This document summarizes a presentation about designing a pen manufacturing facility layout. The presentation includes flow charts for the processes of ball point and retractable pens. It analyzes the facility needs to meet a demand of 0.8 million ball point pens and 1.2 million retractable pens within a budget of 5 million PKR. The analysis finds that the required machinery costs 2.2 million PKR and materials cost 1 million PKR, leaving enough budget for labor costs and remaining within budget to design the facility.