This document summarizes a presentation about roadwork repairs on Parean Road in Kandanghaur District. The presentation addresses how the repairs have been slow, taking over 4 months to complete only 50% of the work. Road users have expressed safety concerns over the incomplete and uneven road conditions. Questions from the audience were answered, addressing accident response plans, typical roadwork timelines, reasons for the road deteriorating, materials used in construction, and safety measures for traveling on the road. Pictures were also included of the student presenters and moderator.
1. Presenting Report
ENGLISH
“Parean Roadwork sluggish”
OLEH :
XII PEMESINAN 1
ARIF SAEFULLAH
as
presenter
ARIS KRISWANTO
as
answer question
BAMBANG IRIANTO as
answer question
NOVSA TRISATYA W as
answer question
NURITA
as
moderator
NUURWENDI
as
writer
SMK NEGERI 1 LOSARANG INDRAMAYU
Jalan Raya PanturaLosarangTelp. (0234) 507237 Losarang – Indramayu
Website :www.smkn1losarang.sch.idE-mail : smkn1losarang@yahoo.co.id
Presenting Report (We Stand Up For The Future)
BAPERSHAT
4
2. Perbaikan di Jalan Parean Dinilai Lambat
KANDANGHAUR – Perbaikan di jalan parean, Desa Kandanghaur,
dinilai lambat. Sampai sekarang, perbaikan jalan di desa Ilir dan desa bulak
masih belum terselesaikan. Jum’at (7/6). Badan pelaksana masih bekerja pada
pengaspalan pekerjaan jalan.
Beberapa pengendara motor berkata, lambatnya perbaikan jalan
berdampak pada kelancaran arus lalu lintas. Selain itu, pengerjaan paving
masih belum selesai dilakukan secara keseluruhan menimbulkan risiko
kecelakaan.
“kondisi jalan raya yang tidak mulus, sementara mengancam keselamatan
pengguna jalan terutama pengendara sepeda motor. Dari mulai dikeruk, saat ini
kondisinya masih tersisa. Setelah selesai pengaspalan tidak secara keseluruhan,”
Ucap Nurkholis (47), salah satu pengendara motor, Jum’at (7/6).
Perbaikan jalan di daerah Kandanghaur panjangnya sekitar dua kilometer.
Perbaikan dilakukan proses pengerukan pada lapisan aspal. Sekarang ini,
Paving baru selesai sekitar 50 persen.
“sudah hampir empat bulan perbaikan masih saja belum selesai. Sekarang
baru desa Ilir dan belum keseluruhannya. Saya fikir, perbaikan jalan lambat
karena perbaikan hanya mengganti lapisan aspalnya saja,” Ucap Santy (33).
Pengguna jalan yang sehari-hari melintasi perbaikan jalan tersebut.
Presenting Report (We Stand Up For The Future)
BAPERSHAT
4
3. Parean Roadwork sluggish
KANDANGHAUR – Coast road improvements in the area Parean,
Districts Kandanghaur, considered slow. Untill now, road repair Ilir and Bulak
village have not yet been completed. Friday (7/6), implementing agency is still
working on asphalting of road works.
A number of riders say, the slow pace of road repairing work in the area
impacts on the smooth flow of traffic . Moreover, still not done woth the paving
of the overall risk of accidents.
“the road conditions are not smooth, while threatening the safety of road
users especially motorcyclist. From the strat of dredged, currently still left their
condition. When done asphalting not overall,” said Nurkholis (47), motorcyclist
to rader. Friday (7/6).
Road improvements in the area Kandanghaur length is about two
kilometers. Repairs are carried out dredging process on the asphalt layer.
Current, new paving completed about 50 percent.
“it has been almost four months of repairing not completed. Now just
recently Ilir village and still not whole. I think, the slow road repairs because the
repairs are replacing the asphalt layer only.” Said Santy (33). Road users who
daily cross the road repair.
Presenting Report (We Stand Up For The Future)
BAPERSHAT
4
4. Question and Answer
Questions :
1. Dian Setiadi : what will you do if any accidents in the road ?
2. Sayful Alwi : how long normal roadwork in Parean ?
3. Mrs.Ratna : why road is broken ?
4. Rahmat Soleh : what the materials on the contruction to make roadwork, and how can
be a intternational roadway ?
5. Irfan Maulana : why the road is broken ?
6. Rudiman : what will we do when be pass Kandanghaur street to safety ?
Answered :
1. We will be saved the road, and we call the police and hospital for send an ambulance
for handle the accident. Before the police and ambulance come, we will give the
sacrivice a first aid for soften the injury
2. Is normally specifed by the implementing agency, but we already know that within
four months srill can not be resolved
3. (because the queastion charles from Mrs.Ratna (no.3) and Irfan (no.5) same, in charge
of one answer). Because the road can to see from asphalt quality. If asphalt quality is
low, so the road will always broke because through by way of a big cars untill the
road will broke. If the asphalt quality is high so the road can’t will broke.
4. The materials is : asphalt,various types of soil,land,grayel,and other supporting
materials. To become an international standard high way, should be good quality high
way, such a smooth way, there is no congestion on the road, in the inside street there
are many shady trees, and comfort on the highway for motorists.
6. We have to drive no too fast so could an accident. When the drive should focus on
street, must respect each other motorist do not preced each other. If posible there
should be police to secure the high way.
Presenting Report (We Stand Up For The Future)
BAPERSHAT
4
5. Pictures
Nurita as Moderator
Aris as the Answer question
Nurita in action
Novsa as the Answer question
Arif as Presenter
Presenting Report (We Stand Up For The Future)
BAPERSHAT
4