Akash Tikhe
What is Landfill?
A landfill is an engineered method for land disposal of solid and
hazardous waste.
Landfilling is the term used to describe the process by which solid
waste is placed in the landfill.
Landfills for individual waste constituents such as combustion ash,
asbestos and other similar wastes are known as monofills.
Landfills for the disposal of hazardous wastes are called secure
landfills.
 Landfill need not be an engineered site when the waste is mostly
inert at final disposal. In rural area waste contain large proportion
of soil and dirt. The practice of disposal of such waste is called as
non–engineered disposal method.
Principle
The purpose of landfilling is to bury/ alter the chemical composition
of the waste so that they do not pose any threat to
environment/public health.
Landfills are usually made up of cells in which a discrete volume of
waste is kept isolated from adjacent waste cells by a suitable barrier.
The term cell is used to describe the volume of material placed in a
landfill during one operating period.
Landfill Design
Characteristics of Landfill
1. solid waste is placed in a suitably selected and prepared (lined)
landfill site in a carefully prescribed manner.
2. the waste material is spread out and compacted with
appropriate heavy machinery.
3. The waste is covered each day with a layer of compacted soil.
4. Most important feature of modern sanitary landfill design is
the technology used to prevent GW pollution.
5. It relies on containment rather than treatment.
Requirements For a Landfill
There are four minimum requirements
1)Full/ partial hydrological isolation
2)Formal engineering preparation
3)Permanent control
4)Planned waste placement and covering
Important aspects of landfill process
The feasibility of land disposal of solid waste depends on factors
Type of solid waste
Quantity of waste
Characteristics of waste
Laws and regulations
Soil and site characteristics
Total capacity and design life of a new landfill depend on
Size
Topography of the site
Rate of refuse generation
The degree of refuse compaction
 The amount of daily soil cover adds 20% of overall fill volume, it
must be considered for evaluation of capacity of landfill.
Site selection process
The suitability of a landfill site is determined by
Its size/area/volume
Techniqual and environmental factors
Climate and hydrological conditions.
It requires a development of a working plan, description of site
location, operation, engineering work and site restoration.
People are reluctant to allow construction of new landfill, thus siting
approval authority is important.
Landfill Component
An environmental sound landfill comprises
An appropriate liners for protection of GW
Runoff controls
Leachate collection and treatment system
Monitoring wells
Appropriate final cover design
Why cell is necessary in Landfill?
 A cell includes the SW deposited and the daily covered material
surrounding it.
Daily cover usually consists of 6-12 in. of native soil or alternative
material such as compost, sand, auto shredder fluff.
The barriers between the cells (soil, compost etc.) restricts
downward/ lateral escape of the waste constituents.
Landfill Cells
Landfill – Design and Operation
1) Planning phase – involves
Preliminary hydro-geological and geo-technical site investigations
as a basis for actual design.
Landfill – Design and Operation
2) Construction phase – involves
Earthwork, road and facility construction and preparation (liners,
drains) of the fill area.
Landfill – Design and Operation
3) Operation Phase (5-20 years)
Involves work at the front of the fill area
Operation of env installations
Completion of finished sections
Has a high traffic intensity
Landfill – Design and Operation
4) Completed phase (20- 100 years)
It involves termination of actual filling to the time when envt.
Installations need no longer to be operated.
The emissions may have decreased to a level where they do not
need any further treatment and can be discharged freely into the
surroundings.
5) Final storage phase
In this phase the landfill is integrated into the surroundings for
the further purpose, no longer needs special attention.
Final Cover or cap Specifications
Once the landfill reaches design height, a final cap is placed
to minimize infiltration of rainwater
Minimize dispersal of waste
Accommodate settling
Facilitate long term maintenance of the
landfill.
The final cover shall have a barrier soil layer.
On the top of barrier soil layer, there shall be drainage layer of 15
cm.
On the top of the drainage there shall be a vegetative layer of 45 cm
to support natural plant growth and to minimize erosion.
Final cap Specification
A cap consists of from top to bottom
Vegetation and supporting soil (6 in)
Filter and drainage layer – protective material (18-36 in) drainage
material (12 in)
A hydraulic barrier– clay layer (24 in), LDPE barrier
Foundation for hydraulic barrier– gravel layer ( 6 inch) sand bedding
for LDPE (4 inch)
Specification For Landfilling Operation
Waste subjected to landfilling shall be compacted in thin layers by
compactors to achieve high density of the waste.
Prior to the commencement of monsoon season, an immediate
cover of 40-65 cm thickness of soil shall be placed on the landfill
with proper compaction and grading to prevent infiltration.
Proper drainage shall be constructed to divert runoff away from
the active cell of the landfill.
When the total depth of landfill exceeds 9 m(30 ft) from base an
intermediate cover to be used at mid depth. It is typically 2 ft of
clay soil and 6” of topsoil over the area.
New phases are started on the top of lower phase.
Landfill Settling Process
It consists of three stages
1. Primary consolidation – Substantial amount of settling occurs at
this stage.
It is caused by weight of the waste layers, truck movements,
bulldozers , mechanical compactors.
After this stage aerobic degradation of waste occurs.
2. Secondary compression
Rate of settling is much lower than first stage.
Settling occurs through compression.
Landfill Settling Process
3. Decomposition- It is the degradation process. Organic material is
converted to gas and leachate.
Settling rate increases as compare to secondary stage, but with the
passage of time it gradually decreases.
It continues till the organic matter is degraded.
Microbial Degradation Process
Biological process is most important aspect in landfilling which
determines the quantity and quality of leachate and gas.
After the disposal, large part of waste becomes anaerobic(du to
absence of oxygen.
Microbial activity degrade the solid organic carbon and produces
methane and carbon dioxide.
In an anaerobic process solid and dissolved organic compounds are
hydrolyzed and fermented to volatile fatty acids, alcohols, hydrogen
and carbon dioxide.
The methanogenic bacteria convert acetic acid to methane and
carbon dioxide.
Hydrogenophilic bacteria convert hydrogen and carbon dioxide to
methane.
Decomposition pathways for common organic waste material
Proteins carbohydrates lipids
↓ ↓ ↓
Amino acids simple sugar long chain of
volatile fatty acids
↓ ↓ ↓
Hydrogen/ Acetate Short chain of
carbon dioxide volatile fatty acids
↓ ↓ ↓
Methane Methane + CO2 Acetate←
Composition Of Landfill Gas
Gases % dry volume basis
Methane 45-60
Carbon dioxide 40-60
Nitrogen 2-5
Ammonia 0.1- 1
Oxygen 0.1- 1
Hydrogen 0-0.2
Carbon monoxide 0-0.2
Factors Affecting The Landfill Gas And Leachate
Generation
1. Nature of waste – amount of gas depends on the content of
biodegradable matter in the waste.
2. Moisture content – microorganisms require minimum 12% moisture for
growth, thus it is important factor in determining gas production.
3. pH – methanogens grow only at low pH around neutrality. % of gas
depends on pH.
4. Particle size and density – particle size affects density achieved by
compaction that affects surface area and hence volume. This affects the
moisture absorption and thus the biological degradation.
5. Temperature – Increase in temperature tends to increase in gas
production. It affects microbial activity.
Methods of Landfilling
The principle methods used for landfilling are
1. Excavated cell/ Trench method- Ideally suited to areas where an
adequate depth of cover material is available at the site and water table
is not near the surface.
SW are placed in cells/ trenches excavated in the soil.
Soil excavated from the site is used for daily and final cover.
excavated cells are lined with synthetic membrane liners/ low
permeability clay/combination of two to limit the movement of
landfill gas and leachate.
Methods of Landfilling
2. Area method- Used when terrain is unsuitable for excavation of
cells/ trenches and GW table is high.
Site preparation includes installation of liners and leachate
management system.
Cover material must be obtained from adjacent land/ burrow, pit
areas.
Since there is limited material for covering, compost, foundry sand
has been utilized as intermediate cover material.
Temporary cover material of soil and geosynthetic blankets placed
temporarily over completed cell and removed before next lift is began.
Leachate generation may occur and may be difficult to control.
Methods of Landfilling
Methods of Landfilling
3. Canyon/depression method
Technique involves placement and compaction of SW in canyon/
depression.
It differs with geometry of site, characteristics of available cover
material, hydrology, geology of the site.
Control of surface drainage is often a critical factor in this method.
Filling starts at the headed of canyon and ends at mouth, to prevent
accumulation of water behind the landfill.
Advantages of Landfilling
In addition to provide an option for waste management, it also
serves to improve/ reclaim poor quality land.
It raises the ground elevation/surface grade of the site. Completed
landfills have been converted to municipal parks, playgrounds, golf
courses, community land use projects.
It is the most economical alternative for SW disposal which accounts
for its frequent application.
Other disposal methods are not entirely safe and efficient throughout
the year.
Advantages of Landfilling
Incineration is a costly process, residue requires ultimate disposal on
land.
Composting is a seasonal option.
It is not possible to reclaim and recycle all SW material.
Thus landfilling is the most convenient option.
Disadvantages
Difficult to find suitable site within economically feasible distance.
It is not possible to build a completely safe and secure SW landfill.
Some of the pollutants may escape in the env in the form of leachate.
Potential harm to public health due to air, soil, water and noise
pollution
Damage to local ecosystem.
Public oppose
Public, environmental and health Concerns
It is important to minimize contamination from landfill to the
surrounding environment.
Hydrology (GW flow) and geology (Rock type, soil permeability) of
the site has a direct influence on the possibility of water pollution
(GW pollution).
Public, environmental and health Concerns
Landfill should not be located in low lying wetland areas i.e. near
marshes, swamps, as the waste should not come in contact with
surface/ GW.
It should not be located in flood plains of streams/ rivers. There
should be minimum distance of 60m from any lake/pond.
Vertical separation of 1.5 m between base of landfill and seasonally
high GW table elevation.
It should not be located in unstable areas or if it is present it must be
designed to resist forces caused by seismic activity.
Thank
You

Weitere ähnliche Inhalte

Was ist angesagt?

Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
Ashish Agarwal
 

Was ist angesagt? (20)

Incineration method of solid waste disposal
Incineration method of solid waste disposalIncineration method of solid waste disposal
Incineration method of solid waste disposal
 
Incineration And Pyrolysis
Incineration And PyrolysisIncineration And Pyrolysis
Incineration And Pyrolysis
 
Sludge treatment and disposal 1
Sludge treatment and disposal 1Sludge treatment and disposal 1
Sludge treatment and disposal 1
 
On-site handling methods - Municipal Solid Wastes
On-site handling methods - Municipal Solid WastesOn-site handling methods - Municipal Solid Wastes
On-site handling methods - Municipal Solid Wastes
 
Municipal Solid Waste Management Process
Municipal Solid Waste Management ProcessMunicipal Solid Waste Management Process
Municipal Solid Waste Management Process
 
Properties of solid waste
Properties of solid wasteProperties of solid waste
Properties of solid waste
 
Sludge treatment and disposal
Sludge treatment and disposalSludge treatment and disposal
Sludge treatment and disposal
 
Solid waste treatment by composting
Solid waste treatment by compostingSolid waste treatment by composting
Solid waste treatment by composting
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Rotating biological contactor
Rotating biological contactorRotating biological contactor
Rotating biological contactor
 
Collection of solid waste
Collection of solid wasteCollection of solid waste
Collection of solid waste
 
Solid waste management
Solid waste managementSolid waste management
Solid waste management
 
Landfill gas management
Landfill gas managementLandfill gas management
Landfill gas management
 
Integrated solid waste management
Integrated solid waste managementIntegrated solid waste management
Integrated solid waste management
 
Activated sludge process
Activated sludge processActivated sludge process
Activated sludge process
 
Trickling filter ppt
Trickling filter pptTrickling filter ppt
Trickling filter ppt
 
Landfill classification
Landfill classificationLandfill classification
Landfill classification
 
Collection of solid waste
Collection of solid wasteCollection of solid waste
Collection of solid waste
 
Solid waste management ppt
Solid waste management pptSolid waste management ppt
Solid waste management ppt
 
Waste water treatment processes
Waste water treatment processesWaste water treatment processes
Waste water treatment processes
 

Ähnlich wie Landfilling

Introduction to disposal part 2 engineering barriers in landfill
Introduction to disposal part 2 engineering barriers in landfillIntroduction to disposal part 2 engineering barriers in landfill
Introduction to disposal part 2 engineering barriers in landfill
Rehab O. Abdel Rahman
 

Ähnlich wie Landfilling (20)

ENVIRONMENTAL ENGINEERING (506)-Module 3.pptx
ENVIRONMENTAL ENGINEERING (506)-Module 3.pptxENVIRONMENTAL ENGINEERING (506)-Module 3.pptx
ENVIRONMENTAL ENGINEERING (506)-Module 3.pptx
 
Landfill revised
Landfill revisedLandfill revised
Landfill revised
 
Solid Waste Disposal into Land
Solid Waste Disposal into LandSolid Waste Disposal into Land
Solid Waste Disposal into Land
 
sanitary landfills design operation and management
sanitary landfills design operation and managementsanitary landfills design operation and management
sanitary landfills design operation and management
 
Introduction to disposal part 2 engineering barriers in landfill
Introduction to disposal part 2 engineering barriers in landfillIntroduction to disposal part 2 engineering barriers in landfill
Introduction to disposal part 2 engineering barriers in landfill
 
LAND FILL SITE AND DUMPING SITE
LAND FILL SITE AND DUMPING SITELAND FILL SITE AND DUMPING SITE
LAND FILL SITE AND DUMPING SITE
 
solid waste management to landfills
solid waste management to landfillssolid waste management to landfills
solid waste management to landfills
 
Unit 5 SHWM.pptx
Unit 5 SHWM.pptxUnit 5 SHWM.pptx
Unit 5 SHWM.pptx
 
TREATMENT TECHNOLOGIES A COMPARISON
TREATMENT TECHNOLOGIES  A COMPARISON TREATMENT TECHNOLOGIES  A COMPARISON
TREATMENT TECHNOLOGIES A COMPARISON
 
Water supply and sanitary engineering seminar report
Water supply and sanitary engineering seminar reportWater supply and sanitary engineering seminar report
Water supply and sanitary engineering seminar report
 
Secure landfilling.pptx
Secure landfilling.pptxSecure landfilling.pptx
Secure landfilling.pptx
 
1.-Landfill-basics.pdf
1.-Landfill-basics.pdf1.-Landfill-basics.pdf
1.-Landfill-basics.pdf
 
Performance of geosynthetic filters in treatment of urban storm water runoff
Performance of geosynthetic filters in treatment of urban storm water runoffPerformance of geosynthetic filters in treatment of urban storm water runoff
Performance of geosynthetic filters in treatment of urban storm water runoff
 
Mod 3 Landfills ppt.pdf
Mod 3 Landfills ppt.pdfMod 3 Landfills ppt.pdf
Mod 3 Landfills ppt.pdf
 
Criteria 3 : Soil Conservation
Criteria 3 : Soil ConservationCriteria 3 : Soil Conservation
Criteria 3 : Soil Conservation
 
environmental geotechnical applications in sanitary landfill design
environmental geotechnical applications in sanitary landfill designenvironmental geotechnical applications in sanitary landfill design
environmental geotechnical applications in sanitary landfill design
 
Remediation of contaminated sites -Surface cover.pdf
Remediation of contaminated sites -Surface cover.pdfRemediation of contaminated sites -Surface cover.pdf
Remediation of contaminated sites -Surface cover.pdf
 
Active landfill
Active landfillActive landfill
Active landfill
 
Refuse disposal area level
Refuse disposal area levelRefuse disposal area level
Refuse disposal area level
 
Legacy waste management
Legacy waste managementLegacy waste management
Legacy waste management
 

Mehr von Akash Tikhe (7)

Introduction of Solid waste management
Introduction of Solid waste managementIntroduction of Solid waste management
Introduction of Solid waste management
 
Introduction of Effluent Treatment Plant
Introduction of Effluent Treatment PlantIntroduction of Effluent Treatment Plant
Introduction of Effluent Treatment Plant
 
Basics of Remote Sensing
Basics of Remote SensingBasics of Remote Sensing
Basics of Remote Sensing
 
Mitigation of an Earthquake
Mitigation of an EarthquakeMitigation of an Earthquake
Mitigation of an Earthquake
 
Causes of Landslide
Causes of LandslideCauses of Landslide
Causes of Landslide
 
Decolourisation of Nigrosine WS dye by Solar Photo-fenton
Decolourisation of Nigrosine WS dye by Solar Photo-fentonDecolourisation of Nigrosine WS dye by Solar Photo-fenton
Decolourisation of Nigrosine WS dye by Solar Photo-fenton
 
5 R- Reduce, Reuse, Recycle, Refuse, Recover
5 R-  Reduce, Reuse, Recycle, Refuse, Recover5 R-  Reduce, Reuse, Recycle, Refuse, Recover
5 R- Reduce, Reuse, Recycle, Refuse, Recover
 

Kürzlich hochgeladen

Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
rajputriyana310
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
kauryashika82
 

Kürzlich hochgeladen (20)

CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
Call Girls In Bloom Boutique | GK-1 ☎ 9990224454 High Class Delhi NCR 24 Hour...
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now ☎ Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 

Landfilling

  • 2. What is Landfill? A landfill is an engineered method for land disposal of solid and hazardous waste. Landfilling is the term used to describe the process by which solid waste is placed in the landfill. Landfills for individual waste constituents such as combustion ash, asbestos and other similar wastes are known as monofills. Landfills for the disposal of hazardous wastes are called secure landfills.
  • 3.  Landfill need not be an engineered site when the waste is mostly inert at final disposal. In rural area waste contain large proportion of soil and dirt. The practice of disposal of such waste is called as non–engineered disposal method.
  • 4. Principle The purpose of landfilling is to bury/ alter the chemical composition of the waste so that they do not pose any threat to environment/public health. Landfills are usually made up of cells in which a discrete volume of waste is kept isolated from adjacent waste cells by a suitable barrier. The term cell is used to describe the volume of material placed in a landfill during one operating period.
  • 6.
  • 7. Characteristics of Landfill 1. solid waste is placed in a suitably selected and prepared (lined) landfill site in a carefully prescribed manner. 2. the waste material is spread out and compacted with appropriate heavy machinery. 3. The waste is covered each day with a layer of compacted soil. 4. Most important feature of modern sanitary landfill design is the technology used to prevent GW pollution. 5. It relies on containment rather than treatment.
  • 8. Requirements For a Landfill There are four minimum requirements 1)Full/ partial hydrological isolation 2)Formal engineering preparation 3)Permanent control 4)Planned waste placement and covering
  • 9. Important aspects of landfill process The feasibility of land disposal of solid waste depends on factors Type of solid waste Quantity of waste Characteristics of waste Laws and regulations Soil and site characteristics Total capacity and design life of a new landfill depend on Size Topography of the site Rate of refuse generation The degree of refuse compaction  The amount of daily soil cover adds 20% of overall fill volume, it must be considered for evaluation of capacity of landfill.
  • 10. Site selection process The suitability of a landfill site is determined by Its size/area/volume Techniqual and environmental factors Climate and hydrological conditions. It requires a development of a working plan, description of site location, operation, engineering work and site restoration. People are reluctant to allow construction of new landfill, thus siting approval authority is important.
  • 11. Landfill Component An environmental sound landfill comprises An appropriate liners for protection of GW Runoff controls Leachate collection and treatment system Monitoring wells Appropriate final cover design
  • 12. Why cell is necessary in Landfill?  A cell includes the SW deposited and the daily covered material surrounding it. Daily cover usually consists of 6-12 in. of native soil or alternative material such as compost, sand, auto shredder fluff. The barriers between the cells (soil, compost etc.) restricts downward/ lateral escape of the waste constituents.
  • 14. Landfill – Design and Operation 1) Planning phase – involves Preliminary hydro-geological and geo-technical site investigations as a basis for actual design.
  • 15. Landfill – Design and Operation 2) Construction phase – involves Earthwork, road and facility construction and preparation (liners, drains) of the fill area.
  • 16. Landfill – Design and Operation 3) Operation Phase (5-20 years) Involves work at the front of the fill area Operation of env installations Completion of finished sections Has a high traffic intensity
  • 17. Landfill – Design and Operation 4) Completed phase (20- 100 years) It involves termination of actual filling to the time when envt. Installations need no longer to be operated. The emissions may have decreased to a level where they do not need any further treatment and can be discharged freely into the surroundings. 5) Final storage phase In this phase the landfill is integrated into the surroundings for the further purpose, no longer needs special attention.
  • 18.
  • 19. Final Cover or cap Specifications Once the landfill reaches design height, a final cap is placed to minimize infiltration of rainwater Minimize dispersal of waste Accommodate settling Facilitate long term maintenance of the landfill. The final cover shall have a barrier soil layer. On the top of barrier soil layer, there shall be drainage layer of 15 cm. On the top of the drainage there shall be a vegetative layer of 45 cm to support natural plant growth and to minimize erosion.
  • 20. Final cap Specification A cap consists of from top to bottom Vegetation and supporting soil (6 in) Filter and drainage layer – protective material (18-36 in) drainage material (12 in) A hydraulic barrier– clay layer (24 in), LDPE barrier Foundation for hydraulic barrier– gravel layer ( 6 inch) sand bedding for LDPE (4 inch)
  • 21. Specification For Landfilling Operation Waste subjected to landfilling shall be compacted in thin layers by compactors to achieve high density of the waste. Prior to the commencement of monsoon season, an immediate cover of 40-65 cm thickness of soil shall be placed on the landfill with proper compaction and grading to prevent infiltration. Proper drainage shall be constructed to divert runoff away from the active cell of the landfill. When the total depth of landfill exceeds 9 m(30 ft) from base an intermediate cover to be used at mid depth. It is typically 2 ft of clay soil and 6” of topsoil over the area. New phases are started on the top of lower phase.
  • 22. Landfill Settling Process It consists of three stages 1. Primary consolidation – Substantial amount of settling occurs at this stage. It is caused by weight of the waste layers, truck movements, bulldozers , mechanical compactors. After this stage aerobic degradation of waste occurs. 2. Secondary compression Rate of settling is much lower than first stage. Settling occurs through compression.
  • 23. Landfill Settling Process 3. Decomposition- It is the degradation process. Organic material is converted to gas and leachate. Settling rate increases as compare to secondary stage, but with the passage of time it gradually decreases. It continues till the organic matter is degraded.
  • 24. Microbial Degradation Process Biological process is most important aspect in landfilling which determines the quantity and quality of leachate and gas. After the disposal, large part of waste becomes anaerobic(du to absence of oxygen. Microbial activity degrade the solid organic carbon and produces methane and carbon dioxide. In an anaerobic process solid and dissolved organic compounds are hydrolyzed and fermented to volatile fatty acids, alcohols, hydrogen and carbon dioxide. The methanogenic bacteria convert acetic acid to methane and carbon dioxide. Hydrogenophilic bacteria convert hydrogen and carbon dioxide to methane.
  • 25. Decomposition pathways for common organic waste material Proteins carbohydrates lipids ↓ ↓ ↓ Amino acids simple sugar long chain of volatile fatty acids ↓ ↓ ↓ Hydrogen/ Acetate Short chain of carbon dioxide volatile fatty acids ↓ ↓ ↓ Methane Methane + CO2 Acetate←
  • 26. Composition Of Landfill Gas Gases % dry volume basis Methane 45-60 Carbon dioxide 40-60 Nitrogen 2-5 Ammonia 0.1- 1 Oxygen 0.1- 1 Hydrogen 0-0.2 Carbon monoxide 0-0.2
  • 27. Factors Affecting The Landfill Gas And Leachate Generation 1. Nature of waste – amount of gas depends on the content of biodegradable matter in the waste. 2. Moisture content – microorganisms require minimum 12% moisture for growth, thus it is important factor in determining gas production. 3. pH – methanogens grow only at low pH around neutrality. % of gas depends on pH. 4. Particle size and density – particle size affects density achieved by compaction that affects surface area and hence volume. This affects the moisture absorption and thus the biological degradation. 5. Temperature – Increase in temperature tends to increase in gas production. It affects microbial activity.
  • 28. Methods of Landfilling The principle methods used for landfilling are 1. Excavated cell/ Trench method- Ideally suited to areas where an adequate depth of cover material is available at the site and water table is not near the surface. SW are placed in cells/ trenches excavated in the soil. Soil excavated from the site is used for daily and final cover. excavated cells are lined with synthetic membrane liners/ low permeability clay/combination of two to limit the movement of landfill gas and leachate.
  • 29. Methods of Landfilling 2. Area method- Used when terrain is unsuitable for excavation of cells/ trenches and GW table is high. Site preparation includes installation of liners and leachate management system. Cover material must be obtained from adjacent land/ burrow, pit areas. Since there is limited material for covering, compost, foundry sand has been utilized as intermediate cover material. Temporary cover material of soil and geosynthetic blankets placed temporarily over completed cell and removed before next lift is began. Leachate generation may occur and may be difficult to control.
  • 31. Methods of Landfilling 3. Canyon/depression method Technique involves placement and compaction of SW in canyon/ depression. It differs with geometry of site, characteristics of available cover material, hydrology, geology of the site. Control of surface drainage is often a critical factor in this method. Filling starts at the headed of canyon and ends at mouth, to prevent accumulation of water behind the landfill.
  • 32. Advantages of Landfilling In addition to provide an option for waste management, it also serves to improve/ reclaim poor quality land. It raises the ground elevation/surface grade of the site. Completed landfills have been converted to municipal parks, playgrounds, golf courses, community land use projects. It is the most economical alternative for SW disposal which accounts for its frequent application. Other disposal methods are not entirely safe and efficient throughout the year.
  • 33. Advantages of Landfilling Incineration is a costly process, residue requires ultimate disposal on land. Composting is a seasonal option. It is not possible to reclaim and recycle all SW material. Thus landfilling is the most convenient option.
  • 34. Disadvantages Difficult to find suitable site within economically feasible distance. It is not possible to build a completely safe and secure SW landfill. Some of the pollutants may escape in the env in the form of leachate. Potential harm to public health due to air, soil, water and noise pollution Damage to local ecosystem. Public oppose
  • 35. Public, environmental and health Concerns It is important to minimize contamination from landfill to the surrounding environment. Hydrology (GW flow) and geology (Rock type, soil permeability) of the site has a direct influence on the possibility of water pollution (GW pollution).
  • 36. Public, environmental and health Concerns Landfill should not be located in low lying wetland areas i.e. near marshes, swamps, as the waste should not come in contact with surface/ GW. It should not be located in flood plains of streams/ rivers. There should be minimum distance of 60m from any lake/pond. Vertical separation of 1.5 m between base of landfill and seasonally high GW table elevation. It should not be located in unstable areas or if it is present it must be designed to resist forces caused by seismic activity.

Hinweis der Redaktion

  1. The cells are typically square, up to 1000 ft. in width and length. Trenches vary from 200 -1000 ft. in length, 3-10 ft. in depth, 15-50 ft. in width.