Design Stage
Here is the assessment criteria
“A Range of feasible…”
• Should be at least 4 different designs.
• Each should be suitable and usable if chosen
  for the final product.
“Each Evaluated…”
• You need to write down an evaluation of each
  design you do, checking it against the design
  specification to make sure it meets it.
• If it doesn’t meet it, the design can’t be
  considered ‘feasible’.
• You could copy your test table and use it here but
  bare in mind that some of the criteria might not
  yet be testable if they require a fully functioning
  website. Select the appropriate ones.
“and evaluates it fully and critically”
• You need to choose one of your prototype
  designs and fully and critically evaluate it
  against the specification.
• This means that you need to write a more
  detailed report of exactly why you chose it,
  why it meets the specification better than the
  other designs and you can also be critical here
  and suggest some improvements to it, in
  order to make it fully meet the specification.
What you need to have
For a Level 5/6:
• At least 4 different prototype designs (in this
  case 4 full radio scripts)
• An evaluation of each design against the
  design specification.
• Identify your chosen design
• Fully and critically evaluate this design against
  the design specification.

Weitere ähnliche Inhalte

Ähnlich wie Design stage grade 11 unit 2

Discussing Design: The Art of Critique
Discussing Design: The Art of CritiqueDiscussing Design: The Art of Critique
Discussing Design: The Art of CritiqueAaron Irizarry
 
Tester Challenges in Agile ?
Tester Challenges in Agile ?Tester Challenges in Agile ?
Tester Challenges in Agile ?alind tiwari
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from ScenariosRavikanth-BA
 
Project management for qa manager
Project management for qa managerProject management for qa manager
Project management for qa managergaoliang641
 
Phases in Agile Development- 9.pptx
Phases in Agile Development- 9.pptxPhases in Agile Development- 9.pptx
Phases in Agile Development- 9.pptxAlishaFida1
 
Creating Disruptive Strategies In Legacy Products
Creating Disruptive Strategies In Legacy ProductsCreating Disruptive Strategies In Legacy Products
Creating Disruptive Strategies In Legacy ProductsJulie Anne Reda
 
Seven deadly sins of software reviews
Seven deadly sins of software reviewsSeven deadly sins of software reviews
Seven deadly sins of software reviewsallle90
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product designDevin Wong
 
project 1- product design
project 1- product designproject 1- product design
project 1- product designTyan Yiing
 
Planning Patterns for Agile Testers
Planning Patterns for Agile TestersPlanning Patterns for Agile Testers
Planning Patterns for Agile TestersGerrit Beine
 
Engineering Design Process
Engineering Design ProcessEngineering Design Process
Engineering Design ProcessM.T.H Group
 
Reduced specification by_example2
Reduced specification by_example2Reduced specification by_example2
Reduced specification by_example2afreidah
 
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...D2L Barry
 
Focus on Quality: Kanban Recipe for Success Step One
Focus on Quality: Kanban Recipe for Success Step OneFocus on Quality: Kanban Recipe for Success Step One
Focus on Quality: Kanban Recipe for Success Step OneJason Yip
 

Ähnlich wie Design stage grade 11 unit 2 (20)

Discussing Design: The Art of Critique
Discussing Design: The Art of CritiqueDiscussing Design: The Art of Critique
Discussing Design: The Art of Critique
 
Tester Challenges in Agile ?
Tester Challenges in Agile ?Tester Challenges in Agile ?
Tester Challenges in Agile ?
 
Agile process
Agile processAgile process
Agile process
 
User Stories from Scenarios
User Stories from ScenariosUser Stories from Scenarios
User Stories from Scenarios
 
Project management for qa manager
Project management for qa managerProject management for qa manager
Project management for qa manager
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
Phases in Agile Development- 9.pptx
Phases in Agile Development- 9.pptxPhases in Agile Development- 9.pptx
Phases in Agile Development- 9.pptx
 
Creating Disruptive Strategies In Legacy Products
Creating Disruptive Strategies In Legacy ProductsCreating Disruptive Strategies In Legacy Products
Creating Disruptive Strategies In Legacy Products
 
Seven deadly sins of software reviews
Seven deadly sins of software reviewsSeven deadly sins of software reviews
Seven deadly sins of software reviews
 
Test Bench Development
Test Bench DevelopmentTest Bench Development
Test Bench Development
 
Agile testing
Agile testingAgile testing
Agile testing
 
Project 1 product design
Project 1 product designProject 1 product design
Project 1 product design
 
project 1- product design
project 1- product designproject 1- product design
project 1- product design
 
Planning Patterns for Agile Testers
Planning Patterns for Agile TestersPlanning Patterns for Agile Testers
Planning Patterns for Agile Testers
 
Engineering Design Process
Engineering Design ProcessEngineering Design Process
Engineering Design Process
 
Reduced specification by_example2
Reduced specification by_example2Reduced specification by_example2
Reduced specification by_example2
 
Graphics presentation
Graphics presentationGraphics presentation
Graphics presentation
 
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...
Presentation at Minnesota Brightspace Ignite on April 24, 2015, byCreating an...
 
WRITING REVIEWS_EAPP.pptx
WRITING REVIEWS_EAPP.pptxWRITING REVIEWS_EAPP.pptx
WRITING REVIEWS_EAPP.pptx
 
Focus on Quality: Kanban Recipe for Success Step One
Focus on Quality: Kanban Recipe for Success Step OneFocus on Quality: Kanban Recipe for Success Step One
Focus on Quality: Kanban Recipe for Success Step One
 

Mehr von ISM

Whyisyourproductneeded 170119081244
Whyisyourproductneeded 170119081244Whyisyourproductneeded 170119081244
Whyisyourproductneeded 170119081244ISM
 
Design specification intro
Design specification introDesign specification intro
Design specification introISM
 
Why is your short film needed?
Why is your short film needed?Why is your short film needed?
Why is your short film needed?ISM
 
G11 Unit 1 Intro - updated
G11 Unit 1 Intro - updatedG11 Unit 1 Intro - updated
G11 Unit 1 Intro - updatedISM
 
G11unit1intro 140907051733-phpapp02
G11unit1intro 140907051733-phpapp02G11unit1intro 140907051733-phpapp02
G11unit1intro 140907051733-phpapp02ISM
 
Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02ISM
 
G11 Unit 1 Intro
G11 Unit 1 IntroG11 Unit 1 Intro
G11 Unit 1 IntroISM
 
Unit 1 Intro
Unit 1 IntroUnit 1 Intro
Unit 1 IntroISM
 
New design cycle intro
New design cycle introNew design cycle intro
New design cycle introISM
 
Deadline g11 unit 2 full
Deadline g11 unit 2 fullDeadline g11 unit 2 full
Deadline g11 unit 2 fullISM
 
Unit question
Unit questionUnit question
Unit questionISM
 
Website project
Website projectWebsite project
Website projectISM
 
Criterion e
Criterion eCriterion e
Criterion eISM
 
Pp criteria & objectives[1]
Pp criteria & objectives[1]Pp criteria & objectives[1]
Pp criteria & objectives[1]ISM
 
Process journal g10
Process journal g10Process journal g10
Process journal g10ISM
 
Form period thursday 3 oct
Form period thursday 3 octForm period thursday 3 oct
Form period thursday 3 octISM
 
Poster lauravanstrraaten
Poster lauravanstrraatenPoster lauravanstrraaten
Poster lauravanstrraatenISM
 
Use of process journal and define the goal
Use of process journal and define the goalUse of process journal and define the goal
Use of process journal and define the goalISM
 
Worksheet for Analysis of a Poster
Worksheet for Analysis of a PosterWorksheet for Analysis of a Poster
Worksheet for Analysis of a PosterISM
 
Design brief g11 unit 1
Design brief g11 unit 1Design brief g11 unit 1
Design brief g11 unit 1ISM
 

Mehr von ISM (20)

Whyisyourproductneeded 170119081244
Whyisyourproductneeded 170119081244Whyisyourproductneeded 170119081244
Whyisyourproductneeded 170119081244
 
Design specification intro
Design specification introDesign specification intro
Design specification intro
 
Why is your short film needed?
Why is your short film needed?Why is your short film needed?
Why is your short film needed?
 
G11 Unit 1 Intro - updated
G11 Unit 1 Intro - updatedG11 Unit 1 Intro - updated
G11 Unit 1 Intro - updated
 
G11unit1intro 140907051733-phpapp02
G11unit1intro 140907051733-phpapp02G11unit1intro 140907051733-phpapp02
G11unit1intro 140907051733-phpapp02
 
Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02Newdesigncycleintro 140901083345-phpapp02
Newdesigncycleintro 140901083345-phpapp02
 
G11 Unit 1 Intro
G11 Unit 1 IntroG11 Unit 1 Intro
G11 Unit 1 Intro
 
Unit 1 Intro
Unit 1 IntroUnit 1 Intro
Unit 1 Intro
 
New design cycle intro
New design cycle introNew design cycle intro
New design cycle intro
 
Deadline g11 unit 2 full
Deadline g11 unit 2 fullDeadline g11 unit 2 full
Deadline g11 unit 2 full
 
Unit question
Unit questionUnit question
Unit question
 
Website project
Website projectWebsite project
Website project
 
Criterion e
Criterion eCriterion e
Criterion e
 
Pp criteria & objectives[1]
Pp criteria & objectives[1]Pp criteria & objectives[1]
Pp criteria & objectives[1]
 
Process journal g10
Process journal g10Process journal g10
Process journal g10
 
Form period thursday 3 oct
Form period thursday 3 octForm period thursday 3 oct
Form period thursday 3 oct
 
Poster lauravanstrraaten
Poster lauravanstrraatenPoster lauravanstrraaten
Poster lauravanstrraaten
 
Use of process journal and define the goal
Use of process journal and define the goalUse of process journal and define the goal
Use of process journal and define the goal
 
Worksheet for Analysis of a Poster
Worksheet for Analysis of a PosterWorksheet for Analysis of a Poster
Worksheet for Analysis of a Poster
 
Design brief g11 unit 1
Design brief g11 unit 1Design brief g11 unit 1
Design brief g11 unit 1
 

Design stage grade 11 unit 2

  • 2. Here is the assessment criteria
  • 3. “A Range of feasible…” • Should be at least 4 different designs. • Each should be suitable and usable if chosen for the final product.
  • 4. “Each Evaluated…” • You need to write down an evaluation of each design you do, checking it against the design specification to make sure it meets it. • If it doesn’t meet it, the design can’t be considered ‘feasible’. • You could copy your test table and use it here but bare in mind that some of the criteria might not yet be testable if they require a fully functioning website. Select the appropriate ones.
  • 5. “and evaluates it fully and critically” • You need to choose one of your prototype designs and fully and critically evaluate it against the specification. • This means that you need to write a more detailed report of exactly why you chose it, why it meets the specification better than the other designs and you can also be critical here and suggest some improvements to it, in order to make it fully meet the specification.
  • 6. What you need to have For a Level 5/6: • At least 4 different prototype designs (in this case 4 full radio scripts) • An evaluation of each design against the design specification. • Identify your chosen design • Fully and critically evaluate this design against the design specification.