1. ( 20 points): A total of 500 parts must be produced. The production cycle time per part is 15 minutes. The machines used for this purpose must be first set-up. This set-up takes 3 hours. A scrap rate of 1% is expected. If availability is 100% and the machines will operate for 10 shifts at.