Group: 9ºc

Members:
- Jhonatan Andrés Aguirre Aristizabal
- Santiago Arenas Santa
- Jhon Alejandro Castaño Arbeláez
- Niver Esneider Villegas Amaya


                         BASIC PROJECT INFORMATION
1.1 INSTITUCION:
R: Institución Educativa Técnico Industrial Simona Duque

1.2 REGIONAL:
R: Antioquia

1.3 PROJECT NAME:
R: Eco-Aseador

1.4 TRAINIG PROGRAM THAT RESPONDS:
R: Ecological and Technological

1.5 ESTIMATED TIME OF EXECUTION OF THE PROJECT (MONTHS):
R: Nine months
1.6 COMPANIES OR INSTITUTIONS INVOLVED IN FINANCING THEIR
EDUCATION OR WHETER THERE:
R: No there

1.7 SEARCH KEYWORDS
R: Robotics – Solar Panel – Battery – Rechargable

                               PROJECT ESTRUCTURE

2.1 STATEMENT OF THE PROBLEM OR NEED TO BE REMEDIED
R: How to build a robot to sweep and mop being rechaged witch sunlight?

2.2 PROJECT JUSTIFICATION
R: this Project we do to help housewives not tire buth two main duties of the house
(sweep and mop)

2.3 GENERAL OBJETIVE:
R: Build a robot to sweep and mop being recharged with sunlight

2.4 SPECIFIC OBJETIVE:
R: - Help housewives in their duties.
- Work together to do the job
- Build the robot using recyclable materia
2.5 SCOPE
R: Municipal ( Marinilla)

2.5.1 BENEFICIARIES OF THE PROJECT
R: Housewives

2.5.2 IMPACT:

- SOCIAL: Socialist as the robot helps housewives

- ECONOMIC: This robot will bevery inexpensive for its energy saving and that will
  be a material libiano.

- ENVIROMENTAL: This robot will not uses electric power

- TECHNOLOGICAL: This robot as great technological

2.5.3 RESTRICTIONS OR ASSOCIATED RISKS :
R: There would be no risk or restriction since that the solar panel is damaged

2.5.4 PRODUCTS OR RESULTS OF THE PROJECT:
R: This project addresses two major tasks in the home (sweep and mop) in houses so
there will be much work.
2.6 : Innovation/ technological magament

  the project addresses a need of the       Does the project meet their needs of
       productive sector yes/no                    the productive sector?

    the project improves the process /    the solar panel which is recently used
         products/ service exists?        initially and are there fore considered
   the project involves the use of new    yes, this robot born of our ideas so this
  techinques and process technologies     robot is copy right by the "allies" af 9-c
                    yes/no                            are our own ideas
   the end products are susceptible to
 industrial protection and / or copyright
                   Yes / no                 yes, as this robot can be to counter
with the development of the project can
meet the need for a potencial customer         not by the thime the project is
                    yes/no                               widespread
                                             this business can bring economic
    feasibility of project business plan    benefist because we can put on the
                    yes/no                                 market
3.planing
                                                3.3 RESULTS OFLEARNING (al
                                                   partir of the program of      3.4 ASSOCIATE
3.1 PROCESS STGES 3.2 ACTIVITIES OF THE PROJECT           formation)             CEMPETITION           EVIDENCES




     Fase1 :                                     open kanow ledge base and       elaboration of      º retus º cuadro
 Fundamentacion                                      maries us project         research questions       questions


                                                                                 elaboration of
                     exposure in spanish and      socialize the knowledge         exhibition in
 PHASE2: formulac           english                        goined                   english             exponsure




     PHASE 3:                                                                     elaboration of
   DIAGBOSTIC           surveys and reports              collect data          surveys and reports surveys and report


4 PHASE: ANALYSIS
       AND
CONSTRUCTION OF                                  mane final agustemts to the
  THE PROPOSAL       analysis of information               project               project analysis   project completion
  5 PHASE: FINAL
SOCIALZATION AND
 EVALUATION OF
 THE PROCESS OF   project completion and final     finalize and present the    exponsure develop
   FORMATION               exhibition                       project                the projet    exhibition project
TEACHERS

PHASE 1: Jairo Miranda – Alba Ines Girado   COURSE: Technological
PHASE 2: Jairo Miranda – Alba Ines Girado   COURSE: Technological
PHASE 3: Alba Ines Giraldo                  COURSE: Informatic
PHASE 4: Francisca Raquel                   COURSE: Matematics
PHASE 5:Luz Marina Ramirez                  COURSE: English

Weitere ähnliche Inhalte

Ähnlich wie Ingles

Formato sena ingles_2010
Formato sena ingles_2010Formato sena ingles_2010
Formato sena ingles_2010IETI SD
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013KaThe Gonzalez
 
Formato Sena EspañOl Ingles Carlos
Formato Sena EspañOl Ingles  CarlosFormato Sena EspañOl Ingles  Carlos
Formato Sena EspañOl Ingles Carlosyeison54
 
Otro ingles afsfasdfasdfsad
Otro ingles afsfasdfasdfsadOtro ingles afsfasdfasdfsad
Otro ingles afsfasdfasdfsadbrian7574
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)ago9813
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)ago9813
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)ago9813
 
formato: proyecto del sena en ingles
formato: proyecto del sena en inglesformato: proyecto del sena en ingles
formato: proyecto del sena en inglesguest2a95fa
 
Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01yair34
 
Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01yair34
 
Project of investigation
Project of investigationProject of investigation
Project of investigationyair34
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013Bryan Tovar
 
Formato Sena EspañOl Ingles Oct 17
Formato Sena EspañOl Ingles  Oct 17Formato Sena EspañOl Ingles  Oct 17
Formato Sena EspañOl Ingles Oct 17yeison54
 
Proyecto Sena En Ingles 1
Proyecto Sena En Ingles 1Proyecto Sena En Ingles 1
Proyecto Sena En Ingles 1jajojajo
 
proyecto sena
proyecto senaproyecto sena
proyecto senajajojajo
 

Ähnlich wie Ingles (20)

Formato sena ingles_2010
Formato sena ingles_2010Formato sena ingles_2010
Formato sena ingles_2010
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Vehiculo solar
Vehiculo solarVehiculo solar
Vehiculo solar
 
Formato Sena EspañOl Ingles Carlos
Formato Sena EspañOl Ingles  CarlosFormato Sena EspañOl Ingles  Carlos
Formato Sena EspañOl Ingles Carlos
 
Otro ingles afsfasdfasdfsad
Otro ingles afsfasdfasdfsadOtro ingles afsfasdfasdfsad
Otro ingles afsfasdfasdfsad
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)Formato sena ingles 2013 (2)
Formato sena ingles 2013 (2)
 
formato: proyecto del sena en ingles
formato: proyecto del sena en inglesformato: proyecto del sena en ingles
formato: proyecto del sena en ingles
 
Formato
FormatoFormato
Formato
 
Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01
 
Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01Projectofinvestigation 120905091209-phpapp01
Projectofinvestigation 120905091209-phpapp01
 
Project of investigation
Project of investigationProject of investigation
Project of investigation
 
Project of investigation
Project of investigationProject of investigation
Project of investigation
 
Formato sena ingles 2013
Formato sena ingles 2013Formato sena ingles 2013
Formato sena ingles 2013
 
Formato Sena EspañOl Ingles Oct 17
Formato Sena EspañOl Ingles  Oct 17Formato Sena EspañOl Ingles  Oct 17
Formato Sena EspañOl Ingles Oct 17
 
Proyecto Sena En Ingles 1
Proyecto Sena En Ingles 1Proyecto Sena En Ingles 1
Proyecto Sena En Ingles 1
 
proyecto sena
proyecto senaproyecto sena
proyecto sena
 

Mehr von amaya-2910

Trabajo de educación física.
Trabajo de educación física.Trabajo de educación física.
Trabajo de educación física.amaya-2910
 
Las eras de la tierra ciencias
Las eras de la tierra   cienciasLas eras de la tierra   ciencias
Las eras de la tierra cienciasamaya-2910
 
Trabajo civismo
Trabajo civismoTrabajo civismo
Trabajo civismoamaya-2910
 
Trabajo civismo
Trabajo civismoTrabajo civismo
Trabajo civismoamaya-2910
 
Trabajo de educación física.
Trabajo de educación física.Trabajo de educación física.
Trabajo de educación física.amaya-2910
 
Parque explora
Parque exploraParque explora
Parque exploraamaya-2910
 
Parque explora
Parque exploraParque explora
Parque exploraamaya-2910
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuenciaamaya-2910
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuenciaamaya-2910
 
Tabla de valoacion
Tabla de valoacionTabla de valoacion
Tabla de valoacionamaya-2910
 
Tabla de valoacion (1)
Tabla de valoacion (1)Tabla de valoacion (1)
Tabla de valoacion (1)amaya-2910
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuenciaamaya-2910
 

Mehr von amaya-2910 (14)

Ingles
InglesIngles
Ingles
 
Trabajo de educación física.
Trabajo de educación física.Trabajo de educación física.
Trabajo de educación física.
 
Las eras de la tierra ciencias
Las eras de la tierra   cienciasLas eras de la tierra   ciencias
Las eras de la tierra ciencias
 
Trabajo civismo
Trabajo civismoTrabajo civismo
Trabajo civismo
 
Trabajo civismo
Trabajo civismoTrabajo civismo
Trabajo civismo
 
Trabajo de educación física.
Trabajo de educación física.Trabajo de educación física.
Trabajo de educación física.
 
Parque explora
Parque exploraParque explora
Parque explora
 
Parque explora
Parque exploraParque explora
Parque explora
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuencia
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuencia
 
Boletin
BoletinBoletin
Boletin
 
Tabla de valoacion
Tabla de valoacionTabla de valoacion
Tabla de valoacion
 
Tabla de valoacion (1)
Tabla de valoacion (1)Tabla de valoacion (1)
Tabla de valoacion (1)
 
Tabla de frecuencia
Tabla de frecuenciaTabla de frecuencia
Tabla de frecuencia
 

Ingles

  • 1.
  • 2. Group: 9ºc Members: - Jhonatan Andrés Aguirre Aristizabal - Santiago Arenas Santa - Jhon Alejandro Castaño Arbeláez - Niver Esneider Villegas Amaya BASIC PROJECT INFORMATION 1.1 INSTITUCION: R: Institución Educativa Técnico Industrial Simona Duque 1.2 REGIONAL: R: Antioquia 1.3 PROJECT NAME: R: Eco-Aseador 1.4 TRAINIG PROGRAM THAT RESPONDS: R: Ecological and Technological 1.5 ESTIMATED TIME OF EXECUTION OF THE PROJECT (MONTHS): R: Nine months
  • 3. 1.6 COMPANIES OR INSTITUTIONS INVOLVED IN FINANCING THEIR EDUCATION OR WHETER THERE: R: No there 1.7 SEARCH KEYWORDS R: Robotics – Solar Panel – Battery – Rechargable PROJECT ESTRUCTURE 2.1 STATEMENT OF THE PROBLEM OR NEED TO BE REMEDIED R: How to build a robot to sweep and mop being rechaged witch sunlight? 2.2 PROJECT JUSTIFICATION R: this Project we do to help housewives not tire buth two main duties of the house (sweep and mop) 2.3 GENERAL OBJETIVE: R: Build a robot to sweep and mop being recharged with sunlight 2.4 SPECIFIC OBJETIVE: R: - Help housewives in their duties. - Work together to do the job - Build the robot using recyclable materia
  • 4. 2.5 SCOPE R: Municipal ( Marinilla) 2.5.1 BENEFICIARIES OF THE PROJECT R: Housewives 2.5.2 IMPACT: - SOCIAL: Socialist as the robot helps housewives - ECONOMIC: This robot will bevery inexpensive for its energy saving and that will be a material libiano. - ENVIROMENTAL: This robot will not uses electric power - TECHNOLOGICAL: This robot as great technological 2.5.3 RESTRICTIONS OR ASSOCIATED RISKS : R: There would be no risk or restriction since that the solar panel is damaged 2.5.4 PRODUCTS OR RESULTS OF THE PROJECT: R: This project addresses two major tasks in the home (sweep and mop) in houses so there will be much work.
  • 5. 2.6 : Innovation/ technological magament the project addresses a need of the Does the project meet their needs of productive sector yes/no the productive sector? the project improves the process / the solar panel which is recently used products/ service exists? initially and are there fore considered the project involves the use of new yes, this robot born of our ideas so this techinques and process technologies robot is copy right by the "allies" af 9-c yes/no are our own ideas the end products are susceptible to industrial protection and / or copyright Yes / no yes, as this robot can be to counter with the development of the project can meet the need for a potencial customer not by the thime the project is yes/no widespread this business can bring economic feasibility of project business plan benefist because we can put on the yes/no market
  • 6. 3.planing 3.3 RESULTS OFLEARNING (al partir of the program of 3.4 ASSOCIATE 3.1 PROCESS STGES 3.2 ACTIVITIES OF THE PROJECT formation) CEMPETITION EVIDENCES Fase1 : open kanow ledge base and elaboration of º retus º cuadro Fundamentacion maries us project research questions questions elaboration of exposure in spanish and socialize the knowledge exhibition in PHASE2: formulac english goined english exponsure PHASE 3: elaboration of DIAGBOSTIC surveys and reports collect data surveys and reports surveys and report 4 PHASE: ANALYSIS AND CONSTRUCTION OF mane final agustemts to the THE PROPOSAL analysis of information project project analysis project completion 5 PHASE: FINAL SOCIALZATION AND EVALUATION OF THE PROCESS OF project completion and final finalize and present the exponsure develop FORMATION exhibition project the projet exhibition project
  • 7. TEACHERS PHASE 1: Jairo Miranda – Alba Ines Girado COURSE: Technological PHASE 2: Jairo Miranda – Alba Ines Girado COURSE: Technological PHASE 3: Alba Ines Giraldo COURSE: Informatic PHASE 4: Francisca Raquel COURSE: Matematics PHASE 5:Luz Marina Ramirez COURSE: English