1. ANIL KOHLI
Location: Amritsar, INDIA
EXPERIENCE - Total 38 Years approximately
CURRENT EMPLOYER
• Urban Mass Transit Company Ltd. (2nd June 2014- Till date)
Joined Urban Mass Transit Company. Ltd as Team Leader PMC for BRTS project at
Amritsar (Approx 31 Kms) on behalf of Client PBMS looking after all day to day works
for Construction of BRT Project including liaison with Clients, Local agencies etc.
complete.
PREVIOUS EXPERIENCES
• Voyants Solutions Pvt. Ltd. (16th
Dec 2013- 31st May 2014)
Joined Voyants Solutions Pvt. Ltd as Team Leader for Railway Doubling project of
Rewari Menheru line (Approx 70 Kms) on behalf of PMC looking after design and day
today works for doubling including liaison with Clients, Local agencies etc. complete.
• URS Scott Wilson India Pvt. Ltd. (4th March 13 – 12th
Dec 2013)
Joined URS Scott Wilson India Pvt. Ltd as Team Leader for Railway Doubling project of
Raipur Titlagarh line Package 3 (57.404 Kms) on behalf of PMC looking after design and
all day today works for doubling including liaison with Clients, Local agencies etc.
complete.
• Delhi Integrated Multimodal Transit System (‘DIMTS) (4th Feb. 09 to 31st
Dec 12)
Joined DIMTS, a Joint Venture of IDFC Foundation and Government of National Capital
Territory of Delhi (GNCTD) as Vice President (Projects), assigned to look after various
projects of the company. Looked after the new upcoming projects of the Delhi
Government in the Transport Sector such as Design and Construction of New Bus
Depots, New BRT Corridor, New design Stainless Steel Bus Queue Shelters for DTC
etc., looking after the complete project works including planning, execution, safety,
aspects, tendering, dealing with the clients, consultants and contractors etc. ensuring
profit for DIMTS.
• IRCON International Ltd (Approx 28 years): (June 1981 to February 2009)
Joined IRCON INTERNATIONAL LTD as Engineer (Civil) in June 1981, and
resigned in February 2009 from the post of General Manager.
Independently executed major projects in IRCON in India and abroad, such as design
and construction of Railway track, Railway electrification projects including
transmission line and design of structures, Highway and Flyover, Road over Bridges,
Residential Colonies and Industrial Building, Airport Hanger and associated
workshops, Metro, etc., The details of the various projects executed are annexed as
annexure A
2. • Central Water Commission: (August 1978 to June 1981)
Worked with Central Water Commission at their Central Soil & Material Research
Station, New Delhi. in the Rock Mechanics Department on explorations & testing of
rocks at the major Hydro Electric Projects in India such as Salal Dam, Chukha Dam,
Loktak Hydel project etc.
• Other Organisations: (June 1977 to August 1978)
Worked with Pendent Cement Authority, Bhutan, Industrial Consulting Bureau, Post &
telegraph Department Delhi at various Civil Engineering positions.
MAJOR PROJECTS EXECUTED AS PROJECT HEAD
The list is attached as Annexure B
QUALIFICATIONS & TRAININGS
• B.Tech from Indian Institute of Technology, Hauz Khas, New Delhi in Year 1977
• Qualified Project Management Professional (‘QPMP’) from International Project
Management Association, Switzerland in Dec. 2003.
• Technological Talent Development on Testing and Evaluation of IN-SITU concrete and
concrete structures conducted by Centre for Continuing Education, National Council for
Cement and Building Materials.
• CADS Training on GT STRUDL & CADS Software at the training centre of Ircon
International Limited, Gurgaon, India
• Have a very good knowledge of Microsoft Word Excel Power-point etc. and working
knowledge of M S Project and Primevera (Senior Executive level)
PERSONAL DETAILS
Father's Name: Late Sh. R.S. Kohli
Date of Birth: 5th
Nov 1953
E-mail: anilkohli1198@yahoo.co.in
Contact No: +91 9717988330 (Handphone, Viber and Whats app)
Postal Address: A 503, IRCON CGHS, Plot 14, Sector 18A, Dwarka, Delhi 110075
Skype anil.kohli60
3. Annexure A
DETAILS OF EXPERIENCE WITH IRCON INTERNATIONAL LTD
(From June 1981 to Feb 2009, Total approximately 28 years)
• Joined as Engineer and resigned as General Manager June 1981 – 3rd Feb 2009
Project Nov 2008 – Feb 2009
ROB projects on Madurai Kanyakumari Section with Head Quarters at Madurai
as General Manager & Project Head controlling the complete design and execution of
the Project including Planning, Execution, Safety, Tendering, Finance and
Administration etc., Dealing with the Clients, Consultants, Contractors and handing
over to the Client ensuring profitability to IRCON. Project cost INR 1427 Million
approximately.
Project July 2004 – Nov 2008
Ministry of Defense on Construction of 5 Housing Colonies, DLP of Construction of
IGRMS works, Bhopal Memorial Hospital etc. at Bhopal as General Manager and
Project Head controlling the complete execution of the Project including Planning,
Administration, Execution, Safety, Tendering and Finance etc., Dealing with the
Clients, Consultants, Contractors and handing over to the Client ensuring profitability to
IRCON. Total value of Projects INR 2395 Million approximately
Project Oct 2003 - July 2004
On the Border Fencing with Pakistan project Planning, Design, Execution, and analysis
of timely completion with profitability to the Organization. I was also preparing estimates
& tendering works on New Track design and laying project in Sudan, Africa with
planning and analyzing the profitability timely completion of the work with the requisite
quality expected by the Clients.
Project Jan. 2001 – Sept 2003
Worked in the Joint Venture of Ircon International Ltd with M/s L&T (ECC), M/S
Dywidag, Germany, M/s Samsung, Korea, M/s Shimizu, Japan. on the Construction
of Underground Metro Rail Corridor of Delhi Metro Rail Corporation (DMRC),
Delhi – seconded by IRCON in the capacity of Additional General Manager. The work
involved was Construction of underground Delhi metro Rail Corridor between ISBT and
Central Secretariat, a length of about 7 km. I was heading the department of
Liasioning, Planning and Safety of the buildings for the complete Project ensuring
timely action on all the issues. The working at this Joint Venture of IRCON was of the
4. international standards with very strict control on the quality and the time schedules
along with foreign experts of the various fields. I was also looking after the Safety of all
the buildings including those very old buildings in the walled city of Delhi over the
alignment of the Metro route and ensured the safety of the building on ground even when
tunneling with TBM or NATM method was being executed underneath these buildings,
Project cost INR 1845 Million approximately
Project April 1998 – Jan 2001
IRCON as Joint General Manager and Additional General Manager heading the
Project of Design and Construction of 1200 Meters long Flyover at JVLR Jaicoach
Junction on the busy Western Express Highway, at Jogeshwari, Mumbai for
Maharastra State Road Development Corporation as Project In charge. The project was
executed on the busy Western Express Highway and the work was to be completed in a
short time frame in the busy area required thorough planning, safety, quality and
execution. The Flyover was completed a month before the required time for construction
of twelve months with the meticulous Planning. Project cost INR 270 Million
approximately
I was also looking after the work of Construction of Multistoried flats for officers of
Ircon International Ltd., and Western Railway at Pali Hill, Bandra (West),
Mumbai, controlling the overall management of the project including planning,
execution, safety, finance, quality control etc. Project cost
INR 180 Million approximately
Besides above I had officiated as GM Western Region controlling all the works of
IRCON in the Western Region of India including design and construction of 29 ROBs in
the State of Maharastra. Project cost INR 1750 Million approximately
Project Nov.1992 - April 1998
IRCON/ Manager, Senior Manager & Joint General Manager/ Design and Construction
of balanced cantilever RCC folded plate hanger of IAL to accommodate 6 Airbus 300 at
Bombay as Project- in-charge. I was also looking after design and construction of Hanger
to accommodate 2 Boeing 747 Jumbos simultaneously, for Air India. The complete
works were planning of the work was to be done ensuring that the operations in the
Hanger could continue uninterrupted The work of Building rehabilitation and new
construction of CIFE was also looked after. After completion of IAL Hanger, looked
after the work of construction of 104 staff quarters for Airport Authority of India which
included complete services also such as Roads, Water Supply, and Drainage etc. Total
value of the Projects was INR 1000 Millions approximately.
I was working as Project In-charge for the above works controlling the overall
management of the project planning, design, execution, finance, safety, quality
control and marketing etc. ensuring the profitability for IRCON
5.
6. Project June1990 - Nov. 1992
IRCON/ as Manager for the Delhi Mathura Highway Project. looking after the works
of construction of Delhi Mathura Highway, offices & residential buildings for clients,
setting up of camps, quarries and besides all other works of construction of highway
project. Project cost INR 1637 Million approximately
Project Jan.1989 – June 1990
IRCON as Deputy Manager (Civil) in Turkey on Sincan Eskiseher Railway
Electrification project looking after the designs and construction of all civil structures.
Project cost US $. 150 Million approximately
Project Jan.1985 - Dec. 1988
IRCON Chandigarh/ as Project Head In-charge of the works looking after the projects of
design and Construction of widening to 4 lane and strengthening of National Highway-1
between Sirhind & Khanna in Punjab of 25 Kms length and Design and Construction
of ballast less track to attain Super Sonic speed with other miscellaneous works for
Ministry of Defense, Government of India. Project cost INR 120 Million approximately
Project Sept.1984 - Dec.1984
IRCON Project in IRAQ for on-site training of high speed track for Govt. of IRAQ
at Samawa, IRAQ.
Overseas Exposure
I was sent to IRAQ for three months onsite training on the construction of High Speed
Rail track works along-with all ancillary works such as Embankment construction, Road
works, Bridges works Buildings etc. The work was being carried out under strict
control of European Consultants. After successfully completing the training I was
repatriated back in Dec 1984. Total value of the Projects was US $ 480 Million
approximately
Project Jun.1981 - Sep. 1984
IRCON on Delhi Mathura Railway Electrification Project as in-charge of works for
design and Construction of Railway Electrification structures, transmission line projects.
Project cost INR 1427 Million approximately
7. Annexure B
FEW OF MAJOR PROJECTS EXECUTED AS PROJECT HEAD
1. Team Leader PMC of 31 Kms long Amritsar BRTS project looking after
complete works.
2. Head PMC for Construction of Roadbed, 4 Major and 40 Minor Bridges,
Overhead 25KV Traction, and General Electrical works for Doubling of Rewari
Menheru section (70 Kms) of NW Railways in the state of Haryana.
3. Head PMC for Construction of Roadbed, 6 Major and 90 Minor Bridges, Outdoor
Signaling and General Electrical works for Doubling of Arand Raipur section
(57.404 Kms) of E C and SEC Railways in the state of Chatisgarh.
4. 1502 Dwelling Units in 5 Projects including all Water Supply, Sewerage, Storm
water drainage, Electrical services and Roads etc complete for MAP at Bhopal
5. Construction of 1157 New Stainless Steel Design Bus Queue Shelters in Delhi.
6. Construction of Bus Depot for Public Transport Buses in Delhi
7. Construction of BRT Corridors in Delhi
8. ROBs on Madurai Kanyakumari section of National Highway NH 7
9. MC 1B Project of Delhi Metro as Leader and Dy. Leader of JV partner IRCON.
10. Construction of JVLR Jaicoach Flyover at Jogeshwari, Mumbai
11. Construction of Housing Colonies for Airport Authority of India at Mumbai
12. Construction of Multistory Flats at Pali Hill Mumbai for Railway and IRCON
officers
13. Construction of 128 Meter span Hangar and Ancillary workshops for Air India at
Santacruz Mumbai
14. Construction of 60 Meter balanced cantilever Hangar with Ancillary workshops
for Indian Airlines at Ville Parle Mumbai
15. Rehabilitation and construction of Buildings for CIFE Mumbai
16. Construction of Office Building for Project Director, Delhi Mathura Highway at
Faridabad
17. Construction of Residential Colony for the Officers working at Project Director
Office, Delhi Mathura Highway at Faridabad
18. Setting up of Camp Offices for the Delhi Mathura Highway Project of NH 1
19. Design and Execution of Railway Electrification Structures on Ankara Eskiseher
Section of Turkish Railways
20. Construction of Sirhind Khanna Highway section of National Highway NH 1
21. Construction of Very High speed track for TBRL, DRDO Chandigarh
22. Construction of 50 KM double circuit Transmission line in Haryana
23. Design of Railway Electrification Structures on Mathura Gangapur Section of
Indian Railways
24. Design of Railway Electrification Structures on Delhi Mathura Section of Indian
Railways