material requirements / quantities,  Method statement - detailed list of detailed constructionMethod statement - detailed list of detailed construction work with short explanation with quantity measured bywork with short explanation with quantity measured by CESMMCESMM  Explanation on the scope of work that will be implementedExplanation on the scope of work that will be implemented by the contractor and then be the basis for pricing theby the contractor and then be the basis for pricing the tender.tender.
  • 12. Purpose of CESMMPurpose of CESMM  The main purpose of the measurementThe main purpose of the measurement based on CESMM is forbased on CESMM is for coordinating andcoordinating and planning of the quantity list, to list theplanning of the quantity list, to list the details of work to ensure consistencydetails of work to ensure consistency and systematic and to state the newand systematic and to state the new techniques of construction clearly.techniques of construction clearly.
  • 13. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 1CESMM; Section 1 DefinitionsDefinitions  A number of definitions are contained.A number of definitions are contained.  Referring to words / expression that will beReferring to words / expression that will be defined in the CESMM and preparation of bill ofdefined in the CESMM and preparation of bill of Quantities.Quantities.  Words and expression defined in the CESMMWords and expression defined in the CESMM shall have the same meaning when defining theshall have the same meaning when defining the words / expression in the Conditions of Contractwords / expression in the Conditions of Contract and the Specificationsand the Specifications  Please refer toPlease refer to CESMM-Section 1: definitionsCESMM-Section 1: definitions..
  • 14. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 2CESMM; Section 2 General PrinciplesGeneral Principles  In this section , it clarify the following:In this section , it clarify the following:  The application and extent of CESMMThe application and extent of CESMM  Objective of CESMMObjective of CESMM  Objectives of the Bill of QuantitiesObjectives of the Bill of Quantities  Malaysian Standard Method ofMalaysian Standard Method of Measurement for Civil Engineering WorksMeasurement for Civil Engineering Works (CESMM) to be used in conjunction with the(CESMM) to be used in conjunction with the conditions of contract for Civil Engineeringconditions of contract for Civil Engineering works.works.  Refer to CESMM-SECTION 2Refer to CESMM-SECTION 2
  • 15. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 3CESMM; Section 3 Application of the Work ClassificationApplication of the Work Classification  Work classification divides work intoWork classification divides work into 1818 mainmain classes; Class A- Class Rclasses; Class A- Class R  Each class comprises up toEach class comprises up to 3 division3 division which classifywhich classify work at successive level of detail.work at successive level of detail.  First divisionFirst division  Second divisionSecond division  Third divisionThird division  Each division comprises a list of up toEach division comprises a list of up to 8 descriptive8 descriptive features of work.features of work.  Each item description shall identify the componentEach item description shall identify the component of work covered with respect to one feature fromof work covered with respect to one feature from each division of the relevant class.each division of the relevant class.
  • 16. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 4CESMM; Section 4 Coding & Numbering of ItemsCoding & Numbering of Items  Each item in the work classification has been placed withEach item in the work classification has been placed with the code and numbering system thatthe code and numbering system that alphabeticallyalphabetically andand notnot more than three digitsmore than three digits..  The letter corresponds to the class in the workThe letter corresponds to the class in the work classification in which the items occurs and the digits giveclassification in which the items occurs and the digits give the position of the item in the first, second and thirdthe position of the item in the first, second and third divisions of the class.divisions of the class.  E.g. CodeE.g. Code F.3.1.0F.3.1.0 identifies an item asidentifies an item as Class F concrete worksClass F concrete works 11stst Division 3 precast concreteDivision 3 precast concrete 22ndnd Division 1 beamsDivision 1 beams 33rdrd Divison 0Divison 0  DescriptionDescription: F.3.1.0 - Precast concrete, in beams: F.3.1.0 - Precast concrete, in beams
  • 17. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 4CESMM; Section 4 Coding & Numbering of ItemsCoding & Numbering of Items  ReasonsReasons::  It gives an advantage to the tendered contractors dueIt gives an advantage to the tendered contractors due to bills that have code.to bills that have code.  Quantity surveyor feels that they are assisted by theQuantity surveyor feels that they are assisted by the code and numbering system and can be used as a briefcode and numbering system and can be used as a brief reference to the file system and data costs.reference to the file system and data costs.  Each class work contains a set of measurements,Each class work contains a set of measurements, definitions, coverage, additional rules of measurementdefinitions, coverage, additional rules of measurement that expands and clarify all information and evidence.that expands and clarify all information and evidence.  Every classification of work explains every units for eachEvery classification of work explains every units for each item of work, within the total allocation and numberingitem of work, within the total allocation and numbering system for each item, the items in units of meters long, insystem for each item, the items in units of meters long, in units of square meters of area (hectares for cleaning site),units of square meters of area (hectares for cleaning site), unit volume and weight and metric units.unit volume and weight and metric units.
  • 18. CESMM; SECTION 4CESMM; SECTION 4 (Code & Numbering of Items)(Code & Numbering of Items) Applications for Bridge WorkApplications for Bridge Work
  • 19. CESMM; SECTION 4CESMM; SECTION 4 (Code & Numbering of Items)(Code & Numbering of Items) Applications for Road worksApplications for Road works
  • 20. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 5CESMM; Section 5 Preparations of the Bill of QuantitiesPreparations of the Bill of Quantities  The preparation of BQ shall be started priorThe preparation of BQ shall be started prior to the completion of measurement works.to the completion of measurement works.  Section of the bill of Quantities:Section of the bill of Quantities:  PreamblePreamble  Work items – division of the BQ into parts.Work items – division of the BQ into parts.  Day work scheduleDay work schedule  Grand summary / tender summaryGrand summary / tender summary
  • 21. Form & Setting of BQForm & Setting of BQ
  • 22. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 6CESMM; Section 6 Completion, Pricing and Use of the BQCompletion, Pricing and Use of the BQ  Rates and prices shall be inserted in theRates and prices shall be inserted in the rate column inrate column in Ringgit MalaysiaRinggit Malaysia withwith SenSen inserted as decimal fractions of oneinserted as decimal fractions of one Ringgit.Ringgit.  Each part of the BQ shall be totaledEach part of the BQ shall be totaled and the total carried to the Grandand the total carried to the Grand SummarySummary
  • 23. FUNDAMENTAL PRINCIPLES OF CESMMFUNDAMENTAL PRINCIPLES OF CESMM CESMM; Section 7CESMM; Section 7 Method-Related ChargesMethod-Related Charges  Meaning: the sum for an item inserted in the BQ by aMeaning: the sum for an item inserted in the BQ by a tenderer.tenderer.  Two types:Two types:  Time-related chargesTime-related charges – a method-related charge for– a method-related charge for work, the cost of which is to be considered aswork, the cost of which is to be considered as proportional to the length of time taken to execute theproportional to the length of time taken to execute the workwork  Fixed charge-Fixed charge- a method-related charge which is not aa method-related charge which is not a time related charge.time related charge.  A tenderer may insert in the BQ the method related chargesA tenderer may insert in the BQ the method related charges as he may decide to cover items of works relating to hisas he may decide to cover items of works relating to his intended method of executing the works, the cost of whichintended method of executing the works, the cost of which are not to be considered as proportional to the quantities ofare not to be considered as proportional to the quantities of the other items and for which he has not allowed in the ratesthe other items and for which he has not allowed in the rates and prices for the other items.and prices for the other items.
  • 24. Planning, Scheduling and Management form the basis for any construction activity. ThoughPlanning, Scheduling and Management form the basis for any construction activity. Though discussiondiscussion here is about construction, the same principles hold good for any organisation.here is about construction, the same principles hold good for any organisation. PlanningPlanning Planning is the decision-making process about What, Where, Who and How (WWWH) to start aPlanning is the decision-making process about What, Where, Who and How (WWWH) to start a project.project. What:What: An individual or a group of enterprising people plan to start a project. They form a groupAn individual or a group of enterprising people plan to start a project. They form a group of high level managers. They identify goals, frame the objective and identify opportunities. Theof high level managers. They identify goals, frame the objective and identify opportunities. The planningplanning done by them may be called as strategic planning.done by them may be called as strategic planning. Where:Where: The strategic planners decide the lime and the place of starting the organisation.The strategic planners decide the lime and the place of starting the organisation. Who:Who: The strategic planners identify the middle level managers and operational level plannersThe strategic planners identify the middle level managers and operational level planners to carry out the task. The middle level management deals with financial management andto carry out the task. The middle level management deals with financial management and coordinatescoordinates with operational planners and strategic planners.with operational planners and strategic planners. How:How: The operational planners have to work at minute details of the work assigned, find theThe operational planners have to work at minute details of the work assigned, find the requirement of machinery and work force and plan day to day activities. They should be readyrequirement of machinery and work force and plan day to day activities. They should be ready withwith alternative plans, if uncertainity creeps in at any stage.alternative plans, if uncertainity creeps in at any stage. PLANNING ENGINEERPLANNING ENGINEER