INTRODUCTION
 Officially known as Rajiv Gandhi Sea Link.
 Cable-stayed bridge with pre-stressed concrete-steel viaducts.
 Links the Bandra (Western suburb) and Worli ( South Mumbai).
 Inaugurated on June 30 , 2009.
 Among the most complex & advanced construction projects
ever in India.
 Designed By : Sheshadri Srinivasan
(Structural engineer ,
Working in Lebanese Engineering Firm
Dar-Al-Handshah )
 Commissioned By : Maharashtra State Road Development Corporation
 Constructed By : Hindustan Construction company , India ( HCC)
HISTORY
 Mahim Causeway was the only link connecting westernsuburbs to island
city of Mumbai, making it highlycongested during the peak hours .
 Vehicular traffic admeasuring about 120,000 PCUtravels on the Mahim
causeway everyday and during peak hours and it takes about forty minutes to
travelfrom Mahim causeway to Worli, a distance of about 8km.
LOCATION
BASIC INFO
Official Name “ Rajiv Gandhi Setu ”
Carries 8 Lanes of Traffic
Owner MSRDC
Design Cable-stayed, Concrete-Steel precast viaducts
Total length 5.6 Km ( 3.5 miles )
Width 2 × 20 m ( 66 ft )
Highest Point 126 m ( 413 ft )
Longest Span 2 × 250 m ( 820 ft )
Vertical Clearance 20 m ( below bridge for transportation )
Foundation Type Pile Foundation
Toll System Automated 16-Lane Toll Plaza
Time Frame
 Estimated Time Frame : 5 years
Construction begin : June 1995
Construction end : March 2003
 Actual Time Frame : 11 years
Construction begin : October 2000
Construction End : 24 March 2010
Opened : 30 June 2009
BUDGET
 Estimated Cost : ₹ 665.81 Cr
 Actual Cost : ₹ 1653.25 Cr
 The Increament in project cost was due to payments of escalation ₹ 213
Cr on account of inordinate delay in completion (61 months ) .
New technical changes in the bridge at the behest of new consultant₹70 Cr
.
Contractor for delay in award of work ₹ 125 Cr .
Interest liability due to delayed completion ₹ 230 Cr .
 PIERS :
 The span between the piers is 50 maters .
 This distance arrived by considering optimization between foundation cost
Vs. superstructure cost .
 If the piers are wide apart then foundation cost comes down , but the
superstructure becomes heavier and its cost goes up .
 Moreover, more number of piers provide better wind resistance .
 CABLE WIRE
 Are also known as ‘ Parallel Wire Stay Cables ’.
 Manufactured by “Shanghai Pujiang Cable Co. Ltd” China .
 Each cable consists a group of steel wires ( 6 wires ) .
 Each steel wire has a diameter 7mm with a breaking limit of 6.28
Tones.
 Group of these wires was packed in two layers of HDPE (High
Density Poly Ethylene) material .
 Highly uneven and variable foundation bed
even for plane area of one pile .
 The maritime Board does not allow marine
traffic in monsoon season . Thus work was
halted Mid-May only to re-commence in
October . Effectively reducing the work
schedule to only seven month in a year .
 Needed for extra steel trusses , further
experts .
 Delay due to change in design of stray Cable
.
BENEFITS
 Considerable savings in travel time from 40
min to 8 min
 Estimated savings in fuel and vehicle
operating cost is around $ 16.2 million .
 Stress free driving .
 Reduced accidents and noise pollution .
 Reduction in air pollution .
Bandra - Worli sea link
Bandra - Worli sea link

Weitere ähnliche Inhalte

Was ist angesagt?

Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge Hakkim Shajahan
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea linkKAVYA H
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase IKaran Shah
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)Gurjit Kaur Kaler
 
conceptual desig of Chenab bridge
conceptual desig of Chenab bridge conceptual desig of Chenab bridge
conceptual desig of Chenab bridge muzafar farooq
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityPramod Kumar
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in indiaNishanth H A
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealinkpriyank123
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation projectVimal Maurya
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
PPT On High level bridge
PPT On High level bridgePPT On High level bridge
PPT On High level bridgeLOKESH
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Biharchauhansunny
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanAamir Rajput Khan
 

Was ist angesagt? (20)

Worldhighestrailwaybridge
Worldhighestrailwaybridge Worldhighestrailwaybridge
Worldhighestrailwaybridge
 
Bandra Worli sea link
Bandra Worli sea linkBandra Worli sea link
Bandra Worli sea link
 
Bandra worli sealink pdf
Bandra worli sealink pdfBandra worli sealink pdf
Bandra worli sealink pdf
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Mumbai metro project Phase I
Mumbai metro project Phase IMumbai metro project Phase I
Mumbai metro project Phase I
 
indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)indian infrastructure and pune metro project (feasibility analysis)
indian infrastructure and pune metro project (feasibility analysis)
 
conceptual desig of Chenab bridge
conceptual desig of Chenab bridge conceptual desig of Chenab bridge
conceptual desig of Chenab bridge
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
Hyderabad Metro Rail Project
Hyderabad Metro Rail ProjectHyderabad Metro Rail Project
Hyderabad Metro Rail Project
 
Presentation On Bandra Worli Sealink
Presentation On Bandra Worli SealinkPresentation On Bandra Worli Sealink
Presentation On Bandra Worli Sealink
 
Bangalore Metro Project
Bangalore Metro ProjectBangalore Metro Project
Bangalore Metro Project
 
Delhi metro rail corporation project
Delhi metro rail corporation projectDelhi metro rail corporation project
Delhi metro rail corporation project
 
report
reportreport
report
 
study on mundra port
study on mundra portstudy on mundra port
study on mundra port
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
PPT On High level bridge
PPT On High level bridgePPT On High level bridge
PPT On High level bridge
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
 
Presentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir KhanPresentation on chenab bridge by Aamir Khan
Presentation on chenab bridge by Aamir Khan
 
Metro ppt - copy
Metro ppt - copyMetro ppt - copy
Metro ppt - copy
 

Andere mochten auch

Bandra Worli Bridge
Bandra Worli BridgeBandra Worli Bridge
Bandra Worli Bridgederebail2008
 
Bandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLBandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLPriyanka Dalal
 
PPT ON GREEN CONCRETE BY TANMAY KUMAR
PPT ON GREEN CONCRETE BY TANMAY KUMARPPT ON GREEN CONCRETE BY TANMAY KUMAR
PPT ON GREEN CONCRETE BY TANMAY KUMARTanmay Kumar
 
PPT on Green concrete by Pankaj Kumar
PPT on Green concrete by Pankaj KumarPPT on Green concrete by Pankaj Kumar
PPT on Green concrete by Pankaj KumarPankaj Kumar
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksSlideShare
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShareSlideShare
 
Cost effective construction materials
Cost effective construction materialsCost effective construction materials
Cost effective construction materialsRAMSIDDARTHAN .
 
GPC PROJECT audit 2 Final
GPC PROJECT audit 2 Final GPC PROJECT audit 2 Final
GPC PROJECT audit 2 Final Prithvi Raj
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli SealinkDesignTeja
 

Andere mochten auch (20)

Bandra Worli Bridge
Bandra Worli BridgeBandra Worli Bridge
Bandra Worli Bridge
 
Bandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSLBandra Worli Sea Link #BWSL
Bandra Worli Sea Link #BWSL
 
Mumbai
MumbaiMumbai
Mumbai
 
B w sealink
B w sealinkB w sealink
B w sealink
 
Mmmodified copy
Mmmodified   copyMmmodified   copy
Mmmodified copy
 
PPT ON GREEN CONCRETE BY TANMAY KUMAR
PPT ON GREEN CONCRETE BY TANMAY KUMARPPT ON GREEN CONCRETE BY TANMAY KUMAR
PPT ON GREEN CONCRETE BY TANMAY KUMAR
 
PPT on Green concrete by Pankaj Kumar
PPT on Green concrete by Pankaj KumarPPT on Green concrete by Pankaj Kumar
PPT on Green concrete by Pankaj Kumar
 
How to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & TricksHow to Make Awesome SlideShares: Tips & Tricks
How to Make Awesome SlideShares: Tips & Tricks
 
Mirage - Rohan Lifescapes
Mirage - Rohan LifescapesMirage - Rohan Lifescapes
Mirage - Rohan Lifescapes
 
Getting Started With SlideShare
Getting Started With SlideShareGetting Started With SlideShare
Getting Started With SlideShare
 
Hanging bridge kota
Hanging bridge kotaHanging bridge kota
Hanging bridge kota
 
Bruj khalifa
Bruj khalifaBruj khalifa
Bruj khalifa
 
Cost effective construction materials
Cost effective construction materialsCost effective construction materials
Cost effective construction materials
 
Paresh
PareshParesh
Paresh
 
GPC PROJECT audit 2 Final
GPC PROJECT audit 2 Final GPC PROJECT audit 2 Final
GPC PROJECT audit 2 Final
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 
Project Management - Critical path method
Project Management - Critical path methodProject Management - Critical path method
Project Management - Critical path method
 
Hydraulics
HydraulicsHydraulics
Hydraulics
 
HOWRAH BRIDGE(ESTD-1943)
HOWRAH BRIDGE(ESTD-1943)HOWRAH BRIDGE(ESTD-1943)
HOWRAH BRIDGE(ESTD-1943)
 

Ähnlich wie Bandra - Worli sea link

Bogibeel Rail cum Road Bridge.pptx
Bogibeel Rail cum Road Bridge.pptxBogibeel Rail cum Road Bridge.pptx
Bogibeel Rail cum Road Bridge.pptxANURAGSWAIN12
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfGarimaSharma754550
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardRajesh Prasad
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge Taseem mir
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyPradeep Kumar
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealinkpeepkya
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealinkAmit Kumar
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkAbhijeetTambade3
 
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...IRJET Journal
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Rajesh Prasad
 
Padma bridge
Padma bridgePadma bridge
Padma bridgemsnsela
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxMdAbiAbdullah1
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Dr.Subramanian Narayanan
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET Journal
 

Ähnlich wie Bandra - Worli sea link (20)

Bridges construction
Bridges constructionBridges construction
Bridges construction
 
Bogibeel Rail cum Road Bridge.pptx
Bogibeel Rail cum Road Bridge.pptxBogibeel Rail cum Road Bridge.pptx
Bogibeel Rail cum Road Bridge.pptx
 
Report CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdfReport CHENAB BRIDGE 46,47,48,49 ....pdf
Report CHENAB BRIDGE 46,47,48,49 ....pdf
 
Innovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yardInnovative solution for crossing larger spaces like railway yard
Innovative solution for crossing larger spaces like railway yard
 
my project on chenab bridge
my project on chenab bridge my project on chenab bridge
my project on chenab bridge
 
Chenab bridge ppt
Chenab bridge pptChenab bridge ppt
Chenab bridge ppt
 
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway TechnologyChenab Bridge, Jammu and Kashmir - Railway Technology
Chenab Bridge, Jammu and Kashmir - Railway Technology
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra Worli Sealink
Bandra Worli SealinkBandra Worli Sealink
Bandra Worli Sealink
 
Bandra worli sealink
Bandra worli sealinkBandra worli sealink
Bandra worli sealink
 
Case Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor linkCase Study on Mumbai Trans Harbor link
Case Study on Mumbai Trans Harbor link
 
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
Review On Parametric Study Of Performance Of Different Types Of Trusses For P...
 
Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...Future fast track model for new road over bridge spanning over railway yard- ...
Future fast track model for new road over bridge spanning over railway yard- ...
 
Padma bridge
Padma bridgePadma bridge
Padma bridge
 
Chenab Bridge
Chenab BridgeChenab Bridge
Chenab Bridge
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptx
 
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
Futuristic Composite Bridges-ING IABSE June 2016-pp 1-11
 
CHENAB BRIDGE
CHENAB BRIDGECHENAB BRIDGE
CHENAB BRIDGE
 
Deh Cho Bridge
Deh Cho BridgeDeh Cho Bridge
Deh Cho Bridge
 
IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)IRJET- Design of Railway Foot Over Bridge (Shelu)
IRJET- Design of Railway Foot Over Bridge (Shelu)
 

Kürzlich hochgeladen

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 

Kürzlich hochgeladen (20)

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Bandra - Worli sea link

  • 1.
  • 2. BANDRA WORLI SEA-LINKBANDRA WORLI SEA LINK Presented By TE ( CIVIL) Ankita Pal SSJCET
  • 3. INTRODUCTION  Officially known as Rajiv Gandhi Sea Link.  Cable-stayed bridge with pre-stressed concrete-steel viaducts.  Links the Bandra (Western suburb) and Worli ( South Mumbai).  Inaugurated on June 30 , 2009.  Among the most complex & advanced construction projects ever in India.
  • 4.  Designed By : Sheshadri Srinivasan (Structural engineer , Working in Lebanese Engineering Firm Dar-Al-Handshah )  Commissioned By : Maharashtra State Road Development Corporation  Constructed By : Hindustan Construction company , India ( HCC)
  • 5. HISTORY  Mahim Causeway was the only link connecting westernsuburbs to island city of Mumbai, making it highlycongested during the peak hours .  Vehicular traffic admeasuring about 120,000 PCUtravels on the Mahim causeway everyday and during peak hours and it takes about forty minutes to travelfrom Mahim causeway to Worli, a distance of about 8km.
  • 7. BASIC INFO Official Name “ Rajiv Gandhi Setu ” Carries 8 Lanes of Traffic Owner MSRDC Design Cable-stayed, Concrete-Steel precast viaducts Total length 5.6 Km ( 3.5 miles ) Width 2 × 20 m ( 66 ft ) Highest Point 126 m ( 413 ft ) Longest Span 2 × 250 m ( 820 ft ) Vertical Clearance 20 m ( below bridge for transportation ) Foundation Type Pile Foundation Toll System Automated 16-Lane Toll Plaza
  • 8. Time Frame  Estimated Time Frame : 5 years Construction begin : June 1995 Construction end : March 2003  Actual Time Frame : 11 years Construction begin : October 2000 Construction End : 24 March 2010 Opened : 30 June 2009
  • 9. BUDGET  Estimated Cost : ₹ 665.81 Cr  Actual Cost : ₹ 1653.25 Cr  The Increament in project cost was due to payments of escalation ₹ 213 Cr on account of inordinate delay in completion (61 months ) . New technical changes in the bridge at the behest of new consultant₹70 Cr . Contractor for delay in award of work ₹ 125 Cr . Interest liability due to delayed completion ₹ 230 Cr .
  • 10.  PIERS :  The span between the piers is 50 maters .  This distance arrived by considering optimization between foundation cost Vs. superstructure cost .  If the piers are wide apart then foundation cost comes down , but the superstructure becomes heavier and its cost goes up .  Moreover, more number of piers provide better wind resistance .
  • 11.
  • 12.  CABLE WIRE  Are also known as ‘ Parallel Wire Stay Cables ’.  Manufactured by “Shanghai Pujiang Cable Co. Ltd” China .  Each cable consists a group of steel wires ( 6 wires ) .  Each steel wire has a diameter 7mm with a breaking limit of 6.28 Tones.  Group of these wires was packed in two layers of HDPE (High Density Poly Ethylene) material .
  • 13.
  • 14.  Highly uneven and variable foundation bed even for plane area of one pile .  The maritime Board does not allow marine traffic in monsoon season . Thus work was halted Mid-May only to re-commence in October . Effectively reducing the work schedule to only seven month in a year .  Needed for extra steel trusses , further experts .  Delay due to change in design of stray Cable .
  • 15. BENEFITS  Considerable savings in travel time from 40 min to 8 min  Estimated savings in fuel and vehicle operating cost is around $ 16.2 million .  Stress free driving .  Reduced accidents and noise pollution .  Reduction in air pollution .