1. Production title – Karma.
Production schedule.
Wk. 1 Mon Tues Weds Thurs Fri Sat Sun
6th October
Planning and
making a time
table with the
actors.
Send an email to
local council
asking for
permission to use
the park.
Getting
permission from
the house owner.
Constant blog of
process.
Rehearse scenes
with actors.
Getting
permission to use
the TV studio.
Production
shopping.
Write down final
editing
techniques/transitions
etc for each scene we
do.
Team chat. Team chat
about sound
effects,
editing and
music and
make sure to
write down.
Wk. 2 Mon Tues Weds Thurs Fri Sat Sun
13th October Getting
permission to use
camera
equipment’s.
Constant blog of
progress.
Get the actors
dressed and ready
to shoot in the
first location
which is the
street. Inform the
actors what to do
then do constant
rehearsals to get
to perfection.
Meet up with actors to
rehearse a different
scene. Next scene will
be when Diana is at
the lockers.
Team chats
about sound
effects,
music and
editing.
(Final
decisions).
Wk. 3 Mon Tues Weds Thurs Fri Sat Sun
20th October Replay all the
scenes to check if
they are
performed well.
Constant blog of
Get Asmaa
dressed up to play
Priscilla, the
ghost. Rehearse
the scene of
Team meeting to
access progress.
Rehearse the ghost
scene again to get to
absolute perfection
then plan the meeting
at Geneva’s house for
Final
confirmation
of the dates
we are
available to
2. Production title – Karma.
Production schedule.
process. Diana receiving
the text then
spotting Priscilla.
Rehearse that
particular scene
of Priscilla on the
bench. Get
camera angles
and shots right.
the bed scene. travel to
Geneva’s
house.
Wk. 4 Mon Tues Weds Thurs Fri Sat Sun
Inform Diana
(main actor) to
bring a night
gown for
Wednesday’s
meet up at
Geneva’s house.
Constant blog of
process.
Get the props of
the camera
equipment, fake
blood, a bible and
cranberry juice to
rehearse at
Geneva’s house.
Rehearse till
perfection.
Do the next act of
Diana arriving to
school looking
pale and tired.
(Location will be
outside college,
near gates).
Get camera shots
etc right.
Team
meeting to
access
performance.
Wk. 5 Mon Tues Weds Thurs Fri Sat Sun
Blog process.
Ask actors to get
the property of
the fake blood
and lipstick for
the toilet scene.
Shoot the toilet
scene, Diana goes
toilet and sees
reflection of
ghost. After Diana
gets out of the
toilet she sees the
sink overflowing
with blood. She
blinks then there
is a writing of the
location of the
park in red/black
lipstick on the
mirror.
Team meeting to
access progress
than rehearse
scene again if
need be.
Arrange a date to
meet at the park
for the final scene
and prepare
transition to the
park.
Wk. 6 Mon Tues Weds Thurs Fri Sat Sun
3. Production title – Karma.
Production schedule.
Blog process.
Replay all scenes
to access
performance.
Remind team to
get properties of a
rope, fake
blood/ink, a
paper, celetape,
the ghost’s gown
and make-up.
Check weather for
park beforehand
e.g. whether it is
raining, foggy or
snowing.
Remind team
about properties
again.
With all
equipment, go to
the park to shoot
the final scene.
Get camera
angles and shot
scenes to get the
angles and shots
right. Rehearse
over again to get
right.
Team meeting to
access performance &
discuss sound, editing,
Discuss
sound,
editing etc
again.
Wk. 7 Mon Tues Weds Thurs Fri Sat Sun
Blog process.
Begin to ask for
feedback amongst
other people.
If need be
rehearse
particular scenes.
Wk. 8 Mon Tues Weds Thurs Fri Sat Sun
Wk. 9 Mon Tues Weds Thurs Fri Sat Sun
Wk. 10 Mon Tues Weds Thurs Fri Sat Sun