HBR 5TH BLOCK SOCIAL AND CULTURAL
                  ASSOCIATION
         No.1489, 17TH C main, 5th block, HBR layout, 1st stage,
                          Bangalore-560043
                    Regd. No.: SOR/BLU/DR/1051/2009

To                                                             10th Nov 2010
Shri. K. J. George. MLA
Sarvagna nagar Constituency,
Banaswadi,
Bangalore

Respected Sir,

Sub: Unfinished development work and short supply of water in HBR 5th block

We, the residents of HBR 5th block would like to bring the following grievances to your kind
notice and needful action.
The area covered under our association is as defined below:
   • On the North side: From 20th cross (near BESCOM-BWSSB office) to 26th cross.
   • On the south side: 1st A cross.
   • On the East side: From 36th to 45th cross of 19th main
   • On the West side: Outer ring road (near Forest Dept. gate)
(A layout map is attached herewith for your reference)
Tarring of roads: The asphalting/tarring work has not been taken up in this segment since
several years and there are innumerable potholes. Some time back BBMP took up
asphalting/tarring of some main roads in 5th block (i.e. from 15th main to 19th main road and
left it half way and incomplete. All other roads namely 14th, 17th C main and all cross roads
(i.e. from 21st to 27th cross near BESCOM office and from 36th cross to 45th cross at 19th main)
were not done. The condition of roads (i.e. 30th C main-BESCOM office road, extension roads
of 17th and 18th main and 21st to 27th cross roads) on the other side of storm water drain is in a
worst and dilapidated state posing danger to all. When the association took up the case, BBMP
started filling up potholes wherever the roads were very bad and that work was also done
partially.




   Dilapidated condition of BESCOM road connecting outer ring road and 19th main in HBR 5th block
Fencing of open SWD: The fencing of open
                                                  SWD (with chain link barbed wires) was done
                                                   long back from ring road to Footstep Bridge.
                                                   The stretch from Footstep Bridge to 19th main
                                                     bridge is left out unfinished. Mr.Gundappa
                                                    sheety, (Ex- EE) and Mr. Vijayakumar, AE
                                                   during their visit to our layout in May ‘10 had
                                                  agreed to finish it in a month’s time. In spite of
                                                    several reminders on this matter nothing has
                                                                 happened till date.
                                                             Fencing of SWD done partially

Retaining walls for SWD: The below photos will illustrate the condition of the SWD beyond
19th main bridge. The sidewall was constructed on one side only for a very short length and the
work was stopped mid way. As there is neither a sidewall nor any fence to the SWD, many
construction people from neighboring and far off places are dumping the debris here day and
night. Due to this there is a hindrance in the flow of sewage water and the same stagnates
becoming a breeding place for mosquitoes and other insects and foul smell emanate from this
stagnated water. In spite of our letter to Chief Engineer SWD, nothing has happened so far.




          SWD seen without side walls              SWD with wall on one side, that too for a small
                                                                                           length.

Cow menace: There are vacant sites at 19th main i.e. site No’s 1280 to 1282-opposite to
Anjaneya temple- which are lying vacant since the inception of this layout and seem not
allotted to anybody by BDA. These sites are being used as debris dumping yard. Apart from
this, the stretch of road in front of these sites are used as cattle’s breeding center and it is a
breading ground of mosquitoes and other disease spreading flies and insects. Nearly 10 to 15
cows are brought to these sites from elsewhere for milking during early morning hours; and
after that it’s left free in the layout for graze. Besides, the cows roam day and night in the
streets and defecate all over the places, making nuisance to the residents/motorist.
Cows kept for milking at 19th main         Cows roaming and grazing in the streets

We are facing the cow menace problem for the last 3 to 4 years. Several complaints to all
concerned have gone into deaf ears.

Garbage collection and disposal: The waste management team at our HBR 5th block layout,
is not doing the collection & disposal of garbage i.e. door-to-door collection and sweeping of
all roads properly and regularly. Roads are being swept once in 5 or 6 days. The swept wastes
are either dumped in vacant sites or burned. The garbage dumped by passers-by near the KEB
transformer at 19th main has not been cleared regularly. Repeated complaints have not yielded
any response.




                  Garbage dumped near KEB Transformer at 19th main

Street signboards: Recently street signboards were erected and painted with street numbers in
our layout; but still at many places signboards are to be erected and painted. It has been
observed that some signboards are with wrong markings as under; and it’s to be corrected to
match with property documents. Even after our reminders no action has been taken.
           17th ‘A’ main is written as 17th main (where it meets with 1st A cross)
           30th’A’ cross is written as 30th cross (at both ends of 30th A cross)
           1st ‘A’ cross is written as 1st main road.
           39th cross is written as 33rd cross at one place and 38th cross at another place.

Side drain cleaning: Side drains were cleaned only in some roads and left half way. We
brought this to the notice of all concerned; but no action was taken.
Construction of demolished sidewall of SWD: The SWD sidewall was broke open to get
entry of JCP into the SWD for the purpose of de-silting. This was done in Jan’10 and lying as
it is till today. The demolished sidewall to be reconstructed immediately; otherwise there are
much likely chances of sewage water entering into the layout during rainy season.




      Demolished sidewall for entry of JCP             Revamping of side drain stopped midway


Revamping of rainwater side drains: Revamping of side drains was done only in some roads
and left half way; and it has to be done in full-fledged manner in all roads.

Overflowing of sewage water: It has been observed that the sewer pipes get clogged very
often and sewage water overflows through manhole chamber and run onto the road creating
foul smell and causing hardship to the residents. The reason being that at many places the
chamber’s manhole lids are either not placed properly or damaged; and in some cases the
chamber’s mouth itself got damaged.

More importantly, the residents near kalana mantapa are facing more sanitation problem
due to frequent overflow of sewage water.
                                                  We are facing this problem ever since the
                                                 choultry came into operational. The sewer
                                                 pipes that were laid long back for residential
                                                 use are not sustaining voluminous sewage
                                                 water coming out of choultry which causing
                                                 overflows. A meeting was conducted on
                                                 Sunday, 30th May ‘10 with our area corporator
                                                 to resolve this problem; but nothing has
                                                 happened afterwards. We have written a letter
                                                 to BWSSB on this matter for remedial action
                                                 and it’s still in the budget stage.


Sewage water overflowing thro’ manhole chamber
KALYANA MANTAPA WOES: The residents, who live in 21st and 22nd crosses face lot of
inconvenience and civic related problems, because of marriages/functions conducted in the
choultries. It has been observed that in this area, the sewage pipes and side drains get blocked
very frequently and overflowing on to the roads. During function hours, vehicles are parked
haphazardly causing inconvenience to the residents; and we are unable to use our vehicles.
Please refer the enclosed sheet for the problems explained in detailed manner.

Short supply of water: We are having acute short supply of water (due to
insufficient water pressure) for the last 6 months. We have made enough
complaints to East zone engineers and also Chairman. But till today there is
no improvement in the water supply.

Park and other civic amenities: Please note that there is no Library, playground for children
and a park in our segment. During the layout formation BDA had earmarked 18 guntas of land
in 18th main; but even after the lapse of 22 years no park has come up in this site. During these
periods the land mafias tried to knock of this prime land many times. The construction
activities of the mafia on this land were stalled by BDA each time by demolishing the
construction. Recently, the BBMP officials recovered this prime site from the hands of land
grabbers and now it’s under way for converting into a PARK. We have made several
representations to the concerned authorities; but nothing has happened till today.

In total, there is nobody to take care of our layout. Layout (BBMP) engineers, health inspector
and corporator are there for only namesake.
The residents of HBR 5th block humbly request your good self to look into the issues and do
the needful.
Thanking you,

With Best regards


A.Rajagopal

Weitere ähnliche Inhalte

Was ist angesagt?

June 20, 2013 Ocean City Capital Plan update
June 20, 2013 Ocean City Capital Plan updateJune 20, 2013 Ocean City Capital Plan update
June 20, 2013 Ocean City Capital Plan update
OceanCityGazette
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Brian Sipes
 
Views from the Heights - Winter 2011
Views from the Heights - Winter 2011Views from the Heights - Winter 2011
Views from the Heights - Winter 2011
jhbg
 

Was ist angesagt? (20)

Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Rosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting PresentationRosehill Vision Committee May 31 2017 Meeting Presentation
Rosehill Vision Committee May 31 2017 Meeting Presentation
 
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017Water Works Open House Presentation, Revised Design Concept - May 1st 2017
Water Works Open House Presentation, Revised Design Concept - May 1st 2017
 
A 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New YorkA 1 Concrete Leveling Western New York
A 1 Concrete Leveling Western New York
 
June 20, 2013 Ocean City Capital Plan update
June 20, 2013 Ocean City Capital Plan updateJune 20, 2013 Ocean City Capital Plan update
June 20, 2013 Ocean City Capital Plan update
 
CV William 2016
CV William 2016CV William 2016
CV William 2016
 
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain TownWalking Mountains Science Center - LEED Platinum in a Small Mountain Town
Walking Mountains Science Center - LEED Platinum in a Small Mountain Town
 
May Service Changes Public
May Service Changes Public May Service Changes Public
May Service Changes Public
 
Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_Oct 13 rosehill reservoir_preliminary_overview_
Oct 13 rosehill reservoir_preliminary_overview_
 
Cubbon Park recharge wells completion report
Cubbon Park recharge wells completion reportCubbon Park recharge wells completion report
Cubbon Park recharge wells completion report
 
Views from the Heights - Winter 2011
Views from the Heights - Winter 2011Views from the Heights - Winter 2011
Views from the Heights - Winter 2011
 
Revival of Open Wells in Belgaum
Revival of Open Wells in BelgaumRevival of Open Wells in Belgaum
Revival of Open Wells in Belgaum
 
CL Final Project: Report
CL Final Project: ReportCL Final Project: Report
CL Final Project: Report
 
Coon Branch at Annandale Community Park-Stream Restoration Project
Coon Branch at Annandale Community Park-Stream Restoration ProjectCoon Branch at Annandale Community Park-Stream Restoration Project
Coon Branch at Annandale Community Park-Stream Restoration Project
 
Tredyffrin Township - Sidewalk Project
Tredyffrin Township - Sidewalk ProjectTredyffrin Township - Sidewalk Project
Tredyffrin Township - Sidewalk Project
 
Wincobank Presentation
Wincobank PresentationWincobank Presentation
Wincobank Presentation
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
Reflex notable projects
Reflex notable projectsReflex notable projects
Reflex notable projects
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community MeetingSpringfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
Springfield Estates Pump Station Gravity Sewer Replacement - Community Meeting
 

Andere mochten auch

Customer Before Company: Revolutionizing Your Business The Nordstrom Way
Customer Before Company: Revolutionizing Your Business The Nordstrom WayCustomer Before Company: Revolutionizing Your Business The Nordstrom Way
Customer Before Company: Revolutionizing Your Business The Nordstrom Way
Maura Neill
 

Andere mochten auch (7)

Customer Before Company: Revolutionizing Your Business The Nordstrom Way
Customer Before Company: Revolutionizing Your Business The Nordstrom WayCustomer Before Company: Revolutionizing Your Business The Nordstrom Way
Customer Before Company: Revolutionizing Your Business The Nordstrom Way
 
Social Media and Digital Marketing
Social Media and Digital MarketingSocial Media and Digital Marketing
Social Media and Digital Marketing
 
Face to Face(book): Offline Networking in an Online World
Face to Face(book): Offline Networking in an Online WorldFace to Face(book): Offline Networking in an Online World
Face to Face(book): Offline Networking in an Online World
 
Face to Face(book): Offline Networking in an Online World
Face to Face(book): Offline Networking in an Online WorldFace to Face(book): Offline Networking in an Online World
Face to Face(book): Offline Networking in an Online World
 
Mobile Apps for REALTORS® - Maura Neill
Mobile Apps for REALTORS® - Maura NeillMobile Apps for REALTORS® - Maura Neill
Mobile Apps for REALTORS® - Maura Neill
 
We care
We careWe care
We care
 
Mzk sem 2
Mzk sem 2Mzk sem 2
Mzk sem 2
 

Ähnlich wie Memorandum to mr.k.j.george. mla doc3

1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
sibusiso sifundza
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
Md. Mahmudor Rahman
 
Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020
Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Crosstown TO
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
Crosstown TO
 

Ähnlich wie Memorandum to mr.k.j.george. mla doc3 (20)

Update for pending works
Update for pending worksUpdate for pending works
Update for pending works
 
lama to lai3 report.
lama to lai3 report.lama to lai3 report.
lama to lai3 report.
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
1.CURRICULUM VITAE AND QUALLIFICATION SFUNDZA original
 
Jamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptxJamuna Bridge & A Successful EIA-Malthus.pptx
Jamuna Bridge & A Successful EIA-Malthus.pptx
 
CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)
 
How effective has the bwaise lubigi drainage channel been
How effective has the bwaise lubigi drainage channel beenHow effective has the bwaise lubigi drainage channel been
How effective has the bwaise lubigi drainage channel been
 
Restoring Westmeadows Meander
Restoring Westmeadows MeanderRestoring Westmeadows Meander
Restoring Westmeadows Meander
 
Hydraulic structures pdf
Hydraulic structures pdfHydraulic structures pdf
Hydraulic structures pdf
 
Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020Pharmacy to Kennedy CLC - March 2020
Pharmacy to Kennedy CLC - March 2020
 
Rainwater harvesting
Rainwater harvesting Rainwater harvesting
Rainwater harvesting
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
Designing Utilities for a Rural Setting in Hong Kong
Designing Utilities for a Rural Setting in Hong KongDesigning Utilities for a Rural Setting in Hong Kong
Designing Utilities for a Rural Setting in Hong Kong
 
bridge design
 bridge design bridge design
bridge design
 
In Support Of Country Lanes
In Support Of Country LanesIn Support Of Country Lanes
In Support Of Country Lanes
 
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdfCLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
CLC Deck - Brentcliffe to Victoria Park - September 1, 2022 - Updated.pdf
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 

Kürzlich hochgeladen

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
PsychicRuben LoveSpells
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
Faga1939
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
hyt3577
 

Kürzlich hochgeladen (20)

Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost LoverPowerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
Powerful Love Spells in Phoenix, AZ (310) 882-6330 Bring Back Lost Lover
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
declarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdfdeclarationleaders_sd_re_greens_theleft_5.pdf
declarationleaders_sd_re_greens_theleft_5.pdf
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Politician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full DetailsPolitician uddhav thackeray biography- Full Details
Politician uddhav thackeray biography- Full Details
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf422524114-Patriarchy-Kamla-Bhasin gg.pdf
422524114-Patriarchy-Kamla-Bhasin gg.pdf
 
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
Transformative Leadership: N Chandrababu Naidu and TDP's Vision for Innovatio...
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 48 (Gurgaon)
 
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's DevelopmentNara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
Nara Chandrababu Naidu's Visionary Policies For Andhra Pradesh's Development
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
THE OBSTACLES THAT IMPEDE THE DEVELOPMENT OF BRAZIL IN THE CONTEMPORARY ERA A...
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
China's soft power in 21st century .pptx
China's soft power in 21st century   .pptxChina's soft power in 21st century   .pptx
China's soft power in 21st century .pptx
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
*Navigating Electoral Terrain: TDP's Performance under N Chandrababu Naidu's ...
 

Memorandum to mr.k.j.george. mla doc3

  • 1. HBR 5TH BLOCK SOCIAL AND CULTURAL ASSOCIATION No.1489, 17TH C main, 5th block, HBR layout, 1st stage, Bangalore-560043 Regd. No.: SOR/BLU/DR/1051/2009 To 10th Nov 2010 Shri. K. J. George. MLA Sarvagna nagar Constituency, Banaswadi, Bangalore Respected Sir, Sub: Unfinished development work and short supply of water in HBR 5th block We, the residents of HBR 5th block would like to bring the following grievances to your kind notice and needful action. The area covered under our association is as defined below: • On the North side: From 20th cross (near BESCOM-BWSSB office) to 26th cross. • On the south side: 1st A cross. • On the East side: From 36th to 45th cross of 19th main • On the West side: Outer ring road (near Forest Dept. gate) (A layout map is attached herewith for your reference) Tarring of roads: The asphalting/tarring work has not been taken up in this segment since several years and there are innumerable potholes. Some time back BBMP took up asphalting/tarring of some main roads in 5th block (i.e. from 15th main to 19th main road and left it half way and incomplete. All other roads namely 14th, 17th C main and all cross roads (i.e. from 21st to 27th cross near BESCOM office and from 36th cross to 45th cross at 19th main) were not done. The condition of roads (i.e. 30th C main-BESCOM office road, extension roads of 17th and 18th main and 21st to 27th cross roads) on the other side of storm water drain is in a worst and dilapidated state posing danger to all. When the association took up the case, BBMP started filling up potholes wherever the roads were very bad and that work was also done partially. Dilapidated condition of BESCOM road connecting outer ring road and 19th main in HBR 5th block
  • 2. Fencing of open SWD: The fencing of open SWD (with chain link barbed wires) was done long back from ring road to Footstep Bridge. The stretch from Footstep Bridge to 19th main bridge is left out unfinished. Mr.Gundappa sheety, (Ex- EE) and Mr. Vijayakumar, AE during their visit to our layout in May ‘10 had agreed to finish it in a month’s time. In spite of several reminders on this matter nothing has happened till date. Fencing of SWD done partially Retaining walls for SWD: The below photos will illustrate the condition of the SWD beyond 19th main bridge. The sidewall was constructed on one side only for a very short length and the work was stopped mid way. As there is neither a sidewall nor any fence to the SWD, many construction people from neighboring and far off places are dumping the debris here day and night. Due to this there is a hindrance in the flow of sewage water and the same stagnates becoming a breeding place for mosquitoes and other insects and foul smell emanate from this stagnated water. In spite of our letter to Chief Engineer SWD, nothing has happened so far. SWD seen without side walls SWD with wall on one side, that too for a small length. Cow menace: There are vacant sites at 19th main i.e. site No’s 1280 to 1282-opposite to Anjaneya temple- which are lying vacant since the inception of this layout and seem not allotted to anybody by BDA. These sites are being used as debris dumping yard. Apart from this, the stretch of road in front of these sites are used as cattle’s breeding center and it is a breading ground of mosquitoes and other disease spreading flies and insects. Nearly 10 to 15 cows are brought to these sites from elsewhere for milking during early morning hours; and after that it’s left free in the layout for graze. Besides, the cows roam day and night in the streets and defecate all over the places, making nuisance to the residents/motorist.
  • 3. Cows kept for milking at 19th main Cows roaming and grazing in the streets We are facing the cow menace problem for the last 3 to 4 years. Several complaints to all concerned have gone into deaf ears. Garbage collection and disposal: The waste management team at our HBR 5th block layout, is not doing the collection & disposal of garbage i.e. door-to-door collection and sweeping of all roads properly and regularly. Roads are being swept once in 5 or 6 days. The swept wastes are either dumped in vacant sites or burned. The garbage dumped by passers-by near the KEB transformer at 19th main has not been cleared regularly. Repeated complaints have not yielded any response. Garbage dumped near KEB Transformer at 19th main Street signboards: Recently street signboards were erected and painted with street numbers in our layout; but still at many places signboards are to be erected and painted. It has been observed that some signboards are with wrong markings as under; and it’s to be corrected to match with property documents. Even after our reminders no action has been taken.  17th ‘A’ main is written as 17th main (where it meets with 1st A cross)  30th’A’ cross is written as 30th cross (at both ends of 30th A cross)  1st ‘A’ cross is written as 1st main road.  39th cross is written as 33rd cross at one place and 38th cross at another place. Side drain cleaning: Side drains were cleaned only in some roads and left half way. We brought this to the notice of all concerned; but no action was taken.
  • 4. Construction of demolished sidewall of SWD: The SWD sidewall was broke open to get entry of JCP into the SWD for the purpose of de-silting. This was done in Jan’10 and lying as it is till today. The demolished sidewall to be reconstructed immediately; otherwise there are much likely chances of sewage water entering into the layout during rainy season. Demolished sidewall for entry of JCP Revamping of side drain stopped midway Revamping of rainwater side drains: Revamping of side drains was done only in some roads and left half way; and it has to be done in full-fledged manner in all roads. Overflowing of sewage water: It has been observed that the sewer pipes get clogged very often and sewage water overflows through manhole chamber and run onto the road creating foul smell and causing hardship to the residents. The reason being that at many places the chamber’s manhole lids are either not placed properly or damaged; and in some cases the chamber’s mouth itself got damaged. More importantly, the residents near kalana mantapa are facing more sanitation problem due to frequent overflow of sewage water. We are facing this problem ever since the choultry came into operational. The sewer pipes that were laid long back for residential use are not sustaining voluminous sewage water coming out of choultry which causing overflows. A meeting was conducted on Sunday, 30th May ‘10 with our area corporator to resolve this problem; but nothing has happened afterwards. We have written a letter to BWSSB on this matter for remedial action and it’s still in the budget stage. Sewage water overflowing thro’ manhole chamber
  • 5. KALYANA MANTAPA WOES: The residents, who live in 21st and 22nd crosses face lot of inconvenience and civic related problems, because of marriages/functions conducted in the choultries. It has been observed that in this area, the sewage pipes and side drains get blocked very frequently and overflowing on to the roads. During function hours, vehicles are parked haphazardly causing inconvenience to the residents; and we are unable to use our vehicles. Please refer the enclosed sheet for the problems explained in detailed manner. Short supply of water: We are having acute short supply of water (due to insufficient water pressure) for the last 6 months. We have made enough complaints to East zone engineers and also Chairman. But till today there is no improvement in the water supply. Park and other civic amenities: Please note that there is no Library, playground for children and a park in our segment. During the layout formation BDA had earmarked 18 guntas of land in 18th main; but even after the lapse of 22 years no park has come up in this site. During these periods the land mafias tried to knock of this prime land many times. The construction activities of the mafia on this land were stalled by BDA each time by demolishing the construction. Recently, the BBMP officials recovered this prime site from the hands of land grabbers and now it’s under way for converting into a PARK. We have made several representations to the concerned authorities; but nothing has happened till today. In total, there is nobody to take care of our layout. Layout (BBMP) engineers, health inspector and corporator are there for only namesake. The residents of HBR 5th block humbly request your good self to look into the issues and do the needful. Thanking you, With Best regards A.Rajagopal