Re: PIPELINE CONSTRUCTION PRESENTATION WRITE-UP
Please find the write – up below for your necessary action
It is a continuation of the previous write- up
Chapter 9.0 Regulatory Bodies– Effects on Pipeline Construction
9.0.1 Nigeria Institute of Survey
9.0.2 American Petroleum Institute (API 1104) 21st Edition
9.0.2.1 Welding- WPS, WPQ
9.0.2.2 NDT- Toxic & Radio active Emission
9.0.3 N S E, COREN.
9.0.4 Financial: Evidence of sponsorship.
Questions may come up from the above bodies.
As a registered surveyor company is required in AKK Project same a registered
Engineering company is needed in Mechanical construction industries. Unlike
AKK, registered surveyor is like a welder in Construction Company.
If you are not a registered COREN company but you have staff with NSE, COREN
etc in addition to backup reports from financial bodies you can still win multiple
million Naira contracts based on your good presentation.
NOTE: The aim of inviting you for presentation could be
(a) They wanted to rate you with your Profile
(b) Confirm your capability, reliability, accountability etc.
It is more difficult to get information in warri but I wish to come on Friday
08/07/2008 for more explanation.