Antonya vijaya raj CV -4 Years Experiences in Senior Sustain Engineer,
1. S.ANTONYA VIJAYA RAJ
Email: antonys.jayam@gmail.com
Mobile: +91-9489632681
Objective:
To learn and function effectively in an organization and be able to deliver to the
bottom-line .To constantly upgrade my knowledge and skills and make a difference in whatever I do.
Profile Summary:
1years 11months of progressive expensive in middle level management in managing Product
data, Engineering changes, Product documents, Creating bill of material, New part code creation,
, Product transfer ,New product implementation, Changes to bill of material for power
conditioning products (Servo Stabilizers, CVT ,UPS and IT) as Senior Engineer.
2years 3months of technical experience in Testing, Platforming, debugging ,validation ,ICT
machine debugging ,ICT testing and tuning, Fixture maintenance(Semi automotive), Load bank
repair and debugging ,PCA testing and debugging and FAT is experience in Test Engineer.
Core Competencies:
● Product Data Management (PDM)● Product Lifecycle Management (PLM)● Engineering
Change Management● Product Engineering ● Component Engineering ● BOM Management● New
product launches/ Product Transfers● Materials Management ● ERP SAP R/3 Enterprises ● Root Cause
Analysis (RCA)● Program/Project Management ●Testing PCA and Units(UPS) ●Validation for PCA
and Units ●ICT testing, tuning and debugging ●Fixture maintenance and debugging● Load bank repair
and debugging.
Experience details:
Company 2: Consul Neowatt power solutions (P) ltd, Chennai
Senior Engineer-Product Engineering Duration : October 2014 to till date
Company 1: Schneider Electric IT Business India (P) Ltd, Bangalore
Test Engineer- Test Engineering Duration : July 2012 to October 2014 (2.3 Years)
Expertise in
• Responsible for product testing of UPS, Inverter and PMM as per quality plan (Semi
automatic and manual testing) is range start from 20kva to 500kva.
• Responsible for product validation for pair of one.
• Debugging and repair the product, if failure occurs.
• Root cause analysis and corrective action implementation for testing failures
• JIG design/ preparation for Testing Purpose.
• Product Transfers & Technology transfers from Plant sites through Program Management &
Product Management techniques.
• Engineering change orders/ notes analysis, interpretation, materials planning, drawing action
plans and checklists, Implementation and signoff.
• Understanding the product, creating and managing the bill of materials in ERP (SAP):
Creating part numbers, vendor lists, creating service BOM, managing changes to BOM and
there structure by creating unique change numbers in ERP; Understanding materials
requirements and its management
• ERP: PP & MM Modules of SAP R/3 enterprises.
2. • Planning, scheduling and executing trials runs, pilot runs and handover to production for
volume production
• Managing EOL (end of life) and obsolete materials Inventory until stock depletion from ERP
• Preparing process documents such as Flow Chart, Control Plan and Work Instructions and
procedures
• Understanding manufacturing engineering and repair operations process flow, functions and
requirements
• Electronic components, their nomenclature and component selection
Work Position Summary and Key Achievement:
Consul Neowatt Power Solutions, Chennai – Senior Engineer, Product Engineering
• Material master creation & maintenance in SAP, product BOM structure creation in SAP,
engineering change detection, creation & order releases, new product launches, customer
inspections, component engineer and data handling in ERP.
• Responsible for reducing manufacturing cost
• Responsible to provide RCA & corrective action to the repetitive customer complaints
• Responsible for complete product data package readiness & ERP set up releases for New product
launches
• Provides regular support to the production department to resolve the product manufacturing/
engineering issues
• Responsible for Bill of materials setup, change note execution in SAP system and product data
tracking and distribution during Project Transfer
• Managing changes to bill of materials (includes changes to parent, child materials, assembly &
sub assembly structure level changes) and controlling them throughout the life cycle in SAP ERP
• Responsible for timely disposition of Obsolete and EOL materials
• Materials & resources (new & existing) planning and control arising due to change notes/ orders
implementations
• Implemented more than 120 change notes across multiple products so far with 100% accuracy
• Zero complaint from internal and external customers on change notes implementations from past
two years
• Analyzing the material requirement in terms of quality & quantity while sourcing
goods/components in right quantity with right margin from the vendors, suppliers; Conduct
Routine checks & discuss with design.
• Work over Operations and planning department for Material Requirement and Next Planning.
• SAP configuration change requirement and improvement activity in process of SAP to give the
scenario of requirement to consultant or ABAP.
• Evaluate the configuration and enhancement of SAP for improvement activity.
Team lead for NPD Activities
Improvement process activity of SAP and Improvement activity in SAP MM by own interest.
Was the NPD head within 1 Year .
Developed 10 model plus of UPS in working modules in engineering.
3. Achieved 50% cost reduction on EOL materials through ECO introduction
Schneider Electric IT Business India (P) Ltd, Bangalore– Test Engineer, Test Engineering
• Development of System Test Procedures (STP) against System requirements as per the
specifications and code reviews, Hardware/Software Integration testing on test bench/test jig.
• Responsible for ICT system Tuning and find out the tuning of actual and capture the variance.
• Responsible for ICT system debugging, maintenance of ICT equipment and reduce the downtime
for production.
• Designed test Jig for controlling the relay Operation inside Power Panel
• Leads in resolving Corrective Actions quickly pertaining to electrical/electronic components
• Actively participates in product transitions and discussions, and ensuring that all
electrical/Electronic parts-related issues affecting product transitions are resolved prior to release
to manufacturing
• Responsible for Test Fixture (Semi automatic/ manual) maintenance and debugging.
• Responsible for handling the equipment in Test Fixture.
• Responsible for Load Bank (RCD, RL) maintenance and debugging.
• Responsible for reduce the downtime of production.
• Responsible for PCA testing, Debugging and Repair PCA.
• Responsible for analyzing field problems based on the Field Quality Engineer feedback and
improve the test procedure in order to reduce the same
• Familiarity with the use and handling of test equipment such as Digital Oscilloscopes, DMM,
Hi-pot testers, LCR meters, Programmable power supplies etc.
• Brought down DPU (defects per unit) ratio, by giving online corrective action to the PCBA/Units
failing at ICT, Functional test, Safety test and Final Test for multiple products
Responsible to Conduct FAT of product, Prepare customer reports and Prepare product test
report.
Knowing Debug is ICT instrument and ICT system, like Spectrum, automotive fixture and Jig
preparation.
Problem fixing towards frequent fixture issue and ICT machine.
Suggestion related safety handling and process improvement activity within time and reducing
timing.
Academic profile:
BE in Electrical &Electronics engineering completed in 2012 of 8.32 CGPA
From Adhiyamaan college of engineering, Hosur, Tamilnadu.
4. DIPLOMA in Electrical &Electronics engineering completed in 2009 of 78%
From Adhiyamaan polytechnic college, Hosur, Tamilnadu.
Personal information:
Date of Birth : 14-07-1989
Father name : Mr. R.Selva Raj
Mother name : Mrs. S.Mary Stella
Marital status : Single
Languages : Tamil, English
Permanent address : Door.no:16/77-75 Ajay nilayam,
Durga nagar, Gani hotel back side,
Hosur-635109,
Krishnagiri district,
Tamilnadu (INDIA)
Declaration:
I hereby declare that all the above information is true and correct to the best of my
knowledge and belief.
Place: Yours faithfully,
Date:
(S.ANTONYA VIJAYA RAJ)