The document provides a 10 week production schedule for a short film titled "Karma". Key details include:
- Weeks 1-6 involve planning permissions, rehearsals, securing equipment and locations, and shooting scenes. Scenes will be shot on the street, at a house, college gates, park and other locations.
- Weeks 7-10 involve reviewing footage, additional rehearsals if needed, seeking feedback, and post-production work like sound editing.
- The schedule outlines preparation, rehearsal, and shooting plans for each day of the production period to ensure all elements are in place to film each scene. Meetings are scheduled to review progress and performance.
Hire↠Young Call Girls in Hari Nagar (Delhi) ☎️ 9205541914 ☎️ Independent Esco...
A2 media Timestable planning
1. Production title – Karma.
Production schedule.
Wk. 1 Mon Tues Weds Thurs Fri Sat Sun
6th
October
Planning and
making a
time table
with the
actors.
Send an
email to local
council
asking for
permission
to use the
park.
Getting
permission
from the
house
owner.
Constant
blog of
process.
Rehearse
scenes
with
actors.
Getting
permission
to use the
TV studio.
Production
shopping.
Write down final
editing
techniques/transitions
etc for each scene we
do.
Team chat. Team chat
about sound
effects,
editing and
music and
make sure
to write
down.
Wk. 2 Mon Tues Weds Thurs Fri Sat Sun
2. Production title – Karma.
Production schedule.
13th
October
Getting
permission
to use
camera
equipment’s.
Constant
blog of
progress.
Get the
actors
dressed
and ready
to shoot in
the first
location
which is
the street.
Inform the
actors what
to do then
do constant
rehearsals
to get to
perfection.
Meet up with actors to
rehearse a different
scene. Next scene will
be when Diana is at
the lockers.
Team chats
about sound
effects,
music and
editing.
(Final
decisions).
Wk. 3 Mon Tues Weds Thurs Fri Sat Sun
20th
October
Replay all
the scenes to
check if they
are
performed
well.
Constant
blog of
process.
Get Asmaa
dressed up
to play
Priscilla,
the ghost.
Rehearse
the scene
of Diana
receiving
Team
meeting
to access
progress.
Rehearse the ghost
scene again to get to
absolute perfection
then plan the meeting
at Geneva’s house for
the bed scene.
Final
confirmation
of the dates
we are
available to
travel to
Geneva’s
house.
3. Production title – Karma.
Production schedule.
the text
then
spotting
Priscilla.
Rehearse
that
particular
scene of
Priscilla on
the bench.
Get camera
angles and
shots right.
Wk. 4 Mon Tues Weds Thurs Fri Sat Sun
Inform Diana
(main actor)
to bring a
night gown
for
Wednesday’s
meet up at
Geneva’s
house.
Constant
blog of
Get the
props of
the camera
equipment,
fake blood,
a bible and
cranberry
juice to
rehearse at
Geneva’s
house.
Rehearse
Do the
next act
of Diana
arriving
to school
looking
pale and
tired.
(Location
will be
outside
college,
Team
meeting to
access
performance.
4. Production title – Karma.
Production schedule.
process. till
perfection.
near
gates).
Get
camera
shots etc
right.
Wk. 5 Mon Tues Weds Thurs Fri Sat Sun
Blog process.
Ask actors to
get the
property of
the fake
blood and
lipstick for
the toilet
scene.
Shoot the
toilet
scene,
Diana goes
toilet and
sees
reflection
of ghost.
After Diana
gets out of
the toilet
she sees
the sink
overflowing
with blood.
She blinks
then there
is a writing
Team
meeting
to access
progress
than
rehearse
scene
again if
need be.
Arrange
a date to
meet at
the park
for the
final
scene
and
prepare
5. Production title – Karma.
Production schedule.
of the
location of
the park in
red/black
lipstick on
the mirror.
transition
to the
park.
Wk. 6 Mon Tues Weds Thurs Fri Sat Sun
Blog process.
Replay all
scenes to
access
performance.
Remind team
to get
properties of
a rope, fake
blood/ink, a
paper,
celetape, the
ghost’s gown
and make-
up.
Check
weather
for park
beforehand
e.g.
whether it
is raining,
foggy or
snowing.
Remind
team about
properties
again.
With all
equipment,
go to the
park to
shoot the
final scene.
Get camera
angles and
shot scenes
to get the
angles and
shots right.
Rehearse
over again
to get
right.
Team meeting to
access performance &
discuss sound, editing,
Discuss
sound,
editing etc
again.
Wk. 7 Mon Tues Weds Thurs Fri Sat Sun
Blog process.
Begin to ask
If need be
rehearse
6. Production title – Karma.
Production schedule.
for feedback
amongst
other people.
particular
scenes.
Wk. 8 Mon Tues Weds Thurs Fri Sat Sun
Wk. 9 Mon Tues Weds Thurs Fri Sat Sun
Wk. 10 Mon Tues Weds Thurs Fri Sat Sun