Chapter 5
Chapter 5
Equipment Operation
Equipment Operation
Madawalabu
Madawalabu
University
University
Chapter 5
Chapter 5
Equipment Operation
Equipment Operation
Inst
Instr
ructor
uctor:
: Andualem
Andualem Endris
Endris (
(M.Sc
M.Sc)
)
andu0117@yahoo.com
andu0117@yahoo.com
School of Engineering,
School of Engineering,
Construction Technology & Management
Construction Technology & Management D
Department
epartment
A. Safety
A. Safety
Signs and symbols
Signs and symbols

 Visible at all times
Visible at all times

 Danger signs
Danger signs

 Caution signs
Caution signs

 Visible at all times
Visible at all times

 Danger signs
Danger signs

 Caution signs
Caution signs
1a
February 2, 2019 2
COTM 4202
Exit signs
Exit signs

 Legible red letters
Legible red letters

 Or red background with legible
Or red background with legible
white letters
white letters

 Legible red letters
Legible red letters

 Or red background with legible
Or red background with legible
white letters
white letters
2a
CLOSED CLOSED
February 2, 2019 3
COTM 4202
Safety instruction
Safety instruction
signs/directional signs
signs/directional signs

 Safety instruction signs
Safety instruction signs

 Directional signs
Directional signs

 Safety instruction signs
Safety instruction signs

 Directional signs
Directional signs
3a
February 2, 2019 4
COTM 4202
Traffic signs
Traffic signs

 Use at points of hazard
Use at points of hazard

 Place at 50m from points of
Place at 50m from points of
hazard
hazard

 Use at points of hazard
Use at points of hazard

 Place at 50m from points of
Place at 50m from points of
hazard
hazard
4a
February 2, 2019 5
COTM 4202
Accident prevention
Accident prevention
tags
tags

 Temporary means of warning
Temporary means of warning
employees
employees

 Not be used in place of accident
Not be used in place of accident
prevention signs
prevention signs

 Temporary means of warning
Temporary means of warning
employees
employees

 Not be used in place of accident
Not be used in place of accident
prevention signs
prevention signs
5a
February 2, 2019 6
COTM 4202
Requirements for
Requirements for
flagmen
flagmen

 Red flags at least
Red flags at least
18 inches
18 inches
square
square

 Sign paddles
Sign paddles

 Red flags at least
Red flags at least
18 inches
18 inches
square
square

 Sign paddles
Sign paddles
6a
February 2, 2019 7
COTM 4202
Requirements for
Requirements for
flagmen
flagmen

 In darkness
In darkness—
—red lights
red lights

 Warning garment
Warning garment

 In darkness
In darkness—
—red lights
red lights

 Warning garment
Warning garment
6b
February 2, 2019 8
COTM 4202
Construction equipment
Construction equipment

 Adjacent to
Adjacent to
a highway
a highway
•
• Unattended at night
Unattended at night

 Adjacent to
Adjacent to
a highway
a highway
•
• Unattended at night
Unattended at night
8a
February 2, 2019 9
COTM 4202
Construction equipment
Construction equipment

 Adjacent to construction areas
Adjacent to construction areas

 Provide lights or
Provide lights or
reflectors
reflectors

 Adjacent to construction areas
Adjacent to construction areas

 Provide lights or
Provide lights or
reflectors
reflectors
8b
February 2, 2019 10
COTM 4202
Equipment inspection
Equipment inspection

 Operate on an off
Operate on an off-
-highway
highway
jobsite
jobsite

 Not open to
Not open to
public traffic
public traffic

 Beginning of
Beginning of
each shift
each shift

 Operate on an off
Operate on an off-
-highway
highway
jobsite
jobsite

 Not open to
Not open to
public traffic
public traffic

 Beginning of
Beginning of
each shift
each shift
12a
February 2, 2019 11
COTM 4202
Inspect for:
Inspect for:

 Service breakers
Service breakers

 Tires
Tires

 Brakes
Brakes

 Service breakers
Service breakers

 Tires
Tires

 Brakes
Brakes
12c
February 2, 2019 12
COTM 4202
Inspect for:
Inspect for:

 Operating controls
Operating controls

 Safety devices
Safety devices

 Seat belts
Seat belts

 Operating controls
Operating controls

 Safety devices
Safety devices

 Seat belts
Seat belts
12e
February 2, 2019 13
COTM 4202
Inspect for:
Inspect for:

 Lights
Lights

 Fire extinguishers
Fire extinguishers

 Reflectors
Reflectors

 Other
Other
equipment
equipment



 Lights
Lights

 Fire extinguishers
Fire extinguishers

 Reflectors
Reflectors

 Other
Other
equipment
equipment


12f
February 2, 2019
14
COTM 4202
Correct all defects
Correct all defects

 Before equipment is placed in
Before equipment is placed in
service
service
12h
February 2, 2019 15
COTM 4202
Operating equipment in
Operating equipment in
reverse: Do if
reverse: Do if

 The equipment has a reverse
The equipment has a reverse
signal alarm distinguishable
signal alarm distinguishable
from the surrounding noise
from the surrounding noise
level, or
level, or

 An employee signals that it is
An employee signals that it is
safe to do so
safe to do so

 The equipment has a reverse
The equipment has a reverse
signal alarm distinguishable
signal alarm distinguishable
from the surrounding noise
from the surrounding noise
level, or
level, or

 An employee signals that it is
An employee signals that it is
safe to do so
safe to do so
13a
February 2, 2019 16
COTM 4202
February 2, 2019 COTM 4202 17
B. Equipment Utilization
B. Equipment Utilization

 Utilization is working time
Utilization is working time
duration, not calendar duration
duration, not calendar duration

 Utilization data are:
Utilization data are:
•
• Work load
Work load
•
• Speed
Speed
•
• Environment
Environment
 (See Chapter 3: Productivity)

 Utilization is working time
Utilization is working time
duration, not calendar duration
duration, not calendar duration

 Utilization data are:
Utilization data are:
•
• Work load
Work load
•
• Speed
Speed
•
• Environment
Environment
 (See Chapter 3: Productivity)
February 2, 2019 COTM 4202 18
C. Technology
C. Technology
 Automation of Equipment
• The introduction of new mechanized equipment
in construction has had a profound effect on the
cost and productivity of construction as well as
the methods used for construction itself.
• An exciting example of innovation in this regard
is the introduction of computer microprocessors
on tools and equipment. As a result, the
performance and activity of equipment can be
continually monitored and adjusted for
improvement.
 Automation of Equipment
• The introduction of new mechanized equipment
in construction has had a profound effect on the
cost and productivity of construction as well as
the methods used for construction itself.
• An exciting example of innovation in this regard
is the introduction of computer microprocessors
on tools and equipment. As a result, the
performance and activity of equipment can be
continually monitored and adjusted for
improvement.
February 2, 2019 COTM 4202 19
Thank You
Thank You
STAY SAFE!
STAY SAFE!
Thank You
Thank You
STAY SAFE!
STAY SAFE!
February 2, 2019 COTM 4202 20

Weitere ähnliche Inhalte

Ähnlich wie Construction equipment management chapter 5

Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...Tony Dale
 
IRJET- Study on Fire Hazard in Textile Industries
IRJET- Study on Fire Hazard in Textile IndustriesIRJET- Study on Fire Hazard in Textile Industries
IRJET- Study on Fire Hazard in Textile IndustriesIRJET Journal
 
IRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET Journal
 
airport building fire safety zurich.pdf
airport building fire safety zurich.pdfairport building fire safety zurich.pdf
airport building fire safety zurich.pdfsriram123456
 
airport building fire safety zurich.pdf
airport building fire safety zurich.pdfairport building fire safety zurich.pdf
airport building fire safety zurich.pdfsriram123456
 
Ian Doig CV 2016
Ian Doig CV 2016Ian Doig CV 2016
Ian Doig CV 2016Ian Doig
 
6706 unit 209 ppt1
6706 unit 209 ppt16706 unit 209 ppt1
6706 unit 209 ppt1kevin porter
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGCESatvirSingh1
 
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYAIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYIRJET Journal
 
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYAIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYIRJET Journal
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringPrakash Kumar Jha
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018Marcep Inc.
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedinSimon Britton
 
industrial-training-in-bharat-electronics-limited
 industrial-training-in-bharat-electronics-limited industrial-training-in-bharat-electronics-limited
industrial-training-in-bharat-electronics-limitedATTO RATHORE
 
2. Practical Ass_Plan and organise work.docx
2. Practical Ass_Plan and organise work.docx2. Practical Ass_Plan and organise work.docx
2. Practical Ass_Plan and organise work.docxCITPainting
 
Automatic covid screening and deep learning
Automatic covid screening and deep learningAutomatic covid screening and deep learning
Automatic covid screening and deep learningIRJET Journal
 
Pp working eff & eff work area
Pp working eff & eff   work areaPp working eff & eff   work area
Pp working eff & eff work areaMaxy2001
 
Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)Rohith Krishnan
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET Journal
 
IRJET- Intelligent Traffic Management for Ambulance and VIP Vehicles
IRJET- Intelligent Traffic Management for Ambulance and VIP VehiclesIRJET- Intelligent Traffic Management for Ambulance and VIP Vehicles
IRJET- Intelligent Traffic Management for Ambulance and VIP VehiclesIRJET Journal
 

Ähnlich wie Construction equipment management chapter 5 (20)

Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...
Geo Therm Ltd -The prevention of breakdowns and electrical fires in logistics...
 
IRJET- Study on Fire Hazard in Textile Industries
IRJET- Study on Fire Hazard in Textile IndustriesIRJET- Study on Fire Hazard in Textile Industries
IRJET- Study on Fire Hazard in Textile Industries
 
IRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly ShopIRJET- Risk Assessment in Automobile Assembly Shop
IRJET- Risk Assessment in Automobile Assembly Shop
 
airport building fire safety zurich.pdf
airport building fire safety zurich.pdfairport building fire safety zurich.pdf
airport building fire safety zurich.pdf
 
airport building fire safety zurich.pdf
airport building fire safety zurich.pdfairport building fire safety zurich.pdf
airport building fire safety zurich.pdf
 
Ian Doig CV 2016
Ian Doig CV 2016Ian Doig CV 2016
Ian Doig CV 2016
 
6706 unit 209 ppt1
6706 unit 209 ppt16706 unit 209 ppt1
6706 unit 209 ppt1
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYAIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
 
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITYAIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
AIR POLLUTION IMPACT ON ENVIRONMENT IN KOZHIKODE CITY
 
Industrial trainning project report for Civil Engineering
Industrial trainning project report for Civil EngineeringIndustrial trainning project report for Civil Engineering
Industrial trainning project report for Civil Engineering
 
Asset corrosion management cui - masterclass 2018
Asset corrosion management   cui - masterclass 2018Asset corrosion management   cui - masterclass 2018
Asset corrosion management cui - masterclass 2018
 
Simon Britton CV linkedin
Simon Britton CV linkedinSimon Britton CV linkedin
Simon Britton CV linkedin
 
industrial-training-in-bharat-electronics-limited
 industrial-training-in-bharat-electronics-limited industrial-training-in-bharat-electronics-limited
industrial-training-in-bharat-electronics-limited
 
2. Practical Ass_Plan and organise work.docx
2. Practical Ass_Plan and organise work.docx2. Practical Ass_Plan and organise work.docx
2. Practical Ass_Plan and organise work.docx
 
Automatic covid screening and deep learning
Automatic covid screening and deep learningAutomatic covid screening and deep learning
Automatic covid screening and deep learning
 
Pp working eff & eff work area
Pp working eff & eff   work areaPp working eff & eff   work area
Pp working eff & eff work area
 
Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)Copy of mis 004-pgdm-1 (full & final)
Copy of mis 004-pgdm-1 (full & final)
 
IRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature ReviewIRJET- Labour Safety in Construction Industry: A Literature Review
IRJET- Labour Safety in Construction Industry: A Literature Review
 
IRJET- Intelligent Traffic Management for Ambulance and VIP Vehicles
IRJET- Intelligent Traffic Management for Ambulance and VIP VehiclesIRJET- Intelligent Traffic Management for Ambulance and VIP Vehicles
IRJET- Intelligent Traffic Management for Ambulance and VIP Vehicles
 

Mehr von Delhi Technological University

Mehr von Delhi Technological University (20)

Chapter 6- Contract Management
Chapter 6- Contract ManagementChapter 6- Contract Management
Chapter 6- Contract Management
 
Chapter 5- Contract Management
Chapter 5- Contract ManagementChapter 5- Contract Management
Chapter 5- Contract Management
 
Chapter 4- Contract Management
Chapter 4- Contract ManagementChapter 4- Contract Management
Chapter 4- Contract Management
 
Chapter 3- Contract Management
Chapter 3- Contract ManagementChapter 3- Contract Management
Chapter 3- Contract Management
 
Chapter 2- Contract Management
Chapter 2- Contract ManagementChapter 2- Contract Management
Chapter 2- Contract Management
 
Chapter 1- Procurement management
Chapter 1- Procurement managementChapter 1- Procurement management
Chapter 1- Procurement management
 
Chapter 4
Chapter 4Chapter 4
Chapter 4
 
Chapter 3- Construction Law
Chapter 3- Construction Law Chapter 3- Construction Law
Chapter 3- Construction Law
 
Chapter 2- Construction Law
Chapter 2- Construction Law Chapter 2- Construction Law
Chapter 2- Construction Law
 
Chapter 1-Construction Law
Chapter 1-Construction Law Chapter 1-Construction Law
Chapter 1-Construction Law
 
Chapter 3- Lecture
Chapter 3- LectureChapter 3- Lecture
Chapter 3- Lecture
 
Chapter 2- Lecture
Chapter 2- LectureChapter 2- Lecture
Chapter 2- Lecture
 
Chapter 1- Lecture
Chapter 1- LectureChapter 1- Lecture
Chapter 1- Lecture
 
Construction equipment management chapter 3
Construction equipment management chapter 3Construction equipment management chapter 3
Construction equipment management chapter 3
 
Construction equipment management chapter 2
Construction equipment management chapter 2Construction equipment management chapter 2
Construction equipment management chapter 2
 
Construction equipment management chapter 1pdf
Construction equipment management chapter 1pdfConstruction equipment management chapter 1pdf
Construction equipment management chapter 1pdf
 
Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]Chapter 5 [compatibility mode]
Chapter 5 [compatibility mode]
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 
Chapter 3 [compatibility mode]
Chapter 3 [compatibility mode]Chapter 3 [compatibility mode]
Chapter 3 [compatibility mode]
 
Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]Chapter 2 [compatibility mode]
Chapter 2 [compatibility mode]
 

Kürzlich hochgeladen

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 

Kürzlich hochgeladen (20)

(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 

Construction equipment management chapter 5

  • 1. Chapter 5 Chapter 5 Equipment Operation Equipment Operation Madawalabu Madawalabu University University Chapter 5 Chapter 5 Equipment Operation Equipment Operation Inst Instr ructor uctor: : Andualem Andualem Endris Endris ( (M.Sc M.Sc) ) andu0117@yahoo.com andu0117@yahoo.com School of Engineering, School of Engineering, Construction Technology & Management Construction Technology & Management D Department epartment A. Safety A. Safety
  • 2. Signs and symbols Signs and symbols   Visible at all times Visible at all times   Danger signs Danger signs   Caution signs Caution signs   Visible at all times Visible at all times   Danger signs Danger signs   Caution signs Caution signs 1a February 2, 2019 2 COTM 4202
  • 3. Exit signs Exit signs   Legible red letters Legible red letters   Or red background with legible Or red background with legible white letters white letters   Legible red letters Legible red letters   Or red background with legible Or red background with legible white letters white letters 2a CLOSED CLOSED February 2, 2019 3 COTM 4202
  • 4. Safety instruction Safety instruction signs/directional signs signs/directional signs   Safety instruction signs Safety instruction signs   Directional signs Directional signs   Safety instruction signs Safety instruction signs   Directional signs Directional signs 3a February 2, 2019 4 COTM 4202
  • 5. Traffic signs Traffic signs   Use at points of hazard Use at points of hazard   Place at 50m from points of Place at 50m from points of hazard hazard   Use at points of hazard Use at points of hazard   Place at 50m from points of Place at 50m from points of hazard hazard 4a February 2, 2019 5 COTM 4202
  • 6. Accident prevention Accident prevention tags tags   Temporary means of warning Temporary means of warning employees employees   Not be used in place of accident Not be used in place of accident prevention signs prevention signs   Temporary means of warning Temporary means of warning employees employees   Not be used in place of accident Not be used in place of accident prevention signs prevention signs 5a February 2, 2019 6 COTM 4202
  • 7. Requirements for Requirements for flagmen flagmen   Red flags at least Red flags at least 18 inches 18 inches square square   Sign paddles Sign paddles   Red flags at least Red flags at least 18 inches 18 inches square square   Sign paddles Sign paddles 6a February 2, 2019 7 COTM 4202
  • 8. Requirements for Requirements for flagmen flagmen   In darkness In darkness— —red lights red lights   Warning garment Warning garment   In darkness In darkness— —red lights red lights   Warning garment Warning garment 6b February 2, 2019 8 COTM 4202
  • 9. Construction equipment Construction equipment   Adjacent to Adjacent to a highway a highway • • Unattended at night Unattended at night   Adjacent to Adjacent to a highway a highway • • Unattended at night Unattended at night 8a February 2, 2019 9 COTM 4202
  • 10. Construction equipment Construction equipment   Adjacent to construction areas Adjacent to construction areas   Provide lights or Provide lights or reflectors reflectors   Adjacent to construction areas Adjacent to construction areas   Provide lights or Provide lights or reflectors reflectors 8b February 2, 2019 10 COTM 4202
  • 11. Equipment inspection Equipment inspection   Operate on an off Operate on an off- -highway highway jobsite jobsite   Not open to Not open to public traffic public traffic   Beginning of Beginning of each shift each shift   Operate on an off Operate on an off- -highway highway jobsite jobsite   Not open to Not open to public traffic public traffic   Beginning of Beginning of each shift each shift 12a February 2, 2019 11 COTM 4202
  • 12. Inspect for: Inspect for:   Service breakers Service breakers   Tires Tires   Brakes Brakes   Service breakers Service breakers   Tires Tires   Brakes Brakes 12c February 2, 2019 12 COTM 4202
  • 13. Inspect for: Inspect for:   Operating controls Operating controls   Safety devices Safety devices   Seat belts Seat belts   Operating controls Operating controls   Safety devices Safety devices   Seat belts Seat belts 12e February 2, 2019 13 COTM 4202
  • 14. Inspect for: Inspect for:   Lights Lights   Fire extinguishers Fire extinguishers   Reflectors Reflectors   Other Other equipment equipment     Lights Lights   Fire extinguishers Fire extinguishers   Reflectors Reflectors   Other Other equipment equipment   12f February 2, 2019 14 COTM 4202
  • 15. Correct all defects Correct all defects   Before equipment is placed in Before equipment is placed in service service 12h February 2, 2019 15 COTM 4202
  • 16. Operating equipment in Operating equipment in reverse: Do if reverse: Do if   The equipment has a reverse The equipment has a reverse signal alarm distinguishable signal alarm distinguishable from the surrounding noise from the surrounding noise level, or level, or   An employee signals that it is An employee signals that it is safe to do so safe to do so   The equipment has a reverse The equipment has a reverse signal alarm distinguishable signal alarm distinguishable from the surrounding noise from the surrounding noise level, or level, or   An employee signals that it is An employee signals that it is safe to do so safe to do so 13a February 2, 2019 16 COTM 4202
  • 17. February 2, 2019 COTM 4202 17
  • 18. B. Equipment Utilization B. Equipment Utilization   Utilization is working time Utilization is working time duration, not calendar duration duration, not calendar duration   Utilization data are: Utilization data are: • • Work load Work load • • Speed Speed • • Environment Environment  (See Chapter 3: Productivity)   Utilization is working time Utilization is working time duration, not calendar duration duration, not calendar duration   Utilization data are: Utilization data are: • • Work load Work load • • Speed Speed • • Environment Environment  (See Chapter 3: Productivity) February 2, 2019 COTM 4202 18
  • 19. C. Technology C. Technology  Automation of Equipment • The introduction of new mechanized equipment in construction has had a profound effect on the cost and productivity of construction as well as the methods used for construction itself. • An exciting example of innovation in this regard is the introduction of computer microprocessors on tools and equipment. As a result, the performance and activity of equipment can be continually monitored and adjusted for improvement.  Automation of Equipment • The introduction of new mechanized equipment in construction has had a profound effect on the cost and productivity of construction as well as the methods used for construction itself. • An exciting example of innovation in this regard is the introduction of computer microprocessors on tools and equipment. As a result, the performance and activity of equipment can be continually monitored and adjusted for improvement. February 2, 2019 COTM 4202 19
  • 20. Thank You Thank You STAY SAFE! STAY SAFE! Thank You Thank You STAY SAFE! STAY SAFE! February 2, 2019 COTM 4202 20