SlideShare ist ein Scribd-Unternehmen logo
1 von 13
RELIABILITY CENTERED 
MAINTENANCE 
WHAT WENT WRONG WI TH BOEING 
Presented By – 
Aman Rawat (07304), Ankit Goyal (07305), Ashlesh Sonkusare 
(07310), Nandhagopal Muralithar (07335)
WHAT IS BOEING 
• An American multinational corporation. 
• It designs, manufactures, and sells fixed-wing aircraft, 
rotorcraft, rockets and satellites. 
• It is among the largest global aircraft manufacturers. 
• It is the second-largest aerospace & defence contractor in the 
world based on 2012 revenue. 
• Boeing Company's corporate headquarters are located 
in Chicago.
INTRODUCTION TO BOEING 
• Revenue in 2012 – US $ 81.7 billion 
• One of the largest US exporters 
• Customers and in 150 countries 
• 0.17 million employees in 70 countries. 
• 2 Business Units 
Boeing Commercial Planes 
Boeing Defense Space and Security
RELIABILITY CENTERED MAINTENANCE 
• It is an industrial improvement approach focused on 
identifying and establishing the operational, maintenance 
and capital improvement policies that will manage risks of 
equipment failure most effectively. 
Determine the 
maintenance 
requirements of 
machinery 
Develop cost effective 
and planned 
maintenance 
programs 
Design process to 
obtain life expectancy 
of component
RELIABILITY CENTERED MAINTENANCE 
• Objectives of RCM: 
Minimum Cost 
Safety of system 
Reliability i.e. avoid risk of failure 
• RCM 2 – 1983 
Objective - To improve the consequence rather than just 
failure avoidance.
IMPLEMENTATION OF RCM AT BOEING 
• Year 1969 
• RCM was used to analyze the causes, impact remedies for 
asset failure and taking preventive action to minimize 
failure rates throughout operation. 
• Maintenance Performance Toolbox is one of the key 
Boeing solutions have to help airlines. 
• RCM focus on 
Failure analysis 
Consequence analysis 
Task analysis
APPLICATION OF RCM AT BOEING 
• Health Monitoring Systems 
Allow airplane to self monitor and report maintenance requirements 
to ground based computer systems. 
• Mobile Application 
Mobile Applications were used for schedule maintenance and faster 
detecting aircraft issues (Toolbox Mobile Parts, Maintenance turn 
time) 
Simultaneously, improvement in real time regulations, decrease 
flight delays and reduce operational expenditures can be handled.
APPLICATION OF RCM AT BOEING 
• RFID (Radio Frequency Identification) 
RFID Systems automated maintenance task on Emergency 
equipment Management, Rotables Management, Repairable 
Management, Structural Repair, Essential Cabin Items etc. 
RFID enabled process were used to check security and servicability, 
independently or simultaneously.
REASONS FOR FAILURE AT BOEING 
• Failure of the Boeing 787 fleet 
• Tried to save costs related to providing on-site 
quality, supplier management and technical 
support by outsourcing them 
• Outsourced 70% compared to 35-50% for 737 & 747 
• Had to send its engineers to sites of various Tier-1, 2 
& 3 suppliers worldwide to solve the technical 
problems
REASONS FOR FAILURE AT BOEING 
• Extra risk in dealing with lengthy supply chain, and 
cultural and language differences with suppliers 
• Important especially when the team did not have members 
with expertise on supply chain risk management 
• Technical problems – overheating batteries, glitches 
with brakes, hydraulic pumps, power issues and ice 
forming in engines 
• Results of failure – lower reliability; higher 
maintenance costs; falling reputation of the 
company
SUGGESTIONS 
• Change in focus from complete outsourcing to 
monitored outsourcing of parts 
• Fundamental change in focus from failure assessment 
based on age to “memoryless” exponential probability 
distribution 
• Effort to be focused on process on failure than 
predicting life expectancy 
• Equal focus on user requirements and design reliability 
• Focus on condition monitoring and predictive 
maintenance 
• Linking levels of tolerable risk to maintenance strategy 
development
SUGGESTIONS 
• Finding root cause without resorting to redesign all 
the time 
• Don’t be afraid of short term solutions, but always 
have long term plan for defect elimination 
• Infant mortality and unknown failure risk high in 
redesign 
• RCM can be used to mitigate defects while also 
working on risks associated with maintenance 
measures.
THANK - YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
James Shearer
 
Reliability Centered Maintenance Case Study
 Reliability Centered Maintenance Case Study Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
Mohammed Hamed Ahmed Soliman
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
Ricky Smith CMRP
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
Ismail Yusof
 

Was ist angesagt? (20)

Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
Predictive maintenance
Predictive maintenancePredictive maintenance
Predictive maintenance
 
Tpm total productive maintenance
Tpm  total productive maintenanceTpm  total productive maintenance
Tpm total productive maintenance
 
Introduction to Reliability Centered Maintenance
Introduction to Reliability Centered MaintenanceIntroduction to Reliability Centered Maintenance
Introduction to Reliability Centered Maintenance
 
Tpm
TpmTpm
Tpm
 
Reliability Centered Maintenance Case Study
 Reliability Centered Maintenance Case Study Reliability Centered Maintenance Case Study
Reliability Centered Maintenance Case Study
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)Failure Modes and Effect Analysis (FMEA)
Failure Modes and Effect Analysis (FMEA)
 
RCM
RCMRCM
RCM
 
Best Practices in Maintenance and Reliability
Best Practices in Maintenance and ReliabilityBest Practices in Maintenance and Reliability
Best Practices in Maintenance and Reliability
 
Preventive Maintenance Process and Program
Preventive Maintenance Process and ProgramPreventive Maintenance Process and Program
Preventive Maintenance Process and Program
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Maintenance strategy
Maintenance strategyMaintenance strategy
Maintenance strategy
 
total productive maintenance
total productive maintenancetotal productive maintenance
total productive maintenance
 
Rcm of compressor
Rcm of compressorRcm of compressor
Rcm of compressor
 
Condition monitoring
Condition monitoringCondition monitoring
Condition monitoring
 
overview of reliability engineering
overview of reliability engineeringoverview of reliability engineering
overview of reliability engineering
 
Applying Condition Based Monitoring Approach in Engineering Management Services
Applying Condition Based Monitoring Approach in  Engineering Management ServicesApplying Condition Based Monitoring Approach in  Engineering Management Services
Applying Condition Based Monitoring Approach in Engineering Management Services
 

Ähnlich wie Boeing - Reliability Centered Maintenance

IRPS rev 3-19-2012
IRPS rev 3-19-2012IRPS rev 3-19-2012
IRPS rev 3-19-2012
Abe Salloum
 
RahulSrivastava - El
RahulSrivastava - ElRahulSrivastava - El
RahulSrivastava - El
Rahul Srivastava
 

Ähnlich wie Boeing - Reliability Centered Maintenance (20)

CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLCCBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
CBM Cost Benefit Analysis by Carl Byington - PHM Design, LLC
 
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptxMODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
MODULE 1 (PREVENTIVE MAINTENANCE OVERVIEW).pptx
 
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael AndrewsReliability Engineering in Biomanufacturing - Presentation by Michael Andrews
Reliability Engineering in Biomanufacturing - Presentation by Michael Andrews
 
Ppt for boeing final
Ppt for boeing finalPpt for boeing final
Ppt for boeing final
 
IRPS rev 3-19-2012
IRPS rev 3-19-2012IRPS rev 3-19-2012
IRPS rev 3-19-2012
 
Reliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During OperationsReliability Levels of Subsea Production Systems During Operations
Reliability Levels of Subsea Production Systems During Operations
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
 
Risk Based Inspection
Risk Based InspectionRisk Based Inspection
Risk Based Inspection
 
Df Maint Tutorial
Df Maint TutorialDf Maint Tutorial
Df Maint Tutorial
 
Rcm
RcmRcm
Rcm
 
Building Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptxBuilding Maintenance Program for engineers.pptx
Building Maintenance Program for engineers.pptx
 
Reliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimientoReliability Centered Maintenance mantenimiento
Reliability Centered Maintenance mantenimiento
 
Reliability Centered Maintenance
Reliability Centered MaintenanceReliability Centered Maintenance
Reliability Centered Maintenance
 
Production and Operations Management
Production and Operations ManagementProduction and Operations Management
Production and Operations Management
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
20cs2024 Ethics in Information Technology
20cs2024 Ethics in Information Technology20cs2024 Ethics in Information Technology
20cs2024 Ethics in Information Technology
 
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
 
RahulSrivastava - El
RahulSrivastava - ElRahulSrivastava - El
RahulSrivastava - El
 
Just in time
Just in timeJust in time
Just in time
 
Operations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing AssetsOperations Excellence in the Management of Ageing Assets
Operations Excellence in the Management of Ageing Assets
 

Mehr von Nandhagopal Muralithar (7)

Rural Marketing Analysis: Jhajjar Tehsil, Haryana
Rural Marketing Analysis: Jhajjar Tehsil, HaryanaRural Marketing Analysis: Jhajjar Tehsil, Haryana
Rural Marketing Analysis: Jhajjar Tehsil, Haryana
 
24 vs Time Bomb
24 vs Time Bomb24 vs Time Bomb
24 vs Time Bomb
 
Tupperware
TupperwareTupperware
Tupperware
 
Credit Card Usage Study
Credit Card Usage StudyCredit Card Usage Study
Credit Card Usage Study
 
Organizational culture
Organizational cultureOrganizational culture
Organizational culture
 
7S framework - Competency Mapping
7S framework - Competency Mapping7S framework - Competency Mapping
7S framework - Competency Mapping
 
Lenovo: Building a global brand
Lenovo: Building a global brandLenovo: Building a global brand
Lenovo: Building a global brand
 

KĂźrzlich hochgeladen

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
allensay1
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
Nauman Safdar
 

KĂźrzlich hochgeladen (20)

Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 

Boeing - Reliability Centered Maintenance

  • 1. RELIABILITY CENTERED MAINTENANCE WHAT WENT WRONG WI TH BOEING Presented By – Aman Rawat (07304), Ankit Goyal (07305), Ashlesh Sonkusare (07310), Nandhagopal Muralithar (07335)
  • 2. WHAT IS BOEING • An American multinational corporation. • It designs, manufactures, and sells fixed-wing aircraft, rotorcraft, rockets and satellites. • It is among the largest global aircraft manufacturers. • It is the second-largest aerospace & defence contractor in the world based on 2012 revenue. • Boeing Company's corporate headquarters are located in Chicago.
  • 3. INTRODUCTION TO BOEING • Revenue in 2012 – US $ 81.7 billion • One of the largest US exporters • Customers and in 150 countries • 0.17 million employees in 70 countries. • 2 Business Units Boeing Commercial Planes Boeing Defense Space and Security
  • 4. RELIABILITY CENTERED MAINTENANCE • It is an industrial improvement approach focused on identifying and establishing the operational, maintenance and capital improvement policies that will manage risks of equipment failure most effectively. Determine the maintenance requirements of machinery Develop cost effective and planned maintenance programs Design process to obtain life expectancy of component
  • 5. RELIABILITY CENTERED MAINTENANCE • Objectives of RCM: Minimum Cost Safety of system Reliability i.e. avoid risk of failure • RCM 2 – 1983 Objective - To improve the consequence rather than just failure avoidance.
  • 6. IMPLEMENTATION OF RCM AT BOEING • Year 1969 • RCM was used to analyze the causes, impact remedies for asset failure and taking preventive action to minimize failure rates throughout operation. • Maintenance Performance Toolbox is one of the key Boeing solutions have to help airlines. • RCM focus on Failure analysis Consequence analysis Task analysis
  • 7. APPLICATION OF RCM AT BOEING • Health Monitoring Systems Allow airplane to self monitor and report maintenance requirements to ground based computer systems. • Mobile Application Mobile Applications were used for schedule maintenance and faster detecting aircraft issues (Toolbox Mobile Parts, Maintenance turn time) Simultaneously, improvement in real time regulations, decrease flight delays and reduce operational expenditures can be handled.
  • 8. APPLICATION OF RCM AT BOEING • RFID (Radio Frequency Identification) RFID Systems automated maintenance task on Emergency equipment Management, Rotables Management, Repairable Management, Structural Repair, Essential Cabin Items etc. RFID enabled process were used to check security and servicability, independently or simultaneously.
  • 9. REASONS FOR FAILURE AT BOEING • Failure of the Boeing 787 fleet • Tried to save costs related to providing on-site quality, supplier management and technical support by outsourcing them • Outsourced 70% compared to 35-50% for 737 & 747 • Had to send its engineers to sites of various Tier-1, 2 & 3 suppliers worldwide to solve the technical problems
  • 10. REASONS FOR FAILURE AT BOEING • Extra risk in dealing with lengthy supply chain, and cultural and language differences with suppliers • Important especially when the team did not have members with expertise on supply chain risk management • Technical problems – overheating batteries, glitches with brakes, hydraulic pumps, power issues and ice forming in engines • Results of failure – lower reliability; higher maintenance costs; falling reputation of the company
  • 11. SUGGESTIONS • Change in focus from complete outsourcing to monitored outsourcing of parts • Fundamental change in focus from failure assessment based on age to “memoryless” exponential probability distribution • Effort to be focused on process on failure than predicting life expectancy • Equal focus on user requirements and design reliability • Focus on condition monitoring and predictive maintenance • Linking levels of tolerable risk to maintenance strategy development
  • 12. SUGGESTIONS • Finding root cause without resorting to redesign all the time • Don’t be afraid of short term solutions, but always have long term plan for defect elimination • Infant mortality and unknown failure risk high in redesign • RCM can be used to mitigate defects while also working on risks associated with maintenance measures.