SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
MANJUNG
3 x 700 MW Thermal Power Plant
           Malaysia




                           Power Turbo-Systems
                           Plants
General Presentation




                           In July 1999, a consortium including
                           Alstom Power and Peremba was
                           awarded by TENAGA NASIONAL
                           BERHARD JANAMANJUNG (TNBJ)
                           for the supply of 3 x 700 MW units
                           for the Manjung thermal power plant.

                           Alstom Power was responsible for the
                           design and supply of the civil works
                           of the power block, the equipment,
                           the erection, the commissioning, the
                           training of the operation and
                           maintenance team, the test run and
                           performance guarantee tests.

                           Peremba was responsible for the
                           civil works of the auxiliary buildings,
                           the electrical and control equipment.

                           The coal yard equipment was
                           designed and supplied by Koch.

                           The power station also features
                           an ALSTOM seawater flue gas
                           desulphurisation (FGD) process plant
                           which utilises the natural properties
                           of seawater to absorb the sulphur
                           dioxide from the flue gas.




                       2
Layout
12
                                           1
                                                                             The Manjung power plant is located
                                               Turbine hall
                                           2   Boiler                        on a reclaimed island, about 10 km
                                 7         3   Electrostatic precipitators   south of the nearest town Lumut, and
                                           4   Stack
                                                                             approximately 288 km north of
                                           5   Electrical building
                                           6   Transformer areas             Kuala Lumpur.
                                           7   Switchyard
                                           8   Water treatment plant
                                                                             The power blocks of the 3 units are
                     1                     9   Pumping station
                                          10   Cool yard                     identical. Their relative position in
                                          11   Fuel oil storage tanks        line allows the simultaneous
         3       2
                                          12   Main entrance                 construction of the 3 units.
     4
                     1

         3       2       6                                                   Although compact, the design of the
                     1                                                       power block leaves sufficient
10                       5           11                                      equipment laydown space for the
         3       2                                                           maintenance and main overhaul
                                                                             programme of the O & M contractors.
                                                                             The circulating water for the open
                                                                             cooling water circuit is taken from
             8                                                               the sea.
                             9
                                                                             The high voltage outgoing lines are
                                                                             connected to the 500 kV switchyard
                                                                             substation.




                                               3
Plant Description - Main Components



                                                    Boiler

                                                    The boilers of the three units are
                                                    drum type and controlled circulation
                                                    tangential firing. They are equipped
                                                    with economiser, superheater,
                                                    reheater and low NOx burners.
                                                    The boilers are designed to burn
                                                    imported international coals as main
                                                    fuel on base load. Light fuel oil
                                                    being used on ignition and for
                                                    sustaining the flame at low load.




   Steam generator parameters
Life steam flow ................ 2390 t/h
Life steam pressure .......... 175 bars abs.
Life steam temperature ..... 539°C
Feedwater temperature ..... 277°C
Fuel ................................ Coal
Ignition fuel ..................... Light oil




                                                4
Turbine

The turbine generator sets have a
rated output corresponding to a
nominal net power of 700 MW and
have a rotating speed of 3000 rpm.
The turbine is of axial flow design
with all turbine and generator rotors
directly coupled in tandem.
The turbine consists of a high pressure
(HP) turbine, an intermediate pressure
(IP) turbine and two double flow low
pressure (LP) turbines.                                                               Steam parameters
                                                                                 at HP turbine throttle :
Standard proven turbine auxilliary                                               Pressure ........................ 175 bar
systems are used wherever possible                                               Temperature ................. 540 °C
and the STG arrangement follows a
                                                                                 at IP cylinder inlet :
simple, practical pre-engineered
layout.                                                                          Pressure ........................ 38 bar
                                                                                 Temperature ................. 540 °C
                                                                                 at LP cylinder inlet :
Generator                                                                        Pressure ........................ 3 bar
                                                                                 Temperature .................. 240 °C
The generator is a two-pole
hydrogen and water cooled machine                                                       Generator parameters
of the “Gigatop” type.                    The stator winding and the terminals
                                                                                 Nominal rating ............... 943 MVA
The rotor winding and the stator          are directly water cooled.
                                                                                 Power factor ................... 0.85
core are hydrogen cooled.                 The machine is fitted with the seal
                                                                                 Voltage .......................... 23 kV
                                          oil, gas cooling and stator water
                                                                                 Frequency ....................... 50 Hz
                                          cooling systems.
                                                                                 Short circuit ratio ............. 0.51
                                          Its excitation is provided by a
                                                                                 Efficiency ........................ 98.9 %
                                          static excitation connected to the
                                                                                 H2 pressure .................... 4 bar gauge
                                          slip ring unit.
                                                                                 Excitation ....................... Static




                                                          5
Mechanical Equipment


                                                                               Circulating water pumps

                                                                               The circulating water system takes
                                                                               cooling water from the sea to the
                                                                               three condensers by means of six
                                                                               50 % duty concrete volute type main
                                                                               cooling water pumps.

                                                                               Feedwater heating plant

                                                                               The feedwater heating plant includes
                                                                               four LP heaters arranged in series, with
                                                                               LP1 & 2 located in the condenser neck,
                                                                               one feedwater tank equipped with a
                                                                               deaerator and three HP heaters. All
                                                                               the feedwater heating equipment is
                                                                               installed horizontally.

                                                                               Feedwater pumps

Steam water loop                                                               The feedwater pump system is
                                                                               composed of 3 x 50 % feedwater
                        Condenser main characteristics                         motor-pump sets, each including :
                   Circulating water temperature ...... 32 °C                  · a booster pump,
                   Condenser pressure .................... 85 mbar             · a main pump,
                                                                               · a variable speed hydraulic coupling,
                         Condensate extraction pumps
                                                                               · a drive motor.
                   Total manometric head ................ 235 mWG
                   Flow rate ................................... 2042 m3/h
                                                                               Condensate extraction pumps
                   Speed ....................................... 1480 rpm
                                                                               The condensate water is drawn from
                                                                               the condenser hotwell by two 100 %
                                                                               motor-pump sets. Each pump is of the
                                                                               multistage, vertical type with barrel.

                                                                               Condenser

                                                                               The condenser is of the single pass,
                                                                               surface type, comprising four titanium
                                                                               tube bundles. Each tube bundle has
                                                                               its own inlet and outlet water box such
                                                                               that the condenser can be considered
                                                                               as two half-condensers of two bundles
                                                                               in parallel. The condenser neck is
                                                                               connected to the LP turbine exhaust
                                                                               box by a suitable flexible bellow.


                                                                             HP heaters

                                                   6
Electrical Distribution - Control and Instrumentation


Electrical equipment                     Instrumentation and control                The analogue control system mainly
                                                                                    includes a load controller for the boiler
The electricity produced by the          Three units share one common main          and feedwater plant, control and
generator is transferred to the 500 kV   control room. The unit control mode        monitoring system for the turbine,
grid via a main three-phase core type    of the main systems (boiler, turbine,      excitation control system for the generator
transformer. Isolated phase busbars      generator and feedwater plant) is          and an energy metering system.
ensure the connection between the        centralised.
generator and the main transformer
as well as the tap connection to the     The centralised logic control equipment
unit transformers.                       is using ABB control equipment. This is
                                         fully programmable electronic equipment.
In normal operation, the 11 kV
network is supplied by the unit          The decentralised control equipment
three-phase transformers from the        is operated using microprocessors
generator 23 kV busbars.                 and is of the programmable logic
                                         controller (PLC) type.
Electricity is supplied to the unit
auxiliaries at different AC voltages :
· High voltage (11 kV) to the main
  motors,
· Medium voltage (3.3 kV) to the
  medium motors,
· Low voltage (415 V) to the small
  motors,
· Low voltage (240 V) to lighting and
  small power.

Four emergency diesel generators
automatically supply the essential
auxiliaries upon complete loss of
AC voltage.

Each 220, 110 and 24 V DC system
provides a secure power supply for
the control and protection of the
power plant.



                                            Electrical single line diagram




                                                               7
Tel. + 33 (0) 1 41 49 20 00 - Fax +33 (0) 1 41 49 24 85 - www.power.alstom.com
ALSTOM Power Centrales - 2, quai Michelet/4, avenue André Malraux - 92309 Levallois-Perret Cedex (France)
                                                                                                              c-
                                                                                                            “ O ALSTOM - 2000. ALSTOM, the logo ALSTOM and their frameworks are trademarks and service trademark applications of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies.
                                                                                                            PWER / BPROB / MJGTPP03 / eng / PPB / 06.03 / FR / 4474 - 389 191 982 RCS Paris - Creation by Big Bang Communication - Printed in France - Illustration : ALSTOM Power - All information is given for indication purpose only and is subject to change without notice.

Weitere ähnliche Inhalte

Was ist angesagt?

C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-reportAnil Saharan
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPCSagnik Saha
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration Mohan Patil
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSPradeep Avanigadda
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training ReportShani Kumar Singh
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training reportsanjeevps12345
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Bikash Gyawali
 
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High Voltage
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High VoltageAir circuit breaker (ACB) Low-Voltage Miduim-Voltage High Voltage
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High VoltageRathana Lan
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant vishal patel
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working pptluckyvarsha
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...haxxo24
 

Was ist angesagt? (20)

C ktps training-report
C ktps training-reportC ktps training-report
C ktps training-report
 
GSECL TPS SIKKA
GSECL TPS SIKKAGSECL TPS SIKKA
GSECL TPS SIKKA
 
Transformers in NTPC
Transformers in NTPCTransformers in NTPC
Transformers in NTPC
 
Gsecl report
Gsecl reportGsecl report
Gsecl report
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Internship Report on Cogeneration
Internship Report on Cogeneration Internship Report on Cogeneration
Internship Report on Cogeneration
 
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPSOperational description of 400kv switchyard NTPC Ramagundam RSTPS
Operational description of 400kv switchyard NTPC Ramagundam RSTPS
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station Kulekhani 2nd hydropower station
Kulekhani 2nd hydropower station
 
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High Voltage
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High VoltageAir circuit breaker (ACB) Low-Voltage Miduim-Voltage High Voltage
Air circuit breaker (ACB) Low-Voltage Miduim-Voltage High Voltage
 
Stirling Engine
Stirling EngineStirling Engine
Stirling Engine
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
التوربينات البخارية.pdf
التوربينات البخارية.pdfالتوربينات البخارية.pdf
التوربينات البخارية.pdf
 
Gas turbines working ppt
Gas turbines working pptGas turbines working ppt
Gas turbines working ppt
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Ntpc barh (bstpp)
Ntpc barh (bstpp)Ntpc barh (bstpp)
Ntpc barh (bstpp)
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Training report on thermal power plant
Training report on thermal power plantTraining report on thermal power plant
Training report on thermal power plant
 
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...Cseb (chhattisgarh state electricity board) korba east vocational training pr...
Cseb (chhattisgarh state electricity board) korba east vocational training pr...
 

Ähnlich wie Janamanjung

Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakaraparnaitik997
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant중구 장
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Airandrewbouldin
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training ReportShivendra Bhushan
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t21403515
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationsagnikchoudhury
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plantAbhinaw kapoor
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)MUHAMMAD AZMAT ULLAH BAIG
 
Vacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon Plc
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdfRahulLodha11
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview reportASHOKKUMARPAL1
 

Ähnlich wie Janamanjung (20)

Nuclear power plant kakarapar
Nuclear power plant kakaraparNuclear power plant kakarapar
Nuclear power plant kakarapar
 
Types of generation plant
Types of generation plantTypes of generation plant
Types of generation plant
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
Vogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean AirVogtle 3&4 - Cleaner Energy Means Clean Air
Vogtle 3&4 - Cleaner Energy Means Clean Air
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
DPL Vocational Training Report
DPL Vocational Training ReportDPL Vocational Training Report
DPL Vocational Training Report
 
Nuclear power plant
Nuclear power plantNuclear power plant
Nuclear power plant
 
Talwandi sabo power plant (t
Talwandi sabo power plant (tTalwandi sabo power plant (t
Talwandi sabo power plant (t
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
training report on Mejia Thermal Power Station
training report on Mejia Thermal Power Stationtraining report on Mejia Thermal Power Station
training report on Mejia Thermal Power Station
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Ppt on tenughat thermal power plant
Ppt on tenughat thermal power plantPpt on tenughat thermal power plant
Ppt on tenughat thermal power plant
 
Electrical Power generation
Electrical Power generationElectrical Power generation
Electrical Power generation
 
Siemens1000 Mw
Siemens1000 MwSiemens1000 Mw
Siemens1000 Mw
 
LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)LAKHRA power generation company limited(LPGCL)
LAKHRA power generation company limited(LPGCL)
 
Niket
NiketNiket
Niket
 
Vacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vesselsVacon energy efficient Ro-Pax vessels
Vacon energy efficient Ro-Pax vessels
 
Kota tharmal plant new.pdf
Kota tharmal plant new.pdfKota tharmal plant new.pdf
Kota tharmal plant new.pdf
 
Power plant technical overview report
Power plant technical overview reportPower plant technical overview report
Power plant technical overview report
 

Kürzlich hochgeladen

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessPixlogix Infotech
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUK Journal
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 

Kürzlich hochgeladen (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Advantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your BusinessAdvantages of Hiring UIUX Design Service Providers for Your Business
Advantages of Hiring UIUX Design Service Providers for Your Business
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 

Janamanjung

  • 1. MANJUNG 3 x 700 MW Thermal Power Plant Malaysia Power Turbo-Systems Plants
  • 2. General Presentation In July 1999, a consortium including Alstom Power and Peremba was awarded by TENAGA NASIONAL BERHARD JANAMANJUNG (TNBJ) for the supply of 3 x 700 MW units for the Manjung thermal power plant. Alstom Power was responsible for the design and supply of the civil works of the power block, the equipment, the erection, the commissioning, the training of the operation and maintenance team, the test run and performance guarantee tests. Peremba was responsible for the civil works of the auxiliary buildings, the electrical and control equipment. The coal yard equipment was designed and supplied by Koch. The power station also features an ALSTOM seawater flue gas desulphurisation (FGD) process plant which utilises the natural properties of seawater to absorb the sulphur dioxide from the flue gas. 2
  • 3. Layout 12 1 The Manjung power plant is located Turbine hall 2 Boiler on a reclaimed island, about 10 km 7 3 Electrostatic precipitators south of the nearest town Lumut, and 4 Stack approximately 288 km north of 5 Electrical building 6 Transformer areas Kuala Lumpur. 7 Switchyard 8 Water treatment plant The power blocks of the 3 units are 1 9 Pumping station 10 Cool yard identical. Their relative position in 11 Fuel oil storage tanks line allows the simultaneous 3 2 12 Main entrance construction of the 3 units. 4 1 3 2 6 Although compact, the design of the 1 power block leaves sufficient 10 5 11 equipment laydown space for the 3 2 maintenance and main overhaul programme of the O & M contractors. The circulating water for the open cooling water circuit is taken from 8 the sea. 9 The high voltage outgoing lines are connected to the 500 kV switchyard substation. 3
  • 4. Plant Description - Main Components Boiler The boilers of the three units are drum type and controlled circulation tangential firing. They are equipped with economiser, superheater, reheater and low NOx burners. The boilers are designed to burn imported international coals as main fuel on base load. Light fuel oil being used on ignition and for sustaining the flame at low load. Steam generator parameters Life steam flow ................ 2390 t/h Life steam pressure .......... 175 bars abs. Life steam temperature ..... 539°C Feedwater temperature ..... 277°C Fuel ................................ Coal Ignition fuel ..................... Light oil 4
  • 5. Turbine The turbine generator sets have a rated output corresponding to a nominal net power of 700 MW and have a rotating speed of 3000 rpm. The turbine is of axial flow design with all turbine and generator rotors directly coupled in tandem. The turbine consists of a high pressure (HP) turbine, an intermediate pressure (IP) turbine and two double flow low pressure (LP) turbines. Steam parameters at HP turbine throttle : Standard proven turbine auxilliary Pressure ........................ 175 bar systems are used wherever possible Temperature ................. 540 °C and the STG arrangement follows a at IP cylinder inlet : simple, practical pre-engineered layout. Pressure ........................ 38 bar Temperature ................. 540 °C at LP cylinder inlet : Generator Pressure ........................ 3 bar Temperature .................. 240 °C The generator is a two-pole hydrogen and water cooled machine Generator parameters of the “Gigatop” type. The stator winding and the terminals Nominal rating ............... 943 MVA The rotor winding and the stator are directly water cooled. Power factor ................... 0.85 core are hydrogen cooled. The machine is fitted with the seal Voltage .......................... 23 kV oil, gas cooling and stator water Frequency ....................... 50 Hz cooling systems. Short circuit ratio ............. 0.51 Its excitation is provided by a Efficiency ........................ 98.9 % static excitation connected to the H2 pressure .................... 4 bar gauge slip ring unit. Excitation ....................... Static 5
  • 6. Mechanical Equipment Circulating water pumps The circulating water system takes cooling water from the sea to the three condensers by means of six 50 % duty concrete volute type main cooling water pumps. Feedwater heating plant The feedwater heating plant includes four LP heaters arranged in series, with LP1 & 2 located in the condenser neck, one feedwater tank equipped with a deaerator and three HP heaters. All the feedwater heating equipment is installed horizontally. Feedwater pumps Steam water loop The feedwater pump system is composed of 3 x 50 % feedwater Condenser main characteristics motor-pump sets, each including : Circulating water temperature ...... 32 °C · a booster pump, Condenser pressure .................... 85 mbar · a main pump, · a variable speed hydraulic coupling, Condensate extraction pumps · a drive motor. Total manometric head ................ 235 mWG Flow rate ................................... 2042 m3/h Condensate extraction pumps Speed ....................................... 1480 rpm The condensate water is drawn from the condenser hotwell by two 100 % motor-pump sets. Each pump is of the multistage, vertical type with barrel. Condenser The condenser is of the single pass, surface type, comprising four titanium tube bundles. Each tube bundle has its own inlet and outlet water box such that the condenser can be considered as two half-condensers of two bundles in parallel. The condenser neck is connected to the LP turbine exhaust box by a suitable flexible bellow. HP heaters 6
  • 7. Electrical Distribution - Control and Instrumentation Electrical equipment Instrumentation and control The analogue control system mainly includes a load controller for the boiler The electricity produced by the Three units share one common main and feedwater plant, control and generator is transferred to the 500 kV control room. The unit control mode monitoring system for the turbine, grid via a main three-phase core type of the main systems (boiler, turbine, excitation control system for the generator transformer. Isolated phase busbars generator and feedwater plant) is and an energy metering system. ensure the connection between the centralised. generator and the main transformer as well as the tap connection to the The centralised logic control equipment unit transformers. is using ABB control equipment. This is fully programmable electronic equipment. In normal operation, the 11 kV network is supplied by the unit The decentralised control equipment three-phase transformers from the is operated using microprocessors generator 23 kV busbars. and is of the programmable logic controller (PLC) type. Electricity is supplied to the unit auxiliaries at different AC voltages : · High voltage (11 kV) to the main motors, · Medium voltage (3.3 kV) to the medium motors, · Low voltage (415 V) to the small motors, · Low voltage (240 V) to lighting and small power. Four emergency diesel generators automatically supply the essential auxiliaries upon complete loss of AC voltage. Each 220, 110 and 24 V DC system provides a secure power supply for the control and protection of the power plant. Electrical single line diagram 7
  • 8. Tel. + 33 (0) 1 41 49 20 00 - Fax +33 (0) 1 41 49 24 85 - www.power.alstom.com ALSTOM Power Centrales - 2, quai Michelet/4, avenue André Malraux - 92309 Levallois-Perret Cedex (France) c- “ O ALSTOM - 2000. ALSTOM, the logo ALSTOM and their frameworks are trademarks and service trademark applications of ALSTOM. The other names mentioned, registered or not, are the property of their respective companies. PWER / BPROB / MJGTPP03 / eng / PPB / 06.03 / FR / 4474 - 389 191 982 RCS Paris - Creation by Big Bang Communication - Printed in France - Illustration : ALSTOM Power - All information is given for indication purpose only and is subject to change without notice.