Lecture 4 – BackfillingLecture 4 – Backfilling
Objectives:-
1.To learn the backfill to existing structures.
2.To relate the backfilling as per clauses in
SMM2
3.To determine the various clauses applied to
the backfilling
Outcomes:-
1.Able to differentiate the different clauses
used for backfilling
2.Able to write down the dimensions clearly.
BackfillingBackfilling
 It is an activity immediately afterIt is an activity immediately after
excavation work.excavation work.
 This activity needs a lot of thinkingThis activity needs a lot of thinking
and imagination.and imagination.
Once we have excavated the soilOnce we have excavated the soil
what next?what next?
Fig. 1 Excavated pit Fig 2. Excavated pit with
footing and stump
Then what ?Then what ?
Fig.1 Plan of a
footing
Fig.2 Section of a footing
We need to backfill
After backfill what next?After backfill what next?
A
B
Total excavated material( A + B = C) so A is the backfill
quantity while C – A = B ( Qty. to be removed)
Lets look at a simple structureLets look at a simple structure
F1
(1.00m x
1.00m )
Ground beam 150mm x 450mm
Stump 150mm
x 150mm
Plan of a Guard house
Testing your eye sightTesting your eye sight
View A
View B
View A
View B
GB1
GB2 GB3
GB4
GB1
GB4GB3
Before excavation we need to knowBefore excavation we need to know
the different activities involvedthe different activities involved
11stst
. Measure the oversite. Measure the oversite
excavation with average depth ofexcavation with average depth of
150mm150mm5.00m
5.00m
Area of oversite excavationArea of oversite excavation
5.00m
5.00m
Excavate for footingExcavate for footing
Section of excavationSection of excavation
Ground level
Base of footing level
Lets put in the structureLets put in the structure
Oversite excavation averageOversite excavation average
150mm thick150mm thick
Lets add in a ground floor slabLets add in a ground floor slab
Slab 100mm
thick
Lets look at the isometric view ofLets look at the isometric view of
the structurethe structure
Grd. Beam
Grd. Floor slab
Stump
Footing
Look at the sequence carefullyLook at the sequence carefully
A B C D
So when you measure backfill youSo when you measure backfill you
shall consider carefully the differentshall consider carefully the different
depth for the different areadepth for the different area
Area 1
Area 2
Area 3 Area 4
Plan view
of footing
Description for excavation, backfill andDescription for excavation, backfill and
removal.removal.
 Excavate pit for footingExcavate pit for footing
commencing from ground levelcommencing from ground level
with plan dimension less thanwith plan dimension less than
1.25m and with depth not1.25m and with depth not
exceeding 2.00m (5 nos.)exceeding 2.00m (5 nos.)
 Selected backfill to requiredSelected backfill to required
formation level, spread, levelledformation level, spread, levelled
and well rammed andand well rammed and
consolidated.consolidated.
 Removing surplus excavatedRemoving surplus excavated
material from site includingmaterial from site including
transporting to contractor’s owntransporting to contractor’s own
Description for oversiteDescription for oversite
excavationexcavation
 Oversite excavation average 200mmOversite excavation average 200mm
thick including transporting top soilthick including transporting top soil
to site to be determined by theto site to be determined by the
architect for re-use.architect for re-use.
 Oversite excavation commencingOversite excavation commencing
from ground level to a depth notfrom ground level to a depth not
exceeding 250mm.exceeding 250mm.
Exercise no. 1: measure the backfillExercise no. 1: measure the backfill
quantity using the descriptionquantity using the description
providedprovided
Footing F1 ( 12 nos.)
1000mm
1000mm
1.85m
650mm
Stump 300mm x
300mm
Exercise no. 2- Measure the backfillExercise no. 2- Measure the backfill
to footing F2to footing F2
900mm
900mm
F2 ( 20 nos.)
1.65m
450mm
Stump 150mm
x 150mm
Grd.
Beam
125mm x
450mm
125mm
450mm
Section of ground beam
Exercise no. 3 – Measure theExercise no. 3 – Measure the
following:following:
 1. Oversite excavation to footing F1.1. Oversite excavation to footing F1.
 2. Excavation to Footing F1.2. Excavation to Footing F1.
 3. Backfilling to Footing F1.3. Backfilling to Footing F1.
 4. Removing surplus earth of footing4. Removing surplus earth of footing
F1.F1.
 5. Write down your answer in the5. Write down your answer in the
correct format with correctcorrect format with correct
description.description.
Footing F1 ( 25 nos.)Footing F1 ( 25 nos.)
950mm
950mm
GL
Oversite excavation
150mm depth
2.00m
50mm lean concrete
Stump 250mm x
250mm
450mm
GB
250mm x
600mm
Plan
Section

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Bearing capacity of Soil
Bearing capacity of SoilBearing capacity of Soil
Bearing capacity of Soil
 
Structural excavation and backfill
Structural excavation and backfillStructural excavation and backfill
Structural excavation and backfill
 
Introduction to Foundation Engineering
Introduction to Foundation EngineeringIntroduction to Foundation Engineering
Introduction to Foundation Engineering
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Reinforced earth walls
Reinforced earth wallsReinforced earth walls
Reinforced earth walls
 
Design and construction of well foundations
Design and construction of well foundationsDesign and construction of well foundations
Design and construction of well foundations
 
Shallow and deep excavation & dewatering
Shallow and deep excavation & dewateringShallow and deep excavation & dewatering
Shallow and deep excavation & dewatering
 
Bearing failure
Bearing failureBearing failure
Bearing failure
 
Deep foundation ppt my final tos work
Deep foundation ppt  my final tos workDeep foundation ppt  my final tos work
Deep foundation ppt my final tos work
 
Standard penetration test (spt)
Standard penetration test (spt)Standard penetration test (spt)
Standard penetration test (spt)
 
A Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ PilesA Presentation on Bored Cast-in-Situ Piles
A Presentation on Bored Cast-in-Situ Piles
 
Diaphragm wall
Diaphragm wallDiaphragm wall
Diaphragm wall
 
1.1 box jacking
1.1 box jacking1.1 box jacking
1.1 box jacking
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Construction of flexible pavements
Construction of flexible pavementsConstruction of flexible pavements
Construction of flexible pavements
 
Soil investigation
Soil investigationSoil investigation
Soil investigation
 
Tunnelling methods
Tunnelling methodsTunnelling methods
Tunnelling methods
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Diaphragm wall construction
Diaphragm wall constructionDiaphragm wall construction
Diaphragm wall construction
 
Shoring and underpinning
Shoring and underpinningShoring and underpinning
Shoring and underpinning
 

Andere mochten auch

Excavation work
Excavation workExcavation work
Excavation workAmit Kumar
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Anne Allan
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Anne Allan
 
Valgma backfilling
Valgma backfillingValgma backfilling
Valgma backfillingIngo Valgma
 
Picture Presentaion of Foundation construction
Picture Presentaion of Foundation constructionPicture Presentaion of Foundation construction
Picture Presentaion of Foundation constructionHarshit Kothari
 
02 Proof of a Global Flood from consideration of South African Gold Mine Geology
02 Proof of a Global Flood from consideration of South African Gold Mine Geology02 Proof of a Global Flood from consideration of South African Gold Mine Geology
02 Proof of a Global Flood from consideration of South African Gold Mine GeologyJamesARobertson
 
Bord Pillar
Bord PillarBord Pillar
Bord PillarVR M
 
Valgma backfilling technologies for estonian oil shale mines(2)
Valgma backfilling technologies for estonian oil shale mines(2)Valgma backfilling technologies for estonian oil shale mines(2)
Valgma backfilling technologies for estonian oil shale mines(2)Ingo Valgma
 
10 Summing up regarding Proof of a Global Flood
10 Summing up regarding Proof of a Global Flood10 Summing up regarding Proof of a Global Flood
10 Summing up regarding Proof of a Global FloodEnd Time Issue Ministries
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines vanam mareswara rao
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning MaterialBhaskar Naidu
 
Mining machinary nit rourkela
Mining machinary nit rourkelaMining machinary nit rourkela
Mining machinary nit rourkelarrosan1991
 

Andere mochten auch (20)

Excavation work
Excavation workExcavation work
Excavation work
 
Excavation 2014a-Lecture3
Excavation 2014a-Lecture3Excavation 2014a-Lecture3
Excavation 2014a-Lecture3
 
Excavation 2014a-Lecture2
Excavation 2014a-Lecture2Excavation 2014a-Lecture2
Excavation 2014a-Lecture2
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
Lecture 4: Underground Mining
Lecture 4: Underground MiningLecture 4: Underground Mining
Lecture 4: Underground Mining
 
Valgma backfilling
Valgma backfillingValgma backfilling
Valgma backfilling
 
Vaizene selective mining
Vaizene selective miningVaizene selective mining
Vaizene selective mining
 
Picture Presentaion of Foundation construction
Picture Presentaion of Foundation constructionPicture Presentaion of Foundation construction
Picture Presentaion of Foundation construction
 
Foundations
FoundationsFoundations
Foundations
 
02 Proof of a Global Flood from consideration of South African Gold Mine Geology
02 Proof of a Global Flood from consideration of South African Gold Mine Geology02 Proof of a Global Flood from consideration of South African Gold Mine Geology
02 Proof of a Global Flood from consideration of South African Gold Mine Geology
 
Bord Pillar
Bord PillarBord Pillar
Bord Pillar
 
Valgma backfilling technologies for estonian oil shale mines(2)
Valgma backfilling technologies for estonian oil shale mines(2)Valgma backfilling technologies for estonian oil shale mines(2)
Valgma backfilling technologies for estonian oil shale mines(2)
 
Mine fill
Mine fillMine fill
Mine fill
 
10 Summing up regarding Proof of a Global Flood
10 Summing up regarding Proof of a Global Flood10 Summing up regarding Proof of a Global Flood
10 Summing up regarding Proof of a Global Flood
 
VDF (Vaccum Dewatered Flooring) & back filling
VDF (Vaccum Dewatered Flooring) & back fillingVDF (Vaccum Dewatered Flooring) & back filling
VDF (Vaccum Dewatered Flooring) & back filling
 
Transportation in underground mines
Transportation  in underground mines Transportation  in underground mines
Transportation in underground mines
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Mining Machinery Learning Material
Mining Machinery Learning MaterialMining Machinery Learning Material
Mining Machinery Learning Material
 
Introductory mining
Introductory miningIntroductory mining
Introductory mining
 
Mining machinary nit rourkela
Mining machinary nit rourkelaMining machinary nit rourkela
Mining machinary nit rourkela
 

Ähnlich wie Backfilling 2014a-Lecture4

Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1Anne Allan
 
Assignment-Lecture5
Assignment-Lecture5Assignment-Lecture5
Assignment-Lecture5Anne Allan
 
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdfRaj Bakhtani
 
lecture_Exploration.ppt shear strength ppt soil mechanics and ppts
lecture_Exploration.ppt shear strength ppt soil mechanics and pptslecture_Exploration.ppt shear strength ppt soil mechanics and ppts
lecture_Exploration.ppt shear strength ppt soil mechanics and pptsShivarajkumar Goudar
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Make Mannan
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1Daniel Ross
 

Ähnlich wie Backfilling 2014a-Lecture4 (6)

Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Assignment-Lecture5
Assignment-Lecture5Assignment-Lecture5
Assignment-Lecture5
 
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
216586577-QUS-201-Building-Measurement-Specification-Theory-Practical.pdf
 
lecture_Exploration.ppt shear strength ppt soil mechanics and ppts
lecture_Exploration.ppt shear strength ppt soil mechanics and pptslecture_Exploration.ppt shear strength ppt soil mechanics and ppts
lecture_Exploration.ppt shear strength ppt soil mechanics and ppts
 
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
Soil exploration/Investigation method, purpose depth of exploration (Usefulse...
 
Trapezium Rule Practical Substructure And Excavation Presentation1
Trapezium Rule Practical  Substructure And Excavation Presentation1Trapezium Rule Practical  Substructure And Excavation Presentation1
Trapezium Rule Practical Substructure And Excavation Presentation1
 

Kürzlich hochgeladen

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 

Backfilling 2014a-Lecture4

  • 1. Lecture 4 – BackfillingLecture 4 – Backfilling Objectives:- 1.To learn the backfill to existing structures. 2.To relate the backfilling as per clauses in SMM2 3.To determine the various clauses applied to the backfilling Outcomes:- 1.Able to differentiate the different clauses used for backfilling 2.Able to write down the dimensions clearly.
  • 2. BackfillingBackfilling  It is an activity immediately afterIt is an activity immediately after excavation work.excavation work.  This activity needs a lot of thinkingThis activity needs a lot of thinking and imagination.and imagination.
  • 3. Once we have excavated the soilOnce we have excavated the soil what next?what next? Fig. 1 Excavated pit Fig 2. Excavated pit with footing and stump
  • 4. Then what ?Then what ? Fig.1 Plan of a footing Fig.2 Section of a footing We need to backfill
  • 5. After backfill what next?After backfill what next? A B Total excavated material( A + B = C) so A is the backfill quantity while C – A = B ( Qty. to be removed)
  • 6. Lets look at a simple structureLets look at a simple structure F1 (1.00m x 1.00m ) Ground beam 150mm x 450mm Stump 150mm x 150mm Plan of a Guard house
  • 7. Testing your eye sightTesting your eye sight View A View B View A View B GB1 GB2 GB3 GB4 GB1 GB4GB3
  • 8. Before excavation we need to knowBefore excavation we need to know the different activities involvedthe different activities involved
  • 9. 11stst . Measure the oversite. Measure the oversite excavation with average depth ofexcavation with average depth of 150mm150mm5.00m 5.00m
  • 10. Area of oversite excavationArea of oversite excavation 5.00m 5.00m
  • 12. Section of excavationSection of excavation Ground level Base of footing level
  • 13. Lets put in the structureLets put in the structure
  • 14. Oversite excavation averageOversite excavation average 150mm thick150mm thick
  • 15. Lets add in a ground floor slabLets add in a ground floor slab Slab 100mm thick
  • 16. Lets look at the isometric view ofLets look at the isometric view of the structurethe structure Grd. Beam Grd. Floor slab Stump Footing
  • 17. Look at the sequence carefullyLook at the sequence carefully A B C D
  • 18. So when you measure backfill youSo when you measure backfill you shall consider carefully the differentshall consider carefully the different depth for the different areadepth for the different area Area 1 Area 2 Area 3 Area 4 Plan view of footing
  • 19. Description for excavation, backfill andDescription for excavation, backfill and removal.removal.  Excavate pit for footingExcavate pit for footing commencing from ground levelcommencing from ground level with plan dimension less thanwith plan dimension less than 1.25m and with depth not1.25m and with depth not exceeding 2.00m (5 nos.)exceeding 2.00m (5 nos.)  Selected backfill to requiredSelected backfill to required formation level, spread, levelledformation level, spread, levelled and well rammed andand well rammed and consolidated.consolidated.  Removing surplus excavatedRemoving surplus excavated material from site includingmaterial from site including transporting to contractor’s owntransporting to contractor’s own
  • 20. Description for oversiteDescription for oversite excavationexcavation  Oversite excavation average 200mmOversite excavation average 200mm thick including transporting top soilthick including transporting top soil to site to be determined by theto site to be determined by the architect for re-use.architect for re-use.  Oversite excavation commencingOversite excavation commencing from ground level to a depth notfrom ground level to a depth not exceeding 250mm.exceeding 250mm.
  • 21. Exercise no. 1: measure the backfillExercise no. 1: measure the backfill quantity using the descriptionquantity using the description providedprovided Footing F1 ( 12 nos.) 1000mm 1000mm 1.85m 650mm Stump 300mm x 300mm
  • 22. Exercise no. 2- Measure the backfillExercise no. 2- Measure the backfill to footing F2to footing F2 900mm 900mm F2 ( 20 nos.) 1.65m 450mm Stump 150mm x 150mm Grd. Beam 125mm x 450mm 125mm 450mm Section of ground beam
  • 23. Exercise no. 3 – Measure theExercise no. 3 – Measure the following:following:  1. Oversite excavation to footing F1.1. Oversite excavation to footing F1.  2. Excavation to Footing F1.2. Excavation to Footing F1.  3. Backfilling to Footing F1.3. Backfilling to Footing F1.  4. Removing surplus earth of footing4. Removing surplus earth of footing F1.F1.  5. Write down your answer in the5. Write down your answer in the correct format with correctcorrect format with correct description.description.
  • 24. Footing F1 ( 25 nos.)Footing F1 ( 25 nos.) 950mm 950mm GL Oversite excavation 150mm depth 2.00m 50mm lean concrete Stump 250mm x 250mm 450mm GB 250mm x 600mm Plan Section