CONSTRUCTION OF AN ADMINISTRATIVE BLOCK AND A HOSTEL BLOCK OF
TWO STOREY BUILDING AND EXTERNAL WORKS
FOR MEDICAL FACULTY TRAINING CENTRE IN BANGI
    Starting Date:    1st Feb 2012
    Completion Date: 30th June 2013

No                        Tasks                                Cost
                                                   Sub Tasks          Main Tasks
 1 Site possession                                                           0.00
 2 Preliminaries and General Conditions                                340,000.00
   Initial                                          143,000.00
   Recurring                                        197,000.00
 3 Site Clearing and Earthwork                                         929,000.00
   Site Clearing                                     33,000.00
   Survey work                                        5,000.00
   Temporary earth drain & sediment control work      5,000.00
   Excavation and embankment                        886,000.00
 4 Piling Work                                                    1,440,000.00
   Setting out                                        10,000.00
   Mobilization & Setting up Piling Equipment         40,000.00
   Initial Pile                                       15,000.00
   Load Test                                          40,000.00
   Piling Work                                     1,300,000.00
   PDA Test                                           20,000.00
   Cut Off Pile                                       15,000.00
 5 Substructure Work
   Pile Cap                                                            210,000.00
      Excavation                                      7,000.00
      Form Work                                      15,000.00
      Lean Concrete                                   5,000.00
      Reinforcement                                  82,000.00
      Concrete Works                                 88,000.00
      Dismantling Formwork                                   -
      Anti Termite                                    7,000.00
      Backfill                                        6,000.00
   Stump                                                                62,000.00
      Form Work                                       8,000.00
      Concrete Works                                 54,000.00
      Dismantling Formwork                                   -
   Ground beam                                                         197,000.00
      Excavation                                      2,000.00
      Form Work                                      51,000.00
      Lean Concrete                                   4,000.00
      Reinforcement                                  91,000.00
      Concrete Works                                 49,000.00
      Dismantling Formwork                                   -
   Ground Slab                                                         122,000.00
      Backfill                                        4,000.00
      Hardcore                                       10,000.00
      Form Work                                       5,000.00
Lean Concrete                            10,000.00
        Damp proof Layer                          3,000.00
        Reinforcement                            53,000.00
        Concrete Works                           37,000.00
        Dismantling Formwork                             -
6    Superstructure Work for two storey blocks
     Ground Column                                             56,000.00
        Reinforcement                            33,000.00
        Form Work                                 5,000.00
        Concrete Works                           18,000.00
        Dismantling Formwork                             -
     Ist Floor Beam and Slab                                  235,000.00
        Reinforcement                            74,000.00
        Form Work                                91,000.00
        Concrete Works                           70,000.00
        Dismantling Formwork                             -
     1st Floor Column                                          56,000.00
        Reinforcement                            34,000.00
        Form Work                                 5,000.00
        Concrete Works                           17,000.00
        Dismantling Formwork                             -
     2nd Floor Beam and Slab                                  235,000.00
        Reinforcement                            74,000.00
        Form Work                                91,000.00
        Concrete Works                           70,000.00
        Dismantling Formwork                             -
     Roof beams                                                69,000.00
        Reinforcement                            25,000.00
        Form Work                                23,000.00
        Concrete Works                           21,000.00
        Dismantling Formwork                             -
     Trusses Design and submission                       -          0.00
7    Roofing                                                  303,000.00
       Trusses Installation                      135,000.00
       Fascia Board                                8,000.00
       Covering & Finishes                        90,000.00
       Gutters and Rain water downpipes           70,000.00
8    Covered Walkway                                           36,000.00
       Structue Work                             19,000.00
       Finishes Work                             17,000.00
9    Architectural Finishes
       Brickworks                                             303,000.00
          Ground Floor                           101,000.00
          1st Floor                              101,000.00
          2nd Floor                              101,000.00
10   Windows and External Door Frame                          250,000.00
11   Internal Wall Finishes                                   247,000.00
12   Internal Floor Finishes                                  260,000.00
13   Steps and Railing                                         20,000.00
14   Ceiling Finishes                                         128,000.00
15   External Wall Finishes                                    90,000.00
16   External Floor Finishes                                   18,000.00
17   Internal Painting                                         64,000.00
18   External Painting                                         36,000.00
19   Door & Window Panel                                      127,000.00
20   Sanitary Fittings & Finishes                              37,000.00
21   Apron & perimeter drains                                  82,000.00

22 Electrical and Mechanical Services                        1,134,000.00
   a) Cold water services                       170,000.00
   b) Sanitary services                          90,000.00
   c) Fire protection system                     92,000.00
   d) Air conditioning and ventilation system   160,000.00
   e) Internal electrical services              322,000.00
   f) Internal telephone services                40,000.00
   g) External electrical services              190,000.00
   h) External telephone services                70,000.00
23 External Works                                            1,000,000.00
   a) Road and car parks                        450,000.00
   b) Surface water drainage                    390,000.00
   c) Water reticulation                         60,000.00
   d) Sewerage system and treatment plant       100,000.00
24 Final inspection
25 Testing & commissioning
26 Handing over
   Total Project Cost                                        8,086,000.00
`

Weitere ähnliche Inhalte

Mehr von armada7000

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Reportarmada7000
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulationarmada7000
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajangarmada7000
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economyarmada7000
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentationarmada7000
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Reportarmada7000
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Reportarmada7000
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3armada7000
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2armada7000
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1armada7000
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chartarmada7000
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Reportarmada7000
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12armada7000
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11armada7000
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1armada7000
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4armada7000
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3armada7000
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5armada7000
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2armada7000
 
KA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm CityKA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm Cityarmada7000
 

Mehr von armada7000 (20)

Sustainable Urban Design Report
Sustainable Urban Design ReportSustainable Urban Design Report
Sustainable Urban Design Report
 
Kajang Sim City Simulation
Kajang Sim City SimulationKajang Sim City Simulation
Kajang Sim City Simulation
 
KA6414_Sustainable Kajang
KA6414_Sustainable KajangKA6414_Sustainable Kajang
KA6414_Sustainable Kajang
 
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable EconomyP57600 Quiz Results  Ecological Footprint Quiz by Center for Sustainable Economy
P57600 Quiz Results Ecological Footprint Quiz by Center for Sustainable Economy
 
P57600 Lusas Presentation
P57600 Lusas PresentationP57600 Lusas Presentation
P57600 Lusas Presentation
 
P57600 Lusas Report
P57600 Lusas ReportP57600 Lusas Report
P57600 Lusas Report
 
KA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport ReportKA6564 Assignment 4 - Urban Public Transport Report
KA6564 Assignment 4 - Urban Public Transport Report
 
KA6564 Assignment 3
KA6564 Assignment 3KA6564 Assignment 3
KA6564 Assignment 3
 
KA6564 Assignment 2
KA6564 Assignment 2KA6564 Assignment 2
KA6564 Assignment 2
 
KA6564 Assignment 1
KA6564 Assignment 1KA6564 Assignment 1
KA6564 Assignment 1
 
Assignment 3 Gantt Chart
Assignment 3 Gantt ChartAssignment 3 Gantt Chart
Assignment 3 Gantt Chart
 
Assignment 1 Site Visit Report
Assignment 1 Site Visit ReportAssignment 1 Site Visit Report
Assignment 1 Site Visit Report
 
KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12KA6954 P57600 Chapter 12
KA6954 P57600 Chapter 12
 
KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11KA6954 P57600 Chapter 11
KA6954 P57600 Chapter 11
 
KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1KA6954 P57600 Chapter 1
KA6954 P57600 Chapter 1
 
KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4KA6423 P57600 Assignment 4
KA6423 P57600 Assignment 4
 
KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3KA6423 P57600 Assignment 3
KA6423 P57600 Assignment 3
 
Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5Surface Water Hidrology - Chapter 5
Surface Water Hidrology - Chapter 5
 
Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2Surface Water Hidrology - Chapter 2
Surface Water Hidrology - Chapter 2
 
KA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm CityKA6414_Sustainable Urban Design - Stockholm City
KA6414_Sustainable Urban Design - Stockholm City
 

Assignment 2 Project Breakdown

  • 1. CONSTRUCTION OF AN ADMINISTRATIVE BLOCK AND A HOSTEL BLOCK OF TWO STOREY BUILDING AND EXTERNAL WORKS FOR MEDICAL FACULTY TRAINING CENTRE IN BANGI Starting Date: 1st Feb 2012 Completion Date: 30th June 2013 No Tasks Cost Sub Tasks Main Tasks 1 Site possession 0.00 2 Preliminaries and General Conditions 340,000.00 Initial 143,000.00 Recurring 197,000.00 3 Site Clearing and Earthwork 929,000.00 Site Clearing 33,000.00 Survey work 5,000.00 Temporary earth drain & sediment control work 5,000.00 Excavation and embankment 886,000.00 4 Piling Work 1,440,000.00 Setting out 10,000.00 Mobilization & Setting up Piling Equipment 40,000.00 Initial Pile 15,000.00 Load Test 40,000.00 Piling Work 1,300,000.00 PDA Test 20,000.00 Cut Off Pile 15,000.00 5 Substructure Work Pile Cap 210,000.00 Excavation 7,000.00 Form Work 15,000.00 Lean Concrete 5,000.00 Reinforcement 82,000.00 Concrete Works 88,000.00 Dismantling Formwork - Anti Termite 7,000.00 Backfill 6,000.00 Stump 62,000.00 Form Work 8,000.00 Concrete Works 54,000.00 Dismantling Formwork - Ground beam 197,000.00 Excavation 2,000.00 Form Work 51,000.00 Lean Concrete 4,000.00 Reinforcement 91,000.00 Concrete Works 49,000.00 Dismantling Formwork - Ground Slab 122,000.00 Backfill 4,000.00 Hardcore 10,000.00 Form Work 5,000.00
  • 2. Lean Concrete 10,000.00 Damp proof Layer 3,000.00 Reinforcement 53,000.00 Concrete Works 37,000.00 Dismantling Formwork - 6 Superstructure Work for two storey blocks Ground Column 56,000.00 Reinforcement 33,000.00 Form Work 5,000.00 Concrete Works 18,000.00 Dismantling Formwork - Ist Floor Beam and Slab 235,000.00 Reinforcement 74,000.00 Form Work 91,000.00 Concrete Works 70,000.00 Dismantling Formwork - 1st Floor Column 56,000.00 Reinforcement 34,000.00 Form Work 5,000.00 Concrete Works 17,000.00 Dismantling Formwork - 2nd Floor Beam and Slab 235,000.00 Reinforcement 74,000.00 Form Work 91,000.00 Concrete Works 70,000.00 Dismantling Formwork - Roof beams 69,000.00 Reinforcement 25,000.00 Form Work 23,000.00 Concrete Works 21,000.00 Dismantling Formwork - Trusses Design and submission - 0.00 7 Roofing 303,000.00 Trusses Installation 135,000.00 Fascia Board 8,000.00 Covering & Finishes 90,000.00 Gutters and Rain water downpipes 70,000.00 8 Covered Walkway 36,000.00 Structue Work 19,000.00 Finishes Work 17,000.00 9 Architectural Finishes Brickworks 303,000.00 Ground Floor 101,000.00 1st Floor 101,000.00 2nd Floor 101,000.00 10 Windows and External Door Frame 250,000.00 11 Internal Wall Finishes 247,000.00 12 Internal Floor Finishes 260,000.00 13 Steps and Railing 20,000.00 14 Ceiling Finishes 128,000.00
  • 3. 15 External Wall Finishes 90,000.00 16 External Floor Finishes 18,000.00 17 Internal Painting 64,000.00 18 External Painting 36,000.00 19 Door & Window Panel 127,000.00 20 Sanitary Fittings & Finishes 37,000.00 21 Apron & perimeter drains 82,000.00 22 Electrical and Mechanical Services 1,134,000.00 a) Cold water services 170,000.00 b) Sanitary services 90,000.00 c) Fire protection system 92,000.00 d) Air conditioning and ventilation system 160,000.00 e) Internal electrical services 322,000.00 f) Internal telephone services 40,000.00 g) External electrical services 190,000.00 h) External telephone services 70,000.00 23 External Works 1,000,000.00 a) Road and car parks 450,000.00 b) Surface water drainage 390,000.00 c) Water reticulation 60,000.00 d) Sewerage system and treatment plant 100,000.00 24 Final inspection 25 Testing & commissioning 26 Handing over Total Project Cost 8,086,000.00