 Outline :
 PengenaIan OEE
 OEE Manufacturing
 Resep rahasia: I x F x A
 Studi kasus: OEE Improvement
2
Created By Anang T
3
Created By Anang T
 OEE (Overall Equipment Effectiveness)
adalah cara "best practice" untuk
memonitor dan mengimprove effectiveness
dari manufacturing processes (i.e.
machines, manufacturing cells, assembly
lines).
 • OEE adalah metriks terpadu yang
mengukur tingkat yang dihasilkan dari
suatu proses
Masurement adalah dasar dari improvement"
4
Body Mass Index Kategori
> 30 OBESITAS
25,0 - 29,9 OVERWEIGHT
18,5 - 24,9 NOMAL
< 18,5 UNDERWEIGHT
mass(kg)
BMI =
(height(m))2
5
Created By Anang T
Losses Due To
Machine Breakdown
Losses Due To Set Up,
Change Over
Losses Due To
Deffect
Losses Due To
Rework
Speed Loss Minor Stopage
“Berapa Resources Yang Terbuang”
Input :
 Machine
 Man Power
 Material
 Energy
6
Created By Anang T
7
Created By Anang T
8
Created By Anang T
Company OEE
Awal Untuk OEE Umum 30% - 50%
World Class OEE 85% - 95%
9
Created By Anang T
 OEE = Availability x Performance x Quality
OEE
Availability Performance Quality
Breakdown Losses Minor Stoppage Scrap/Rework
Setup & Adjustment Speed Losses Start Up
Six Big Losses
10
11
Created By Anang T
Business Result
Return Of Stageholder Equity
Operating Margin, Cash Flow
Operating Excellence
Continous
Improvement
OEE – Operational Stability
5R Stadndart Work, Maintenant Management
People Lean Processes
12
13
 OEE = Availability x Performance x Quality
14
Perusahaan Manufacturing
Running Time = 8 Jam
Beakdown Mesin = 60 menit
Setup Adjustment = 30 menit
Availability = (Actual Running Time / Planed Running Time) x 100%
= (8 Jam – (60+30 Menit) / (8 Jam)) x 100%
= 81 %
15
Created By Anang T
Avaiability Time = 8 Jam – 1,5 Jam = 6,5 Jam
Theoritical Speed = 120 Pcs / Jam
Actual Output = 580 Pcs (Good+Reject)
Performance = (Actual Output/Theoritical OutPut) x 100%
= (580 Pcs/(120 Pcs/Jam x 6,5 Jam)) x 100%
= 74%
16
Created By Anang T
Actual Output = 580 Pcs (Good+Reject)
Good = 500 Pcs
Reject/Rework = 80 Pcs
Quality = (Actual Good / Actual Output) x 100%
= (500 Pcs/580 Pcs) x 100%
= 86%
17
Created By Anang T
Availability = 81%
Performance = 74%
Quality = 86%
OEE = Availability x Performance x Quality
= 81% x 745 x 86%
= 52%
18
Created By Anang T
19
Created By Anang T
20
Diketahui :
 Total Time = 7 Jam
 Breakdown Mesin = 45 Menit
 Setup Adjustment = 45 Menit
 Theoritical Speed =2.000 Botol/Jam
 Actual Output = 6.300 Botol (Good & Reject)
 Good Product = 5.900 Botol; Reject = 400 Botol
Hitung : Availability, Performance, Quality dan OEE ?
21
Created By Anang T
 Availability : (7 x 60) – (45 x 2) / (7 x 60)
: 330 / 420
: 78,57 %
 Performance : 6.300 / ((330/60) x 2.000)
: 6.300 / 11.000
: 57,27 %
 Quality : 5.900 / 6.300
: 93,65 %
 OEE : 78,57 % x 57,27 % x 93,65 %
: 42,14 %
22
Diketahui :
 Running Time = 7 Jam
 Breakdown Mesin = 45 Menit
 Setup Adjustment = 45 Menit
 Cleaning Mesin = 20 Menit
 Theoritical Speed =2.000 Botol/Jam
 Idle menunggu Kemasan = 15 Menit
 Actual Output = 6.300 Botol (Good & Reject)
 Good Product = 5.900 Botol; Reject = 400 Botol
 Jumlah Yang Bisa di Rework = 200 Botol
Hitung : Availability, Performance, Quality dan OEE ?
23
Created By Anang T
24
Created By Anang T
Information x Focus x Action
 Terlalu Banyak Data, Tetapi Tidak Banyak Informasi
 Tidak ada Informasi Dapat Berarti Keputusan dibuat Berdasarkan Insting.
 Ketiadaan Informasi menyebabkan tidak ada focus di perusahaan
 Tidak ada Fokus utama untuk Improvment.effisiensi hanya menjadi
sakah satu performance Indikator, tetapi belum menjadi sasaran
satu perusahaan.
 Tidak ada nya fokus menjadi penyebab tidak adanya alasan nyata untuk
aksi.
 Tidak ada aksi untuk mencapai sasaran bersama.
Semua menjalankan bisnis as ussual (seperti biasanya)
25
Accurate Data
 As Close to real time as you can get it
 Focusing On what caused you to be off track
 Review regularly and act !!!
26
 Collect Data pada banyak mesin, masalah
produkstivitas,Tidak ada waktu - terlalu sibuk
 Data tidak akurat :
Tidak merekan minor Stop
Membulatkan angka
Budget Time
 Karena data idak akurat, maka data tidak
dipakai, sehingga operator tidak mengisi
dengan benar.
 Hasilnya : Tidak ada improvement
27
Manual System - Reaktif Automated System - Proaktif
Slow Reaktion Rapid Reaction
Historical Information Real Time
Snap Shot Audit Continous Visualization
Inaccurate data Accurate Data
Perceived Losses On Critical Machine Real Losses on Critical Machine
28
Created By Anang T
29
Created By Anang T

Weitere ähnliche Inhalte

Was ist angesagt?

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
Chris Cummins
 

Was ist angesagt? (20)

Lean manufacturing
Lean manufacturing Lean manufacturing
Lean manufacturing
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
smed
smedsmed
smed
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)OEE (overall eqipment effectiveness)
OEE (overall eqipment effectiveness)
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
Kaizen forms xls
Kaizen forms xlsKaizen forms xls
Kaizen forms xls
 
Tpm
TpmTpm
Tpm
 
SMED Final
SMED FinalSMED Final
SMED Final
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
Oee guide
Oee guideOee guide
Oee guide
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
My machine camp
My machine campMy machine camp
My machine camp
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 

Andere mochten auch

6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
Webseology
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
ahmed_shimi
 

Andere mochten auch (17)

OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
Design For OEE (DFOEE)
Design For OEE (DFOEE)Design For OEE (DFOEE)
Design For OEE (DFOEE)
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
 
OEE
OEEOEE
OEE
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
 
Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012Using OEE to Improve Production - Interphex 2012
Using OEE to Improve Production - Interphex 2012
 
Preso: The OEE Story
Preso: The OEE StoryPreso: The OEE Story
Preso: The OEE Story
 
OEE Target - ¿What is the basis for your current OEE goal?
OEE Target - ¿What is the basis for your current OEE goal?OEE Target - ¿What is the basis for your current OEE goal?
OEE Target - ¿What is the basis for your current OEE goal?
 
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICASIDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
IDASANET - AUTOMATISMOS INDUSTRIALES Y APLICACIONES INFORMATICAS
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
Integrating OEE and Process Improvement
Integrating OEE  and Process ImprovementIntegrating OEE  and Process Improvement
Integrating OEE and Process Improvement
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 

Ähnlich wie OEE IMPLEMENTATION part 1

Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
Alan Desrocher
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
jsgerges
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
Sameer Kumar
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
gstevick1980
 

Ähnlich wie OEE IMPLEMENTATION part 1 (20)

Techniques for measurement of productivity
Techniques for measurement of productivityTechniques for measurement of productivity
Techniques for measurement of productivity
 
OEE Webinar
OEE WebinarOEE Webinar
OEE Webinar
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Production & Operarions Management Compre Review
Production & Operarions Management Compre ReviewProduction & Operarions Management Compre Review
Production & Operarions Management Compre Review
 
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
What Food Manufacturers Need to Know about Measuring OEE - London Consulting ...
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
Productivity concepts
Productivity conceptsProductivity concepts
Productivity concepts
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
Lean Smpl 1
Lean Smpl 1Lean Smpl 1
Lean Smpl 1
 
Productivity
ProductivityProductivity
Productivity
 
Productivity.ppt
Productivity.pptProductivity.ppt
Productivity.ppt
 
Productivity (1)
 Productivity (1) Productivity (1)
Productivity (1)
 
Lean 6sigma and DMAIC
Lean 6sigma and DMAICLean 6sigma and DMAIC
Lean 6sigma and DMAIC
 
Olio ie training for all stuff
Olio ie training for all stuffOlio ie training for all stuff
Olio ie training for all stuff
 
Productivity
ProductivityProductivity
Productivity
 
Productivity related Vital Measures through simulations
Productivity related Vital Measures through simulationsProductivity related Vital Measures through simulations
Productivity related Vital Measures through simulations
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
Productivity,competitiveness,strategy
Productivity,competitiveness,strategyProductivity,competitiveness,strategy
Productivity,competitiveness,strategy
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 

OEE IMPLEMENTATION part 1

  • 2.  Outline :  PengenaIan OEE  OEE Manufacturing  Resep rahasia: I x F x A  Studi kasus: OEE Improvement 2 Created By Anang T
  • 4.  OEE (Overall Equipment Effectiveness) adalah cara "best practice" untuk memonitor dan mengimprove effectiveness dari manufacturing processes (i.e. machines, manufacturing cells, assembly lines).  • OEE adalah metriks terpadu yang mengukur tingkat yang dihasilkan dari suatu proses Masurement adalah dasar dari improvement" 4
  • 5. Body Mass Index Kategori > 30 OBESITAS 25,0 - 29,9 OVERWEIGHT 18,5 - 24,9 NOMAL < 18,5 UNDERWEIGHT mass(kg) BMI = (height(m))2 5 Created By Anang T
  • 6. Losses Due To Machine Breakdown Losses Due To Set Up, Change Over Losses Due To Deffect Losses Due To Rework Speed Loss Minor Stopage “Berapa Resources Yang Terbuang” Input :  Machine  Man Power  Material  Energy 6 Created By Anang T
  • 9. Company OEE Awal Untuk OEE Umum 30% - 50% World Class OEE 85% - 95% 9 Created By Anang T
  • 10.  OEE = Availability x Performance x Quality OEE Availability Performance Quality Breakdown Losses Minor Stoppage Scrap/Rework Setup & Adjustment Speed Losses Start Up Six Big Losses 10
  • 12. Business Result Return Of Stageholder Equity Operating Margin, Cash Flow Operating Excellence Continous Improvement OEE – Operational Stability 5R Stadndart Work, Maintenant Management People Lean Processes 12
  • 13. 13
  • 14.  OEE = Availability x Performance x Quality 14
  • 15. Perusahaan Manufacturing Running Time = 8 Jam Beakdown Mesin = 60 menit Setup Adjustment = 30 menit Availability = (Actual Running Time / Planed Running Time) x 100% = (8 Jam – (60+30 Menit) / (8 Jam)) x 100% = 81 % 15 Created By Anang T
  • 16. Avaiability Time = 8 Jam – 1,5 Jam = 6,5 Jam Theoritical Speed = 120 Pcs / Jam Actual Output = 580 Pcs (Good+Reject) Performance = (Actual Output/Theoritical OutPut) x 100% = (580 Pcs/(120 Pcs/Jam x 6,5 Jam)) x 100% = 74% 16 Created By Anang T
  • 17. Actual Output = 580 Pcs (Good+Reject) Good = 500 Pcs Reject/Rework = 80 Pcs Quality = (Actual Good / Actual Output) x 100% = (500 Pcs/580 Pcs) x 100% = 86% 17 Created By Anang T
  • 18. Availability = 81% Performance = 74% Quality = 86% OEE = Availability x Performance x Quality = 81% x 745 x 86% = 52% 18 Created By Anang T
  • 20. 20
  • 21. Diketahui :  Total Time = 7 Jam  Breakdown Mesin = 45 Menit  Setup Adjustment = 45 Menit  Theoritical Speed =2.000 Botol/Jam  Actual Output = 6.300 Botol (Good & Reject)  Good Product = 5.900 Botol; Reject = 400 Botol Hitung : Availability, Performance, Quality dan OEE ? 21 Created By Anang T
  • 22.  Availability : (7 x 60) – (45 x 2) / (7 x 60) : 330 / 420 : 78,57 %  Performance : 6.300 / ((330/60) x 2.000) : 6.300 / 11.000 : 57,27 %  Quality : 5.900 / 6.300 : 93,65 %  OEE : 78,57 % x 57,27 % x 93,65 % : 42,14 % 22
  • 23. Diketahui :  Running Time = 7 Jam  Breakdown Mesin = 45 Menit  Setup Adjustment = 45 Menit  Cleaning Mesin = 20 Menit  Theoritical Speed =2.000 Botol/Jam  Idle menunggu Kemasan = 15 Menit  Actual Output = 6.300 Botol (Good & Reject)  Good Product = 5.900 Botol; Reject = 400 Botol  Jumlah Yang Bisa di Rework = 200 Botol Hitung : Availability, Performance, Quality dan OEE ? 23 Created By Anang T
  • 25. Information x Focus x Action  Terlalu Banyak Data, Tetapi Tidak Banyak Informasi  Tidak ada Informasi Dapat Berarti Keputusan dibuat Berdasarkan Insting.  Ketiadaan Informasi menyebabkan tidak ada focus di perusahaan  Tidak ada Fokus utama untuk Improvment.effisiensi hanya menjadi sakah satu performance Indikator, tetapi belum menjadi sasaran satu perusahaan.  Tidak ada nya fokus menjadi penyebab tidak adanya alasan nyata untuk aksi.  Tidak ada aksi untuk mencapai sasaran bersama. Semua menjalankan bisnis as ussual (seperti biasanya) 25
  • 26. Accurate Data  As Close to real time as you can get it  Focusing On what caused you to be off track  Review regularly and act !!! 26
  • 27.  Collect Data pada banyak mesin, masalah produkstivitas,Tidak ada waktu - terlalu sibuk  Data tidak akurat : Tidak merekan minor Stop Membulatkan angka Budget Time  Karena data idak akurat, maka data tidak dipakai, sehingga operator tidak mengisi dengan benar.  Hasilnya : Tidak ada improvement 27
  • 28. Manual System - Reaktif Automated System - Proaktif Slow Reaktion Rapid Reaction Historical Information Real Time Snap Shot Audit Continous Visualization Inaccurate data Accurate Data Perceived Losses On Critical Machine Real Losses on Critical Machine 28 Created By Anang T

Hinweis der Redaktion

  1. “Masurement adalah dasar dari improvement"