INDUSTRIAL SEMINAR ON NHPC TLDP-III
PRESENTED BY:-
NAME-RANJAN KUMAR JHA
ROLL NO.-11901611072
DEPT.- ELECTRICAL ENGINEERING
INTRODUCTION TO HYDROELECTRIC
POWER PLANT
 IN HYDROELECTRIC POWER PLANTS THE POTENTIAL ENERGY OF WATER
STORED AT A HEIGHT IS CONVERTED INTO ELECTRICAL ENERGY.
 THE HYDROELECTRIC POWER DEPENDS ON :-
1. HEAD OF WATER.
2. DISCHARGE OF WATER.
 TOTAL POWER THAT CAN BE GENERATED IS:-
P= (0.736*W*H*Q*Ƞ/75) KW
INTRODUCTION TO TLDP-III
 TEESTA LOW DAM PROJECT-III WAS ENTRUSTED TO NHPC ON 15TH NOV,
2000.
 TECHNICAL FEATURES OF TLDP-III :-
LOCATION ON RIVER TEESTA IN DARJEELING (W.B)
HEAD 20 m
CAPACITY 132 MW (4 X 33 MW)
PROJECT COST Rs. 768.92 CRORES
ANNUAL GENERATION 594.07 MU
HEIGHT OF BARRAGE/LOW DAM 32.5 m HIGH (RCC RAFT WITH PIERS)
TAIL RACE CHANNEL 100 m
SWITCHYARD 220 KV GAS INSULATED SWITCHGEAR
EVACUATION OF POWER 01 LINE TLDP-III TO NEW JALPAIGURI
TWO MAIN PARTS OF TLDP-III
1. BARRAGE
 IN TLDP-III 140 m LONG BARRAGE HAS BEEN CONSTRUCTED ACROSS
RIVER TEESTAAT 27 MILES FROM RAMBI.
 THE HEIGHT OF THE BARRAGE IS 32.5m AND HAVING 7 GATES.
2. POWER HOUSE
TLDP-III CONSISTS OF A UNDERGROUND AND SURFACE POWER
HOUSE.
POWER HOUSE OF TLDP-III CONSISTS OF: -
 PRIMARY COOLING FLOOR.
 SECONDARY COOLING FLOOR.
 TURBINE FLOOR.
 GENERATOR FLOOR.
 MACHINE HALL.
 CONTROL ROOM.
PRIMARY COOLING FLOOR
 LOCATED AT AN ELEVATION OF 176.5 M.
 IT IS OPEN WATER CIRCULATING SYSTEM.
 SPECIFICATION OF PRIMARY COOLING FLOOR:-
NO. OF PUMP MOTOR SET 6
RATING OF THE MOTOR 55 KW
NO. OF DUPLEX STRAINER 6
LENGTH OF RAW WATER HEADER 76.5 M
LENGTH OF DELIVERY WATER HEADER 70 M
SECONDARY COOLING FLOOR
 LOCATED AT AN ELEVATION OF 180.25 M.
 IT IS A CLOSED CIRCULATING SYSTEM.
 SPECIFICATION OF SECONDARY FLOOR: -
NO. OF PUMP MOTOR SET 8
RATING OF THE MOTOR 45 KW
NO. OF SIMPLEX STRAINER 4
NO. OF CYCLONE SEPERATOR 1
NO. OF HEAT EXCHANGER 5
TURBINE FLOOR
 THIS FLOOR IS LOCATED AT AN ELEVATION OF 184.5 M.
 THE TURBINE EMPLOYED AT TLDP – III IS KAPLAN TURBINE (VERTICAL
CONFIGURATION).
 RATED OUTPUT OF EACH TURBINE IS 34MW.
 TYPE OF SEALING: -
• SHAFT SEAL
• MAINTENANCE SEAL
GENERATOR FLOOR
 THIS FLOOR IS LOCATED AT AN ELEVATION OF 187.25 M.
 IN THE ALTERNATOR OF TLDP-III, THE CONSTRUCTION OF ROTOR IS
SALIENT-POLE TYPE & THE STATOR WINDING IS OF Y-CONNECTED TO LINE.
 IN TLDP-III THE EXCITATION SYSTEM IS STATIC, DIGITAL & CONSTANT-
VOLTAGE TYPE WITH CONTROLLED THYRISTORS.
 SPECIFICATION OF ALTERNATOR: -
RATED SPEED 136.36 RPM
RATED FREQUENCY 50 Hz
RATED OUTPUT 36670 KVA
RATED CURRENT 1924.7 AMP
RATED VOLTAGE 11000 ±10% VOLTS
RATED POWER FACTOR 0.9
RATED FIELD VOLTAGE 118 VOLTS
CONNECTION STAR-2 FOLD PARALLEL
MACHINE HALL
 THE ELEVATION OF MACHINE HALL IS 190.5M.
 THE MACHINE HALL HAS FOLLOWING INSTALLATIONS: -
1. OPU & GCP
2. EXCITATION CONTROL BOARD.
3. OPU CONTROL BOARD.
4. UNIT CONTROL BOARD.
CONTROL ROOM
 THE ELEVATION OF CONTROL ROOM IS 190.5M.
 THE WHOLE PLANT IS CONTROLLED THROUGH SCADA (SUPERVISORY
CONTROL AND DATAACQUISITION).
 IN TLDP-III THERE ARE TWO SERVER NAMELY SERVER A & SERVER B.
 CONTROL ROOM HAS TWO MORE ROOM, THEY ARE: -
1. BATTERY ROOM
2. LTAC ROOM
LIST OF IMPORTANT INSTALLATIONS IN TLDP-III
WORKING PRESSURE: -
HP COMPRESSOR:- 68 BAR
LP COMPRESSOR:- 7.8 BAR.
ROLE OF HP COMPRESSOR: -
 PROVIDES AIR PRESSURE TO OIL PRESSURE UNIT (OPU)
 AIR IS PROVIDED TO LP COMPRESSOR FROM HP COMPRESSOR.
ROLE OF LP COMPRESSOR: -
 PROVIDES AIR FOR SERVICE.
 PROVIDES PRESSURE TO THE MAINTENANCE SEAL.
 FOR BRAKING PURPOSE.
1. HP & LP COMPRESSOR: -
2. HIGH PRESSURE OIL SYSTEM (HPOS)
 HPOS IS USED TO CREATE AN OIL FILM IN BETWEEN THRUST PAD AND
THRUST COLLAR.
 ROTOR IS ROTATING ON THIS OIL FILM.
 HPOS HAS TWO MOTORS OF SAME RATING.
 ONE OF THEM IS AC AND ANOTHER ONE IS DC MOTOR.
 AT A TIME ONLY ONE IS OPERATED.
3. OPU
 USED TO CONTROL THE RUNNER BLADES AND GUIDE VAN.
 THE OPERATING PRESSURE IS 57 TO 62 BAR.
 IN OPU TANK RATIO OF OIL AND AIR IS IN 60 : 40.
4. TRANSFORMERS
 IN TLDP-III ON THE BASIS OF WORKING THERE ARE SIX TRANSFORMERS
USED FOR EACH INDIVIDUAL UNIT.
THEY ARE AS FOLLOWS: -
1. GENERATOR TRANSFORMER (GT).
2. UNIT AUXILIARY TRANSFORMER (UAT).
3. SERVICE STATION TRANSFORMER (SST).
4. EXCITATION TRANSFORMER (ET).
5. LIGHTING ARRESTER VOLTAGE TRANSFORMER (LAVT).
6. NEUTRAL GROUNDING CUBICLE (NGC).
5.GAS INSULATED SWITCHGEAR
 USED TO CONTROL, PROTECT AND ISOLATE ELECTRICAL EQUIPMENT.
 SWITCHGEAR IS THE COMBINATION OF ELECTRICAL SWITCHES, ISOLATORS &
CIRCUIT BREAKERS.
 SULPHUR HEXAFLUORIDE GAS ACT AS THE INSULATING MEDIUM.
6. SUBSTATION
 IN TLDP-III THERE IS A SMALL SUBSTATION ON THE ROOF OF GIS
BUILDING.
 SUBSTATIONS GENERALLY HAVE SWITCHING, PROTECTION AND CONTROL
EQUIPMENT AND TRANSFORMERS.
 THERE ARE TWO NUMBER OUTPUT LINES OF 220 KV.
 NO. OF WAVE TRAP IS FOUR.
7. DEWATERING & DRAINAGE SYSTEM
1. DRAINAGE SYSTEM: -
A. USED TO DRAIN OUT LEAKAGE WATER OF THE PLANT TO THE RIVER.
B. FOR THIS PURPOSE TWO 90 KW MOTOR IS USED.
2. DEWATERING SYSTEM: -
A. USED TO DRAIN OUT WATER IN BETWEEN INTAKE GATE AND DRAFT
TUBE AT THE TIME OF MAINTENANCE.
B. FOR THIS PURPOSE SIX 90 KW MOTOR IS USED.
8. PROTECTION SYSTEM
 VITAL INSTALLATION FOR POWER PLANT.
 IN TLDP-III THERE ARE SEVERAL TYPES OF PROTECTION TO PROTECT
IMPORTANT COMPONENTS USING SEVERAL TYPES OF RELAYS: -
 GENERATOR PROTECTION.
 BUS-BAR PROTECTION.
 TRANSFORMER PROTECTION.
 LINE PROTECTION.
 FIRE FIGHTING SYSTEM: -
 USE OF CO2
 USE OF WATER
CONCLUSION
I WOULD LIKE TO SAY THAT THIS TRAINING IS AN EXCELLENT OPPORTUNITY
FOR ME.
THE MAIN OBJECTIVES OF THIS INDUSTRIAL TRAINING ARE TO OBSERVE AND
PRACTICE HOW THE BASIC MACHINE KNOWLEDGE AND ENGINEERING IS
APPLICABLE IN THE REAL INDUSTRIES.
IT IS NOT ONLY TO GET TECHNICAL EXPERIENCE BUT ALSO TO OBSERVE
MANAGEMENT PRACTICE AND HOW TO INTERACT WITH FELLOW WORKERS.
THANKYOU!

Weitere ähnliche Inhalte

Was ist angesagt?

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARVIMAL VAIBHAV
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT Amit Gupta
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHAKHILESH KUMAR
 
Vocational training report
Vocational training reportVocational training report
Vocational training reportATUL RAJ
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdfZahidLateef2
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdfSourav Bhunia
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report muhammad khurram
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training reportravi kant
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power PlantHimanshu Dixit
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVIKASH BAGHEL
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants FAHAD KHAN
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hingeamit307
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plantRavinder Jangid
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plantMohdAreebQureshi
 

Was ist angesagt? (20)

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHARKBUNL - NTPC KANTI MUZAFFARPUR BIHAR
KBUNL - NTPC KANTI MUZAFFARPUR BIHAR
 
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Industrial Training Report.pdf
Industrial Training Report.pdfIndustrial Training Report.pdf
Industrial Training Report.pdf
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Captive Power Plants.pdf
Captive Power Plants.pdfCaptive Power Plants.pdf
Captive Power Plants.pdf
 
Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report Neelum Jhelum Hydropower Internship Report
Neelum Jhelum Hydropower Internship Report
 
Ntpc kahalgaon training report
Ntpc kahalgaon training reportNtpc kahalgaon training report
Ntpc kahalgaon training report
 
Kota Super Thermal Power Plant
Kota Super Thermal Power PlantKota Super Thermal Power Plant
Kota Super Thermal Power Plant
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
VOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBAVOCATIONAL TRAINING REPORT ON NTPC KORBA
VOCATIONAL TRAINING REPORT ON NTPC KORBA
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
Thermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit HingeThermal Power plant visit Report by Amit Hinge
Thermal Power plant visit Report by Amit Hinge
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Industrial training report of thermal power plant
Industrial training report of thermal power plantIndustrial training report of thermal power plant
Industrial training report of thermal power plant
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
SUMMER Training report AT NTPC FOR INSTRUMENTATION (kbunl)
 

Ähnlich wie Presentation on NHPC (TLDP-III)

THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)Baibhav Saha
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTSohail Akhtar
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSUJAY RAVI KALE
 
SIP Presentation
SIP PresentationSIP Presentation
SIP PresentationAmay Jain
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopalPRAVEENKUMARSINGH87
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliariesAshvani Shukla
 
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...54NayeemurRahman
 
Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptNarhari1
 
Erectn n commisioning
Erectn n commisioningErectn n commisioning
Erectn n commisioningnileshgiri
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 

Ähnlich wie Presentation on NHPC (TLDP-III) (20)

Pintu raj
Pintu rajPintu raj
Pintu raj
 
THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)THERMAL POWER PLANT (COAL TO POWER)
THERMAL POWER PLANT (COAL TO POWER)
 
DVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPTDVC, BOKARO THERMAL PPT
DVC, BOKARO THERMAL PPT
 
Shivesh ntpc ppt
Shivesh ntpc pptShivesh ntpc ppt
Shivesh ntpc ppt
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.pptSEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
SEMINAR TOPIC- 3 PHASE SELETOR AND PREVENTER FOR INDUSTRIAL APPS. 2007.ppt
 
Energy management
Energy managementEnergy management
Energy management
 
SIP Presentation
SIP PresentationSIP Presentation
SIP Presentation
 
V.T ppt
V.T pptV.T ppt
V.T ppt
 
220 kv gss renwal ppt
220 kv gss renwal ppt220 kv gss renwal ppt
220 kv gss renwal ppt
 
Industrial training ppt bhel bhopal
Industrial training ppt bhel bhopalIndustrial training ppt bhel bhopal
Industrial training ppt bhel bhopal
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries660 mw turbo generator & its auxiliaries
660 mw turbo generator & its auxiliaries
 
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...
SERVICES AND CALCULATIONSaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa...
 
Ktps presentation
Ktps presentationKtps presentation
Ktps presentation
 
Thermopack ppt
Thermopack pptThermopack ppt
Thermopack ppt
 
Turbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.pptTurbo Generator & Its auxiliaries.ppt
Turbo Generator & Its auxiliaries.ppt
 
Erectn n commisioning
Erectn n commisioningErectn n commisioning
Erectn n commisioning
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 

Kürzlich hochgeladen

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadhamedmustafa094
 

Kürzlich hochgeladen (20)

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Presentation on NHPC (TLDP-III)

  • 1. INDUSTRIAL SEMINAR ON NHPC TLDP-III PRESENTED BY:- NAME-RANJAN KUMAR JHA ROLL NO.-11901611072 DEPT.- ELECTRICAL ENGINEERING
  • 2. INTRODUCTION TO HYDROELECTRIC POWER PLANT  IN HYDROELECTRIC POWER PLANTS THE POTENTIAL ENERGY OF WATER STORED AT A HEIGHT IS CONVERTED INTO ELECTRICAL ENERGY.  THE HYDROELECTRIC POWER DEPENDS ON :- 1. HEAD OF WATER. 2. DISCHARGE OF WATER.  TOTAL POWER THAT CAN BE GENERATED IS:- P= (0.736*W*H*Q*Ƞ/75) KW
  • 3. INTRODUCTION TO TLDP-III  TEESTA LOW DAM PROJECT-III WAS ENTRUSTED TO NHPC ON 15TH NOV, 2000.  TECHNICAL FEATURES OF TLDP-III :- LOCATION ON RIVER TEESTA IN DARJEELING (W.B) HEAD 20 m CAPACITY 132 MW (4 X 33 MW) PROJECT COST Rs. 768.92 CRORES ANNUAL GENERATION 594.07 MU HEIGHT OF BARRAGE/LOW DAM 32.5 m HIGH (RCC RAFT WITH PIERS) TAIL RACE CHANNEL 100 m SWITCHYARD 220 KV GAS INSULATED SWITCHGEAR EVACUATION OF POWER 01 LINE TLDP-III TO NEW JALPAIGURI
  • 4. TWO MAIN PARTS OF TLDP-III 1. BARRAGE  IN TLDP-III 140 m LONG BARRAGE HAS BEEN CONSTRUCTED ACROSS RIVER TEESTAAT 27 MILES FROM RAMBI.  THE HEIGHT OF THE BARRAGE IS 32.5m AND HAVING 7 GATES.
  • 5. 2. POWER HOUSE TLDP-III CONSISTS OF A UNDERGROUND AND SURFACE POWER HOUSE. POWER HOUSE OF TLDP-III CONSISTS OF: -  PRIMARY COOLING FLOOR.  SECONDARY COOLING FLOOR.  TURBINE FLOOR.  GENERATOR FLOOR.  MACHINE HALL.  CONTROL ROOM.
  • 6. PRIMARY COOLING FLOOR  LOCATED AT AN ELEVATION OF 176.5 M.  IT IS OPEN WATER CIRCULATING SYSTEM.  SPECIFICATION OF PRIMARY COOLING FLOOR:- NO. OF PUMP MOTOR SET 6 RATING OF THE MOTOR 55 KW NO. OF DUPLEX STRAINER 6 LENGTH OF RAW WATER HEADER 76.5 M LENGTH OF DELIVERY WATER HEADER 70 M
  • 7. SECONDARY COOLING FLOOR  LOCATED AT AN ELEVATION OF 180.25 M.  IT IS A CLOSED CIRCULATING SYSTEM.  SPECIFICATION OF SECONDARY FLOOR: - NO. OF PUMP MOTOR SET 8 RATING OF THE MOTOR 45 KW NO. OF SIMPLEX STRAINER 4 NO. OF CYCLONE SEPERATOR 1 NO. OF HEAT EXCHANGER 5
  • 8. TURBINE FLOOR  THIS FLOOR IS LOCATED AT AN ELEVATION OF 184.5 M.  THE TURBINE EMPLOYED AT TLDP – III IS KAPLAN TURBINE (VERTICAL CONFIGURATION).  RATED OUTPUT OF EACH TURBINE IS 34MW.  TYPE OF SEALING: - • SHAFT SEAL • MAINTENANCE SEAL
  • 9. GENERATOR FLOOR  THIS FLOOR IS LOCATED AT AN ELEVATION OF 187.25 M.  IN THE ALTERNATOR OF TLDP-III, THE CONSTRUCTION OF ROTOR IS SALIENT-POLE TYPE & THE STATOR WINDING IS OF Y-CONNECTED TO LINE.  IN TLDP-III THE EXCITATION SYSTEM IS STATIC, DIGITAL & CONSTANT- VOLTAGE TYPE WITH CONTROLLED THYRISTORS.  SPECIFICATION OF ALTERNATOR: - RATED SPEED 136.36 RPM RATED FREQUENCY 50 Hz RATED OUTPUT 36670 KVA RATED CURRENT 1924.7 AMP RATED VOLTAGE 11000 ±10% VOLTS RATED POWER FACTOR 0.9 RATED FIELD VOLTAGE 118 VOLTS CONNECTION STAR-2 FOLD PARALLEL
  • 10. MACHINE HALL  THE ELEVATION OF MACHINE HALL IS 190.5M.  THE MACHINE HALL HAS FOLLOWING INSTALLATIONS: - 1. OPU & GCP 2. EXCITATION CONTROL BOARD. 3. OPU CONTROL BOARD. 4. UNIT CONTROL BOARD.
  • 11. CONTROL ROOM  THE ELEVATION OF CONTROL ROOM IS 190.5M.  THE WHOLE PLANT IS CONTROLLED THROUGH SCADA (SUPERVISORY CONTROL AND DATAACQUISITION).  IN TLDP-III THERE ARE TWO SERVER NAMELY SERVER A & SERVER B.  CONTROL ROOM HAS TWO MORE ROOM, THEY ARE: - 1. BATTERY ROOM 2. LTAC ROOM
  • 12. LIST OF IMPORTANT INSTALLATIONS IN TLDP-III WORKING PRESSURE: - HP COMPRESSOR:- 68 BAR LP COMPRESSOR:- 7.8 BAR. ROLE OF HP COMPRESSOR: -  PROVIDES AIR PRESSURE TO OIL PRESSURE UNIT (OPU)  AIR IS PROVIDED TO LP COMPRESSOR FROM HP COMPRESSOR. ROLE OF LP COMPRESSOR: -  PROVIDES AIR FOR SERVICE.  PROVIDES PRESSURE TO THE MAINTENANCE SEAL.  FOR BRAKING PURPOSE. 1. HP & LP COMPRESSOR: -
  • 13. 2. HIGH PRESSURE OIL SYSTEM (HPOS)  HPOS IS USED TO CREATE AN OIL FILM IN BETWEEN THRUST PAD AND THRUST COLLAR.  ROTOR IS ROTATING ON THIS OIL FILM.  HPOS HAS TWO MOTORS OF SAME RATING.  ONE OF THEM IS AC AND ANOTHER ONE IS DC MOTOR.  AT A TIME ONLY ONE IS OPERATED.
  • 14. 3. OPU  USED TO CONTROL THE RUNNER BLADES AND GUIDE VAN.  THE OPERATING PRESSURE IS 57 TO 62 BAR.  IN OPU TANK RATIO OF OIL AND AIR IS IN 60 : 40.
  • 15. 4. TRANSFORMERS  IN TLDP-III ON THE BASIS OF WORKING THERE ARE SIX TRANSFORMERS USED FOR EACH INDIVIDUAL UNIT. THEY ARE AS FOLLOWS: - 1. GENERATOR TRANSFORMER (GT). 2. UNIT AUXILIARY TRANSFORMER (UAT). 3. SERVICE STATION TRANSFORMER (SST). 4. EXCITATION TRANSFORMER (ET). 5. LIGHTING ARRESTER VOLTAGE TRANSFORMER (LAVT). 6. NEUTRAL GROUNDING CUBICLE (NGC).
  • 16. 5.GAS INSULATED SWITCHGEAR  USED TO CONTROL, PROTECT AND ISOLATE ELECTRICAL EQUIPMENT.  SWITCHGEAR IS THE COMBINATION OF ELECTRICAL SWITCHES, ISOLATORS & CIRCUIT BREAKERS.  SULPHUR HEXAFLUORIDE GAS ACT AS THE INSULATING MEDIUM.
  • 17. 6. SUBSTATION  IN TLDP-III THERE IS A SMALL SUBSTATION ON THE ROOF OF GIS BUILDING.  SUBSTATIONS GENERALLY HAVE SWITCHING, PROTECTION AND CONTROL EQUIPMENT AND TRANSFORMERS.  THERE ARE TWO NUMBER OUTPUT LINES OF 220 KV.  NO. OF WAVE TRAP IS FOUR.
  • 18. 7. DEWATERING & DRAINAGE SYSTEM 1. DRAINAGE SYSTEM: - A. USED TO DRAIN OUT LEAKAGE WATER OF THE PLANT TO THE RIVER. B. FOR THIS PURPOSE TWO 90 KW MOTOR IS USED. 2. DEWATERING SYSTEM: - A. USED TO DRAIN OUT WATER IN BETWEEN INTAKE GATE AND DRAFT TUBE AT THE TIME OF MAINTENANCE. B. FOR THIS PURPOSE SIX 90 KW MOTOR IS USED.
  • 19. 8. PROTECTION SYSTEM  VITAL INSTALLATION FOR POWER PLANT.  IN TLDP-III THERE ARE SEVERAL TYPES OF PROTECTION TO PROTECT IMPORTANT COMPONENTS USING SEVERAL TYPES OF RELAYS: -  GENERATOR PROTECTION.  BUS-BAR PROTECTION.  TRANSFORMER PROTECTION.  LINE PROTECTION.  FIRE FIGHTING SYSTEM: -  USE OF CO2  USE OF WATER
  • 20. CONCLUSION I WOULD LIKE TO SAY THAT THIS TRAINING IS AN EXCELLENT OPPORTUNITY FOR ME. THE MAIN OBJECTIVES OF THIS INDUSTRIAL TRAINING ARE TO OBSERVE AND PRACTICE HOW THE BASIC MACHINE KNOWLEDGE AND ENGINEERING IS APPLICABLE IN THE REAL INDUSTRIES. IT IS NOT ONLY TO GET TECHNICAL EXPERIENCE BUT ALSO TO OBSERVE MANAGEMENT PRACTICE AND HOW TO INTERACT WITH FELLOW WORKERS.