SANDIN.pptx

J
UNDER THE GUIDANCE OF
Mr. G. LIN, M.E.,
Assistant Professor
Department of Civil Engineering
Mar Ephraem college of Engineeringand Technology
PRESENTED BY,
ABEESH B 961419103002
SANJAI P 961419103046
Department of Civil Engineering
Mar Ephraem college of Engineering and Technology
PLANNING, ANALYSIS, DESIGN AND
ESTIMATION OF AAUDITORIUM
ABSTRACT
The project deals with planning, analyzing and designing of
auditorium building. The location of the proposed auditorium in
Thozhicode at Kanyakumari district. There are few auditorium with
less spacing available in that particular area but the land facility are
more in that area.
The main objective of this project is to make the auditorium more
comfortable for people with more spacing. The plinth area of the
auditorium is 460 sq.m. The structure is going to be analysed
manually and designed by Limit state method of design respectively.
The M20 grade concrete and Fe415 steel are considered for design.
Site Plan
Ground Floor
First Floor
SANDIN.pptx
DESIGN OF SLAB
DESIGN OF TWO WAY SLAB
DATA
Slab dimension = 3 x 3m
Lx = 3m
Ly = 3m
fck = 25 N/mm2
fy = 500N/mm2
Live load = 2 KN/m2
Floor Finish = 1KN/m2
Wall Thickness = 230 mm
Check the ratio
LY/LX = 3/3 = 1
1 < 2 Hence it is Two way slab
CALCULATE THE DEPTH OF SLAB
Overall Depth (D)
D = span/(basic value)
D = 3000/(26) = 115.38 mmProvide 120
mm effective depth
Effective depth, d= Overall Depth - Clear cover - diameter/2
Provide 20mm clear cover and 12mm diameter
d = 120 – 20 - 12/2
= 94 mm
~ 95mm
CALCULATE THE EFFECTIVE SPAN
FOR SHORTER SPAN
Case 1:
Le = clear span + effective depth
= 3000 + 95
= 3095 mm
Case 2:
Le = clear span + wall thickness
= 3000 + 230
= 3230mm
Take least value 3095mm
FOR LONGER SPAN
Case 1:
Le = clear span + effective depth
= 3000 + 95
= 3095 mm
Case 2:
Le = clear span + wall thickness
= 3000 + 230
= 3230mm
Take least value 3095mm
LOAD CALCULATION
Total Load = Dead load +Live load +Floor finish + Parapet load
i. Dead load = 0.12 x 25 = 3 KN/m2
ii. Live load = 2 KN/m2
iii. Floor finish = 1KN/m2
iv. Parapet load = 0.12 x 20 = 2.4 KN/m2
Total load = 3+2+1+2.4
= 8.4 KN/m2
Factored load = Total load x Factor of safety
= 8.4 x 1.5
= 12.6 KN/m2
BENDING MOMENT CALCULATIONS
Mx = αxwlx
2 =0.062 x 12.6 x 3.0952 = 7.48KNm
My = αywlx
2 =0.062 x 12.6 x 3.0952 = 7.48KNm
CALCULATE THE DEPTH BASED ON FLEXURE MOMENT
Check for effective depth
dreq = 𝐵𝑀
𝑅𝑢𝑏
Ru = 0.36fck
𝑋𝑢𝑚𝑎𝑥
𝑑
(1-0.42
𝑋𝑢𝑚𝑎𝑥
𝑑
)
𝑋𝑢𝑚𝑎𝑥
𝑑
= 0.46
Ru = 0.36 x 25 x0.46 (1-0.42 x 0.46)= 3.34 N/mm2
dreq = 7
.
48𝑥10⁶
3
.
34 𝑥1000
= 47.32 mm
dreq < dpro
Hence it is safe.
CALCULATE THE AREA OF MAIN STEEL IN X DIRECTION
Mu = 0.87fyAst d[1-( Astfy /bdfck)]
7.48x106 = 0.87 x 500 x Ast x95 [1-(
𝐴𝑠𝑡 𝑥 500
95 𝑥 1000𝑥 25
)]
7.48x106 = 41325Ast[1-2.105x10-4Ast]
7.48x106 = 41325Ast – 8.6989Ast2
8.698 Ast2-41325Ast +7.48x106 =0
Ast = 188.48 mm2
Provide 12mm diameter bar at main reinforcement
Spacing
i. S =
1000𝑎𝑠𝑡
𝐴𝑠𝑡
=
1000𝑥
𝜋
4
𝑥12²
188.48
= 600.05 mm
ii. 3xd = 3x95 = 285 mm
iii. 300 mm, Take least value, provide 285 mm
Provide 12mm diameter at 285 mm centre to centre spacing
CALCULATE THE AREA OF MAIN STEEL IN Y DIRECTION
Mu = 0.87fyAst d[1-( Astfy /bdfck)]
7.48x106 = 0.87 x 500 x Ast x95 [1-(
𝐴𝑠𝑡 𝑥 500
95 𝑥 1000𝑥 25
)]
7.48x106 = 41325Ast[1-2.105x10-4Ast]
7.48x106 = 41325Ast – 8.6989Ast2
8.698 Ast2-41325Ast +7.48x106 =0
Ast = 188.48 mm2
Provide 12mm diameter bar at main reinforcement
Spacing
i. S =
1000𝑎𝑠𝑡
𝐴𝑠𝑡
=
1000𝑥
𝜋
4
𝑥12²
188.48
= 600.05 mm
ii. 3xd = 3x95 = 285 mm
iii. 300 mm
Take least value, provide 285 mm
Provide 12mm diameter at 285 mm centre to centre spacing
CHECK FOR SHEAR
Factored shear force, Vu =
𝑊𝑢𝑙
2
=
12.6 𝑥 3.095
2
= 19.5 KN
Nominal shear force, τv =
𝑉𝑢
𝑏 𝑑
=
19.5 𝑥 103
1000𝑥 95
= 0.2 N/mm2
Design of shear strength
Pt =
100 𝐴𝑠𝑡
𝑏𝑑
=
100 𝑋 188.48
1000 𝑋 95
= 0.2
From code IS 456:2000
τc = 0.325 N/mm2
τv < τc Hence safe in shear
DESIGN OF TORSION REINFORCEMENT:
Ast = 3/4 x Ast
= 3/4 x 188.48
= 141.36 mm2
Torsion Size = Lx/5
= 3000/5 = 600 mm
Spacing
S =
1000𝑎𝑠𝑡
𝐴𝑠𝑡
=
1000 𝑋
𝜋
4
𝑥 62
141.36
= 200.01 mm
= 200 mm
Provide 6mm diameter at 200 mm centre to centre spacing to torsional
reinforcement
REINFORCEMENT DETAILS
Two Way Slab
DESIGN OF ONE WAY SLAB
Slab dimension = 1.2 x 3m
Lx = 1.2 m
Ly = 3 m
fck = 25 N/mm2
fy = 500N/mm2
Live load = 3KN/m2
Floor Finish = 1KN/m2
Wall thickness = 230mm
DESIGN OF BEAM
Clear span = 3 m
fck = 25 N/mm2
fy = 500N/mm2
Live load = 2 KN/m2
Depth (D) = 450mm
Width of beam (b) = 0.23m
Reinforcement details for beam
DESIGN OF COLUMN
Size of column = 230 mm x 450 mm
Height of column = 3.6m
Pu = 700KN
fy = 500N/mm2
fck = 25 N/mm2
lx = 3.23m
ly = 3.23m
Reinforcement Detail for Column
DESIGN OF STAIRCASE
lx = 3 m
ly = 4m
h = 3.6m
fck = 25 N/mm2
fy = 500N/mm2
Reinforcement details for staircase
DESIGN OF SUNSHADE
Length = 0.6m
Effective depth, d = span/7 = 600/7 = 85.7mm
Provide d = 85mm
Overall depth ,D = 85 + 15 +12/2
D = 106mm
Fy = 500N/mm2
Fck = 25 N/mm2
Reinforcement details for sunshade
DESIGN OF LINTEL
Size of lintel = 230mm x 210mm
Fck = 25 N/mm2
Fy = 500N/mm2
Reinforcement details for lintel
DESIGN OF FOOTING
Size of footing = 1.5 m x 1.5 m
Unit weight of soil γ = 20KN/m3
α = 300
fck = 25 N/mm2
fy = 500N/mm2
Allowable bearing capacity (q0) = 150N/mm2
Reinforcement details for Footing
CONCLUSION
This project deals with “Planning, Analysis and Design of a
Auditorium Building”. We have successfully designed the Auditorium
Building in consideration to the principles of building by laws. We have
succeeded in designing the building to be a very economic one making
considerations to all the space that was available to us.
REFERENCES
i. IS 875 Part -2 1987
ii. IS 456-2000, “Design Aids for Reinforced Concrete”.
iii. Krishna Raju, N. (2004) ‘ Structural Design and Drawing; CBS Publishers
and Distributors, NewDelhi
iv. Subramanian, N. ‘Design of Reinforced Concrete Structure”
v. SP 16:1978 ‘Design Aids for Reinforced Concrete” to IS 456:2000.
vi. IS456:2000, Code of practice for Plain and Reinforced Concrete, Bureau of
Indian Standards, New Delhi, 2007
vii.IS1905:1987, Code of Practice for Structural use of Unreinforced Masonry
Bureau of Indian Standards, New Delhi, 2002
viii.Jain, A.K., “Limit State Design of RC Structures”, Nemchand Publications,
Roorkee, 1998
THANK YOU
1 von 27

Recomendados

Design of Steel Grillage Foundation for an Auditorium von
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumIRJET Journal
221 views9 Folien
New Microsoft PowerPoint Presentation.pptx von
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxRajeshKumar25548
7 views50 Folien
Passive Cooling Design Feature for Energy Efficient in PERI Auditorium von
Passive Cooling Design Feature for Energy Efficient in PERI AuditoriumPassive Cooling Design Feature for Energy Efficient in PERI Auditorium
Passive Cooling Design Feature for Energy Efficient in PERI AuditoriumIRJET Journal
29 views6 Folien
final internship ppt.pptx von
final internship ppt.pptxfinal internship ppt.pptx
final internship ppt.pptxKiranKr32
19 views48 Folien
Design of Football Stadium - Design Project for Civil Engineers von
Design of Football Stadium - Design Project for Civil EngineersDesign of Football Stadium - Design Project for Civil Engineers
Design of Football Stadium - Design Project for Civil EngineersIndhumathi1134
14.6K views45 Folien
Chimney design von
Chimney designChimney design
Chimney designDHRUV PATEL
2.1K views35 Folien

Más contenido relacionado

Similar a SANDIN.pptx

Structural Design von
Structural DesignStructural Design
Structural DesignVj NiroSh
4.4K views32 Folien
IRJET - Design and Analysis of Residential Institute Building von
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute BuildingIRJET Journal
41 views9 Folien
Design of Bioclimatic Structure with Insulation of Cavity Wall von
Design of  Bioclimatic Structure with Insulation of Cavity WallDesign of  Bioclimatic Structure with Insulation of Cavity Wall
Design of Bioclimatic Structure with Insulation of Cavity WallIRJET Journal
30 views5 Folien
Analysis and Design of Residential building.pptx von
Analysis and Design of Residential building.pptxAnalysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptxDP NITHIN
182 views42 Folien
Design and analysis of school building von
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school buildingRaghav Sankar
12.1K views49 Folien
Unit i von
Unit iUnit i
Unit iperiyar maniammai university
507 views8 Folien

Similar a SANDIN.pptx(20)

Structural Design von Vj NiroSh
Structural DesignStructural Design
Structural Design
Vj NiroSh4.4K views
IRJET - Design and Analysis of Residential Institute Building von IRJET Journal
IRJET - Design and Analysis of Residential Institute BuildingIRJET - Design and Analysis of Residential Institute Building
IRJET - Design and Analysis of Residential Institute Building
IRJET Journal41 views
Design of Bioclimatic Structure with Insulation of Cavity Wall von IRJET Journal
Design of  Bioclimatic Structure with Insulation of Cavity WallDesign of  Bioclimatic Structure with Insulation of Cavity Wall
Design of Bioclimatic Structure with Insulation of Cavity Wall
IRJET Journal30 views
Analysis and Design of Residential building.pptx von DP NITHIN
Analysis and Design of Residential building.pptxAnalysis and Design of Residential building.pptx
Analysis and Design of Residential building.pptx
DP NITHIN182 views
Design and analysis of school building von Raghav Sankar
Design and analysis of school buildingDesign and analysis of school building
Design and analysis of school building
Raghav Sankar12.1K views
Theatre building PPT.pptx von DivyaprabaN
Theatre building PPT.pptxTheatre building PPT.pptx
Theatre building PPT.pptx
DivyaprabaN125 views
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx von subhashini214160
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptxDESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
DESIGN OF CIRCULAR OVERHEAD WATER TANK.pptx
subhashini214160952 views
Structural design of 350 kl overhead water tank at telibagh,lucknow von Anchit Agrawal
Structural design of 350 kl overhead water tank at telibagh,lucknowStructural design of 350 kl overhead water tank at telibagh,lucknow
Structural design of 350 kl overhead water tank at telibagh,lucknow
Anchit Agrawal2.8K views
IRJET- Design of the Support Structure for the Pipe Line System von IRJET Journal
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line System
IRJET Journal35 views
350 kl overhead water intze tank design von Harish Mahavar
350 kl overhead water intze tank design350 kl overhead water intze tank design
350 kl overhead water intze tank design
Harish Mahavar1.1K views
IRJET- Planning, Analysis and Designing of Cantilever Residential Building von IRJET Journal
IRJET- Planning, Analysis and Designing of Cantilever Residential BuildingIRJET- Planning, Analysis and Designing of Cantilever Residential Building
IRJET- Planning, Analysis and Designing of Cantilever Residential Building
IRJET Journal29 views
Sachpazis: Flat slab design to bs8110 part 1-1997 von Dr.Costas Sachpazis
Sachpazis: Flat slab design to bs8110 part 1-1997Sachpazis: Flat slab design to bs8110 part 1-1997
Sachpazis: Flat slab design to bs8110 part 1-1997
Dr.Costas Sachpazis2.4K views
Design of Floating Bridge Cross Over von IRJET Journal
Design of Floating Bridge Cross OverDesign of Floating Bridge Cross Over
Design of Floating Bridge Cross Over
IRJET Journal70 views

Más de John Ajish

PPT.pptx von
PPT.pptxPPT.pptx
PPT.pptxJohn Ajish
3 views20 Folien
PPT.pptx von
PPT.pptxPPT.pptx
PPT.pptxJohn Ajish
5 views19 Folien
FINAL PPT.pdf von
FINAL PPT.pdfFINAL PPT.pdf
FINAL PPT.pdfJohn Ajish
5 views17 Folien
PPT.pptx von
PPT.pptxPPT.pptx
PPT.pptxJohn Ajish
2 views24 Folien
PPT.pptx von
PPT.pptxPPT.pptx
PPT.pptxJohn Ajish
10 views25 Folien
PPT.pptx von
PPT.pptxPPT.pptx
PPT.pptxJohn Ajish
12 views22 Folien

Último

Defcon Network.pdf von
Defcon Network.pdfDefcon Network.pdf
Defcon Network.pdfJesse Mauck
18 views4 Folien
Bloomerang Thank Yous Dec 2023.pdf von
Bloomerang Thank Yous Dec 2023.pdfBloomerang Thank Yous Dec 2023.pdf
Bloomerang Thank Yous Dec 2023.pdfBloomerang
106 views66 Folien
CORPORATE COMMUNICATION.pdf von
CORPORATE COMMUNICATION.pdfCORPORATE COMMUNICATION.pdf
CORPORATE COMMUNICATION.pdfAKarthikeyan8
14 views71 Folien
Top 10 Web Development Companies in California von
Top 10 Web Development Companies in CaliforniaTop 10 Web Development Companies in California
Top 10 Web Development Companies in CaliforniaTopCSSGallery
73 views27 Folien
port23_2023121_resize2.pdf von
port23_2023121_resize2.pdfport23_2023121_resize2.pdf
port23_2023121_resize2.pdfSivaphan Wuttingam
19 views64 Folien
The Talent Management Navigator Performance Management von
The Talent Management Navigator Performance ManagementThe Talent Management Navigator Performance Management
The Talent Management Navigator Performance ManagementSeta Wicaksana
26 views36 Folien

Último(20)

Bloomerang Thank Yous Dec 2023.pdf von Bloomerang
Bloomerang Thank Yous Dec 2023.pdfBloomerang Thank Yous Dec 2023.pdf
Bloomerang Thank Yous Dec 2023.pdf
Bloomerang106 views
Top 10 Web Development Companies in California von TopCSSGallery
Top 10 Web Development Companies in CaliforniaTop 10 Web Development Companies in California
Top 10 Web Development Companies in California
TopCSSGallery73 views
The Talent Management Navigator Performance Management von Seta Wicaksana
The Talent Management Navigator Performance ManagementThe Talent Management Navigator Performance Management
The Talent Management Navigator Performance Management
Seta Wicaksana26 views
Super Solar Mounting Solutions 20230509(1).pdf von carrie55bradshaw
Super Solar Mounting Solutions 20230509(1).pdfSuper Solar Mounting Solutions 20230509(1).pdf
Super Solar Mounting Solutions 20230509(1).pdf
carrie55bradshaw10 views
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck von HajeJanKamps
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deckPitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
Pitch Deck Teardown: Scalestack's $1M AI sales tech Seed deck
HajeJanKamps502 views
voice logger software aegis.pdf von Nirmal Sharma
voice logger software aegis.pdfvoice logger software aegis.pdf
voice logger software aegis.pdf
Nirmal Sharma39 views
NewBase 02 December 2023 Energy News issue - 1678 by Khaled Al Awadi.pdf von Khaled Al Awadi
NewBase  02 December 2023  Energy News issue - 1678 by Khaled Al Awadi.pdfNewBase  02 December 2023  Energy News issue - 1678 by Khaled Al Awadi.pdf
NewBase 02 December 2023 Energy News issue - 1678 by Khaled Al Awadi.pdf
Khaled Al Awadi10 views
Navigating EUDR Compliance within the Coffee Industry von Peter Horsten
Navigating EUDR Compliance within the Coffee IndustryNavigating EUDR Compliance within the Coffee Industry
Navigating EUDR Compliance within the Coffee Industry
Peter Horsten43 views
Presentation on proposed acquisition of leading European asset manager Aermon... von KeppelCorporation
Presentation on proposed acquisition of leading European asset manager Aermon...Presentation on proposed acquisition of leading European asset manager Aermon...
Presentation on proposed acquisition of leading European asset manager Aermon...
KeppelCorporation210 views
PMU Launch - Guaranteed Slides von pmulaunch
PMU Launch - Guaranteed SlidesPMU Launch - Guaranteed Slides
PMU Launch - Guaranteed Slides
pmulaunch16 views
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen... von morshedislam3
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...
davood_keshavarz_david_keshavarz_criminal_conviction_prison_sentence_judgemen...
morshedislam314 views
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf von Bloomerang
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdfBloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf
Bloomerang_Forecasting Your Fundraising Revenue 2024.pptx.pdf
Bloomerang134 views

SANDIN.pptx

  • 1. UNDER THE GUIDANCE OF Mr. G. LIN, M.E., Assistant Professor Department of Civil Engineering Mar Ephraem college of Engineeringand Technology PRESENTED BY, ABEESH B 961419103002 SANJAI P 961419103046 Department of Civil Engineering Mar Ephraem college of Engineering and Technology PLANNING, ANALYSIS, DESIGN AND ESTIMATION OF AAUDITORIUM
  • 2. ABSTRACT The project deals with planning, analyzing and designing of auditorium building. The location of the proposed auditorium in Thozhicode at Kanyakumari district. There are few auditorium with less spacing available in that particular area but the land facility are more in that area. The main objective of this project is to make the auditorium more comfortable for people with more spacing. The plinth area of the auditorium is 460 sq.m. The structure is going to be analysed manually and designed by Limit state method of design respectively. The M20 grade concrete and Fe415 steel are considered for design.
  • 7. DESIGN OF SLAB DESIGN OF TWO WAY SLAB DATA Slab dimension = 3 x 3m Lx = 3m Ly = 3m fck = 25 N/mm2 fy = 500N/mm2 Live load = 2 KN/m2 Floor Finish = 1KN/m2 Wall Thickness = 230 mm
  • 8. Check the ratio LY/LX = 3/3 = 1 1 < 2 Hence it is Two way slab CALCULATE THE DEPTH OF SLAB Overall Depth (D) D = span/(basic value) D = 3000/(26) = 115.38 mmProvide 120 mm effective depth Effective depth, d= Overall Depth - Clear cover - diameter/2 Provide 20mm clear cover and 12mm diameter d = 120 – 20 - 12/2 = 94 mm ~ 95mm
  • 9. CALCULATE THE EFFECTIVE SPAN FOR SHORTER SPAN Case 1: Le = clear span + effective depth = 3000 + 95 = 3095 mm Case 2: Le = clear span + wall thickness = 3000 + 230 = 3230mm Take least value 3095mm
  • 10. FOR LONGER SPAN Case 1: Le = clear span + effective depth = 3000 + 95 = 3095 mm Case 2: Le = clear span + wall thickness = 3000 + 230 = 3230mm Take least value 3095mm
  • 11. LOAD CALCULATION Total Load = Dead load +Live load +Floor finish + Parapet load i. Dead load = 0.12 x 25 = 3 KN/m2 ii. Live load = 2 KN/m2 iii. Floor finish = 1KN/m2 iv. Parapet load = 0.12 x 20 = 2.4 KN/m2 Total load = 3+2+1+2.4 = 8.4 KN/m2 Factored load = Total load x Factor of safety = 8.4 x 1.5 = 12.6 KN/m2
  • 12. BENDING MOMENT CALCULATIONS Mx = αxwlx 2 =0.062 x 12.6 x 3.0952 = 7.48KNm My = αywlx 2 =0.062 x 12.6 x 3.0952 = 7.48KNm CALCULATE THE DEPTH BASED ON FLEXURE MOMENT Check for effective depth dreq = 𝐵𝑀 𝑅𝑢𝑏 Ru = 0.36fck 𝑋𝑢𝑚𝑎𝑥 𝑑 (1-0.42 𝑋𝑢𝑚𝑎𝑥 𝑑 ) 𝑋𝑢𝑚𝑎𝑥 𝑑 = 0.46 Ru = 0.36 x 25 x0.46 (1-0.42 x 0.46)= 3.34 N/mm2 dreq = 7 . 48𝑥10⁶ 3 . 34 𝑥1000 = 47.32 mm dreq < dpro Hence it is safe.
  • 13. CALCULATE THE AREA OF MAIN STEEL IN X DIRECTION Mu = 0.87fyAst d[1-( Astfy /bdfck)] 7.48x106 = 0.87 x 500 x Ast x95 [1-( 𝐴𝑠𝑡 𝑥 500 95 𝑥 1000𝑥 25 )] 7.48x106 = 41325Ast[1-2.105x10-4Ast] 7.48x106 = 41325Ast – 8.6989Ast2 8.698 Ast2-41325Ast +7.48x106 =0 Ast = 188.48 mm2 Provide 12mm diameter bar at main reinforcement Spacing i. S = 1000𝑎𝑠𝑡 𝐴𝑠𝑡 = 1000𝑥 𝜋 4 𝑥12² 188.48 = 600.05 mm ii. 3xd = 3x95 = 285 mm iii. 300 mm, Take least value, provide 285 mm Provide 12mm diameter at 285 mm centre to centre spacing
  • 14. CALCULATE THE AREA OF MAIN STEEL IN Y DIRECTION Mu = 0.87fyAst d[1-( Astfy /bdfck)] 7.48x106 = 0.87 x 500 x Ast x95 [1-( 𝐴𝑠𝑡 𝑥 500 95 𝑥 1000𝑥 25 )] 7.48x106 = 41325Ast[1-2.105x10-4Ast] 7.48x106 = 41325Ast – 8.6989Ast2 8.698 Ast2-41325Ast +7.48x106 =0 Ast = 188.48 mm2 Provide 12mm diameter bar at main reinforcement Spacing i. S = 1000𝑎𝑠𝑡 𝐴𝑠𝑡 = 1000𝑥 𝜋 4 𝑥12² 188.48 = 600.05 mm ii. 3xd = 3x95 = 285 mm iii. 300 mm Take least value, provide 285 mm Provide 12mm diameter at 285 mm centre to centre spacing
  • 15. CHECK FOR SHEAR Factored shear force, Vu = 𝑊𝑢𝑙 2 = 12.6 𝑥 3.095 2 = 19.5 KN Nominal shear force, τv = 𝑉𝑢 𝑏 𝑑 = 19.5 𝑥 103 1000𝑥 95 = 0.2 N/mm2 Design of shear strength Pt = 100 𝐴𝑠𝑡 𝑏𝑑 = 100 𝑋 188.48 1000 𝑋 95 = 0.2 From code IS 456:2000 τc = 0.325 N/mm2 τv < τc Hence safe in shear
  • 16. DESIGN OF TORSION REINFORCEMENT: Ast = 3/4 x Ast = 3/4 x 188.48 = 141.36 mm2 Torsion Size = Lx/5 = 3000/5 = 600 mm Spacing S = 1000𝑎𝑠𝑡 𝐴𝑠𝑡 = 1000 𝑋 𝜋 4 𝑥 62 141.36 = 200.01 mm = 200 mm Provide 6mm diameter at 200 mm centre to centre spacing to torsional reinforcement
  • 18. DESIGN OF ONE WAY SLAB Slab dimension = 1.2 x 3m Lx = 1.2 m Ly = 3 m fck = 25 N/mm2 fy = 500N/mm2 Live load = 3KN/m2 Floor Finish = 1KN/m2 Wall thickness = 230mm
  • 19. DESIGN OF BEAM Clear span = 3 m fck = 25 N/mm2 fy = 500N/mm2 Live load = 2 KN/m2 Depth (D) = 450mm Width of beam (b) = 0.23m Reinforcement details for beam
  • 20. DESIGN OF COLUMN Size of column = 230 mm x 450 mm Height of column = 3.6m Pu = 700KN fy = 500N/mm2 fck = 25 N/mm2 lx = 3.23m ly = 3.23m Reinforcement Detail for Column
  • 21. DESIGN OF STAIRCASE lx = 3 m ly = 4m h = 3.6m fck = 25 N/mm2 fy = 500N/mm2 Reinforcement details for staircase
  • 22. DESIGN OF SUNSHADE Length = 0.6m Effective depth, d = span/7 = 600/7 = 85.7mm Provide d = 85mm Overall depth ,D = 85 + 15 +12/2 D = 106mm Fy = 500N/mm2 Fck = 25 N/mm2 Reinforcement details for sunshade
  • 23. DESIGN OF LINTEL Size of lintel = 230mm x 210mm Fck = 25 N/mm2 Fy = 500N/mm2 Reinforcement details for lintel
  • 24. DESIGN OF FOOTING Size of footing = 1.5 m x 1.5 m Unit weight of soil γ = 20KN/m3 α = 300 fck = 25 N/mm2 fy = 500N/mm2 Allowable bearing capacity (q0) = 150N/mm2 Reinforcement details for Footing
  • 25. CONCLUSION This project deals with “Planning, Analysis and Design of a Auditorium Building”. We have successfully designed the Auditorium Building in consideration to the principles of building by laws. We have succeeded in designing the building to be a very economic one making considerations to all the space that was available to us.
  • 26. REFERENCES i. IS 875 Part -2 1987 ii. IS 456-2000, “Design Aids for Reinforced Concrete”. iii. Krishna Raju, N. (2004) ‘ Structural Design and Drawing; CBS Publishers and Distributors, NewDelhi iv. Subramanian, N. ‘Design of Reinforced Concrete Structure” v. SP 16:1978 ‘Design Aids for Reinforced Concrete” to IS 456:2000. vi. IS456:2000, Code of practice for Plain and Reinforced Concrete, Bureau of Indian Standards, New Delhi, 2007 vii.IS1905:1987, Code of Practice for Structural use of Unreinforced Masonry Bureau of Indian Standards, New Delhi, 2002 viii.Jain, A.K., “Limit State Design of RC Structures”, Nemchand Publications, Roorkee, 1998