SlideShare ist ein Scribd-Unternehmen logo
1 von 22
Downloaden Sie, um offline zu lesen
© 2016 TALIAN Infodinamika
Using MAXIMO Safety Plans
PT. CHANGSHIN REKSA JAYA
D u a n e A r i t o n a n g
Senior EAM Consultant – IBM Maximo Solution
Last Update: 2016-April-03
© 2016 TALIAN Infodinamika2
Many Enterprises are Challenged with the Same Types of
Pressures in different ways…
© 2016 TALIAN Infodinamika3
Using Maximo Safety Plans
 Module Overview
 Use Cases
 Creating Safety Plans
Applications
• Safety Plans
• Hazards
• Precautions
• Lock Outs/Tag Outs
© 2016 TALIAN Infodinamika4
Enterprise Asset Management
Safety Plans Module Overview
© 2016 TALIAN Infodinamika5
 A safety plan includes all the information needed to safely perform a
specific type of work or job plan. To create a safety plan, you need to
understand the relationship between its work assets and locations, related
assets and locations, and all related hazards, hazardous materials,
precautions, and tag out procedures.
 Before you create a safety plan, consider the following: Have a specific
job in mind that requires a safety plan.
 List the work assets and locations on which a job plan might use this
safety plan. When you create a safety plan, the work asset combined with
the type of work dictates the safety information that is required.
 Understand how hazards relate to the work assets.
 List all related assets and locations that might cause hazards or other
safety problems when a job plan is used. You create this asset list on the
Safety-Related Assets subtab, which is on the Safety tab in the Assets
application and the Locations application.
Safety Plans Module Overview
© 2016 TALIAN Infodinamika6
 Safety plans provide all the safety related information about an asset or
location in one record, which you can then copy to job plans and work
orders. You must clearly associate safety requirements and procedures with
work orders to fulfill the requirements of regulatory agencies. You use the
Safety Plans application to create safety plans and to add and view
associated work assets, hazards, precautions, and tag out procedures.
 When you use a safety plan on a work order, the information about
hazards, precautions, and hazardous material is copied to the work
order, even if no work assets are associated with the work order.
Safety Plans Applications
© 2016 TALIAN Infodinamika7
Enterprise Asset Management
Safety Plans Applications
© 2016 TALIAN Infodinamika8
Safety Plans Applications
 Associate Safety Requirements and procedures with
work orders to fulfill regulatory requirements.
 Created generic (use on all assets or locations); or specific
for use on particular Asset or Location.
 Safety Plans are associated to
- Job Plans
(contain the step-by-step procedure to complete work)
- Assets or Locations
- Hazards
Safety Plans
Hazards
Precautions
Lock Outs/Tag Outs
© 2016 TALIAN Infodinamika9
Safety Plans - sample list #1 (SPLAN1)
“SPLAN1 – General Safety Plan used when dust is present”
© 2016 TALIAN Infodinamika10
SPLAN1 – General Safety Plan used when dust is present
(Tab 1) Safety Plan
– Work Assets section
(Tab 2) Hazards and Precautions
– Hazards section
(Tab 2) Hazards and Precautions
– Precautions section
(1)
(2)
© 2016 TALIAN Infodinamika11
Safety Plans - sample list #2 (SPLAN2)
“SPLAN2 – Safety Procedure for Centrifugal Pump100”
© 2016 TALIAN Infodinamika12
SPLAN2 – Safety Procedure for Centrifugal Pump100
(Tab 1) Safety Plan
– Work Assets section
continue 
(1)
© 2016 TALIAN Infodinamika13
SPLAN2 – Safety Procedure for Centrifugal Pump100
(Tab 4) Tag Outs
– Hazards section
(Tab 4) Tag Outs
– Lock Out
Operation section
(Tab 4) Tag Outs
– Tag Outs section
(4)
© 2016 TALIAN Infodinamika14
Safety Plans - sample list #3 (ELECPOLE)
“ELECPOLE – Safety Plan for work on Electrical Service Pole”
© 2016 TALIAN Infodinamika15
ELECPOLE – Safety Plan for work on Electrical Service Pole
(Tab 1) Safety Plan
– Work Assets section
(Tab 2) Hazards and Precautions
– Hazards section
(Tab 2) Hazards and Precautions
– Precautions section
continue 
(1)
(2)
© 2016 TALIAN Infodinamika16
ELECPOLE – Safety Plan for work on Electrical Service Pole
(Tab 4) Tag Outs
– Hazards section
(Tab 4) Tag Outs
– Tag Outs section
(Tab 4) Tag Outs – Lock Out Operation section
(4)
© 2016 TALIAN Infodinamika17
Safety Plans - sample list #4 (CSELECPO)
“CSELECPO – BEDFORD CS CSELECPO”
© 2016 TALIAN Infodinamika18
CSELECPO – BEDFORD CS CSELECPO
(Tab 1) Safety Plan
– Work Assets section
(Tab 2) Hazards and Precautions
– Hazards section
(Tab 2) Hazards and Precautions
– Precautions section
continue 
(1)
(2)
© 2016 TALIAN Infodinamika19
CSELECPO – BEDFORD CS CSELECPO
(Tab 4) Tag Outs
– Hazards section
(Tab 4) Tag Outs
– Tag Outs section
(Tab 4) Tag Outs – Lock Out Operation section
(4)
© 2016 TALIAN Infodinamika20
Safety Plans – Use Cases
Associate Safety Plans to Locations, Assets, Rotating Items
and Job Plans for association with Work Orders
Inform employees of hazards they may encounter while
performing work, as well as the actions they must take to
prevent accidents
Familiarize and train employees to reduce, report and
avoid hazards.
© 2016 TALIAN Infodinamika21
Creating Safety Plans in Maximo
 Select the Job to be Analyzed
 Identify potential hazards
 Determine preventable measures to overcome hazards
 Eliminate hazards with Lock Out/Tag Out procedures
 Identify Precautions to avoid hazards
© 2016 TALIAN Infodinamika22 www/.TALIAN.co.id © 2016 TALIAN Infodinamika22
Thank You
An Industr y So lutio n C o mpa ny
@ TalianGoLive
Duane Aritonang
Senior EAM Consultant -
IBM Maximo Solutions
Email: duane.aritonang@talian.net
Mobile: +62 813 8364 1750

Weitere ähnliche Inhalte

Was ist angesagt?

Maximo Training - Inventory Management
Maximo Training - Inventory ManagementMaximo Training - Inventory Management
Maximo Training - Inventory ManagementBruno Portaluri
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Bruno Portaluri
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementRobert Zientara
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricksjohnnyg14
 
Maximo integration to other systems by Bashar Mahasen
 Maximo integration to other systems by Bashar Mahasen Maximo integration to other systems by Bashar Mahasen
Maximo integration to other systems by Bashar MahasenBashar Mahasen
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailPravir Kumar Dwivedi
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for UtilitiesVincent Kwon
 
Maximo Training - Work Management
Maximo Training - Work ManagementMaximo Training - Work Management
Maximo Training - Work ManagementBruno Portaluri
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementRobert Zientara
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset ManagementBruno Portaluri
 
Domains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementDomains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementRobert Zientara
 
IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016Helen Fisher
 

Was ist angesagt? (20)

Maximo Training - Inventory Management
Maximo Training - Inventory ManagementMaximo Training - Inventory Management
Maximo Training - Inventory Management
 
Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1Maximo Scheduler 7.5.1
Maximo Scheduler 7.5.1
 
Maximo Roadmap - September 2019
Maximo Roadmap - September 2019Maximo Roadmap - September 2019
Maximo Roadmap - September 2019
 
ibm_maximo
ibm_maximoibm_maximo
ibm_maximo
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
 
IBM Maximo Tips & Tricks
IBM Maximo Tips & TricksIBM Maximo Tips & Tricks
IBM Maximo Tips & Tricks
 
Maximo integration to other systems by Bashar Mahasen
 Maximo integration to other systems by Bashar Mahasen Maximo integration to other systems by Bashar Mahasen
Maximo integration to other systems by Bashar Mahasen
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and Monorail
 
Why upgrade to maximo v7.6
Why upgrade to maximo v7.6Why upgrade to maximo v7.6
Why upgrade to maximo v7.6
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for Utilities
 
Maximo Training - Work Management
Maximo Training - Work ManagementMaximo Training - Work Management
Maximo Training - Work Management
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset Management
 
Maximo 7.6 Features
Maximo 7.6 Features Maximo 7.6 Features
Maximo 7.6 Features
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset Management
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
Domains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementDomains in IBM Maximo Asset Management
Domains in IBM Maximo Asset Management
 
IBM Maximo Asset Management
IBM Maximo Asset ManagementIBM Maximo Asset Management
IBM Maximo Asset Management
 
IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016
 
DMS component for MAXIMO
DMS component for MAXIMODMS component for MAXIMO
DMS component for MAXIMO
 
Maximo 7.5 New Features
Maximo 7.5 New FeaturesMaximo 7.5 New Features
Maximo 7.5 New Features
 

Ähnlich wie Using IBM MAXIMO Safety Plans

OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017Triumvirate Environmental
 
4-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 20164-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 2016Shivendra Kapoor
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINALMelissa Spencer
 
Cybersecurity for Real Estate & Construction
Cybersecurity for Real Estate & ConstructionCybersecurity for Real Estate & Construction
Cybersecurity for Real Estate & ConstructionAronson LLC
 
Chris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers
 
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident Response
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident ResponseSplunk Discovery Köln - 17-01-2020 - Accelerate Incident Response
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident ResponseSplunk
 
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...Denim Group
 
October 2018 ComplianceSigns Connection Newsletter
October 2018 ComplianceSigns Connection NewsletterOctober 2018 ComplianceSigns Connection Newsletter
October 2018 ComplianceSigns Connection NewsletterComplianceSigns, LLC
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud EL Bahnsy
 
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...walk_the_safety_talk
 
Running a High-Efficiency, High-Visibility Application Security Program with...
Running a High-Efficiency, High-Visibility Application Security Program with...Running a High-Efficiency, High-Visibility Application Security Program with...
Running a High-Efficiency, High-Visibility Application Security Program with...Denim Group
 
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019Triumvirate Environmental
 
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"Alexander Much
 
February 2016 ComplianceSigns Connection Workplace Safety Newsletter
February 2016 ComplianceSigns Connection Workplace Safety NewsletterFebruary 2016 ComplianceSigns Connection Workplace Safety Newsletter
February 2016 ComplianceSigns Connection Workplace Safety NewsletterComplianceSigns, LLC
 
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...Splunk
 
An approach towards sotif with ansys medini analyze
An approach towards sotif with ansys medini analyzeAn approach towards sotif with ansys medini analyze
An approach towards sotif with ansys medini analyzeBernhard Kaiser
 
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018Splunk
 
Functional safety of collision avoidance systems in mines marcus punch
Functional safety of collision avoidance systems in mines   marcus punchFunctional safety of collision avoidance systems in mines   marcus punch
Functional safety of collision avoidance systems in mines marcus punchNSW Environment and Planning
 

Ähnlich wie Using IBM MAXIMO Safety Plans (20)

OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2017
 
4-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 20164-SIS in EPC Project Lifecycle, May 2016
4-SIS in EPC Project Lifecycle, May 2016
 
Safety Based Estimation FINAL
Safety Based Estimation FINALSafety Based Estimation FINAL
Safety Based Estimation FINAL
 
Cybersecurity for Real Estate & Construction
Cybersecurity for Real Estate & ConstructionCybersecurity for Real Estate & Construction
Cybersecurity for Real Estate & Construction
 
Chris Withers Managing Safely Project
Chris Withers Managing Safely ProjectChris Withers Managing Safely Project
Chris Withers Managing Safely Project
 
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident Response
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident ResponseSplunk Discovery Köln - 17-01-2020 - Accelerate Incident Response
Splunk Discovery Köln - 17-01-2020 - Accelerate Incident Response
 
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...
ThreadFix and SD Elements Unifying Security Requirements and Vulnerability Ma...
 
Hazard Communication - GHS by UAF
Hazard Communication - GHS by UAFHazard Communication - GHS by UAF
Hazard Communication - GHS by UAF
 
October 2018 ComplianceSigns Connection Newsletter
October 2018 ComplianceSigns Connection NewsletterOctober 2018 ComplianceSigns Connection Newsletter
October 2018 ComplianceSigns Connection Newsletter
 
Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1Mahmoud El Bahnsy HSE Manager1
Mahmoud El Bahnsy HSE Manager1
 
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...
Safety Management Systems - Discourse on safety in the Sri Lankan Constructio...
 
Running a High-Efficiency, High-Visibility Application Security Program with...
Running a High-Efficiency, High-Visibility Application Security Program with...Running a High-Efficiency, High-Visibility Application Security Program with...
Running a High-Efficiency, High-Visibility Application Security Program with...
 
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
OSHA's Top 10: An Analysis of the Most Cited Workplace Violations in 2019
 
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"
20160914 EuroSPI: "Automotive Security: Challenges, Standards and Solutions"
 
Safety Precautions & Emergency Response Plan
Safety Precautions & Emergency Response PlanSafety Precautions & Emergency Response Plan
Safety Precautions & Emergency Response Plan
 
February 2016 ComplianceSigns Connection Workplace Safety Newsletter
February 2016 ComplianceSigns Connection Workplace Safety NewsletterFebruary 2016 ComplianceSigns Connection Workplace Safety Newsletter
February 2016 ComplianceSigns Connection Workplace Safety Newsletter
 
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...
SplunkLive! Munich 2018: Use Splunk for incident Response, Orchestration and ...
 
An approach towards sotif with ansys medini analyze
An approach towards sotif with ansys medini analyzeAn approach towards sotif with ansys medini analyze
An approach towards sotif with ansys medini analyze
 
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018
The Splunk AISecOps Initiative - Splunk Security Roundtable: Zurich 2018
 
Functional safety of collision avoidance systems in mines marcus punch
Functional safety of collision avoidance systems in mines   marcus punchFunctional safety of collision avoidance systems in mines   marcus punch
Functional safety of collision avoidance systems in mines marcus punch
 

Kürzlich hochgeladen

How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsAndolasoft Inc
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVshikhaohhpro
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comFatema Valibhai
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Modelsaagamshah0812
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...ICS
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...MyIntelliSource, Inc.
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionSolGuruz
 
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️anilsa9823
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfkalichargn70th171
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...Health
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...OnePlan Solutions
 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AIABDERRAOUF MEHENNI
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxComplianceQuest1
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...panagenda
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdfWave PLM
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️Delhi Call girls
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providermohitmore19
 
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsAlberto González Trastoy
 

Kürzlich hochgeladen (20)

How To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.jsHow To Use Server-Side Rendering with Nuxt.js
How To Use Server-Side Rendering with Nuxt.js
 
Optimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTVOptimizing AI for immediate response in Smart CCTV
Optimizing AI for immediate response in Smart CCTV
 
HR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.comHR Software Buyers Guide in 2024 - HRSoftware.com
HR Software Buyers Guide in 2024 - HRSoftware.com
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
Steps To Getting Up And Running Quickly With MyTimeClock Employee Scheduling ...
 
Diamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with PrecisionDiamond Application Development Crafting Solutions with Precision
Diamond Application Development Crafting Solutions with Precision
 
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online  ☂️
CALL ON ➥8923113531 🔝Call Girls Kakori Lucknow best sexual service Online ☂️
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
Tech Tuesday-Harness the Power of Effective Resource Planning with OnePlan’s ...
 
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AISyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
SyndBuddy AI 2k Review 2024: Revolutionizing Content Syndication with AI
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
 
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
W01_panagenda_Navigating-the-Future-with-The-Hitchhikers-Guide-to-Notes-and-D...
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 
5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf5 Signs You Need a Fashion PLM Software.pdf
5 Signs You Need a Fashion PLM Software.pdf
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
TECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service providerTECUNIQUE: Success Stories: IT Service provider
TECUNIQUE: Success Stories: IT Service provider
 
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time ApplicationsUnveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
Unveiling the Tech Salsa of LAMs with Janus in Real-Time Applications
 

Using IBM MAXIMO Safety Plans

  • 1. © 2016 TALIAN Infodinamika Using MAXIMO Safety Plans PT. CHANGSHIN REKSA JAYA D u a n e A r i t o n a n g Senior EAM Consultant – IBM Maximo Solution Last Update: 2016-April-03
  • 2. © 2016 TALIAN Infodinamika2 Many Enterprises are Challenged with the Same Types of Pressures in different ways…
  • 3. © 2016 TALIAN Infodinamika3 Using Maximo Safety Plans  Module Overview  Use Cases  Creating Safety Plans Applications • Safety Plans • Hazards • Precautions • Lock Outs/Tag Outs
  • 4. © 2016 TALIAN Infodinamika4 Enterprise Asset Management Safety Plans Module Overview
  • 5. © 2016 TALIAN Infodinamika5  A safety plan includes all the information needed to safely perform a specific type of work or job plan. To create a safety plan, you need to understand the relationship between its work assets and locations, related assets and locations, and all related hazards, hazardous materials, precautions, and tag out procedures.  Before you create a safety plan, consider the following: Have a specific job in mind that requires a safety plan.  List the work assets and locations on which a job plan might use this safety plan. When you create a safety plan, the work asset combined with the type of work dictates the safety information that is required.  Understand how hazards relate to the work assets.  List all related assets and locations that might cause hazards or other safety problems when a job plan is used. You create this asset list on the Safety-Related Assets subtab, which is on the Safety tab in the Assets application and the Locations application. Safety Plans Module Overview
  • 6. © 2016 TALIAN Infodinamika6  Safety plans provide all the safety related information about an asset or location in one record, which you can then copy to job plans and work orders. You must clearly associate safety requirements and procedures with work orders to fulfill the requirements of regulatory agencies. You use the Safety Plans application to create safety plans and to add and view associated work assets, hazards, precautions, and tag out procedures.  When you use a safety plan on a work order, the information about hazards, precautions, and hazardous material is copied to the work order, even if no work assets are associated with the work order. Safety Plans Applications
  • 7. © 2016 TALIAN Infodinamika7 Enterprise Asset Management Safety Plans Applications
  • 8. © 2016 TALIAN Infodinamika8 Safety Plans Applications  Associate Safety Requirements and procedures with work orders to fulfill regulatory requirements.  Created generic (use on all assets or locations); or specific for use on particular Asset or Location.  Safety Plans are associated to - Job Plans (contain the step-by-step procedure to complete work) - Assets or Locations - Hazards Safety Plans Hazards Precautions Lock Outs/Tag Outs
  • 9. © 2016 TALIAN Infodinamika9 Safety Plans - sample list #1 (SPLAN1) “SPLAN1 – General Safety Plan used when dust is present”
  • 10. © 2016 TALIAN Infodinamika10 SPLAN1 – General Safety Plan used when dust is present (Tab 1) Safety Plan – Work Assets section (Tab 2) Hazards and Precautions – Hazards section (Tab 2) Hazards and Precautions – Precautions section (1) (2)
  • 11. © 2016 TALIAN Infodinamika11 Safety Plans - sample list #2 (SPLAN2) “SPLAN2 – Safety Procedure for Centrifugal Pump100”
  • 12. © 2016 TALIAN Infodinamika12 SPLAN2 – Safety Procedure for Centrifugal Pump100 (Tab 1) Safety Plan – Work Assets section continue  (1)
  • 13. © 2016 TALIAN Infodinamika13 SPLAN2 – Safety Procedure for Centrifugal Pump100 (Tab 4) Tag Outs – Hazards section (Tab 4) Tag Outs – Lock Out Operation section (Tab 4) Tag Outs – Tag Outs section (4)
  • 14. © 2016 TALIAN Infodinamika14 Safety Plans - sample list #3 (ELECPOLE) “ELECPOLE – Safety Plan for work on Electrical Service Pole”
  • 15. © 2016 TALIAN Infodinamika15 ELECPOLE – Safety Plan for work on Electrical Service Pole (Tab 1) Safety Plan – Work Assets section (Tab 2) Hazards and Precautions – Hazards section (Tab 2) Hazards and Precautions – Precautions section continue  (1) (2)
  • 16. © 2016 TALIAN Infodinamika16 ELECPOLE – Safety Plan for work on Electrical Service Pole (Tab 4) Tag Outs – Hazards section (Tab 4) Tag Outs – Tag Outs section (Tab 4) Tag Outs – Lock Out Operation section (4)
  • 17. © 2016 TALIAN Infodinamika17 Safety Plans - sample list #4 (CSELECPO) “CSELECPO – BEDFORD CS CSELECPO”
  • 18. © 2016 TALIAN Infodinamika18 CSELECPO – BEDFORD CS CSELECPO (Tab 1) Safety Plan – Work Assets section (Tab 2) Hazards and Precautions – Hazards section (Tab 2) Hazards and Precautions – Precautions section continue  (1) (2)
  • 19. © 2016 TALIAN Infodinamika19 CSELECPO – BEDFORD CS CSELECPO (Tab 4) Tag Outs – Hazards section (Tab 4) Tag Outs – Tag Outs section (Tab 4) Tag Outs – Lock Out Operation section (4)
  • 20. © 2016 TALIAN Infodinamika20 Safety Plans – Use Cases Associate Safety Plans to Locations, Assets, Rotating Items and Job Plans for association with Work Orders Inform employees of hazards they may encounter while performing work, as well as the actions they must take to prevent accidents Familiarize and train employees to reduce, report and avoid hazards.
  • 21. © 2016 TALIAN Infodinamika21 Creating Safety Plans in Maximo  Select the Job to be Analyzed  Identify potential hazards  Determine preventable measures to overcome hazards  Eliminate hazards with Lock Out/Tag Out procedures  Identify Precautions to avoid hazards
  • 22. © 2016 TALIAN Infodinamika22 www/.TALIAN.co.id © 2016 TALIAN Infodinamika22 Thank You An Industr y So lutio n C o mpa ny @ TalianGoLive Duane Aritonang Senior EAM Consultant - IBM Maximo Solutions Email: duane.aritonang@talian.net Mobile: +62 813 8364 1750