Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮĄ
Introduction to Cost Estimating
٢
Is Cost Estimating an Art or a Science?
What is an Estimate?
What is the Purpose of Estimating?
What is the Role of the Estimator?
What the Estimator Must Know (Skills)?
The Components of an Estimate.
Possible Sources of Errors in Cost Estimates.
Today’s Lecture
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٢
ŮŁ
Is Cost Estimating an Art or a Science?
Before answering this question, let us first define what
is an Art ? And what is a Science ?
An art is the process of arranging elements in
a manner that affects senses and emotions. It
involves imagination and creativity.
A science is the systematic approach to
gathering knowledge and data based on laws
and theories.
Cost estimating involves calculating cost as well as
visualization of how the project will be built, therefore,
cost estimating is a blend of both art and science.
٤
What is an Estimate?
An estimate involves calculating the costs of
construction work on the basis of probabilities.
Two activities are undertaken when carrying out a
cost estimate:
Measurements: all measurements are
approximate.
Pricing: the degree of approximation is even
greater because of the difficulty in predicting
all the probabilities of items such as labor
productivity and site conditions.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮŁ
ŮĽ
What is an Estimate?
Costs of construction work are classified as:
1. Materials costs.
2. Labor costs.
3. Equipment costs.
4. Overhead (general and job) costs.
5. Profit.
Data on all of these costs are required to develop or
prepare an estimate.
ŮŚ
What is the Purpose of Estimating?
The purpose of estimating is to forecast (predict) the
cost required to complete a construction project in
accordance with the contract plans and specifications.
There are two distinct tasks in estimating:
To determine the probable real cost of the project.
To determine the probable real time to build the
project.
Because construction estimates are prepared before
a project is constructed, an estimate is, at best, a
close approximation of the actual costs.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٤
٧
What is the Purpose of Estimating?
The true value of the project will not be known until
the project has been completed and all costs have
been recorded.
Therefore, the estimator does not establish the cost
of a project; he simply establishes the amount which
the contractor will receive for constructing the project.
٨
What is the Role of the Estimator?
The estimator’s job is to prepare estimates of building
project costs.
The success of a contractor’s business depends on the
accuracy of these estimates.
The estimator’s success will be based on his previous
experience and knowledge of the construction industry.
A contractor or estimator lacking this experience may
over-, or under-estimates his project costs.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮĽ
ŮŠ
What is the Role of the Estimator?
In either case, this could impact the success of his
company:
If costs are too high, his jobs will be few and
far between.
If costs are too low, he will not be able to stay
in business.
All cost data is acquired from experience.
If an estimator does not have cost data from his own
experience, he must use cost data from price books
and handbooks.
ŮĄŮ 
What is the Role of the Estimator?
The more valid data the estimator has available, the
better he will be able to estimate the probabilities of
costs.
The following factors affect the accuracy of cost
estimates:
1. Site location and accessibility.
2. Subsurface and soil conditions.
3. Time and season.
4. Climatic conditions.
5. Wage agreements.
6. Strikes.
7. Market prices of basic materials.
8. Availability of money.
9. The demand for construction.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮŚ
ŮĄŮĄ
What the Estimator Must Know (Skills)?
1. He must have a thorough knowledge of the building
trades.
This includes types of construction and methods
of construction.
2. He must be able to read building plans and notes, and
understand the specifications.
If he finds any discrepancies between the plans
and specifications, he will bring them to the
attention of the architect or owner for solution.
When all the questions are answered and
problems are solved, he can then prepare and
finish the cost estimate.
٥٢
What the Estimator Must Know?
3. He must have a thorough understanding of the
building codes in the area where the building project
is to be constructed.
4. He must have a thorough understanding of
construction materials.
He must understand the sizes, strengths, and the
capabilities of the materials with which he works.
He must be able to substitute equal quality
materials when specified material are not
available.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٧
ŮĄŮŁ
What the Estimator Must Know?
5. He must keep up with the development of new construction
products and materials.
To keep current, he should frequently visit trade
shows and subscribe to building magazines.
6. He has to possess some basic mathematical ability.
7. He has to have at his fingertips reference materials, books,
tables, and tabulating equipments to speed up his job.
In time he will acquire reference materials in the
form of material catalogs, brochures, and
manufacturer specification sheets for the product
he uses.
٥٤
What the Estimator Must Know?
8. Finally, he must project (forecast) labor cost changes.
The estimator must realize that labor costs may
vary in different geographical areas of the country.
He must also realize and project in his estimates
future increases in labor costs because of
upcoming events.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ٨
ŮĄŮĽ
The Components of an Estimate
Most estimates are made up of the following five parts:
1. Materials: The estimator makes a take-off of
all the different materials required on the
project from the plans and specifications.
2. Labor: The estimator estimates the hours
needed to do the required work and then
multiply by the appropriate wage.
3. Equipment: The cost of equipment includes
ownership or rental fees, moving to the job
site, erecting, dismantling and operating.
ŮĄŮŚ
The Components of an Estimate
4. Overhead: There are two types of overheads:
4a. General overhead: includes all costs that
can not be directly charged to any particular
project, such as the cost of office supplies,
rent, travel expenses and salaries.
4b. Job overhead: includes all costs which
apply directly to the project and can not be
charged to materials, labor, or equipment.
5. Profit: Most estimators show the profit
expected from a job as a percentage of the
total estimated cost of the project. The profit
varies from 6-15%.
Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮŠ
٥٧
The Components of an Estimate
Approximate profits usually expected are:
Small projects 15%
Medium projects 12%
Large projects 10%
Very large projects 6-8%
٥٨
Possible Sources of Errors in Estimates
1. Mistakes in material take-offs.
2. Errors in carrying forward material from quantity sheets
to summary sheets and from there to direct cost
sheets.
3. Mistakes in estimating the labor time required for
certain items of work.
4. Errors in estimating hourly wages of labor.
5. Failure to allow for rising costs of materials.
6. Failure to allow for delays due to breakdown of
machines and acts of God (e.g. earthquakes and
storms).
Building Economy ARE 431
Dr. Mohammad A. Hassanain ŮĄŮ 
ŮĄŮŠ
Possible Sources of Errors in Estimates
7. Making no provisions to have estimates checked.
8. Insufficient allowance for overhead.
9. Omission of profit.

Weitere ähnliche Inhalte

Was ist angesagt?

Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
AYM1979
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
LIJI A
 

Was ist angesagt? (20)

Types of estimate
Types of estimateTypes of estimate
Types of estimate
 
Estimating part 1
Estimating part 1Estimating part 1
Estimating part 1
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Estimation and Costing
Estimation and Costing Estimation and Costing
Estimation and Costing
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Civil Engineering Measurment
Civil Engineering MeasurmentCivil Engineering Measurment
Civil Engineering Measurment
 
Estimation and costing of a commercial building
Estimation and costing of a commercial buildingEstimation and costing of a commercial building
Estimation and costing of a commercial building
 
What is construction management & its Benefits?
What is construction management & its Benefits?What is construction management & its Benefits?
What is construction management & its Benefits?
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Construction contract
Construction contract Construction contract
Construction contract
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Estimation and Costing
Estimation and CostingEstimation and Costing
Estimation and Costing
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
1# introduction to Quantity Surveying
1# introduction to Quantity Surveying1# introduction to Quantity Surveying
1# introduction to Quantity Surveying
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
construction project planing
 construction project planing construction project planing
construction project planing
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 

Andere mochten auch

REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
Natalie Ulza
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
Yousuf Dinar
 

Andere mochten auch (8)

Construction Estimating
Construction EstimatingConstruction Estimating
Construction Estimating
 
Slab
SlabSlab
Slab
 
REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1REINFORCEMENT CONCRETE chapter 1
REINFORCEMENT CONCRETE chapter 1
 
Estimation and costing
Estimation and costingEstimation and costing
Estimation and costing
 
Book for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABSBook for Beginners, RCC Design by ETABS
Book for Beginners, RCC Design by ETABS
 
ONE WAY SLAB DESIGN
ONE WAY SLAB DESIGNONE WAY SLAB DESIGN
ONE WAY SLAB DESIGN
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Project management
Project managementProject management
Project management
 

Ähnlich wie 1 introduction to cost estimating

3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
Ali Juma Albahrani
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docx
roushhsiu
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
bkbk37
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
ssuserad21d8
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
Redsun Communication
 
Software Cost and Effort Esitmation
Software Cost and Effort EsitmationSoftware Cost and Effort Esitmation
Software Cost and Effort Esitmation
Muhammad Taqi
 
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
Hasan Subhani
 

Ähnlich wie 1 introduction to cost estimating (20)

Purpose and importance of estimate
Purpose and importance of estimatePurpose and importance of estimate
Purpose and importance of estimate
 
3 estimate considerations
3 estimate considerations3 estimate considerations
3 estimate considerations
 
Lec.1 Introduction to Estimation
Lec.1   Introduction to EstimationLec.1   Introduction to Estimation
Lec.1 Introduction to Estimation
 
abate and h.pptx
abate and h.pptxabate and h.pptx
abate and h.pptx
 
Module Three Exercises 2BA 1200 Foundations of Business.docx
Module Three Exercises  2BA 1200 Foundations of Business.docxModule Three Exercises  2BA 1200 Foundations of Business.docx
Module Three Exercises 2BA 1200 Foundations of Business.docx
 
Introduction of civil engineering.pdf
Introduction of civil engineering.pdfIntroduction of civil engineering.pdf
Introduction of civil engineering.pdf
 
5.2 unit pricing
5.2 unit pricing5.2 unit pricing
5.2 unit pricing
 
46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf46R-11 Skills & Knowledge of Cost Estimators.pdf
46R-11 Skills & Knowledge of Cost Estimators.pdf
 
5.3 estimate setup
5.3 estimate setup5.3 estimate setup
5.3 estimate setup
 
Suvarna consultancy services
Suvarna consultancy services Suvarna consultancy services
Suvarna consultancy services
 
Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016Introduction to Hospital consultancy 2016
Introduction to Hospital consultancy 2016
 
Software Cost and Effort Esitmation
Software Cost and Effort EsitmationSoftware Cost and Effort Esitmation
Software Cost and Effort Esitmation
 
Project mgt
Project mgtProject mgt
Project mgt
 
2 types of estimates
2 types of estimates2 types of estimates
2 types of estimates
 
5.1 quantity take-off
5.1 quantity take-off5.1 quantity take-off
5.1 quantity take-off
 
Estimation
EstimationEstimation
Estimation
 
Estimation guidelines and templates
Estimation guidelines and templatesEstimation guidelines and templates
Estimation guidelines and templates
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Interest in Engineering Economic
Interest in Engineering Economic Interest in Engineering Economic
Interest in Engineering Economic
 
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making24648682 evaluation-of-ratio-analysis-on-investment-decision-making
24648682 evaluation-of-ratio-analysis-on-investment-decision-making
 

Mehr von Ali Juma Albahrani

Mehr von Ali Juma Albahrani (15)

10 depreciation and depletion
10 depreciation and depletion10 depreciation and depletion
10 depreciation and depletion
 
9 benefit to cost ratio method
9 benefit to cost ratio method9 benefit to cost ratio method
9 benefit to cost ratio method
 
8.the rate of return method
8.the rate of return method8.the rate of return method
8.the rate of return method
 
7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method7.2 equivalent uniform annual cost method
7.2 equivalent uniform annual cost method
 
7.1 present worth method
7.1 present worth method7.1 present worth method
7.1 present worth method
 
7.0 life cycle costing
7.0 life cycle costing7.0 life cycle costing
7.0 life cycle costing
 
6.4 multiple factors
6.4 multiple factors6.4 multiple factors
6.4 multiple factors
 
6.3 use of interest tables
6.3 use of interest tables6.3 use of interest tables
6.3 use of interest tables
 
6.2 cash flow - time diagrams
6.2 cash flow - time diagrams6.2 cash flow - time diagrams
6.2 cash flow - time diagrams
 
6.1 simple versus compound interest
6.1 simple versus compound interest6.1 simple versus compound interest
6.1 simple versus compound interest
 
5.0 detailed estimating
5.0 detailed estimating5.0 detailed estimating
5.0 detailed estimating
 
4.3 assemblies estimating
4.3 assemblies estimating4.3 assemblies estimating
4.3 assemblies estimating
 
4.2 square foot estimating
4.2 square foot estimating4.2 square foot estimating
4.2 square foot estimating
 
4.1 conceptual estimates
4.1 conceptual estimates4.1 conceptual estimates
4.1 conceptual estimates
 
4.0 pre-construction estimates
4.0 pre-construction estimates4.0 pre-construction estimates
4.0 pre-construction estimates
 

KĂźrzlich hochgeladen

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
KreezheaRecto
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
 

KĂźrzlich hochgeladen (20)

Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 

1 introduction to cost estimating

  • 1. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮĄ Introduction to Cost Estimating ٢ Is Cost Estimating an Art or a Science? What is an Estimate? What is the Purpose of Estimating? What is the Role of the Estimator? What the Estimator Must Know (Skills)? The Components of an Estimate. Possible Sources of Errors in Cost Estimates. Today’s Lecture
  • 2. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٢ ŮŁ Is Cost Estimating an Art or a Science? Before answering this question, let us first define what is an Art ? And what is a Science ? An art is the process of arranging elements in a manner that affects senses and emotions. It involves imagination and creativity. A science is the systematic approach to gathering knowledge and data based on laws and theories. Cost estimating involves calculating cost as well as visualization of how the project will be built, therefore, cost estimating is a blend of both art and science. ٤ What is an Estimate? An estimate involves calculating the costs of construction work on the basis of probabilities. Two activities are undertaken when carrying out a cost estimate: Measurements: all measurements are approximate. Pricing: the degree of approximation is even greater because of the difficulty in predicting all the probabilities of items such as labor productivity and site conditions.
  • 3. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮŁ ŮĽ What is an Estimate? Costs of construction work are classified as: 1. Materials costs. 2. Labor costs. 3. Equipment costs. 4. Overhead (general and job) costs. 5. Profit. Data on all of these costs are required to develop or prepare an estimate. ŮŚ What is the Purpose of Estimating? The purpose of estimating is to forecast (predict) the cost required to complete a construction project in accordance with the contract plans and specifications. There are two distinct tasks in estimating: To determine the probable real cost of the project. To determine the probable real time to build the project. Because construction estimates are prepared before a project is constructed, an estimate is, at best, a close approximation of the actual costs.
  • 4. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٤ ٧ What is the Purpose of Estimating? The true value of the project will not be known until the project has been completed and all costs have been recorded. Therefore, the estimator does not establish the cost of a project; he simply establishes the amount which the contractor will receive for constructing the project. ٨ What is the Role of the Estimator? The estimator’s job is to prepare estimates of building project costs. The success of a contractor’s business depends on the accuracy of these estimates. The estimator’s success will be based on his previous experience and knowledge of the construction industry. A contractor or estimator lacking this experience may over-, or under-estimates his project costs.
  • 5. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮĽ ŮŠ What is the Role of the Estimator? In either case, this could impact the success of his company: If costs are too high, his jobs will be few and far between. If costs are too low, he will not be able to stay in business. All cost data is acquired from experience. If an estimator does not have cost data from his own experience, he must use cost data from price books and handbooks. ŮĄŮ  What is the Role of the Estimator? The more valid data the estimator has available, the better he will be able to estimate the probabilities of costs. The following factors affect the accuracy of cost estimates: 1. Site location and accessibility. 2. Subsurface and soil conditions. 3. Time and season. 4. Climatic conditions. 5. Wage agreements. 6. Strikes. 7. Market prices of basic materials. 8. Availability of money. 9. The demand for construction.
  • 6. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮŚ ŮĄŮĄ What the Estimator Must Know (Skills)? 1. He must have a thorough knowledge of the building trades. This includes types of construction and methods of construction. 2. He must be able to read building plans and notes, and understand the specifications. If he finds any discrepancies between the plans and specifications, he will bring them to the attention of the architect or owner for solution. When all the questions are answered and problems are solved, he can then prepare and finish the cost estimate. ٥٢ What the Estimator Must Know? 3. He must have a thorough understanding of the building codes in the area where the building project is to be constructed. 4. He must have a thorough understanding of construction materials. He must understand the sizes, strengths, and the capabilities of the materials with which he works. He must be able to substitute equal quality materials when specified material are not available.
  • 7. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٧ ŮĄŮŁ What the Estimator Must Know? 5. He must keep up with the development of new construction products and materials. To keep current, he should frequently visit trade shows and subscribe to building magazines. 6. He has to possess some basic mathematical ability. 7. He has to have at his fingertips reference materials, books, tables, and tabulating equipments to speed up his job. In time he will acquire reference materials in the form of material catalogs, brochures, and manufacturer specification sheets for the product he uses. ٥٤ What the Estimator Must Know? 8. Finally, he must project (forecast) labor cost changes. The estimator must realize that labor costs may vary in different geographical areas of the country. He must also realize and project in his estimates future increases in labor costs because of upcoming events.
  • 8. Building Economy ARE 431 Dr. Mohammad A. Hassanain ٨ ŮĄŮĽ The Components of an Estimate Most estimates are made up of the following five parts: 1. Materials: The estimator makes a take-off of all the different materials required on the project from the plans and specifications. 2. Labor: The estimator estimates the hours needed to do the required work and then multiply by the appropriate wage. 3. Equipment: The cost of equipment includes ownership or rental fees, moving to the job site, erecting, dismantling and operating. ŮĄŮŚ The Components of an Estimate 4. Overhead: There are two types of overheads: 4a. General overhead: includes all costs that can not be directly charged to any particular project, such as the cost of office supplies, rent, travel expenses and salaries. 4b. Job overhead: includes all costs which apply directly to the project and can not be charged to materials, labor, or equipment. 5. Profit: Most estimators show the profit expected from a job as a percentage of the total estimated cost of the project. The profit varies from 6-15%.
  • 9. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮŠ ٥٧ The Components of an Estimate Approximate profits usually expected are: Small projects 15% Medium projects 12% Large projects 10% Very large projects 6-8% ٥٨ Possible Sources of Errors in Estimates 1. Mistakes in material take-offs. 2. Errors in carrying forward material from quantity sheets to summary sheets and from there to direct cost sheets. 3. Mistakes in estimating the labor time required for certain items of work. 4. Errors in estimating hourly wages of labor. 5. Failure to allow for rising costs of materials. 6. Failure to allow for delays due to breakdown of machines and acts of God (e.g. earthquakes and storms).
  • 10. Building Economy ARE 431 Dr. Mohammad A. Hassanain ŮĄŮ  ŮĄŮŠ Possible Sources of Errors in Estimates 7. Making no provisions to have estimates checked. 8. Insufficient allowance for overhead. 9. Omission of profit.