From a risk management viewpoint, which of the following options is not acceptable? a) Accept the risk b) Assign the risk c) Avoid the risk d) Defer the risk Solution d. “Deferring risk” means either ignoring the risk at hand or postponing the issue until further consideration. If the decision to defer the risk is a calculated one, it is hoped that management had the necessary data..