8.
9.
10. OTHER MAJOR COMPONENTS OF PEB CRANE BRACKETS & BEAMS MEZZANINE FLOORS STRUCTURAL PARTIONS FASCIAS CANOPIES
11.
12. PRE-ENGINEERED BUILDINGS NOMENCLATURE – STANDARD FRAMING SYSTEMS TCCS = TAPERED COLUMN CLEAR SPAN TCMS-1 TAPERED COLUMN MULTI-SPAN WITH 1 INTERMEDIATE COLUMN .
13. SSCS = SINGLE SLOPE CLEAR SPAN . SSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1 INTERMEDIATE COLUMN
14.
15.
16.
17. Varying of Width of Frame Only Primary Frame Design Purline 250 X 2.5 mm 2 Spacing-1.5 7.67 kg/m Design Girt 200X1.75 mm 2 Spacing-1.5 6.09 kg/m
18. Varying Height and width Only Primary Frame Design Purline 250 X 2.5 mm 2 Spacing-1.5 7.67 kg/m Spacing-1.5 Design Girt 250X2.0 mm 2 Spacing-1.5 6.09 kg/m Spacing-1.5
19. Varying Bay length with Height Total weight of Frame, Purline and Girt Heigth-6 Heigth-8 Heigth-9 Purline Girt Purline Girt Pur line Girt 6 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 7 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 8 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 9 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 10 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0
20. Varying bay length with width Total weight of Frame, Purline and Girt Heigth-6 Heigth-8 Heigth-9 Purline Girt Purline Girt Purline Girt 6 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 7 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 Z 250X 2.0 Spacing-1.5 Z 250X1.75 Spacing-1.35 8 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 9 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 C250 X 2.5 Spacing-1.4 C 250 X 2.5 Spacing-1.35 10 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0 C 250 X 2.5 Spacing-1.0
21. Varying wind speed with width Total weight of Frame, Purline and Girt wind Width-20m Width-35 speed Purline Girt Purline Girt 33 Z 200 X 1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 Z 200 X 1.75 Spacing-1.5 Z 200X1.75 Spacing-1.5 39 Z 200 X 2.0 Spacing-1.5 Z 200X2.0 Spacing-1.5 Z 200 X 2.0 Spacing-1.5 Z 200X2.0 Spacing-1.5 43 Z 250 X 2 Spacing-1.5 Z 250X2.0 Spacing-1.4 Z 250 X 2 Spacing-1.5 Z 250X2.0 Spacing-1.4 47 Z 250 X 2.5 Spacing-1.5 Z 250X2.0 Spacing-1.45 Z 250 X 2.5 Spacing-1.5 Z 250X2.0 Spacing-1.45 50 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 Z 250 X 2.5 Spacing-1.5 55 C 250 X 2.5 Spacing-1.35 C 250 X 2.5 Spacing-1.5 C 250 X 2.5 Spacing-1.35 C 250 X 2.5 Spacing-1.5
26. PROCESSES PEB BUILT UP LINE COLD FORM LINE SHEETING PRIMARY MEMBERS CKD C & Z PURLINS LINE HR SECTIONS & MISCELLANEOUS PARTS ROOF & WALL SHEETING GUTTER, FLASHINGS, TRIMS, ETC CKD CKD CKD ACCESSORIES SHIPMENT