March 25, 2015
The Council on Environmental Quality
ATTN: Horst Greczmiel, Associate Director for National Environmental Policy Act Oversight
722 Jackson Place, NW
Washington, DC 20503
Re: Revised Draft Guidance for Federal Departments and Agencies on Consideration of
Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews
On behalf of the 6,000 members of the American Road and Transportation Builders Association
(ARTBA), I respectfully offer comments on the Council on Environmental Quality’s (CEQ)
draft guidance regarding the consideration of greenhouse gas emission (GHGs) and the effects of
climate change in National Environmental Policy Act (NEPA) Reviews.
ARTBA’s membership includes private and public sector representatives that are involved in the
planning, designing, construction and maintenance of the nation’s roadways, waterways, bridges,
ports, airports, rail and transit systems. Our industry generates more than $380 billion annually
in U.S. economic activity and sustains more than 3.3 million American jobs.
ARTBA members undertake a variety of activities that are subject to the environmental review
and approval process in the normal course of their daily operations. ARTBA’s public sector
members adopt, approve, or fund transportation plans, programs, or projects. ARTBA’s private
sector members plan, design, construct and provide supplies for these federal transportation
improvement projects. This document represents the collective views of our 6,000 member
companies and organizations.
According to a report by the U.S. Government Accountability Office (GAO), as many as 200
major steps are involved in developing a transportation project from the identification of the
project need to the start of construction. According to the same report, it typically takes between
nine and 19 years to plan, gain approval of, and construct a new major federally funded highway
project. This process involves dozens of overlapping state and federal laws, including NEPA,
state NEPA equivalents, wetland permits, endangered species implementation, clean air
conformity, etc. Often times these procedures mask disparate agendas or, at a minimum,
demonstrate an institutional lack of interagency coordination that results in unnecessary delays.
There has been a general recognition in both the legislative and regulatory arenas that the NEPA
review process is simply too long. On the legislative front, the bipartisan “Moving Ahead for
Progress in the 21st
Century” (MAP-21) surface transportation reauthorization law contained a
number of provisions specifically designed to reduce the amount of delay in the NEPA process
which are currently being implemented through the regulatory process. Further, CEQ recently
published guidance in October of 2014 on the effective use of programmatic agreements as a
2
means of lessening the amount of time involved in NEPA project reviews. Then, as now,
ARTBA shared CEQ’s aim of reducing NEPA delays.
With this joint goal in mind, ARTBA opposes CEQ’s draft guidance broadening the scope of
NEPA to cover GHGs and the effects of climate change. Expanding the scope of NEPA runs
counter to all of the aforementioned efforts to reduce the amount of time involved in the review
and approval process. Further, NEPA was passed in 1969—long before GHGs and climate
change were being looked at from a regulatory perspective. The statute does not contain the
proper regulatory mechanism for assessing GHGs and climate change.
NEPA is designed to deal with the present, not the future and was designed to account for the
direct impacts of federal actions. For transportation projects, this means tangible effects on the
environment, such as removal of wetlands and impacts to wildlife. Climate change impacts,
however, are different. They are speculative and may not be realized until long after a project is
completed.
Further, if climate change impacts were to be taken into account for NEPA reviews of
transportation projects, there would need to be a manner by which to take into account both the
potential benefits and adverse impacts. For example, a complete analysis would take consider a
reduction in GHGs resulting from the extent to which a transportation improvement alleviates
congestion. Emissions from vehicles stuck in traffic are much greater than those on roads where
traffic is free flowing.
Additionally, any proposed NEPA GHG and climate change analysis should be limited to the
project itself. NEPA was not meant to ascertain the impacts of what may or may not happen
once a project is completed. Thus, if a transportation improvement is reviewed under NEPA for
GHG and climate change impacts, the analysis should focus only on the project itself and not
attempt include subsequent development which may or may not occur once the project is
complete.
NEPA was never meant to be a statute enabling delay, but rather a vehicle to promote balance.
While the centerpiece of this balancing is the environmental impacts of a project, other factors
must be considered as well, such as the economic, safety, and mobility needs of the affected area
and how a transportation project or any identified alternative will address those needs. As such,
ARTBA urges CEQ to withdraw the proposed guidance, which would only expand NEPA’s
reach and increase delays during review and approval. ARTBA appreciates the chance to offer
these comments and looks forward to working with CEQ to continue to improve the NEPA
process.
Sincerely,
T. Peter Ruane
President & C.E.O

Weitere ähnliche Inhalte

Andere mochten auch

Comments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared BatComments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared Batartba
 
10/31/13 – Virginia Supreme Court Decision
10/31/13 – Virginia Supreme Court Decision10/31/13 – Virginia Supreme Court Decision
10/31/13 – Virginia Supreme Court Decisionartba
 
ARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” RuleARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” Ruleartba
 
Artba comments re docket no fhwa 2014-0017
Artba comments re docket no fhwa 2014-0017Artba comments re docket no fhwa 2014-0017
Artba comments re docket no fhwa 2014-0017artba
 
Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
Industry Letter Supporting Passage of Keystone XL Pipeline LegislationIndustry Letter Supporting Passage of Keystone XL Pipeline Legislation
Industry Letter Supporting Passage of Keystone XL Pipeline Legislationartba
 
Coalition Letter to House Appropriators Supporting Increased Corps Funding
Coalition Letter to House Appropriators Supporting Increased Corps FundingCoalition Letter to House Appropriators Supporting Increased Corps Funding
Coalition Letter to House Appropriators Supporting Increased Corps Fundingartba
 
Keystone Letter To Kerry From Associations 7/8/14
Keystone Letter To Kerry From Associations 7/8/14Keystone Letter To Kerry From Associations 7/8/14
Keystone Letter To Kerry From Associations 7/8/14artba
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Constructionartba
 
ARTBA Supports FHWA’s Proposed Standards for Pavement and Bridges
ARTBA Supports FHWA’s Proposed Standards for Pavement and BridgesARTBA Supports FHWA’s Proposed Standards for Pavement and Bridges
ARTBA Supports FHWA’s Proposed Standards for Pavement and Bridgesartba
 
Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule
 Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule
Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Ruleartba
 
03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guideartba
 
03/05: Multi-Industry Permit Streamlining Letter
03/05: Multi-Industry Permit Streamlining Letter03/05: Multi-Industry Permit Streamlining Letter
03/05: Multi-Industry Permit Streamlining Letterartba
 
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining Rule
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining RuleARTBA Comments Supporting FHWA and FTA Proposed Streamlining Rule
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining Ruleartba
 
01/10: FTA Right of Way Guidance
01/10: FTA Right of Way Guidance01/10: FTA Right of Way Guidance
01/10: FTA Right of Way Guidanceartba
 
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...artba
 
02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letterartba
 
New York Times Ad opposing tighter ozone standards
New York Times Ad opposing tighter ozone standardsNew York Times Ad opposing tighter ozone standards
New York Times Ad opposing tighter ozone standardsartba
 
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...artba
 
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”artba
 
Multi-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone StandardsMulti-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone Standardsartba
 

Andere mochten auch (20)

Comments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared BatComments Objecting to ESA protections for the Long-Eared Bat
Comments Objecting to ESA protections for the Long-Eared Bat
 
10/31/13 – Virginia Supreme Court Decision
10/31/13 – Virginia Supreme Court Decision10/31/13 – Virginia Supreme Court Decision
10/31/13 – Virginia Supreme Court Decision
 
ARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” RuleARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” Rule
 
Artba comments re docket no fhwa 2014-0017
Artba comments re docket no fhwa 2014-0017Artba comments re docket no fhwa 2014-0017
Artba comments re docket no fhwa 2014-0017
 
Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
Industry Letter Supporting Passage of Keystone XL Pipeline LegislationIndustry Letter Supporting Passage of Keystone XL Pipeline Legislation
Industry Letter Supporting Passage of Keystone XL Pipeline Legislation
 
Coalition Letter to House Appropriators Supporting Increased Corps Funding
Coalition Letter to House Appropriators Supporting Increased Corps FundingCoalition Letter to House Appropriators Supporting Increased Corps Funding
Coalition Letter to House Appropriators Supporting Increased Corps Funding
 
Keystone Letter To Kerry From Associations 7/8/14
Keystone Letter To Kerry From Associations 7/8/14Keystone Letter To Kerry From Associations 7/8/14
Keystone Letter To Kerry From Associations 7/8/14
 
Suggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation ConstructionSuggested Best Practices for Design-Build in Transportation Construction
Suggested Best Practices for Design-Build in Transportation Construction
 
ARTBA Supports FHWA’s Proposed Standards for Pavement and Bridges
ARTBA Supports FHWA’s Proposed Standards for Pavement and BridgesARTBA Supports FHWA’s Proposed Standards for Pavement and Bridges
ARTBA Supports FHWA’s Proposed Standards for Pavement and Bridges
 
Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule
 Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule
Coalition Letter Requesting Re-Opening of Proposed Water Quality Standards Rule
 
03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide03/10: Draft Core Toll Concessions P3 Model Contract Guide
03/10: Draft Core Toll Concessions P3 Model Contract Guide
 
03/05: Multi-Industry Permit Streamlining Letter
03/05: Multi-Industry Permit Streamlining Letter03/05: Multi-Industry Permit Streamlining Letter
03/05: Multi-Industry Permit Streamlining Letter
 
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining Rule
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining RuleARTBA Comments Supporting FHWA and FTA Proposed Streamlining Rule
ARTBA Comments Supporting FHWA and FTA Proposed Streamlining Rule
 
01/10: FTA Right of Way Guidance
01/10: FTA Right of Way Guidance01/10: FTA Right of Way Guidance
01/10: FTA Right of Way Guidance
 
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
ARTBA Comments on the Federal Accounting Standard Board’s Disclosure Requirem...
 
02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter02/25: Multi-Industry Regulatory Reform Letter
02/25: Multi-Industry Regulatory Reform Letter
 
New York Times Ad opposing tighter ozone standards
New York Times Ad opposing tighter ozone standardsNew York Times Ad opposing tighter ozone standards
New York Times Ad opposing tighter ozone standards
 
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...
Coalition Letter to House of Representatives on Failure to Advance S. 1140, t...
 
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
Industry letter supporting S. 2006, “The Regulatory Accountability Act of 2015.”
 
Multi-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone StandardsMulti-Industry Letter to Congress on EPA Ozone Standards
Multi-Industry Letter to Congress on EPA Ozone Standards
 

Ähnlich wie ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse Gas Analysis in NEPA

ARTBA Comments on FHWA/FTA Environmental Review Process Guidance
ARTBA Comments on FHWA/FTA Environmental Review Process Guidance  ARTBA Comments on FHWA/FTA Environmental Review Process Guidance
ARTBA Comments on FHWA/FTA Environmental Review Process Guidance artba
 
04/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-2104/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-21artba
 
Comments Opposing Tightening Federal Ozone Regulations
 Comments Opposing Tightening Federal Ozone Regulations Comments Opposing Tightening Federal Ozone Regulations
Comments Opposing Tightening Federal Ozone Regulationsartba
 
Testimony Of ARTBA July 15 EPA Veto Hearing
Testimony Of ARTBA  July 15 EPA Veto HearingTestimony Of ARTBA  July 15 EPA Veto Hearing
Testimony Of ARTBA July 15 EPA Veto Hearingartba
 
ARTBA Statement Re May 28 Ozone Casac Meeting
ARTBA Statement Re May 28 Ozone Casac MeetingARTBA Statement Re May 28 Ozone Casac Meeting
ARTBA Statement Re May 28 Ozone Casac Meetingartba
 
05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilitiesartba
 
Overview of the Permitting Requirements for LNG Projects in British Columbia
Overview of the Permitting Requirements for LNG Projects in British ColumbiaOverview of the Permitting Requirements for LNG Projects in British Columbia
Overview of the Permitting Requirements for LNG Projects in British ColumbiaBlake, Cassels & Graydon LLP
 
Comments on DOT Planning Regulations
Comments on DOT Planning RegulationsComments on DOT Planning Regulations
Comments on DOT Planning Regulationsartba
 
08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilitiesartba
 
ARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” RuleARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” RuleJenny Fischer
 
Nepa streamlining icf_rw_041818
Nepa streamlining icf_rw_041818Nepa streamlining icf_rw_041818
Nepa streamlining icf_rw_041818Rich Walter
 
FY 2013 R&D REPORT January 6 2014 - Department of Transportation
FY 2013 R&D REPORT January 6 2014 - Department of TransportationFY 2013 R&D REPORT January 6 2014 - Department of Transportation
FY 2013 R&D REPORT January 6 2014 - Department of TransportationLyle Birkey
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsEdgar Tovilla
 
env_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfenv_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfKentThomas17
 
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Best Best and Krieger LLP
 
Air Pollution and Climate Change Investment Bonds
Air Pollution and Climate Change Investment BondsAir Pollution and Climate Change Investment Bonds
Air Pollution and Climate Change Investment Bondseric keogh
 
01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessmentartba
 
A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)IRJET Journal
 

Ähnlich wie ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse Gas Analysis in NEPA (20)

ARTBA Comments on FHWA/FTA Environmental Review Process Guidance
ARTBA Comments on FHWA/FTA Environmental Review Process Guidance  ARTBA Comments on FHWA/FTA Environmental Review Process Guidance
ARTBA Comments on FHWA/FTA Environmental Review Process Guidance
 
04/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-2104/29: 2 New CEs Created Under MAP-21
04/29: 2 New CEs Created Under MAP-21
 
Comments Opposing Tightening Federal Ozone Regulations
 Comments Opposing Tightening Federal Ozone Regulations Comments Opposing Tightening Federal Ozone Regulations
Comments Opposing Tightening Federal Ozone Regulations
 
Testimony Of ARTBA July 15 EPA Veto Hearing
Testimony Of ARTBA  July 15 EPA Veto HearingTestimony Of ARTBA  July 15 EPA Veto Hearing
Testimony Of ARTBA July 15 EPA Veto Hearing
 
ARTBA Statement Re May 28 Ozone Casac Meeting
ARTBA Statement Re May 28 Ozone Casac MeetingARTBA Statement Re May 28 Ozone Casac Meeting
ARTBA Statement Re May 28 Ozone Casac Meeting
 
05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities05/08: California Assumption of CE Responsibilities
05/08: California Assumption of CE Responsibilities
 
Overview of the Permitting Requirements for LNG Projects in British Columbia
Overview of the Permitting Requirements for LNG Projects in British ColumbiaOverview of the Permitting Requirements for LNG Projects in British Columbia
Overview of the Permitting Requirements for LNG Projects in British Columbia
 
Comments on DOT Planning Regulations
Comments on DOT Planning RegulationsComments on DOT Planning Regulations
Comments on DOT Planning Regulations
 
08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities08/28: Texas Assumption of CE Responsibilities
08/28: Texas Assumption of CE Responsibilities
 
ARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” RuleARTBA Comments on EPA “Exceptional Events” Rule
ARTBA Comments on EPA “Exceptional Events” Rule
 
Nepa streamlining icf_rw_041818
Nepa streamlining icf_rw_041818Nepa streamlining icf_rw_041818
Nepa streamlining icf_rw_041818
 
The State of Sustainability in Southern California
The State of Sustainability in Southern CaliforniaThe State of Sustainability in Southern California
The State of Sustainability in Southern California
 
FY 2013 R&D REPORT January 6 2014 - Department of Transportation
FY 2013 R&D REPORT January 6 2014 - Department of TransportationFY 2013 R&D REPORT January 6 2014 - Department of Transportation
FY 2013 R&D REPORT January 6 2014 - Department of Transportation
 
WEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, OffsetsWEAO Influents Spring2015, Offsets
WEAO Influents Spring2015, Offsets
 
env_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfenv_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdf
 
Question
QuestionQuestion
Question
 
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
Work Session X: Water Quality - What Is Integrated Water Quality Planning And...
 
Air Pollution and Climate Change Investment Bonds
Air Pollution and Climate Change Investment BondsAir Pollution and Climate Change Investment Bonds
Air Pollution and Climate Change Investment Bonds
 
01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment01/21: EPA Draft NOx Science Assessment
01/21: EPA Draft NOx Science Assessment
 
A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)A Review Article on "Environmental Impact Assessment" (Eia)
A Review Article on "Environmental Impact Assessment" (Eia)
 

Mehr von artba

2017 media kit
2017 media kit2017 media kit
2017 media kitartba
 
September October tb_2016
September October tb_2016September October tb_2016
September October tb_2016artba
 
Transportation Builder July/August 2016
Transportation Builder July/August 2016Transportation Builder July/August 2016
Transportation Builder July/August 2016artba
 
The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016artba
 
ARTBA 2016 National Convention Program
ARTBA 2016 National Convention ProgramARTBA 2016 National Convention Program
ARTBA 2016 National Convention Programartba
 
May/June Transportation Builder
May/June Transportation BuilderMay/June Transportation Builder
May/June Transportation Builderartba
 
Northeastern regional meeting
Northeastern regional meetingNortheastern regional meeting
Northeastern regional meetingartba
 
Southern regional meeting
Southern regional meetingSouthern regional meeting
Southern regional meetingartba
 
Central regional meeting
Central regional meetingCentral regional meeting
Central regional meetingartba
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meetingartba
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meetingartba
 
July/August 2015 TB magazine
July/August 2015 TB magazineJuly/August 2015 TB magazine
July/August 2015 TB magazineartba
 
September/October 2015 TB magazine
September/October 2015 TB magazineSeptember/October 2015 TB magazine
September/October 2015 TB magazineartba
 
November/December 2015 TB
November/December 2015 TBNovember/December 2015 TB
November/December 2015 TBartba
 
January/February 2016 TB
January/February 2016 TBJanuary/February 2016 TB
January/February 2016 TBartba
 
March/April 2016 TB
March/April 2016 TBMarch/April 2016 TB
March/April 2016 TBartba
 
2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Scheduleartba
 
2016 ARTBA FIP Program
2016 ARTBA FIP Program2016 ARTBA FIP Program
2016 ARTBA FIP Programartba
 
2016 ILDP Agenda
2016 ILDP Agenda2016 ILDP Agenda
2016 ILDP Agendaartba
 
P3 Agenda 2016
P3 Agenda 2016P3 Agenda 2016
P3 Agenda 2016artba
 

Mehr von artba (20)

2017 media kit
2017 media kit2017 media kit
2017 media kit
 
September October tb_2016
September October tb_2016September October tb_2016
September October tb_2016
 
Transportation Builder July/August 2016
Transportation Builder July/August 2016Transportation Builder July/August 2016
Transportation Builder July/August 2016
 
The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016The National Work Zone Management Conference Agenda 2016
The National Work Zone Management Conference Agenda 2016
 
ARTBA 2016 National Convention Program
ARTBA 2016 National Convention ProgramARTBA 2016 National Convention Program
ARTBA 2016 National Convention Program
 
May/June Transportation Builder
May/June Transportation BuilderMay/June Transportation Builder
May/June Transportation Builder
 
Northeastern regional meeting
Northeastern regional meetingNortheastern regional meeting
Northeastern regional meeting
 
Southern regional meeting
Southern regional meetingSouthern regional meeting
Southern regional meeting
 
Central regional meeting
Central regional meetingCentral regional meeting
Central regional meeting
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meeting
 
Western regional meeting
Western regional meetingWestern regional meeting
Western regional meeting
 
July/August 2015 TB magazine
July/August 2015 TB magazineJuly/August 2015 TB magazine
July/August 2015 TB magazine
 
September/October 2015 TB magazine
September/October 2015 TB magazineSeptember/October 2015 TB magazine
September/October 2015 TB magazine
 
November/December 2015 TB
November/December 2015 TBNovember/December 2015 TB
November/December 2015 TB
 
January/February 2016 TB
January/February 2016 TBJanuary/February 2016 TB
January/February 2016 TB
 
March/April 2016 TB
March/April 2016 TBMarch/April 2016 TB
March/April 2016 TB
 
2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule2016 ­ARTBA FIP Schedule
2016 ­ARTBA FIP Schedule
 
2016 ARTBA FIP Program
2016 ARTBA FIP Program2016 ARTBA FIP Program
2016 ARTBA FIP Program
 
2016 ILDP Agenda
2016 ILDP Agenda2016 ILDP Agenda
2016 ILDP Agenda
 
P3 Agenda 2016
P3 Agenda 2016P3 Agenda 2016
P3 Agenda 2016
 

Kürzlich hochgeladen

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...hyt3577
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...Andy (Avraham) Blumenthal
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreiebhavenpr
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKISHAN REDDY OFFICE
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Tableget joys
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdfFIRST INDIA
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...AlexisTorres963861
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhbhavenpr
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceDelhi Call girls
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Delhi Call girls
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkobhavenpr
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceDelhi Call girls
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeRahatulAshafeen
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Delhi Call girls
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackPsychicRuben LoveSpells
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)Delhi Call girls
 

Kürzlich hochgeladen (20)

{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
{Qatar{^🚀^(+971558539980**}})Abortion Pills for Sale in Dubai. .abu dhabi, sh...
 
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
America Is the Target; Israel Is the Front Line _ Andy Blumenthal _ The Blogs...
 
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreieGujarat-SEBCs.pdf pfpkoopapriorjfperjreie
Gujarat-SEBCs.pdf pfpkoopapriorjfperjreie
 
Kishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdfKishan Reddy Report To People (2019-24).pdf
Kishan Reddy Report To People (2019-24).pdf
 
Julius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the TableJulius Randle's Injury Status: Surgery Not Off the Table
Julius Randle's Injury Status: Surgery Not Off the Table
 
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Greater Noida Escorts >༒8448380779 Escort Service
 
06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf06052024_First India Newspaper Jaipur.pdf
06052024_First India Newspaper Jaipur.pdf
 
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
Defensa de JOH insiste que testimonio de analista de la DEA es falso y solici...
 
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Sector 62 Noida Escorts >༒8448380779 Escort Service
 
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdhEmbed-4.pdf lkdiinlajeklhndklheduhuekjdh
Embed-4.pdf lkdiinlajeklhndklheduhuekjdh
 
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort ServiceEnjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
Enjoy Night⚡Call Girls Rajokri Delhi >༒8448380779 Escort Service
 
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 135 Noida Escorts >༒8448380779 Escort Service
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Gurgaon Sector 46 (Gurgaon)
 
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopkoEmbed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
Embed-2 (1).pdfb[k[k[[k[kkkpkdpokkdpkopko
 
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort ServiceBusty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
Busty Desi⚡Call Girls in Vasundhara Ghaziabad >༒8448380779 Escort Service
 
Group_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the tradeGroup_5_US-China Trade War to understand the trade
Group_5_US-China Trade War to understand the trade
 
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
Enjoy Night ≽ 8448380779 ≼ Call Girls In Palam Vihar (Gurgaon)
 
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover BackVerified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
Verified Love Spells in Little Rock, AR (310) 882-6330 Get My Ex-Lover Back
 
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 143 Noida Escorts >༒8448380779 Escort Service
 
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
WhatsApp 📞 8448380779 ✅Call Girls In Chaura Sector 22 ( Noida)
 

ARTBA Comments on CEQ Draft Guidance Including Climate Change and Greenhouse Gas Analysis in NEPA

  • 1. March 25, 2015 The Council on Environmental Quality ATTN: Horst Greczmiel, Associate Director for National Environmental Policy Act Oversight 722 Jackson Place, NW Washington, DC 20503 Re: Revised Draft Guidance for Federal Departments and Agencies on Consideration of Greenhouse Gas Emissions and the Effects of Climate Change in NEPA Reviews On behalf of the 6,000 members of the American Road and Transportation Builders Association (ARTBA), I respectfully offer comments on the Council on Environmental Quality’s (CEQ) draft guidance regarding the consideration of greenhouse gas emission (GHGs) and the effects of climate change in National Environmental Policy Act (NEPA) Reviews. ARTBA’s membership includes private and public sector representatives that are involved in the planning, designing, construction and maintenance of the nation’s roadways, waterways, bridges, ports, airports, rail and transit systems. Our industry generates more than $380 billion annually in U.S. economic activity and sustains more than 3.3 million American jobs. ARTBA members undertake a variety of activities that are subject to the environmental review and approval process in the normal course of their daily operations. ARTBA’s public sector members adopt, approve, or fund transportation plans, programs, or projects. ARTBA’s private sector members plan, design, construct and provide supplies for these federal transportation improvement projects. This document represents the collective views of our 6,000 member companies and organizations. According to a report by the U.S. Government Accountability Office (GAO), as many as 200 major steps are involved in developing a transportation project from the identification of the project need to the start of construction. According to the same report, it typically takes between nine and 19 years to plan, gain approval of, and construct a new major federally funded highway project. This process involves dozens of overlapping state and federal laws, including NEPA, state NEPA equivalents, wetland permits, endangered species implementation, clean air conformity, etc. Often times these procedures mask disparate agendas or, at a minimum, demonstrate an institutional lack of interagency coordination that results in unnecessary delays. There has been a general recognition in both the legislative and regulatory arenas that the NEPA review process is simply too long. On the legislative front, the bipartisan “Moving Ahead for Progress in the 21st Century” (MAP-21) surface transportation reauthorization law contained a number of provisions specifically designed to reduce the amount of delay in the NEPA process which are currently being implemented through the regulatory process. Further, CEQ recently published guidance in October of 2014 on the effective use of programmatic agreements as a
  • 2. 2 means of lessening the amount of time involved in NEPA project reviews. Then, as now, ARTBA shared CEQ’s aim of reducing NEPA delays. With this joint goal in mind, ARTBA opposes CEQ’s draft guidance broadening the scope of NEPA to cover GHGs and the effects of climate change. Expanding the scope of NEPA runs counter to all of the aforementioned efforts to reduce the amount of time involved in the review and approval process. Further, NEPA was passed in 1969—long before GHGs and climate change were being looked at from a regulatory perspective. The statute does not contain the proper regulatory mechanism for assessing GHGs and climate change. NEPA is designed to deal with the present, not the future and was designed to account for the direct impacts of federal actions. For transportation projects, this means tangible effects on the environment, such as removal of wetlands and impacts to wildlife. Climate change impacts, however, are different. They are speculative and may not be realized until long after a project is completed. Further, if climate change impacts were to be taken into account for NEPA reviews of transportation projects, there would need to be a manner by which to take into account both the potential benefits and adverse impacts. For example, a complete analysis would take consider a reduction in GHGs resulting from the extent to which a transportation improvement alleviates congestion. Emissions from vehicles stuck in traffic are much greater than those on roads where traffic is free flowing. Additionally, any proposed NEPA GHG and climate change analysis should be limited to the project itself. NEPA was not meant to ascertain the impacts of what may or may not happen once a project is completed. Thus, if a transportation improvement is reviewed under NEPA for GHG and climate change impacts, the analysis should focus only on the project itself and not attempt include subsequent development which may or may not occur once the project is complete. NEPA was never meant to be a statute enabling delay, but rather a vehicle to promote balance. While the centerpiece of this balancing is the environmental impacts of a project, other factors must be considered as well, such as the economic, safety, and mobility needs of the affected area and how a transportation project or any identified alternative will address those needs. As such, ARTBA urges CEQ to withdraw the proposed guidance, which would only expand NEPA’s reach and increase delays during review and approval. ARTBA appreciates the chance to offer these comments and looks forward to working with CEQ to continue to improve the NEPA process. Sincerely, T. Peter Ruane President & C.E.O